Lab-Scale Development of a Solid Sorbent for CO 2 Capture Process for Coal-Fired Power Plants

It is increasingly clear that CO 2 capture and sequestration (CCS) must play a critical role in curbing worldwide CO 2 emissions to the atmosphere. Development of these technologies to cost-effectively remove CO 2 from coal-fired power plants is very important to mitigating the impact these power plants have within the world’s power generation portfolio. Currently, conventional CO 2 capture technologies, such as aqueous-monoethanolamine based solvent systems, are prohibitively expensive and if implemented could result in a 75 to 100% increase in the cost of electricity for consumers worldwide. Solid sorbent CO 2 capture processes – such as RTI’s 3rd Generation Solid Sorbent CO 2 Capture Process – are promising alternatives to conventional, liquid solvents. Supported amine sorbents – of the nature RTI has developed – are particularly attractive due to their potential for high CO 2 loadings, excellent stability over multiple cycles, reduced corrosivity/volatility and a potential to reduce the regeneration energy needed to carry out CO 2 capture. The remaining challenges for these sorbent processes have provided the framework for the project team’s research and development and target for advancing the technology beyond lab-scale testing. Previous work in this area has failed to adequately address various technology challenges such as sorbent stability and regenerability, sorbent scale-up, improved physical strength and attrition-resistance, proper heat management and temperature control, proper solids handling, as well as the proper coupling of process engineering advancements that are tailored for a promising sorbent technology. Under a cooperative agreement with the US Department of Energy, and part of NETL’s CO 2 Capture Program, RTI has led an effort to address and mitigate the challenges associated with solid sorbent CO 2 capture. The overall objective of this project was to mitigate the technical and economic risks associated with the performance and scale-up of solid sorbent-based CO 2 capture processes, enabling subsequent larger pilot demonstrations and ultimately commercial deployment. An integrated development approach has been a key focus of this project in which sorbent development, process development, and economic analyses have informed each of the other development processes. Development efforts have focused on developing novel hybrid solids-based CO 2 capture sorbents and improving their performance stability, refining process engineering and design, and evaluating the viability of the technology through detailed economic analyses. Sorbent advancements have led to a next generation, commercially-viable CO 2 capture sorbent exhibiting performance stability in various gas environments and a physically strong fluidizable form. The team has reduced sorbent production costs and optimized the production and scale-up of novel metal-organic framework (MOF) hybrid solids-based CO 2 capture sorbents, fluidizable sorbents. Refinement of the process engineering and design at the lab-scale research unit has demonstrated promising CO 2 capture performance in simulated coal-fired flue gas conditions. Long-term testing has informed the project team on the process conditions needed to operate a solids-based system for optimal performance. Data collected from all phases of testing has been used to develop a detailed techno-economic assessment of RTI’s technology. These detailed analyses show that RTI’s technology has significant economic advantages over current amine scrubbing and potential to achieve the DOE’s Carbon Capture Program’s goal of >90% CO 2 capture rate at a cost of almost $40/tonne CO 2 captured by 2025. Through this integrated technology development approach, the project team has advanced RTI’s 3rd generation CO 2 capture technology to TRL-3, according to the DOE/FE definitions for Technology Readiness Levels. At a broader level, this project has advanced the whole of the solid sorbent CO 2 capture field, with advancements in process engineering and design, technical risk mitigation, sorbent scale-up optimization, and an understanding of the commercial viability and applicability of solid sorbent CO 2 capture technologies for the U.S. existing fleet of coal-fired power plants.

20 FOSSIL-FUELED POWER PLANTS↗

Cyber-Informed Engineering Implementation Guide

This Implementation Guide describes the principles of Cyber-Informed Engineering (CIE) and outlines questions that engineering teams should consider during each phase of a system’s lifecycle to effectively employ these principles. It describes what it means to engineer systems in a cyber-informed way, rather than offering a comprehensive, step-by-step process or procedure for CIE implementation. This guide complements—but does not replace—the application of cybersecurity standards or practices currently in place within an organization. Engineers and technicians that design critical energy infrastructure installations can use this Implementation Guide to integrate the 12 principles of CIE into each phase of the engineering lifecycle, from concept to retirement. The guide is aimed at system or design engineers, rather than software engineers or operational cybersecurity practitioners. The engineers who design, build, operate, and maintain the physical infrastructure are best positioned to leverage a system’s engineering design to diminish the severity of cyber attacks or digital technology failures. CIE expands cybersecurity decisions into the engineering space, not by asking engineers to become cyber experts, but by calling on engineers to apply engineering tools and make engineering decisions that improve cybersecurity outcomes. CIE examines the engineering consequences that a sophisticated cyber attacker could achieve and drives engineering changes that may provide deterministic mitigations to limit or eliminate those consequences.

42 ENGINEERING↗

CMRR Public Meeting, April 25, 2012 Volume 13

Planned MCRR Nuclear Facility Activities are: (1) in FY12 CMRR Nuclear Facility design will continue until substantially complete; (2) project activities will be cataloged to preserve the engineering and design investment; (3) a roadmap for future restart will be developed for the next project team; (4) staff transition to other non-project endeavors is underway; and (5) final closeout activities will continue into 1st quarter Fy 2013 with limited staff.

Air quality↗

Recent advances in rational design of defect-engineered photocatalysts toward sustainable NH 3 synthesis as H 2 carrier: From fundamental and development to machine-learning

In this study, we provide a detailed overview of the fundamental mechanisms underpinning photocatalytic N 2 reduction. We also discuss advances in catalyst design for the synthesis of NH 3 . Particular emphasis is placed on the role of surface defect engineering, which includes the creation of surface defects to enhance the performance of semiconducting photocatalysts for efficient N 2 reduction. In addition, the application of a machine learning-based computational modeling approach is discussed as an important driving force for predicting and regulating NH 3 synthesis efficiency based on catalyst features and reaction conditions. Finally, existing challenges and future perspectives for improving the performance of defect-engineered photocatalysts are outlined to contribute to the ongoing discourse on sustainable ammonia generation. This review aims to clarify recent progress in the rational design of defect-containing photocatalysts for the synthesis of NH 3 and encourages innovative approaches to catalyst optimization rather than solely focusing on new materials.

08 HYDROGEN↗

CIE Curriculum Guide (V.2.0)

The Cyber-Informed Engineering (CIE) Curriculum Guide offers a comprehensive framework, guidance, and resources for integrating CIE into university-level engineering programs and related educational activities. The primary goal is to help educators adopt CIE principles into their teaching to produce future engineers and technicians who understand digital risks in modern engineered systems, thereby addressing the nation’s infrastructure resilience needs. This guide outlines practical integration examples, links to resources to accelerate CIE adoption, and shares insights from partner academic institutions on various implementation strategies. CIE is a framework for embedding engineered controls that mitigate the impact of cyber-attacks in any cyber-physical system used in critical energy infrastructure and other sectors. Developed by the U.S. Department of Energy’s Office of Cybersecurity, Energy Security, and Emergency Response (CESER), the National Cyber-Informed Engineering Strategy emphasizes embedding CIE into formal education, training, and credentialing. This guide supports this strategic objective by providing examples of integrating CIE concepts into engineering curricula, from class activities to new courses and certificate programs. The importance of educating cyber-informed engineers is underscored by the evolving cybersecurity threats facing engineered systems. As industrial control systems (ICS) increasingly incorporate digital technologies, the responsibility for security extends to both cyber professionals and engineers. CIE addresses critical gaps in designing and protecting physical systems with digital components against cyber risks, ensuring engineers consider digital risk throughout the engineering design lifecycle. Currently, engineering education does not routinely include cyber-informed principles, highlighting a gap in addressing modern engineering system risks. This guide advocates for updating engineering curricula to include digital risk management as a fundamental element. By doing so, future engineers will be equipped to design resilient systems that mitigate digital risks from the outset. Through this guide, engineering faculty can integrate CIE into their curricula, bridging the gap between digital risk and engineering. This approach prepares a cyber-informed workforce capable of safeguarding the cyber-physical systems crucial to national security and public welfare. By embedding CIE into education and training, institutions can produce engineers and technicians who can effectively mitigate cyber impacts throughout the engineering design lifecycle, resulting in more secure critical infrastructures.

42 - ENGINEERING↗

Multi-scale Material Parameter Identification Using LS-DYNA® and LS-OPT®

Ever-tightening regulations on fuel economy and carbon emissions demand continual innovation in finding ways for reducing vehicle mass. Classical methods for computational mass reduction include sizing, shape and topology optimization. One of the few remaining options for weight reduction can be found in materials engineering and material design optimization. Apart from considering different types of materials by adding material diversity, an appealing option in automotive design is to engineer steel alloys for the purpose of reducing thickness while retaining sufficient strength and ductility required for durability and safety. Such a project was proposed and is currently being executed under the auspices of the United States Automotive Materials Partnership (USAMP) funded by the Department of Energy. Under this program, new steel alloys (Third Generation Advanced High Strength Steel or 3GAHSS) are being designed, tested and integrated with the remaining design variables of a benchmark vehicle Finite Element model. In this project the principal phases identified are (i) material identification, (ii) formability optimization and (iii) multi-disciplinary vehicle optimization. This paper serves as an introduction to the LS-OPT methodology and therefore mainly focuses on the first phase, namely an approach to integrate material identification using material models of different length scales. For this purpose, a multi-scale material identification strategy, consisting of a Crystal Plasticity (CP) material model and a Homogenized State Variable (SV) model, is discussed and demonstrated. The paper concludes with proposals for integrating the multi-scale methodology into the overall vehicle design.

36 MATERIALS SCIENCE↗

Lake Charles CCS Project (Final Technical Report, Phase 2)

In late September 2014 development of the Lake Charles Clean Energy (LCCE) Plant was abandoned resulting in termination of Lake Charles Carbon Capture and Sequestration (CCS) Project which was a subset the LCCE Plant. As a result, the project was only funded through Phase 2A (Design) and did not enter Phase 2B (Construction) or Phase 2C (Operations). This report was prepared relying on information prepared and provided by engineering companies which were engaged by Leucadia Energy, LLC to prepare or review Front End Engineering and Design (FEED) for the Lake Charles Clean Energy Project, which includes the Carbon Capture and Sequestration (CCS) Project in Lake Charles, Louisiana. The Lake Charles Carbon Capture and Sequestration (CCS) Project was to be a large-scale industrial CCS project intended to demonstrate advanced technologies that capture and sequester carbon dioxide (CO 2 ) emissions from industrial sources into underground formations. The Scope of work was divided into two discrete sections; 1) Capture and Compression prepared by the Recipient Leucadia Energy, LLC, and 2) Transport and Sequestration prepared by sub-Recipient Denbury Onshore, LLC. Capture and Compression-The Lake Charles CCS Project Final Technical Report describes the systems and equipment that would be necessary to capture CO 2 generated in a large industrial gasification process and sequester the CO 2 into underground formations. The purpose of each system is defined along with a description of its equipment and operation. Criteria for selection of major equipment are provided and ancillary utilities necessary for safe and reliable operation in compliance with environmental regulations are described. Construction considerations are described including a general arrangement of the CCS process units within the overall gasification project. A cost estimate is provided, delineated by system area with cost breakdown showing equipment, piping and materials, construction labor, engineering, and other costs. The CCS Project Final Technical Report is based on a Front End Engineering and Design (FEED) study prepared by SK E&C, completed in [June] 2014. Subsequently, Fluor Enterprises completed a FEED validation study in mid-September 2014. The design analyses indicated that the FEED package was sufficient and as expected. However, Fluor considered the construction risk based on a stick-build approach to be unacceptable, but construction risk would be substantially mitigated through utilization of modular construction where site labor and schedule uncertainty is minimized. Fluor’s estimate of the overall EPC project cost utilizing the revised construction plan was comparable to SKE&C’s value after reflecting Fluor’s assessment of project scope and risk characteristic. Development was halted upon conclusion of Phase 2A FEED and the project was not constructed.Transport and Sequestration – The overall objective of the pipeline project was to construct a pipeline to transport captured CO 2 from the Lake Charles Clean Energy project to the existing Denbury Green Line and then to the Hastings Field in Southeast Texas to demonstrate effective geologic sequestration of captured CO 2 through commercial EOR operations. The overall objective of the MVA portion of the project was to demonstrate effective geologic sequestration of captured CO 2 through commercial Enhanced Oil Recovery (EOR) operations in order to evaluate costs, operational processes and technical performance. The DOE target for the project was to capture and implement a research MVA program to demonstrate the sequestration through EOR of approximately one million tons of CO 2 per year as an integral component of commercial operations.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Engineering Analysis Baseline Model Requirements

The purpose of this document is to set requirements for the development, documentation, implementation, and maintenance of engineering analysis baseline models used by the Advanced Engineering and Analysis group to model and simulate systems. The intended audience of this document is the Engineering Technology and Design division Advanced Engineering and Analysis group—in particular the baseline model owners and users—and the Group Leaders and members of the Systems Engineering groups. Section 1 presents a discussion of general concepts related to engineering analysis models and baseline models, including definitions of common terms used in this requirements document. It also presents the purpose and intentions of creating and using baseline models and exposes some underlying assumptions about what baseline models are supposed to be. Section 2 presents requirements on the general categories of: the Advanced Engineering and Analysis Group Leader and the baseline model owner; parts, materials, and load cases; the process of generating and using the model; and how the baseline model will be stored, maintained, and documented. This document presents requirements on the baseline model as well as some aspects of the development process and the people responsible for the development; it does not address how the results of simulations utilizing these models will be used to make assessments

42 ENGINEERING↗

Helium recovery system at IB3A

The growing demand for sustainable cryogenic operations at Fermilab has underscored the need to improve helium management, particularly at the Industrial Building 3A (IB3A) test facility. IB3A characterizes and tests superconductors, cables, and coils for projects such as the HL-LHC AUP and Mu2e, yet currently relies on 500 L Dewars whose boil-off is vented to atmosphere, wasting a critical, non-renewable resource and increasing the cost of testing. A project is therefore under way to link IB3A to an existing purification and liquefaction station in a neighboring building through a dedicated pipeline. Captured helium will be transferred, purified, reliquefied, and returned for reuse, cutting losses and operating costs. This paper details the first two project phases: "Design and Engineering" and "Procurement and Installation." The design phase finalizes pipeline specifications, establishes flow-control requirements, and resolves integration challenges with existing cryogenic infrastructure. The procurement and installation phase covers material sourcing, pipeline construction, and deployment of control and monitoring systems to assure reliable, efficient operation. Key technical hurdles-route optimization, pressure drop mitigation, and interface compatibility-are discussed alongside implemented solutions. Implementing the pipeline and upgrading IB3A will dramatically reduce helium consumption and therefore testing cost, strengthening Fermilab's capacity to support frontier science far into the future.

Porwisiak, D. [Fermilab; Wroclaw Tech. U.]↗

Training and certification of human organizational factors designers in nuclear plant engineering - 344

Performing an increasing number of small and large-scope nuclear Human Factors Programs, AREVA NP is facing the challenging situation that (1) well-trained experts in Human Factors or Usability Engineering are currently hard to find and (2) newly hired ones need at least two years 'on the job' to become familiar with the nuclear field and the complexity of engineering Human Factors in this field. To innovatively meet this challenge we focus instead on company-internal engineers. Demonstrated nuclear engineering knowledge and skills and pronounced interest to extend both renders them optimal applicants to the AREVA NP two years Human Organizational Factors Training and Certification program. The AREVA NP training shall convey Human Factors knowledge and skills within the limited time of two years. We also stress the need to change participants' mindset from a technically-biased to a human-centered approach, committed to involve end-users throughout design. Next to psychology principles, user testing, user-centered design, plant operation principles, and the acquisition and documentation of users' requirements, design constraints, and inherent tradeoffs, participants will be trained to apply learned methods in a real environment and meet the challenges of real projects. The following sections provide insights in the training conception and preparation phase, the identification of appropriate candidates, the development of course syllabuses, and the schedule of lectures and tests. The promising experiences made thus far are reported as well. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Design Basis Model for Hosting Small Modular Reactors

An aggressive transition from fossil fuels to other types of energy implies the need to construct a large number of nuclear power plants in the near future. However, the real and perceived risks of nuclear energy remain a significant impediment to this transition. This paper describes a comprehensive work process that combines the rigor of model-based systems engineering (MBSE) with 1) the Idaho National Laboratory's (INL) decades of experience with small reactors and with 2) modern project delivery processes. The objective is to reduce the risk of building new facilities or converting existing facilities to nuclear power generation.

42 ENGINEERING↗

2022 Prototype Design Development Awardee: RRD Engineering

The innovative BladeRunner distributed wind turbine concept from RRD Engineering will address the need for dependable, efficient, and affordable midsize turbines to power operations in the commercial, industrial, agricultural, military, governmental, and institutional sectors. The inventive design funded by this Competitiveness Improvement Project (CIP) award reduces LCOE by using materials and components that cost and weigh less than those found in conventional turbines, while delivering savings related to manufacturing and maintenance requirements.

CIP↗

Nuclear thermal source transfer unit, post-blast soil sample drying system

Los Alamos National Laboratory states that its mission is “To solve national security challenges through scientific excellence.” The Science Undergraduate Laboratory Internship (SULI) programs exists to engage undergraduate students in STEM work by providing opportunity to work at DOE facilities. As an undergraduate mechanical engineering intern under the SULI program at Los Alamos during the fall semester of 2016, I had the opportunity to contribute to the mission of the Laboratory while developing skills in a STEM discipline. I worked with Technology Applications, an engineering group that supports non-proliferation, counter terrorism, and emergency response missions. This group specializes in tool design, weapons engineering, rapid prototyping, and mission training. I assisted with two major projects during my appointment Los Alamos. The first was a thermal source transportation unit, intended to safely contain a nuclear thermal source during transit. The second was a soil drying unit for use in nuclear postblast field sample collection. These projects have given me invaluable experience working alongside a team of professional engineers. Skills developed include modeling, simulation, group design, product and system design, and product testing.

42 ENGINEERING↗

Architectural development of an ST fusion device

A recent U.S. National Academy study recommended the development of a next step Sustained High Power Density (SHPD) facility within the U.S. as an intermediate step in designing and building a Pilot Plant device. Several papers have been written describing the physics, design and engineering scoping analysis performed in developing this machine design. This paper places emphasis on the continued evolution of the architectural development of past activities to meet the requirements of an ST fusion pilot plant and power plant. The current effort centers on meeting basic physics and component requirements in a machine design that improves the chance of achieving fission level availability (95%) within an arrangement that promotes design simplicity, offsite construction with on-site modular assembly. As a prelude to both the SHPD and Pilot Plant, a scoping design of a 500MWe Spherical Tokamak Advanced Reactor (STAR) has been defined to investigate design options and physics scenarios that can successfully meet physics performance, engineering requirements and economic conditions of an ST power plant. Following a successful physics/engineering assessment, the STAR Power Plant design will be downsized to meet the specifications established in the design of a near term ST Pilot Plant

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

The human dimensions of energy use in buildings: A review

The “human dimensions” of energy use in buildings refer to the energy-related behaviors of key stakeholders that affect energy use over the building life cycle. Stakeholders include building designers, operators, managers, engineers, occupants, industry, vendors, and policymakers, who directly or indirectly influence the acts of designing, constructing, living, operating, managing, and regulating the built environments, from individual building up to the urban scale. Among factors driving high-performance buildings, human dimensions play a role that is as significant as that of technological advances. However, this factor is not well understood, and, as a result, human dimensions are often ignored or simplified by stakeholders. This work presents a review of the literature on human dimensions of building energy use to assess the state-of-the-art in this topic area. The paper highlights research needs for fully integrating human dimensions into the building design and operation processes with the goal of reducing energy use in buildings while enhancing occupant comfort and productivity. This research focuses on identifying key needs for each stakeholder involved in a building's life cycle and takes an interdisciplinary focus that spans the fields of architecture and engineering design, sociology, data science, energy policy, codes, and standards to provide targeted insights. Greater understanding of the human dimensions of energy use has several potential benefits including reductions in operating cost for building owners; enhanced comfort conditions and productivity for building occupants; more effective building energy management and automation systems for building operators and energy managers; and the integration of more accurate control logic into the next generation of human-in-the-loop technologies. The review concludes by summarizing recommendations for policy makers and industry stakeholders for developing codes, standards, and technologies that can leverage the human dimensions of energy use to reliably predict and achieve energy use reductions in the residential and commercial buildings sectors.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

An approach to developing an integrated pyroprocessing simulator

Pyroprocessing has been studied for a decade as one of the promising fuel recycling options in Korea. We have built a pyroprocessing integrated inactive demonstration facility (PRIDE) to assess the feasibility of integrated pyroprocessing technology and scale-up issues of the processing equipment. Even though such facility cannot be replaced with a real integrated facility using spent nuclear fuel (SF), many insights can be obtained in terms of the world's largest integrated pyroprocessing operation. In order to complement or overcome such limited test-based research, a pyroprocessing Modelling and simulation study began in 2011. The Korea Atomic Energy Research Institute (KAERI) suggested a Modelling architecture for the development of a multi-purpose pyroprocessing simulator consisting of three-tiered models: unit process, operation, and plant-level-model. The unit process model can be addressed using governing equations or empirical equations as a continuous system (CS). In contrast, the operation model describes the operational behaviors as a discrete event system (DES). The plant-level model is an integrated model of the unit process and an operation model with various analysis modules. An interface with different systems, the incorporation of different codes, a process-centered database design, and a dynamic material flow are discussed as necessary components for building a framework of the plant-level model. As a sample model that contains methods decoding the above engineering issues was thoroughly reviewed, the architecture for building the plant-level-model was verified. By analyzing a process and operation-combined model, we showed that the suggested approach is effective for comprehensively understanding an integrated dynamic material flow. This paper addressed the current status of the pyroprocessing Modelling and simulation activity at KAERI, and also predicted its path forward.

42 ENGINEERING↗

Advancing Turbulent Spray and Combustion Models for Compression Ignition Engine Simulations

This thesis seeks to investigate the turbulent mixing influence on spray atomization and combustion processes encountered in compression ignition diesel engines. Despite greater thermal efficiency of diesel engine than spark ignition engine, the nature of stratified air-fuel mixture and non-premixed flame gives rise to unacceptable levels of nitrogen oxides (NOx) and particulate matter (PM), thus the use of diesel engines has often been limited to heavy-duty vehicle and industrial power sources. However, recent advancement in diesel engine combustion strategies, e.g. low temperature com-bustion (LTC), has demonstrated promising pathways towards improvement in the engine-out pollutants. Therefore, particularly in the effort of computer-aided en-gine design tasks, such a new engine design concept requires more accurate modeling techniques applicable over a broader range of engine operating conditions than those of conventional engine strategies. In the notion of challenges in new engine operat-ing conditions, this thesis aims to present successful implementation of improvement in numerical modeling techniques in high-pressure spray atomization and resulting turbulent spray flame of interest. Three-dimensional Computational Fluid Dynamics (CFD) in in-cylinder turbu-lent combustion is considered an integral part of engine design progress, but rather a cost-prohibitive to apply over a broad range of engine relevant conditions. In spite of successful use of existing spray atomization modeling, prior researchers have pointed out some degree of failure in LTC targeted injection strategies. Furthermore, finite rate and strong nonlinearity of chemistry influenced by local turbulent mixing still re-main in challenges to account for in cost-efficient CFD analysis. In this context, a new attempt of hybrid spray primary breakup modeling is presented and demonstrated in successful application aimed at LTC technique. In addition, the Representative Interactive Flamelets (RIF) model with aid of multi-flamelets approach is extensively assessed in terms of predictive capability against classical combustion model. The combustion model employed in this study are fully examined in the general diesel combustion metric, e.g., ignition delay and flame lift-off length as well as newly sug-gested test metric, combustion recession. The combustion recession has been recently idenfied, but still remain largely unknown. Since the governing physics of this phe-nomenon is characterized by turbulent mixing coupled with finite rate chemistry, this can be considered as a relevant test metric for turbulent combustion models. In ad-dition, very recent experimental studies have introduced a new non-sooting diesel combustion technique by manipulating direct injection method. The ducted fuel in-jection (DFI) has thus been demonstrated with its potential of low soot emissions. Knowing that the duct equipped ahead of injector nozzle was identifed to enhance turbulent mixing, investigations of DFI combustion may prove the effectiveness of turbulece-chemistry interaction modeling. This thesis presents comprehensive under-standings of aformentioned diesel combustion techniques in terms of several important physics keywords, e.g., turbulent mixing and detailed chemistry

33 ADVANCED PROPULSION SYSTEMS↗