Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “STEAM SYSTEMS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

Hybrid fuel cell/diesel generation total energy system, part 2

Meeting the Goldstone Deep Space Communications Complex (DGSCC) electrical and thermal requirements with the existing system was compared with using fuel cells. Fuel cell technology selection was based on a 1985 time frame for installation. The most cost-effective fuel feedstock for fuel cell application was identified. Fuels considered included diesel oil, natural gas, methanol and coal. These fuel feedstocks were considered not only on the cost and efficiency of the fuel conversion process, but also on complexity and integration of the fuel processor on system operation and thermal energy availability. After a review of fuel processor technology, catalytic steam reformer technology was selected based on the ease of integration and the economics of hydrogen production. The phosphoric acid fuel cell was selected for application at the GDSCC due to its commercial readiness for near term application. Fuel cell systems were analyzed for both natural gas and methanol feedstock. The subsequent economic analysis indicated that a natural gas fueled system was the most cost effective of the cases analyzed.

Blazek, C. F.↗

A pulsed eddy current probe for inspection of support plates from within Alloy-800 steam generator tubes

Support plate degradation and fouling in nuclear steam generators (SGs) can lead to SG tube corrosion and loss of efficiency. Inspection and monitoring of these conditions can be integrated with preventive maintenance programs, thereby advancing station-life management processes. A prototype pulsed eddy current (PEC) probe, targeting inspection issues associated with SG tubes in SS410 tube support plate structures, has been developed using commercial finite element (FE) software. FE modeling was used to identify appropriate driver and pickup coil configurations for optimum sensitivity to changes in gap and offset for Alloy-800 SG tubes passing through 25 mm thick SS410 support plates. Experimental measurements using a probe that was manufactured based on the modeled configuration, were used to confirm the sensitivity of differential PEC signals to changes in relative position of the tube within the tube support plate holes. Models investigated the effect of shift and tilt of tube with respect to hole centers. Near hole centers and for small shifts, modeled signal amplitudes from the differentially connected coil pairs were observed to change linearly with tube shift. This was in agreement with experimentally measured TEC coil response. The work paves the way for development of a system targeting the inspection and evaluation of support plate structures in steam generators.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Vendor-Independent Design Requirements for a Boiling Water Reactor Safety System Upgrade

This Vendor-Independent License Amendment Request (LAR) Framework Document is a research product developed for the Idaho National Laboratory Light Water Reactor Sustainability (LWRS) Program. It was developed by MPR Associates, Inc. with technical input from LWRS and Exelon Generation personnel. To accomplish the purpose of this research, an operating plant (Limerick Generating Station [LGS]) was used as a reference to provide a concrete example and to present a "top-down" view of design concepts consistent with functional requirements baseline documents (references X and Y) also developed for this research. While this document is written in a framework to support a complete LAR submittal, its purpose is to communicate research concepts and provide an example of how to present digital information necessary to address expectations with regard to leveraging the Alternate Review Process as provided in Digital Instrumentation and Controls Interim Staff Guidance #06, Revision 2, Licensing Process. To leverage that process, this research document presupposes that a utility would select a vendor platform which has been prequalified for safety-related by the United States Nuclear Regulatory Commission. While this document is written using the Exelon Generation Limerick Generating Station (LGS) Units 1 and 2 as a baseline, this document is a research product. This document contains no commitments and makes no binding design decisions for Exelon Generation. Exelon Generation is leveraging this research to support their in-progress LGS Plant Protection System (PPS) upgrade efforts and plans to leverage it for their Redundant Reactor Control System (RRCS) replacement. The LWRS Program appreciates the research support provided by Exelon Generation in the generation of this document.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Selection of materials for sodium fast reactor steam generators

Sodium Fast Reactor (SFR) is considered in France as the most mature technology of the different Generation IV systems. In the short-term the designing work is focused on the identification of the potential tracks to demonstrate licensing capability, availability, in-service inspection capability and economical performance. In that frame materials selection for the major components, as the steam generator, is a particularly key point managed within a French Research and Development program launched by AREVA, CEA and EDF. The choice of the material for the steam generator is indeed complex because various aspects shall be considered like mechanical and thermal properties at high temperature, interaction with sodium on one side and water and steam on the other side, resistance to wastage, procurement, fabrication, weldability and ability for inspection and in-situ intervention. The following relevant options are evaluated: the modified 9Cr1Mo ferritic-martensitic grade and the Alloy 800 austenitic grade. The objective of this paper is to assess for both candidates their abilities to reach the current SFR needs regarding material design data, from AFCEN RCC-MRx Code in particular, compatibility with environments and manufacturability. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Experience in the development and introduction of a full scale process control system for the PGU-450T power production unit at Mosenergo TETs-27 heat and electric power plant

This is a description of experience in the development and introduction of a full-scale process control system for the PGU-450T power production unit of station No. 3 at the TETs-27 heat and electric power station of JSC 'Mosenergo' based on the latest, fourth generation program package SPPA-T3000, which is being used for the first time in Russia for steam-gas units. The fundamental technical solutions for the structure of the process control system are described, along with the features of the algorithms for control of the main engineering equipment in electric power plants based on the PGU-450.

42 ENGINEERING↗

MEASUR - Manufacturing Energy Assessment Software for Utility Reduction

MEASUR your energy savings with the free DOE MEASUR software The Department of Energy (DOE), with Oak Ridge National Laboratory (ORNL), released version 1.0 of their energy efficiency software tool MEASUR (Manufacturing Energy Assessment Software for Utility Reduction). MEASUR has been available for several years as a beta version, being tested by industry experts and real users, and will continue to be updated and improved in the coming years. It is an integrated suite of tools to aid manufacturers in improving the efficiency of energy systems and equipment within a plant, including motors, pumps, fans, process heating, steam, and compressed air. Additionally, there are modules for wastewater energy analysis and to help perform energy treasure hunts. Several calculators are also included, allowing users to independently perform smaller calculations and analyses (such as estimating pump head, performing a fan traverse analysis, estimating waste heat recovery potential, and cataloging compressed air leaks). The MEASUR modules are based on previous DOE software tools that have been used by industry since the early 2000s (such as MotorMaster, AirMaster+, PSAT, PHAST, and FSAT). The original tools only ran on Windows operating systems, and by Windows 10, most of them were inoperable. DOE started their energy efficiency software tool revitalization effort in 2016, first with PSAT (for pumps), then began to integrate the other tools and expand their functionality and utility. The new MEASUR suite provides an extensively more user-friendly, modern, and versatile set of tools. All the assessment modules and most of the calculators have several visual components and graphs and detailed help text for every user input. To help reach international users, the tool utilizes Google translate and users can easily change unit systems, even converting existing user inputs if desired. The assessment files can be organized within the internal file system and easily shared to other users, regardless of their operating system. The entire suite is free, open-source, and can be downloaded on Windows, Mac, or Linux operating systems.

Accawi, Gina [Oak Ridge National Lab. (ORNL), Oak ↗

Solar thermal power system

A solar thermal power generator includes an inclined elongated boiler tube positioned in the focus of a solar concentrator for generating steam from water. The boiler tube is connected at one end to receive water from a pressure vessel as well as connected at an opposite end to return steam back to the vessel in a fluidic circuit arrangement that stores energy in the form of heated water in the pressure vessel. An expander, condenser, and reservoir are also connected in series to respectively produce work using the steam passed either directly (above a water line in the vessel) or indirectly (below a water line in the vessel) through the pressure vessel, condense the expanded steam, and collect the condensed water. The reservoir also supplies the collected water back to the pressure vessel at the end of a diurnal cycle when the vessel is sufficiently depressurized, so that the system is reset to repeat the cycle the following day. The circuital arrangement of the boiler tube and the pressure vessel operates to dampen flow instabilities in the boiler tube, damp out the effects of solar transients, and provide thermal energy storage which enables time shifting of power generation to better align with the higher demand for energy during peak energy usage periods.

14 SOLAR ENERGY↗

Microfabricated rankine cycle steam turbine for power generation and methods of making the same

In accordance with the present invention, an integrated micro steam turbine power plant on-a-chip has been provided. The integrated micro steam turbine power plant on-a-chip of the present invention comprises a miniature electric power generation system fabricated using silicon microfabrication technology and lithographic patterning. The present invention converts heat to electricity by implementing a thermodynamic power cycle on a chip. The steam turbine power plant on-a-chip generally comprises a turbine, a pump, an electric generator, an evaporator, and a condenser. The turbine is formed by a rotatable, disk-shaped rotor having a plurality of rotor blades disposed thereon and a plurality of stator blades. The plurality of stator blades are interdigitated with the plurality of rotor blades to form the turbine. The generator is driven by the turbine and converts mechanical energy into electrical energy.

Frechette, Luc↗

Improved Heat Exchanger Performance Achieved Through Improved Condensate Drainage - 18478

Hanford's 242-A Evaporator has had the mission of reducing waste volume in the Hanford Tank Farms since the late 1970's. At the very heart of the 242-A evaporation process is the E-A-1 reboiler, a heat exchanger which adds heat to the waste, and the vacuum condenser system, a three-stage condenser/ejector system which condenses the waste vapors and provides the vacuum at which the evaporation process operates. Over a long period of time, significant degraded performance has been observed in the heat exchangers in both the heating system and in the vacuum condensing system. This degraded performance was indicative of degraded conditions in equipment and/or piping associated with both the heating and vacuum condenser systems. However, in searching for degraded condition in these systems, 242-A engineering also discovered that both systems contained design errors in the condensate drainage associated with all heat exchangers in both systems. By addressing the condensate design errors in addition to correcting the degraded conditions, system performance was restored and even possibly improved. All heat exchangers in the heating and vacuum condensing systems are shell and tube type heat exchangers. Both have liquid on the tube side and vapor on the shell side (in the case of the reboiler the liquid is tank waste and the vapor is 10 lb heating steam, and in the case of the vacuum condensers the liquid is cooling water and the vapor is waste vapor). In both systems, engineering proposed that the vapor condensate was backing up into the heat exchanger, resulting in added poor performance. By focusing on basic heat exchanger system design, projects were initiated to redesign the condensate drainage of these systems and re-plumb the condensate drain lines. Data collected before and after the replumbing provides evidence that the corrected drain lines from the heat exchangers improved the performance of the system as a whole, and in the case of the reboiler, removed a potentially damaging steam condensate water hammer condition. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Applications of thermal energy storage to process heat and waste heat recovery in the iron and steel industry

The system identified operates from the primary arc furnace evacuation system as a heat source. Energy from the fume stream is stored as sensible energy in a solid medium (packed bed). A steam-driven turbine is arranged to generate power for peak shaving. A parametric design approach is presented since the overall system design, at optimum payback is strongly dependent upon the nature of the electric pricing structure. The scope of the project was limited to consideration of available technology so that industry-wide application could be achieved by 1985. A search of the literature, coupled with interviews with representatives of major steel producers, served as the means whereby the techniques and technologies indicated for the specific site are extrapolated to the industry as a whole and to the 1985 time frame. The conclusion of the study is that by 1985, a national yearly savings of 1.9 million barrels of oil could be realized through recovery of waste heat from primary arc furnace fume gases on an industry-wide basis. Economic studies indicate that the proposed system has a plant payback time of approximately 5 years.

Katter, L. B.↗

Experience with Chemical Looping Combustion of Coal in a 200 kW Dual Fluidized Bed Reactor

The University of Utah recently commissioned a dual fluidized bed process development unit (PDU) for investigating chemical looping combustion (CLC) and chemical looping with oxygen uncoupling (CLOU) of coal. The reactors and supporting systems were sized to support at least 200 kW of coal input based on available reaction rate data. Both the air reactor and fuel reactor are circulating fluidized beds and bed material passes between the reactors via loop seals. The reactors are refractory-lined rather than electrically heated, so the system must be preheated with natural gas before chemical looping combustion can begin. Air and steam are preheated through a combination of electric heating and natural gas burners and reactor product gas flows through heat exchangers and bag houses to cool and clean the gas of particulate. As is typical with pilot-scale systems, several operational challenges were encountered as the system was brought online and operation progressed from heatup and initial testing with gaseous fuels towards full CLOU processing of coal. The system hardware and operational procedures have undergone several modifications, but the PDU can now reliably be preheated to the operating temperature and coal can be fed at the target feed rate. This paper presents the PDU, describes the procedures for evaluating carbon conversion, CO2 capture and CO2 purity, and presents initial results from chemical looping combustion of coal with non-CLOU and CLOU carriers. General experience of operating the plant and notable challenges and solutions are also presented.

Whitty, Kevin J.↗

Liquid-metal magnetohydrodynamic system evaluation

The present study emphasizes a direct coal-fired design using a bubbly two-component flow of sodium and argon in the MHD generator and a Rankine steam-bottoming plant. Two basic cycles were studied, corresponding to argon temperatures of 922 and 1089 K at the duct inlet. The MHD duct system consisted of multiple ducts arranged in clusters and separated by iron magnet pole pieces. The ducts, each with an output of about 100 MW, were parallel to the flow, but were connected in series electrically to provide a higher MHD voltage. With channel efficiencies of 80%, a pump efficiency of 90%, and a 45% efficient steam-bottoming plant, the overall efficiency of the 1089 K liquid-metal MHD power plant was 43%.

Holman, R. R.↗

PROCESS MODEL FOR THE PRODUCTION OF SYNGAS VIA HIGH TEMPERATURE CO-ELECTROLYSIS

A process model has been developed to evaluate the potential performance of a large-scale high-temperature coelectrolysis plant for the production of syngas from steam and carbon dioxide. The coelectrolysis process allows for direct electrochemical reduction of the steam – carbon dioxide gas mixture, yielding hydrogen and carbon monoxide, or syngas. The process model has been developed using the HYSYS systems analysis code. Using this code, a detailed process flowsheet has been defined that includes all the components that would be present in an actual plant such as pumps, compressors, heat exchangers, turbines, and the electrolyzer. Since the electrolyzer is not a standard HYSYS component, a custom one-dimensional coelectrolysis model was developed for incorporation into the overall HYSYS process flowsheet. The 1-D coelectrolysis model assumes local chemical equilibrium among the four process-gas species via the shift reaction. The electrolyzer model allows for the determination of coelectrolysis outlet temperature, composition (anode and cathode sides), mean Nernst potential, operating voltage and electrolyzer power based on specified inlet gas flow rates, heat loss or gain, current density, and cell area-specific resistance. The one-dimensional electrolyzer model was validated by comparison with results obtained from a fully 3-D computational fluid dynamics model developed using FLUENT, and by comparison to experimental data. This paper provides representative results obtained from the HYSYS flowsheet model for a 300 MW coelectrolysis plant, coupled to a high-temperature gas-cooled nuclear reactor. The coelectrolysis process, coupled to a nuclear reactor, provides a means of recycling carbon dioxide back into a useful liquid fuel. If the carbon dioxide source is based on biomass, the entire process would be climate neutral.

08 HYDROGEN↗

Developing Fully Coupled Dynamical Reactor Core Isolation System Models in RELAP-7 for Extended Station Black-Out Analysis

The reactor core isolation cooling (RCIC) system in a boiling water reactor (BWR) provides makeup water to the reactor vessel for core cooling when the main steam lines are isolated and the normal supply of water to the reactor vessel is lost. It was one of the very few safety systems still available during the Fukushima Daiichi accidents after the tsunamis hit the plants and the system successfully delayed the core meltdown for a few days for unit 2 & 3. Therefore, detailed models for RCIC system components are indispensable to understand extended station black-out accidents (SBO) for BWRs. As part of the effort to develop the new generation reactor system safety analysis code RELAP-7, major components to simulate the RCIC system have been developed. This paper describes the models for those components such as turbine, pump, and wet well. Selected individual component test simulations and a simplified SBO simulation up to but before core damage is presented. The successful implementation of the simplified RCIC and wet well models paves the way to further improve the models for safety analysis by including more detailed physical processes in the near future.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Primary System Test Facility Review

Idaho National Laboratory (INL) is designing a Dynamic Energy Transport and Integration Laboratory (DETAIL) to demonstrate the operation of an integrated energy system as part of supporting research and development needs for the DOE Office of Nuclear Energy Integrated Energy Systems (IES) Program. DETAIL will demonstrate real-time integration with the electrical grid, renewable energy inputs, thermal and electrical energy storage, and energy delivery to an end user. A Thermal Energy Distribution System (TEDS) is being constructed within the DETAIL facility to demonstrate the operation of integrated energy system heat transfer components, thermal energy storage, distribution systems, and instrumentation and control (I&C), which will allow the facility to emulate the distribution of thermal energy to the generation of electrical power, and/or producing non-electrical commodities (e.g., hydrogen). As is the case for other subsystems within DETAIL, TEDS is designed to operate either independently or as a part of an integrated system to demonstrate the operation of integrated components, develop and validate thermal energy transport models and control systems, and study thermal energy inertia and energy storage. In an effort to completely understand how TEDS will integrate with operational plants, data from tests previously run at existing integral system test facilities (IST) will be used to drive the TEDS heater. Alternatively, a real-time data connection would allow steam conditions at the IST to drive the TEDS heater at the same time as having TEDS conditions provide feedback to the IST in terms of steam demand and/or pressure. This integrated testing approach will assess the ability of TEDS to operate during all plant conditions. Three existing integral system test facilities have been reviewed to determine their suitability for demonstrating TEDS capabilities when integrated within the DETAIL. This report summarizes the capabilities of each IST facility and any challenges that must be overcome to meet the operational needs of TEDS and DETAIL.

25 ENERGY STORAGE↗

Greenhouse Gas emissions from California Geothermal Power Plants

The information given in this file represents GHG emissions and corresponding emission rates for California flash and dry steam geothermal power plants. This stage of the life cycle is the fuel use component of the fuel cycle and arises during plant operation. Despite that no fossil fuels are being consumed during operation of these plants, GHG emissions nevertheless arise from GHGs present in the geofluids and dry steam that get released to the atmosphere upon passing through the system. Data for the years of 2008 to 2012 are analyzed.

15 GEOTHERMAL ENERGY↗

Silicon Carbide Multilayer Piping for 900°C Supercritical CO 2 Brayton Cycle: Chemical Compatibility in CO 2

The US Department of Energy's Office of Nuclear Energy is interested in developing supercritical carbon dioxide (sCO 2 ) power cycles that can achieve higher cycle efficiencies and lower costs than the traditional steam Rankine cycles. For the application of an sCO2 energy conversion system with a Very High Temperature Gas Reactor (VHTGR), turbine inlet temperatures over 850°C may be required. Consequently, it is necessary to demonstrate structural materials, including turbine inlet piping, that can be code certified at operating temperatures up to 900°C at sCO 2 pressures up to 42 MPa (6100 psi). There are very few metal alloys that retain their strength at these high temperatures, and that are chemically compatible with sCO 2 .

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant. Conceptual Design Engineering Report (CDER). Volume 4: Supplementary engineering data

The reference conceptual design of the Magnetohydrodynamic Engineering Test Facility (ETF), a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commercial feasibility of open cycle MHD is summarized. Main elements of the design are identified and explained, and the rationale behind them is reviewed. Major systems and plant facilities are listed and discussed. Construction cost and schedule estimates, and identification of engineering issues that should be reexamined are also given. The latest (1980-1981) information from the MHD technology program are integrated with the elements of a conventional steam power electric generating plant. Supplementary Engineering Data (Issues, Background, Performance Assurance Plan, Design Details, System Design Descriptions and Related Drawings) is presented.

Source record↗