Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Engineering Design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

Mechanisms Engineering Test Loop - Flexicask Design and Testing Report

This report documents the design development and testing of the Flexicask system for the Mechanisms Engineering Test Loop (METL). Currently, METL has completed Phase I construction and has been operating for over a year. The Flexicask system (Figure 1) was designed to allow for the removal and insertion of test articles into a METL test vessel while maintaining an acceptable inert atmosphere to minimize contamination of the METL sodium. This report discusses the design development of the Flexicask system, the commissioning and testing of the system, and the initial use of the Flexicask system to remove the Gear Test Assembly (GTA) from the METL Test Vessel 1.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Flex Fuel Optimized SI and HCCI Engine

The central objective of the proposed work is to demonstrate an HCCI (homogeneous charge compression ignition) capable SI (spark ignited) engine that is capable of fast and smooth mode transition between SI and HCCI combustion modes. The model-based control technique was used to develop and validate the proposed control strategy for the fast and smooth combustion mode transition based upon the developed control-oriented engine; and an HCCI capable SI engine was designed and constructed using production ready two-step valve-train with electrical variable valve timing actuating system. Finally, smooth combustion mode transition was demonstrated on a metal engine within eight engine cycles. The Chrysler turbocharged 2.0L I4 direct injection engine was selected as the base engine for the project and the engine was modified to fit the two-step valve with electrical variable valve timing actuating system. To develop the model-based control strategy for stable HCCI combustion and smooth combustion mode transition between SI and HCCI combustion, a control-oriented real-time engine model was developed and implemented into the MSU HIL (hardware-in-the-loop) simulation environment. The developed model was used to study the engine actuating system requirement for the smooth and fast combustion mode transition and to develop the proposed mode transition control strategy. Finally, a single cylinder optical engine was designed and fabricated for studying the HCCI combustion characteristics. Optical engine combustion tests were conducted in both SI and HCCI combustion modes and the test results were used to calibrate the developed control-oriented engine model. Intensive GT-Power simulations were conducted to determine the optimal valve lift (high and low) and the cam phasing range. Delphi was selected to be the supplier for the two-step valve-train and Denso to be the electrical variable valve timing system supplier. A test bench was constructed to develop control strategies for the electrical variable valve timing (VVT) actuating system and satisfactory electrical VVT responses were obtained. Target engine control system was designed and fabricated at MSU for both single-cylinder optical and multi-cylinder metal engines. Finally, the developed control-oriented engine model was successfully implemented into the HIL simulation environment. The Chrysler 2.0L I4 DI engine was modified to fit the two-step vale with electrical variable valve timing actuating system. A used prototype engine was used as the base engine and the cylinder head was modified for the two-step valve with electrical VVT actuating system. Engine validation tests indicated that cylinder #3 has very high blow-by and it cannot be reduced with new pistons and rings. Due to the time constraint, it was decided to convert the four-cylinder engine into a single cylinder engine by blocking both intake and exhaust ports of the unused cylinders. The model-based combustion mode transition control algorithm was developed in the MSU HIL simulation environment and the Simulink based control strategy was implemented into the target engine controller. With both single-cylinder metal engine and control strategy ready, stable HCCI combustion was achived with COV of 2.1% Motoring tests were conducted to validate the actuator transient operations including valve lift, electrical variable valve timing, electronic throttle, multiple spark and injection controls. After the actuator operations were confirmed, 15-cycle smooth combustion mode transition from SI to HCCI combustion was achieved; and fast 8-cycle smooth combustion mode transition followed. With a fast electrical variable valve timing actuator, the number of engine cycles required for mode transition can be reduced down to five. It was also found that the combustion mode transition is sensitive to the charge air and engine coolant temperatures and regulating the corresponding temperatures to the target levels during the combustion mode transition is the key for a smooth combustion mode transition. As a summary, the proposed combustion mode transition strategy using the hybrid combustion mode that starts with the SI combustion and ends with the HCCI combustion was experimentally validated on a metal engine. The proposed model-based control approach made it possible to complete the SI-HCCI combustion mode transition within eight engine cycles utilizing the well controlled hybrid combustion mode. Without intensive control-oriented engine modeling and HIL simulation study of using the hybrid combustion mode during the mode transition, it would be impossible to validate the proposed combustion mode transition strategy in a very short period.

33 ADVANCED PROPULSION SYSTEMS↗

Tool and Fixture Design [Poster]

In a manufacturing process, a need is identified and a product is created to fill this need. While design and engineering of the final product is important, the tools and fixtures that aid in the creation of the final product are just as important, if not more so. Power supplies assembled at the TA-55 PF-5 have been designed by an excellent engineering team. The task in PF-5 now is to ensure that all steps of the assembly and manufacturing process can be completed safely, reliably, and in a quality repeatable manner. One of these process steps involves soldering fine wires to an electrical connector. During the process development phase, the method of soldering included placing the power supply in a vice in order to manipulate it into a position conducive to soldering. This method is unacceptable from a reliability, repeatability, and ergonomic standpoint. To combat these issues, a fixture was designed to replace the current method. To do so, a twelve step engineering design process was used to create the fixture that would provide a solution to a multitude of problems, and increase the safety and efficiency of production.

42 ENGINEERING↗

Cyber-Informed Engineering Implementation Guide: Version 1.0 [Slides]

This Implementation Guide describes the principles of Cyber-Informed Engineering (CIE) and outlines questions that engineering teams should consider during each phase of a system's lifecycle to effectively employ these principles. It describes what it means to engineer systems in a cyber-informed way, rather than offering a comprehensive, step-by-step process or procedure for CIE implementation. This guide complements - but does not replace - the application of cybersecurity standards or practices currently in place within an organization. Engineers and technicians that design critical energy infrastructure installations can use this Implementation Guide to integrate the 12 principles of CIE into each phase of the engineering lifecycle, from concept to retirement. The guide is aimed at system or design engineers, rather than software engineers or operational cybersecurity practitioners. The engineers who design, build, operate, and maintain the physical infrastructure are best positioned to leverage a system's engineering design to diminish the severity of cyber attacks or digital technology failures. CIE expands cybersecurity decisions into the engineering space, not by asking engineers to become cyber experts, but by calling on engineers to apply engineering tools and make engineering decisions that improve cybersecurity outcomes. CIE examines the engineering consequences that a sophisticated cyber attacker could achieve and drives engineering changes that may provide deterministic mitigations to limit or eliminate those consequences.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Three dimensional finite element methods: Their role in the design of DC accelerator systems

High Voltage Engineering has designed, built and tested a 2 MV dual irradiation system that will be applied for radiation damage studies and ion beam material modification. The system consists of two independent accelerators which support simultaneous proton and electron irradiation (energy range 100 keV - 2 MeV) of target sizes of up to 300 Multiplication-Sign 300 mm{sup 2}. Three dimensional finite element methods were used in the design of various parts of the system. The electrostatic solver was used to quantify essential parameters of the solid-state power supply generating the DC high voltage. The magnetostatic solver and ray tracing were used to optimize the electron/ion beam transport. Close agreement between design and measurements of the accelerator characteristics as well as beam performance indicate the usefulness of three dimensional finite element methods during accelerator system design.

36 MATERIALS SCIENCE↗

Heat Exchanger Design Optimization for Mitigation of Diesel Engine Exhaust Fouling

Abstract The design optimization of a diesel exhaust-coupled heat and mass exchanger that drives a 2.71 kW cooling capacity absorption heat pump is presented in this study. Fouling layer thermal resistance and pressure drops from single-tube experiments are used to develop a thermodynamic, heat transfer, and pressure drop model for the exhaust-coupled desorber. A parametric study is performed to select a desorber design that meets system performance while minimizing footprint. Experimental heat duties and pressure drops are within 10% and 3%, respectively, of the model predictions. Thus, large data sets from single-tube experiments with representative geometries are successful in accounting for fouling effects at the component level. Desorber design optimization based on this approach ensures continued heat pump performance after fouling. This study, along with the single-tube experiments, presents a systematic approach to design exhaust-coupled heat exchangers while considering the effects of fouling. These results are applicable for a wide range of waste-heat recovery applications, and this method can be extended to different geometries and operating conditions.

Energy & Fuels↗

Bench-scale Development of an Advanced Solid Sorbent-based CO 2 Capture Process for Coal-fired Power Plants

It is increasingly clear that CO 2 capture and sequestration (CCS) must play a critical role in curbing worldwide CO 2 emissions to the atmosphere. Development of these technologies to cost-effectively remove CO 2 from coal-fired power plants is very important to mitigating the impact these power plants have within the world’s power generation portfolio. Currently, conventional CO 2 capture technologies, such as aqueous-monoethanolamine based solvent systems, are prohibitively expensive and if implemented could result in a 75 to 100% increase in the cost of electricity for consumers worldwide. Solid sorbent CO 2 capture processes – such as RTI’s Advanced Solid Sorbent CO 2 , Capture Process – are promising alternatives to conventional, liquid solvents. Supported amine sorbents – of the nature RTI has developed – are particularly attractive due to their high CO 2 loadings, low heat capacities, reduced corrosivity/volatility and the potential to reduce the regeneration energy needed to carry out CO 2 capture. Previous work in this area has failed to adequately address various technology challenges such as sorbent stability and regenerability, sorbent scale-up, improved physical strength and attrition-resistance, proper heat management and temperature control, proper solids handling and circulation control, as well as the proper coupling of process engineering advancements that are tailored for a promising sorbent technology. The remaining challenges for these sorbent processes have provided the framework for the project team’s research and development and target for advancing the technology beyond lab- and bench-scale testing. Under a cooperative agreement with the US Department of Energy, and part of NETL’s CO 2 Capture Program, RTI has led an effort to address and mitigate the challenges associated with solid sorbent CO 2 capture. The overall objective of this project was to mitigate the technical and economic risks associated with the scale-up of solid sorbent-based CO 2 capture processes, enabling subsequent larger pilot demonstrations and ultimately commercial deployment. An integrated development approach has been a key focus of this project in which process development, sorbent development, and economic analyses have informed each of the other development processes. Development efforts have focused on improving the performance stability of sorbent candidates, refining process engineering and design, and evaluating the viability of the technology through detailed economic analyses. Sorbent advancements have led to a next generation, commercially-viable CO 2 capture sorbent exhibiting performance stability in various gas environments and a physically strong fluidizable form. The team has reduced sorbent production costs and optimized the production process and scale-up of PEI-impregnated, fluidizable sorbents. Refinement of the process engineering and design, as well as the construction and operation of a bench-scale research unit has demonstrated promising CO 2 capture performance under simulated coal-fired flue gas conditions. Parametric testing has shown how CO 2 capture performance is impacted by changing process variables, such as Adsorber temperature, Regenerator temperature, superficial flue gas velocity, solids circulation rate, CO 2 partial pressure in the Regenerator, and many others. Long-term testing has generated data for the project team to set the process conditions needed to operate a solids-based system for optimal performance, with continuous 90% CO 2 capture, and no operational interruptions. Data collected from all phases of testing has been used to develop a detailed techno-economic assessment of RTI’s technology. These detailed analyses show that RTI’s technology has significant economic advantages over current amine scrubbing and potential to achieve the DOE’s Carbon Capture Program’s goal of >90% CO 2 capture rate at a cost of < $40/T-CO 2 captured by 2025. Through this integrated technology development approach, the project team has advanced RTI’s CO 2 capture technology to TRL-4 (nearly TRL-5, with the missing variable being testing on actual, coal-fired flue gas), according to the DOE/FE definitions for Technology Readiness Levels. At a broader level, this project has advanced the whole of the solid sorbent CO 2 capture field, with advancements in process engineering and design, technical risk mitigation, sorbent scale-up optimization, and an understanding of the commercial viability and applicability of solid sorbent CO 2 capture technologies for the U.S. existing fleet of coal-fired power plants.

01 COAL, LIGNITE, AND PEAT↗

Engineered Containment Mound (ECM) Design for LLRW at CNL in Chalk River, Canada - 19123

The Atomic Energy of Canada Limited has an initiative to transform the Chalk River Laboratory (CRL) facility into an updated research facility to continue nuclear energy and other energy research which is paramount to the continued growth of the energy sector in Canada. The Near Surface Disposal Facility (NSDF) will be licensed by Canadian Nuclear Safety Commission prior to construction and receipt of waste. The NSDF has been designed to allow for disposal of waste in a manner that is protective of the environment and human health. The Engineered Containment Mound (ECM) is a major structure associated with the NSDF design to allow for long-term disposal of 1,000,000 cubic meters of LLRW. This paper describes the design of major components of the ECM: ECM geometry, perimeter berm, base liner system, and cover system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lab-Scale Development of a Solid Sorbent for CO 2 Capture Process for Coal-Fired Power Plants

It is increasingly clear that CO 2 capture and sequestration (CCS) must play a critical role in curbing worldwide CO 2 emissions to the atmosphere. Development of these technologies to cost-effectively remove CO 2 from coal-fired power plants is very important to mitigating the impact these power plants have within the world’s power generation portfolio. Currently, conventional CO 2 capture technologies, such as aqueous-monoethanolamine based solvent systems, are prohibitively expensive and if implemented could result in a 75 to 100% increase in the cost of electricity for consumers worldwide. Solid sorbent CO 2 capture processes – such as RTI’s 3rd Generation Solid Sorbent CO 2 Capture Process – are promising alternatives to conventional, liquid solvents. Supported amine sorbents – of the nature RTI has developed – are particularly attractive due to their potential for high CO 2 loadings, excellent stability over multiple cycles, reduced corrosivity/volatility and a potential to reduce the regeneration energy needed to carry out CO 2 capture. The remaining challenges for these sorbent processes have provided the framework for the project team’s research and development and target for advancing the technology beyond lab-scale testing. Previous work in this area has failed to adequately address various technology challenges such as sorbent stability and regenerability, sorbent scale-up, improved physical strength and attrition-resistance, proper heat management and temperature control, proper solids handling, as well as the proper coupling of process engineering advancements that are tailored for a promising sorbent technology. Under a cooperative agreement with the US Department of Energy, and part of NETL’s CO 2 Capture Program, RTI has led an effort to address and mitigate the challenges associated with solid sorbent CO 2 capture. The overall objective of this project was to mitigate the technical and economic risks associated with the performance and scale-up of solid sorbent-based CO 2 capture processes, enabling subsequent larger pilot demonstrations and ultimately commercial deployment. An integrated development approach has been a key focus of this project in which sorbent development, process development, and economic analyses have informed each of the other development processes. Development efforts have focused on developing novel hybrid solids-based CO 2 capture sorbents and improving their performance stability, refining process engineering and design, and evaluating the viability of the technology through detailed economic analyses. Sorbent advancements have led to a next generation, commercially-viable CO 2 capture sorbent exhibiting performance stability in various gas environments and a physically strong fluidizable form. The team has reduced sorbent production costs and optimized the production and scale-up of novel metal-organic framework (MOF) hybrid solids-based CO 2 capture sorbents, fluidizable sorbents. Refinement of the process engineering and design at the lab-scale research unit has demonstrated promising CO 2 capture performance in simulated coal-fired flue gas conditions. Long-term testing has informed the project team on the process conditions needed to operate a solids-based system for optimal performance. Data collected from all phases of testing has been used to develop a detailed techno-economic assessment of RTI’s technology. These detailed analyses show that RTI’s technology has significant economic advantages over current amine scrubbing and potential to achieve the DOE’s Carbon Capture Program’s goal of >90% CO 2 capture rate at a cost of almost $40/tonne CO 2 captured by 2025. Through this integrated technology development approach, the project team has advanced RTI’s 3rd generation CO 2 capture technology to TRL-3, according to the DOE/FE definitions for Technology Readiness Levels. At a broader level, this project has advanced the whole of the solid sorbent CO 2 capture field, with advancements in process engineering and design, technical risk mitigation, sorbent scale-up optimization, and an understanding of the commercial viability and applicability of solid sorbent CO 2 capture technologies for the U.S. existing fleet of coal-fired power plants.

20 FOSSIL-FUELED POWER PLANTS↗

Cyber-Informed Engineering Implementation Guide

This Implementation Guide describes the principles of Cyber-Informed Engineering (CIE) and outlines questions that engineering teams should consider during each phase of a system’s lifecycle to effectively employ these principles. It describes what it means to engineer systems in a cyber-informed way, rather than offering a comprehensive, step-by-step process or procedure for CIE implementation. This guide complements—but does not replace—the application of cybersecurity standards or practices currently in place within an organization. Engineers and technicians that design critical energy infrastructure installations can use this Implementation Guide to integrate the 12 principles of CIE into each phase of the engineering lifecycle, from concept to retirement. The guide is aimed at system or design engineers, rather than software engineers or operational cybersecurity practitioners. The engineers who design, build, operate, and maintain the physical infrastructure are best positioned to leverage a system’s engineering design to diminish the severity of cyber attacks or digital technology failures. CIE expands cybersecurity decisions into the engineering space, not by asking engineers to become cyber experts, but by calling on engineers to apply engineering tools and make engineering decisions that improve cybersecurity outcomes. CIE examines the engineering consequences that a sophisticated cyber attacker could achieve and drives engineering changes that may provide deterministic mitigations to limit or eliminate those consequences.

42 ENGINEERING↗

CMRR Public Meeting, April 25, 2012 Volume 13

Planned MCRR Nuclear Facility Activities are: (1) in FY12 CMRR Nuclear Facility design will continue until substantially complete; (2) project activities will be cataloged to preserve the engineering and design investment; (3) a roadmap for future restart will be developed for the next project team; (4) staff transition to other non-project endeavors is underway; and (5) final closeout activities will continue into 1st quarter Fy 2013 with limited staff.

Air quality↗

Recent advances in rational design of defect-engineered photocatalysts toward sustainable NH 3 synthesis as H 2 carrier: From fundamental and development to machine-learning

In this study, we provide a detailed overview of the fundamental mechanisms underpinning photocatalytic N 2 reduction. We also discuss advances in catalyst design for the synthesis of NH 3 . Particular emphasis is placed on the role of surface defect engineering, which includes the creation of surface defects to enhance the performance of semiconducting photocatalysts for efficient N 2 reduction. In addition, the application of a machine learning-based computational modeling approach is discussed as an important driving force for predicting and regulating NH 3 synthesis efficiency based on catalyst features and reaction conditions. Finally, existing challenges and future perspectives for improving the performance of defect-engineered photocatalysts are outlined to contribute to the ongoing discourse on sustainable ammonia generation. This review aims to clarify recent progress in the rational design of defect-containing photocatalysts for the synthesis of NH 3 and encourages innovative approaches to catalyst optimization rather than solely focusing on new materials.

08 HYDROGEN↗

CIE Curriculum Guide (V.2.0)

The Cyber-Informed Engineering (CIE) Curriculum Guide offers a comprehensive framework, guidance, and resources for integrating CIE into university-level engineering programs and related educational activities. The primary goal is to help educators adopt CIE principles into their teaching to produce future engineers and technicians who understand digital risks in modern engineered systems, thereby addressing the nation’s infrastructure resilience needs. This guide outlines practical integration examples, links to resources to accelerate CIE adoption, and shares insights from partner academic institutions on various implementation strategies. CIE is a framework for embedding engineered controls that mitigate the impact of cyber-attacks in any cyber-physical system used in critical energy infrastructure and other sectors. Developed by the U.S. Department of Energy’s Office of Cybersecurity, Energy Security, and Emergency Response (CESER), the National Cyber-Informed Engineering Strategy emphasizes embedding CIE into formal education, training, and credentialing. This guide supports this strategic objective by providing examples of integrating CIE concepts into engineering curricula, from class activities to new courses and certificate programs. The importance of educating cyber-informed engineers is underscored by the evolving cybersecurity threats facing engineered systems. As industrial control systems (ICS) increasingly incorporate digital technologies, the responsibility for security extends to both cyber professionals and engineers. CIE addresses critical gaps in designing and protecting physical systems with digital components against cyber risks, ensuring engineers consider digital risk throughout the engineering design lifecycle. Currently, engineering education does not routinely include cyber-informed principles, highlighting a gap in addressing modern engineering system risks. This guide advocates for updating engineering curricula to include digital risk management as a fundamental element. By doing so, future engineers will be equipped to design resilient systems that mitigate digital risks from the outset. Through this guide, engineering faculty can integrate CIE into their curricula, bridging the gap between digital risk and engineering. This approach prepares a cyber-informed workforce capable of safeguarding the cyber-physical systems crucial to national security and public welfare. By embedding CIE into education and training, institutions can produce engineers and technicians who can effectively mitigate cyber impacts throughout the engineering design lifecycle, resulting in more secure critical infrastructures.

42 - ENGINEERING↗

Multi-scale Material Parameter Identification Using LS-DYNA® and LS-OPT®

Ever-tightening regulations on fuel economy and carbon emissions demand continual innovation in finding ways for reducing vehicle mass. Classical methods for computational mass reduction include sizing, shape and topology optimization. One of the few remaining options for weight reduction can be found in materials engineering and material design optimization. Apart from considering different types of materials by adding material diversity, an appealing option in automotive design is to engineer steel alloys for the purpose of reducing thickness while retaining sufficient strength and ductility required for durability and safety. Such a project was proposed and is currently being executed under the auspices of the United States Automotive Materials Partnership (USAMP) funded by the Department of Energy. Under this program, new steel alloys (Third Generation Advanced High Strength Steel or 3GAHSS) are being designed, tested and integrated with the remaining design variables of a benchmark vehicle Finite Element model. In this project the principal phases identified are (i) material identification, (ii) formability optimization and (iii) multi-disciplinary vehicle optimization. This paper serves as an introduction to the LS-OPT methodology and therefore mainly focuses on the first phase, namely an approach to integrate material identification using material models of different length scales. For this purpose, a multi-scale material identification strategy, consisting of a Crystal Plasticity (CP) material model and a Homogenized State Variable (SV) model, is discussed and demonstrated. The paper concludes with proposals for integrating the multi-scale methodology into the overall vehicle design.

36 MATERIALS SCIENCE↗

Lake Charles CCS Project (Final Technical Report, Phase 2)

In late September 2014 development of the Lake Charles Clean Energy (LCCE) Plant was abandoned resulting in termination of Lake Charles Carbon Capture and Sequestration (CCS) Project which was a subset the LCCE Plant. As a result, the project was only funded through Phase 2A (Design) and did not enter Phase 2B (Construction) or Phase 2C (Operations). This report was prepared relying on information prepared and provided by engineering companies which were engaged by Leucadia Energy, LLC to prepare or review Front End Engineering and Design (FEED) for the Lake Charles Clean Energy Project, which includes the Carbon Capture and Sequestration (CCS) Project in Lake Charles, Louisiana. The Lake Charles Carbon Capture and Sequestration (CCS) Project was to be a large-scale industrial CCS project intended to demonstrate advanced technologies that capture and sequester carbon dioxide (CO 2 ) emissions from industrial sources into underground formations. The Scope of work was divided into two discrete sections; 1) Capture and Compression prepared by the Recipient Leucadia Energy, LLC, and 2) Transport and Sequestration prepared by sub-Recipient Denbury Onshore, LLC. Capture and Compression-The Lake Charles CCS Project Final Technical Report describes the systems and equipment that would be necessary to capture CO 2 generated in a large industrial gasification process and sequester the CO 2 into underground formations. The purpose of each system is defined along with a description of its equipment and operation. Criteria for selection of major equipment are provided and ancillary utilities necessary for safe and reliable operation in compliance with environmental regulations are described. Construction considerations are described including a general arrangement of the CCS process units within the overall gasification project. A cost estimate is provided, delineated by system area with cost breakdown showing equipment, piping and materials, construction labor, engineering, and other costs. The CCS Project Final Technical Report is based on a Front End Engineering and Design (FEED) study prepared by SK E&C, completed in [June] 2014. Subsequently, Fluor Enterprises completed a FEED validation study in mid-September 2014. The design analyses indicated that the FEED package was sufficient and as expected. However, Fluor considered the construction risk based on a stick-build approach to be unacceptable, but construction risk would be substantially mitigated through utilization of modular construction where site labor and schedule uncertainty is minimized. Fluor’s estimate of the overall EPC project cost utilizing the revised construction plan was comparable to SKE&C’s value after reflecting Fluor’s assessment of project scope and risk characteristic. Development was halted upon conclusion of Phase 2A FEED and the project was not constructed.Transport and Sequestration – The overall objective of the pipeline project was to construct a pipeline to transport captured CO 2 from the Lake Charles Clean Energy project to the existing Denbury Green Line and then to the Hastings Field in Southeast Texas to demonstrate effective geologic sequestration of captured CO 2 through commercial EOR operations. The overall objective of the MVA portion of the project was to demonstrate effective geologic sequestration of captured CO 2 through commercial Enhanced Oil Recovery (EOR) operations in order to evaluate costs, operational processes and technical performance. The DOE target for the project was to capture and implement a research MVA program to demonstrate the sequestration through EOR of approximately one million tons of CO 2 per year as an integral component of commercial operations.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Engineering Analysis Baseline Model Requirements

The purpose of this document is to set requirements for the development, documentation, implementation, and maintenance of engineering analysis baseline models used by the Advanced Engineering and Analysis group to model and simulate systems. The intended audience of this document is the Engineering Technology and Design division Advanced Engineering and Analysis group—in particular the baseline model owners and users—and the Group Leaders and members of the Systems Engineering groups. Section 1 presents a discussion of general concepts related to engineering analysis models and baseline models, including definitions of common terms used in this requirements document. It also presents the purpose and intentions of creating and using baseline models and exposes some underlying assumptions about what baseline models are supposed to be. Section 2 presents requirements on the general categories of: the Advanced Engineering and Analysis Group Leader and the baseline model owner; parts, materials, and load cases; the process of generating and using the model; and how the baseline model will be stored, maintained, and documented. This document presents requirements on the baseline model as well as some aspects of the development process and the people responsible for the development; it does not address how the results of simulations utilizing these models will be used to make assessments

42 ENGINEERING↗

Helium recovery system at IB3A

The growing demand for sustainable cryogenic operations at Fermilab has underscored the need to improve helium management, particularly at the Industrial Building 3A (IB3A) test facility. IB3A characterizes and tests superconductors, cables, and coils for projects such as the HL-LHC AUP and Mu2e, yet currently relies on 500 L Dewars whose boil-off is vented to atmosphere, wasting a critical, non-renewable resource and increasing the cost of testing. A project is therefore under way to link IB3A to an existing purification and liquefaction station in a neighboring building through a dedicated pipeline. Captured helium will be transferred, purified, reliquefied, and returned for reuse, cutting losses and operating costs. This paper details the first two project phases: "Design and Engineering" and "Procurement and Installation." The design phase finalizes pipeline specifications, establishes flow-control requirements, and resolves integration challenges with existing cryogenic infrastructure. The procurement and installation phase covers material sourcing, pipeline construction, and deployment of control and monitoring systems to assure reliable, efficient operation. Key technical hurdles-route optimization, pressure drop mitigation, and interface compatibility-are discussed alongside implemented solutions. Implementing the pipeline and upgrading IB3A will dramatically reduce helium consumption and therefore testing cost, strengthening Fermilab's capacity to support frontier science far into the future.

Porwisiak, D. [Fermilab; Wroclaw Tech. U.]↗