Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

Innovation in Contracting Strategy for a Master Services Agreement for Remediation of Low Level Radioactive Waste - 18381

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI on time and within budget is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.2 million cubic metres of historic waste from several locations, including the Port Hope Harbour, a closed municipal landfill and approximately 800 residential properties. This complex project requires contracting the services of qualified, skilled and experienced environmental remediation contractors to meet the diverse needs of the myriad tasks that comprise the remediation and restoration of all properties. This paper will highlight how the CNL contracting services team developed an innovative approach to a contracting strategy designed to deliver the safe execution of work and keep the project on time and within budget. The approach addresses the complexities of a scope of work that consists of multiple work packages to be executed both concurrently and in tandem, and that require highly specialized trades/skills, as well as high-level project management expertise to ensure seamless coordination among the various contractors. The author will discuss CNL's strategy to engage the market with a Request for Expression of Interest to identify potential qualified suppliers and gauge their level of interest, issue a Request for Prequalification (RFPQ) to determine eligible contractors and, ultimately, issue a Request for Proposal for a Master Services Agreement (MSA) that would competitively evaluate each contractor's direct experience, technical expertise, quality management programs, safety systems compliance and track record. Using CNL's experience as a case study, the paper will highlight how an innovative approach can positively affect project timelines by describing how CNL addressed the challenge associated with the limited time available to implement procurement processes and deliver a series of executed agreements while ensuring that work would begin on time and key project milestones would be met. The author will summarize how CNL's strategy put the project back on schedule, without compromising the process guideline/requirements, and ensured that a qualified and experienced set of contractors, committed to a strong safety culture, will be available to perform the work required when the cleanup in the Port Hope community begins in 2018. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

AmeriFlux FLUXNET-1F US-RGo Glenn County Organic Rice Farm

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-RGo Glenn County Organic Rice Farm. This is the FLUXNET version of the carbon flux data for the site US-RGo Glenn County Organic Rice Farm produced by applying the standard ONEFlux (1F) software. Site Description - Organically farmed medium-grain brown rice field in Glenn County, California. Part of a five-year, ground-truthing field study under the DOE ARPA-E SMARTFARM project. Field check is approx. 7 ha in size (1,250 ft by 250 ft), part of a 75+ acre site in several checks with commercial rice over rice rotation on Tehama silt loam, management practices include winter cover crops and AWD.

Schuppenhauer, Michael R.↗

Changing the Project Execution Culture at NASA Dryden

Dryden has embarked on implementing Critical Chain Project Management (CCPM) philosophies and tools to reduce workforce stress and increase the centers work throughput. This effort has been under way for over one year and represents a fundamental state change in how various projects are planned and executed at the center. The implementation of CCPM philosophies and the required cultural changes represent the most difficult aspects of the implementation.

Horn, Thomas J.↗

Update on Multi-Variable Parametric Cost Models for Ground and Space Telescopes

Parametric cost models can be used by designers and project managers to perform relative cost comparisons between major architectural cost drivers and allow high-level design trades; enable cost-benefit analysis for technology development investment; and, provide a basis for estimating total project cost between related concepts. This paper reports on recent revisions and improvements to our ground telescope cost model and refinements of our understanding of space telescope cost models. One interesting observation is that while space telescopes are 50X to 100X more expensive than ground telescopes, their respective scaling relationships are similar. Another interesting speculation is that the role of technology development may be different between ground and space telescopes. For ground telescopes, the data indicates that technology development tends to reduce cost by approximately 50% every 20 years. But for space telescopes, there appears to be no such cost reduction because we do not tend to re-fly similar systems. Thus, instead of reducing cost, 20 years of technology development may be required to enable a doubling of space telescope capability. Other findings include: mass should not be used to estimate cost; spacecraft and science instrument costs account for approximately 50% of total mission cost; and, integration and testing accounts for only about 10% of total mission cost.

Stahl, H. Philip↗

Towards a Multi-Variable Parametric Cost Model for Ground and Space Telescopes

Parametric cost models can be used by designers and project managers to perform relative cost comparisons between major architectural cost drivers and allow high-level design trades; enable cost-benefit analysis for technology development investment; and, provide a basis for estimating total project cost between related concepts. This paper hypothesizes a single model, based on published models and engineering intuition, for both ground and space telescopes: OTA Cost approximately (X) D(exp (1.75 +/- 0.05)) lambda(exp(-0.5 +/- 0.25) T(exp -0.25) e (exp (-0.04)Y). Specific findings include: space telescopes cost 50X to 100X more ground telescopes; diameter is the most important CER; cost is reduced by approximately 50% every 20 years (presumably because of technology advance and process improvements); and, for space telescopes, cost associated with wavelength performance is balanced by cost associated with operating temperature. Finally, duplication only reduces cost for the manufacture of identical systems (i.e. multiple aperture sparse arrays or interferometers). And, while duplication does reduce the cost of manufacturing the mirrors of segmented primary mirror, this cost savings does not appear to manifest itself in the final primary mirror assembly (presumably because the structure for a segmented mirror is more complicated than for a monolithic mirror).

Space Mirror Technology↗

The NASA DEVELOP Model: Multidisciplinary Teams Conduct Interdisciplinary Projects to Produce Transdisciplinary Outcomes

The DEVELOP Program, part of NASA’s Earth Applied Sciences’ Capacity Building Program, conducts 50-70 feasibility studies each year that utilize Earth observations to address local decision-making challenges and help inform action. DEVELOP uses these projects as the mechanism to build skills in its participants and partner organizations to assess and apply satellite data insights to environmental decision-making processes. While organized by thematic focus (ex. water resource management, ecological forecasting, disaster management), projects use a multidisciplinary team approach with teams of students, recent graduates, early career professionals, and transitioning career professionals, bringing different disciplines, life experience, and perspectives to execute projects that have been collaboratively designed with end-user partner organizations (federal agencies, state and local governments, non-profit and for-profit organizations, and international organizations). Projects are interdisciplinary in nature as they integrate methods from multiple disciplines, with a focus on the incorporation of satellite data with other data sources such as socioeconomic and demographic data, in situ measurements, model outputs, and partners’ knowledge, and take place under the guidance of science advisors from NASA, academia, and other partner organizations. The culmination of these multidisciplinary teams working on projects that draw from interdisciplinary methods and approaches, is a transdisciplinary solution for the partner organizations to explore further for potential adoption. This presentation will highlight the DEVELOP model of co-production and collaboration, lessons learned integrating people and project methodologies, and impact assessment activities surrounding the program’s efforts.

Capacity Building↗

Power Electronics Thermal Management R&D; NREL (National Renewable Energy Laboratory)

Presentation containing an update for the Power Electronics Thermal Management project in the Electric Drive Train task funded by the Vehicle Technology Office of DOE. This presentation outlines the purpose, plan, and results of research thus far for cooling and material selection strategies to manage heat in power electronic assemblies such as inverters, converters, and chargers.

30 DIRECT ENERGY CONVERSION↗

Management on Hazardous Materials During Decommissioning - 18310

Non-radiological contaminants in site systems, on structures, and in site media (soil, groundwater, sediment, and surface water) often become a significant driver to cost and schedule in nuclear power plant decommissioning. This is borne out by historical experience in decommissioning projects. Management of non-radiological issues in site decommissioning is complicated by the site-specific nature of non-radiological contaminants in systems, structures and media; the variety of regulatory programs potentially applicable to compliance management; how these issues impact planning and execution of decommissioning elements; and interface with the management of site radiological issues in the decommissioning process. To address the importance of management of non-radiological hazards during decommissioning, EPRI recently issued the report Guidance for Management of Hazardous Materials during Decommissioning (EPRI 3002010592) [1]. The report provides an experience-based framework for identifying nonradiological issues at plants early in the decommissioning process, planning for regulatory compliance, options for remedial management, and considerations for integration into the plant decommissioning process. This paper summarizes the content of the EPRI report, including description of a framework for identifying non-radiological issues early in the decommissioning planning process such that site-specific issues can be optimally addressed, and funding to manage those issues can be established. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Natural Resources Assessment for the SNS Second Target Station, Oak Ridge, Tennessee

The US Department of Energy’s Oak Ridge National Laboratory (ORNL) is a leading institution in advanced materials, supercomputing, neutrons, and nuclear science. As a research laboratory managed by UT-Battelle, LLC for DOE, ORNL has national priorities in energy, security, and scientific discovery that necessitate facility improvements and expansions. DOE is also committed to environmental stewardship. The laboratory is located on the ~32,000-acre Oak Ridge Reservation (ORR), much of which is categorized as a National Environmental Research Park and a state Wildlife Management Area. DOE works with the Tennessee Wildlife Resources Agency (TWRA), Tennessee Department of Environment and Conservation (TDEC), US Fish and Wildlife Service (USFWS), US Department of Agriculture, and other agencies to serve as an effective steward of the ORR. Accordingly, project managers must conform to environmental regulations, agreements, and policies at the federal, state, and institutional levels. Per 40 CFR (Code of Federal Regulations) 1508.14, potential effects on research and science education on the National Environmental Research Park represent potential impacts of federal actions. Moreover, federal actions that affect the quantity and quality of hunting opportunities and deer reduction harvest on the Oak Ridge Wildlife Management Area must be considered whenever other aspects of the human environment (as defined by NEPA) are affected. The Spallation Neutron Source (SNS) is a premiere facility at ORNL that provides advanced capabilities in neutron scattering to promote new discoveries and research opportunities in material sciences, physics, chemistry, biological sciences, and others. A conceptual design for a Second Target Station (STS) has been in consideration for several years. The STS is intended to complement and enhance existing ORNL capabilities, notably research and exploration of complex materials. The proposed STS will involve development of existing natural areas on the ORR, which might contain sensitive resources that require mitigation or avoidance in accordance with existing policies and regulation. This report summarizes current knowledge of natural and cultural resources within the STS project area. At the time of this report, the proposed STS project consisted of an operations area comprising 55.4 acres (22.4 ha) and a total review area for potential construction comprising ~224 acres (90.6 ha). The review area is located primarily within forested natural areas of the ORR with minor development in the form of power-line rights-of-way and secondary/graveled roads (Figure 1). The primary goal was to evaluate potential effects on sensitive resources that might result from development of the STS. In addition to onthe-ground surveys during summer 2009 and fall 2019 to summer 2020 by ORNL Natural Resources Management Program and Aquatic Ecology Group staff, this report makes use of historical (pre-1995) and contemporary (1995 to present) data from additional confirmed sources (e.g., TDEC). Likewise, forest conditions were compiled primarily from a 2013 forest inventory effort for Forest Management Compartment 17 and supplemented with limited ground observations in 2019. The individuals who obtained and compiled the data that are presented here are familiar with and routinely assess sensitive resources on the ORR.

54 ENVIRONMENTAL SCIENCES↗

FECM/NETL CO2 Saline Storage Cost Model CO2_S_COM 2024 (v4)

The U.S. Department of Energy's (DOE) Office of Fossil Energy and Carbon Management (FECM), in collaboration with the National Energy Technology Laboratory (NETL), has developed the FECM/NETL CO2 Saline Storage Cost Model (CO2_S_COM). This Excel-based tool provides a comprehensive framework for estimating the costs and breakeven prices associated with storing carbon dioxide (CO2) in deep saline formations. Designed from the perspective of a CO2 storage site owner, the CO2_S_COM incorporates four integrated modules—project management, financial analysis, activity cost estimation, and geological evaluation—to deliver fast, robust and actionable insights for screening project finances.

CO2 storage↗

Requirements, Verification, and Compliance (RVC) Database Tool

This paper describes the development, design, and implementation of the Requirements, Verification, and Compliance (RVC) database used on the International Space Welding Experiment (ISWE) project managed at Marshall Space Flight Center. The RVC is a systems engineer's tool for automating and managing the following information: requirements; requirements traceability; verification requirements; verification planning; verification success criteria; and compliance status. This information normally contained within documents (e.g. specifications, plans) is contained in an electronic database that allows the project team members to access, query, and status the requirements, verification, and compliance information from their individual desktop computers. Using commercial-off-the-shelf (COTS) database software that contains networking capabilities, the RVC was developed not only with cost savings in mind but primarily for the purpose of providing a more efficient and effective automated method of maintaining and distributing the systems engineering information. In addition, the RVC approach provides the systems engineer the capability to develop and tailor various reports containing the requirements, verification, and compliance information that meets the needs of the project team members. The automated approach of the RVC for capturing and distributing the information improves the productivity of the systems engineer by allowing that person to concentrate more on the job of developing good requirements and verification programs and not on the effort of being a "document developer".

Rainwater, Neil E., II↗

FECM/NETL CO 2 Saline Storage Cost Model (2024): User’s Manual

The U.S. Department of Energy's (DOE) Office of Fossil Energy and Carbon Management (FECM), in collaboration with the National Energy Technology Laboratory (NETL), has developed the FECM/NETL CO 2 Saline Storage Cost Model (CO2_S_COM). This Excel-based tool provides a comprehensive framework for estimating the costs and breakeven prices associated with storing carbon dioxide (CO 2 ) in deep saline formations. Designed from the perspective of a CO 2 storage site owner, the CO2_S_COM incorporates four integrated modules—project management, financial analysis, activity cost estimation, and geological evaluation—to deliver fast, robust, and actionable insights for evaluating project finances. This is the user's manual for CO2_S_COM. The model may be accessed at this link: FECM/NETL CO2 Saline Storage Cost Model CO2_S_COM 2024 (v4) - Submissions - EDX

54 ENVIRONMENTAL SCIENCES↗

NASA ETM Modeling and Simulation Upper E Traffic Management Meeting December 2020

This is a slide set to be used as part of a meeting series with members of a working group aimed at the development of a concept that addresses needs and gaps in the management of high altitude airspace operations. This concept leverages elements developed through the UAS Traffic Management project with respect to a cooperative, service-based approach that provides services and capabilities in areas (e.g., Upper Class E airspace) that currently receive no or limited service from Air Traffic Control. This concept is meant to provide a safe, fair, and scalable approach to management of Upper Class E operations that reduces the burden on ATC while providing the flexibility and access desired by current and new users of the airspace. This set of slides includes an overview of the past accomplishments, current project structure, and a simulation roadmap for planned work ahead.

NASA ETM modeling and simulation↗

Shuttle Propulsion System Major Events and the Final 22 Flights

Numerous lessons have been documented from the Space Shuttle Propulsion elements. Major events include loss of the Solid Rocket Boosters (SRB's) on STS-4 and shutdown of a Space Shuttle Main Engine (SSME) during ascent on STS-51F. On STS-112 only half the pyrotechnics fired during release of the vehicle from the launch pad, a testament for redundancy. STS-91 exhibited freezing of a main combustion chamber pressure measurement and on STS-93 nozzle tube ruptures necessitated a low liquid level oxygen cut off of the main engines. A number of on pad aborts were experienced during the early program resulting in delays. And the two accidents, STS-51L and STS-107, had unique heritage in history from early program decisions and vehicle configuration. Following STS-51L significant resources were invested in developing fundamental physical understanding of solid rocket motor environments and material system behavior. And following STS-107, the risk of ascent debris was better characterized and controlled. Situational awareness during all mission phases improved, and the management team instituted effective risk assessment practices. The last 22 flights of the Space Shuttle, following the Columbia accident, were characterized by remarkable improvement in safety and reliability. Numerous problems were solved in addition to reduction of the ascent debris hazard. The Shuttle system, though not as operable as envisioned in the 1970's, successfully assembled the International Space Station (ISS). By the end of the program, the remarkable Space Shuttle Propulsion system achieved very high performance, was largely reusable, exhibited high reliability, and was a heavy lift earth to orbit propulsion system. During the program a number of project management and engineering processes were implemented and improved. Technical performance, schedule accountability, cost control, and risk management were effectively managed and implemented. Award fee contracting was implemented to provide performance incentives. The Certification of Flight Readiness and Mission Management processes became very effective. A key to the success of the propulsion element projects was related to relationships between the MSFC project office and support organizations with their counterpart contractor organizations. The teams worked diligently to understand and satisfy requirements and achieve mission success.

Owen, James W.↗

Carbon Utilization and Storage Partnership of the Western United States

This technical report documents research conducted under DOE Award No. DE-FE0031837 focused on evaluating the feasibility of carbon capture, utilization, and storage (CCUS) systems in the central and western United States. The project integrated geologic characterization, reservoir simulation, infrastructure modeling, and economic analysis to assess CO₂ storage potential near industrial sources and develop strategies for transport and sequestration. The work included subsurface modeling, risk assessment, monitoring and verification (MRV) planning, and evaluation of regulatory pathways such as EPA Underground Injection Control (UIC) Class VI permitting and IRS 45Q tax credit eligibility. Results demonstrate the viability of multiple storage approaches, including saline formations, enhanced coalbed methane recovery, and basalt mineralization, supported by data-driven workflows and regional analyses. The project also produced permitting templates, technology transfer activities, and stakeholder engagement efforts to support deployment readiness. These findings contribute to the development of scalable, economically viable CCUS systems and provide a repeatable framework for future carbon management projects.

20 FOSSIL-FUELED POWER PLANTS↗

Preliminary risk assessment for the Black Brant XII

In order to provide the scientific community, as well as NASA management, with a preview of typical safety restrictions for the proposed Black Brant XII sounding rocket, a risk assessment for a typical payload has been performed. This paper details the considerations which ensure minimal risk for projects managed by Wallops Flight Facility and the safety criteria required to conduct an operation. Specifically, three launch scenarios for the Black Brant XII have been considered. The first case assumes a test launch from Wallops, and the other two cases analyze typical scientific missions from Poker Flat Research Range.

Underwood, B. E.↗

We're Here to Help You

Air Force lore tells us that the two biggest lies you will ever hear on the tarmac are when the Inspector General steps off the plane and says to the Wing Commander, "We're here to help you," and the Wing Commander replies, "We're glad to see you." Not too surprisingly, a similar relationship is often perceived between a project manager and the mission assurance representative (especially for operations). This perception intensifies as budgets shrink and missions shorten, after all, where is the value added? That is the question we will examine for three small, short projects: Phoenix, WISE, and Grail (which is yet to launch). All have limited resources to devote to "niceties" and a very short mission to reap the benefits for their operations. We will examine how mission operations assurance evolved for each project, what worked well, what could have been improved, and how these lessons can be applied to ensure mission operations assurance is a value added function for Grail and future small missions.

Topex↗

Advanced Assay Systems for Radionuclide Contamination in Soils

Through the support of the Department of Energy (DOE) Office of Environmental Management (EM) Technical Assistance Program, the Idaho National Laboratory (INL) has developed and deployed a suite of systems that rapidly scan, characterize, and analyze surface soil contamination. The INL systems integrate detector systems with data acquisition and synthesis software and with global positioning technology to provide a real-time, user-friendly field deployable turn-key system. INL real-time systems are designed to characterize surface soil contamination using methodologies set forth in the Multi-Agency Radiation Surveys and Site Investigation Manual (MARSSIM). MARSSIM provides guidance for planning, implementing, and evaluating environmental and facility radiological surveys conducted to demonstrate compliance with a dose or risk-based regulation and provides real-time information that is immediately available to field technicians and project management personnel. This paper discusses the history of the development of these systems and describes some of the more recent examples and their applications. In summary: INL mobile real-time systems have been successfully used as pre-certification devices for contaminated soils under specific conditions, and accepted by regulators as an approved method to replace or significantly reduce physical sampling and laboratory analysis. These systems coupled with advanced data collection and analysis software developed at the INL to perform production pre-screening soil surveys are also used to determine final analytical sample locations for final validation of sites. The success of the real-time soil characterization program at DOE-Ohio field office sites at Mound and Fernald provided the driver for use of some of these systems at the current INL ICP. Additionally, the use of INL real-time advanced assay systems at Fernald resulted in overall cost savings to the soil remediation project totaling $34 M by the end of the project in 2006. Although the genesis of these systems occurred in the DOE Environmental Management program, other agencies have examined the use of real-time mobile spectrometry in cross-cutting applications such as National Homeland Security; where modified versions of these systems could be applied to monitoring, and surveillance of facilities and events as well as event-response to terrorist attacks using radioactive materials. (authors)

54 ENVIRONMENTAL SCIENCES↗