Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “work management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

Optimization of well design and CO 2 injection strategy for risk reduction in Class VI geological carbon sequestration wells

The safety and durability of Class VI wells are critical for geological carbon sequestration (GCS). However, current GCS operations face unique challenges: unlike traditional Class II wells, Class VI CO 2 injection wells operate at rates up to 100 times higher, dramatically increasing the risk of wellbore leakage and structural compromise due to severe temperature drops and associated mechanical stresses. Despite existing guidelines on material selection, there remains a substantial gap in understanding how rapid CO 2 injection rates, low surface temperatures, and variable reservoir conditions interact to threaten long-term well integrity. This study presents a comprehensive, original workflow integrating advanced analytical and numerical models for both well flow and well integrity analysis. By systematically simulating a wide range of field-relevant scenarios—including variations in injection rate, CO 2 temperature, and reservoir pressure—this work provides the first cross-validated assessment of cooling effects on wellbore. The results reveal that extreme temperature drops, up to 60 °C, can occur under high injection rates, particularly in depleted reservoirs, significantly increasing the risk of cement failure. Building on these insights, the study proposes innovative, practical well design and operational strategies, including ductile cement formulations, pre-stressing techniques, advanced insulation coatings, and proactive management of injection rates. The safety of Class VI well extends beyond simply using CO 2 resistant materials. Cement materials should possess optimal thermo-hydraulic-mechanical-chemical properties for effective performance. This work provides a scientific basis for optimizing Class VI well designs, with direct benefits for minimizing environmental risk, lowering operational costs, and enhancing the long-term reliability of GCS.

25 ENERGY STORAGE↗

OWL Change Control Process

The Online Waste Library (OWL) provides a consolidated source of information on Department of Energy-managed radioactive waste likely to require deep geologic disposal. With the release of OWL Version 1.0 in fiscal year 2019 (FY2019), much of the FY2020 work involved developing the OWL change control process and the OWL release process. These two processes (in draft form) were put into use for OWL Version 2.0, which was released in early FY2021. With the knowledge gained, the OWL team refined and documented the two processes in two separate reports. This report focuses on the change control process and discusses the following: (1) definitions and system components; (2) roles and responsibilities; (3) origin of changes; (4) the change control process including the Change List, Task List, activity categories, implementation examples, and checking and review; and (5) the role of the re lease process in ensuring changes in the Change List are incorporated into a public release.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear Criticality Safety Program (NA-ESH) [Slides]

This presentation provides an overview of the Nuclear Criticality Safety Program, including its history, mission, vision, organization, measurement and evaluation priorities for FY23, 5-year plan, and cross-cutting nuclear data work.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Summary of SRNL Support to the DOE-ORP Enhanced Waste Glass Program for FY23

In fiscal year 2023 (FY23) Savannah River National Laboratory (SRNL) continued tasked work for the Office of River Protection (ORP) to expand glass compositional regions accessible for low-activity waste (LAW) and high-activity waste (HLW) vitrification processing. Experimental work continued in four primary technical areas focused on processing and performance of glasses relevant to the Hanford missions. The data and results from this work will be used to expand and validate the glass models being developed at Pacific Northwest National Laboratory (PNNL) for waste processing and acceptance. This report summarizes the activities and deliverables associated with work performed in FY23.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and License Application Development for TRISO-X (Final Scientific Technical Report)

This is the final progress report submitted by X-energy, LLC (XE) to the Department of Energy in support of cooperative agreement DE-NE0008745. This report provides a high-level summary of the work performed during the entire period of performance, running from August 24, 2018 – August 22, 2022. This span of time covers the original 3-year award and a one year no-cost extension. There were five tasks within this project: (1) project management, (2) systems engineering and studies, (3) TRISO-X Facility design, (4) facility license application development, and (5) support to application review. Detailed reporting during execution of the project was provided by a total of 16 quarterly reports, voluntary monthly update presentations, and annual summary presentations. Technical work products include 103 X-energy technical reports, 38 subcontractor (Centrus technical reports), 75 Nuclear Criticality Safety Evaluations/Calculation reports, and 272 miscellaneous design documents (e.g., Engineering Service Orders, Engineering Component Specifications, Procedures, Guidelines/Policies, Design and Interface Requirements documents, and Drawings). All 29 of the X Energy milestones/deliverables were met early or on time and are archived in the DOE Office of Nuclear Energy’s Program Information Control System: Nuclear Energy under Fiscal Year 2018, Work Breakdown Structure F.OA – Industry FOA FY 2018 Awards, F.03 – X-Energy TRISO-X Project. All other work products are available to DOE upon request.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Blockchain and PKI-Based Secure Vehicle-to-Vehicle Energy-Trading Protocol

With the increasing awareness for sustainable future and green energy, the demand for electric vehicles (EVs) is growing rapidly, thus placing immense pressure on the energy grid. To alleviate this, local trading between EVs should be encouraged. In this paper, we propose a blockchain and public key infrastructure (PKI)-based secure vehicle-to-vehicle (V2V) energy-trading protocol. A permissioned blockchain utilizing the proof of authority (PoA) consensus and smart contracts is used to securely store data. Encrypted communication is ensured through transport layer security (TLS), with PKI managing the necessary digital certificates and keys. A multi-leader, multi-follower Stackelberg game-based trade algorithm is formulated to determine the optimal energy demands, supplies, and prices. Finally, we propose a detailed communication protocol that ties all the components together, enabling smooth interaction between them. Key findings, such as system behavior and performance, scalability of the trade algorithm and the blockchain, smart contract execution costs, etc., are presented through numerical results by implementing and simulating the protocol in various scenarios. This work not only enhances local energy trading among EVs, encouraging efficient energy usage and reducing burden on the power grid, but also paves a way for future research in sustainable energy management.

Stackelberg game↗

FY-20 GIF-RSWG and WGSAR Status Report

This report provides an end of year summary that reflects the progress and status of United States (U.S.) activities supporting the Global International Forum’s (GIF) Risk & Safety Working Group (RSWG) and the international regulators associated with the Working Group on the Safety of Advanced Reactors (WGSAR). This effort has commenced the development of a technology neutral, risk-informed approach for the selection of licensing basis events (LBE) and the assessment of defense in depth for Gen IV reactor technologies. These U.S. activities are being managed by Idaho National Laboratory on behalf of the U.S. Department of Energy.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Decade of Innovative Approaches to Treating and Dispositioning Radioactive Waste at the Savannah River Site - 20620

This year marks the 70. anniversary of the U.S. Department of Energy's (DOE) Savannah River Site (SRS), located near Aiken, South Carolina. SRS is a key industrial complex responsible for environmental stewardship, environmental cleanup, waste management, and disposition of nuclear materials. SRS also continues to have a role in critical defense-related activities and the reprocessing of used reactor fuel. The SRS encompasses 803 square kilometers (310 square miles) in parts of Aiken, Barnwell, and Allendale counties. The Liquid Waste Mission starts with the safe receipt and storage of radioactive liquid waste in the waste tanks, which principally includes Cold War legacy waste, but also waste from support of National Aeronautics Space Administration missions, medical isotope production, and research activities. This 133,000 cubic meters (m{sup 3}) (35 million gallons [Mgal]) of high-level radioactive waste (HLW) is currently held in 43 large underground waste tanks. The capacity of each of these tanks range from 2,800 m{sup 3} to 5,000 m{sup 3} (0.75 to 1.33 Mgal) and were placed in operation between 1954 and 1986. In July 2009, the DOE awarded a stand-alone contract to execute the Liquid Waste Mission at SRS. The Liquid Waste Contractor selected was Savannah River Remediation LLC1 (SRR), which is responsible for receipt, storage, retrieval and treatment of all HLW, disposal of the decontaminated low-activity waste fraction, as well as operationally closing cleaned HLW tanks. Since July 2009, SRR has successfully grouted and operationally closed six large underground tanks, poured 1,476 canisters of vitrified HLW (a stable glass waste form), treated approximately 34,200 m{sup 3} (9.0 Mgal) of HLW, and dispositioned over 41,200 m{sup 3} (10.9 Mgal) of decontaminated salt solution as low-level waste (LLW) into the Saltstone Disposal Units (SDUs) being constructed by SRR on site. The innovative work performed by SRR in the LLW portion of its mission has earned it the Richard S. Hodes Award. The work conducted by SRR is the same work championed by the late Richard S. Hodes, a respected physician, statesmen, and Chairman of the Southeast Compact Commission for Low-Level Radioactive Waste Management. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Electrolytically Assisted Surface Decontamination (EASD{sup TM}) for POCO Operations - 20282

NNL in collaboration with C-Tech Innovation Ltd and Sellafield Ltd has been exploring innovative technologies to enable a significant reduction of radiological hazards within facilities during the Post Operational Clean Out (POCO) phase of a nuclear plant's life cycle. Reducing the hazard by effectively decontaminating plants in-situ during POCO delivers huge cost reductions for future decommissioning operations. These cost reduction benefits are realized by reducing the number and complexity of remote operations as well as lowering the long-term waste disposal costs. Whilst chemical decontamination can achieve the desired level of decontamination, applying aggressive chemical reagents is hazardous, potentially difficult to control and requires there to be complimentary effluent treatment and waste routes. This work has aimed to develop flexible and controllable decontamination processes which could be operated without the additional complexity and issues associated with chemical decontamination. The processes needed to be relatively fast and effective to minimize the time operators would spend in an active area. In addition, there was a driver to produce decontamination methodologies which generated a secondary waste compatible with current routes and which takes advantage of current waste capacity. The strategy therefore was to come up with a solution that works with, rather than against, the science and engineering behind process plants at Sellafield. Electrolytically Assisted Surface Decontamination (EASD{sup TM}) is an innovative electrochemical decontamination process (developed by NNL and C-Tech Innovation Ltd) that can remove activity from contaminated metal in very short time periods. Application of the patented electric waveform to the surface when treating contaminated metal with nitric acid has been shown to significantly enhance the decontamination performance. When compared to proposed baseline washout procedures at Sellafield, the only change to the process is the applied electrical waveform which is temporary and controllable. The current causes dissolution of the metal surface being decontaminated which leads to activity transferring from the plant item into the nitric acid effluent stream. This innovation has the potential to transform the POCO process and allow a nitric acid based washout approach to deliver POCO quickly and cost effectively within the existing infrastructure. Several devices have now been designed that incorporate this EASD{sup TM} technology and enable the decontamination process to be applied to a range items commonly identified as being contaminated during nuclear decommissioning programmes such as pipework, tanks and hotspots of walls/floors. Inactive and active laboratory-scale testing has been completed using both simulated and 'real-life' contaminated (low level waste) metallic items retrieved from different nuclear sites. Active trials demonstrated that contaminated items could be treated to free release levels within minutes. Engineering scale tests are currently being performed, with guidance from Sellafield's system engineers and plant managers, to provide the necessary re-assurance the designed devices could be successfully deployed in an on-plant scenario. The final stage of this development work is to carry out an active demonstration of the decontamination technology on Thorp at Sellafield. This paper aims to highlight progress made to date with the EASD{sup TM} technology and, more specifically, the development of an in-situ decontamination device for deployment within radioactive pipework. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mathematical modeling of novel porous transport layer architectures for proton exchange membrane electrolysis cells

Thin foil based porous transport layers (PTLs) that contain highly structured pore arrays have shown promise as anode PTLs in proton exchange membrane electrolysis cells. These novel PTLs, fabricated with advanced manufacturing techniques, produce thin, tunable, multifunctional layers with reduced flow and interfacial resistances and high thermal and electric conductivities. To further optimize their design, it is important to understand their fundamental impact on the transport of protons, electrons, and liquid/vapor mixtures in the electrode. In this work, we develop a two-dimensional multiphysics model to simulate the coupled electrochemistry and multiphase transport in an electrolysis cell operated with the novel PTL architecture. The results show that larger pores improve access of water to the anode catalyst layer, which is beneficial for both the oxygen evolution reaction and membrane hydration. Larger pore sizes also improve oxygen gas transport from the catalyst layer, because generated oxygen gas is forced to travel in-plane through the anode catalyst layer until it reaches a pore opening that is connected to a channel. The discussed results confirm that the proposed thin foil based PTLs are fundamentally different from conventional PTLs, such as felts or layered meshes. The model developed in this work also provides generalizable insight into fundamental PEMEC phenomena, such as the competition between liquid and gas phase transport, membrane hydration and water management, and nonuniform electrochemical reactions, which are processes relevant to all PEMEC designs.

25 ENERGY STORAGE↗

High-efficiency frost and ice control via sensing-assisted nanovibrational slippery surfaces

Frost and ice accretions on surfaces pose persistent challenges across numerous industrial, residential and transportation systems. While various removal strategies exist, they often suffer from limited effectiveness or high energy consumption, such as frosting delay, ice crack generation, and Joule heating. Here, in this work, we report a novel integrated approach combining vibrational quasi-liquid surface (QLS) and capacitive sensing for efficient condensate, frost, and ice management. Compared to Joule heating, our approach does not rely on complete melting and evaporation for removal, resulting in 68% and 95% energy savings for frost and ice removal, respectively. Our QLS coating significantly reduces surface retention forces, achieving 91% and 87% less residual mass compared to hydrophilic surfaces for frost and ice removal through surface nanovibration, respectively. The integrated capacitive sensor provides real-time detection of different phase states, enabling on-demand removal in precise timeframes. This sensor-assisted approach showed 3.8 times lower energy consumption compared to conventional Joule heating for defrosting. This synergistic integration of surface engineering, nanovibration, and intelligent sensing represents a significant advancement in phase change processes, offering an energy-efficient solution for frost and ice mitigation in energy-intensive systems.

Shen, Yuchen [Univ. of Texas at Dallas, Richardson↗

Megafires: A New Fire Paradigm [Slides]

Twenty-five years ago LANL started a wildfire modeling effort with Rodman Linn to help educate firefighters. This work led to the development of HIGRAD-FIRETEC that has been used to examine a range of fires, controlled burns, and forest management. Rodman Linn and Mike Brown have recently developed QUIC-FIRE for DoD applications and wildland firefighters. HIGRAD-FIRETEC is currently being used to examine a variety of large fires including megafires.

54 ENVIRONMENTAL SCIENCES↗

Refractory Wear Characterization in Lime Recovery Kilns

The industry standard for lime recovery kiln calcining zone refractories is 60% or 70% alumina brick. Rapid unexpected refractory wear in lime recovery kilns has often been attributed to excess alkali carryover in the lime kiln feed. Recent laboratory work attributes refractory wear to overheating and the lime charge fluxing the refractory. This paper corroborates this laboratory work with some case history post-mortem examinations of bricks removed from rotary lime kiln linings. The paper concludes with methods to manage refractory wear, including kiln burner performance.

Hemrick, James↗

Optimized V1G and V2G Electric Vehicle Fleet Management and Grid Transaction at Marine Corps Air Station Miramar in San Diego, CA

The overall technical goal of the project was to demonstrate an all-electric bi-directional non-tactical fleet at Marine Corps Air Station (MCAS) Miramar that was integrated and controlled with other distributed energy resources (DERs) (i.e., PV, stationary battery, and building loads) to provide resilience to critical electric loads in the event of grid outages, to minimize charging costs, and to provide economic energy resources to electricity markets. In this project, the specific, technical objectives were: 1. Demonstrate that bi-directional electric vehicles can provide critical complementary services to fixed storage batteries in microgrid applications while performing function as non-tactical vehicles. 2. Demonstrate participation of bi-directional (V2G) and unidirectional (V1G) PEVs for demand management and minimization of charging costs. 3. Demonstrate integration of multiple DERs for grid service participation. US Marine Corps Air Station (MCAS) Miramar in San Diego was the site of this electric vehicle-to-microgrid-utility grid test and demonstration project. Existing microgrid assets in this study included (1) a public works building; (2) a 30-kW rooftop photovoltaic (PV) system and (3) a separate 250 kW carport PV system. In this project, six bi-directional V2G vans were located at the MCAS Miramar’s showcase building-scale microgrid to develop and test technical capabilities that V2G can provide in microgrid applications (e.g., cost reduction and resiliency). These resources provided aggregated demand management and simulated participation in current retail DR programs. The vehicles used in this demonstration were selected because they provided functionality that MCAS Miramar needed, 15 passenger transport and facilities work cargo carrying capacity, and bi-directional charging capability that the research project required. All vehicles in this study were manufactured and distributed by VIA Motors, Inc. There were six vehicles total and each was VIA’s VTRUX eREV V2G model, a modified General Motors Chevrolet 2500 2WD van. Three of the vans were configured as passenger vans and the other three were configured as cargo vans. Each van had an on-board bi-direcrtional inverter/charger, Bel Power Solutions model 350INVCHGT150-120-240-8G nominally rated at +/-15 kW. The VIA van’s charging connector follows the J1772 charging protocol. The bi-directional EVSEs demonstrated in this study were manufactured by Coritech, Inc. Each VGI-80-AC charging station enabled enhanced V2G charging capability to a Clipper Creek CS-100 charging module. The enhanced capabilities included ethernet communication following the SEP2.0 protocol with a distributed energy resource function set and an operator screen displaying real-time SOC, voltage, and current. The VGI-80-AC charging stations are classified as level 2 with a maximum current output of 80 A or effectively 19 kW. The VIA van’s onboard charger limited the charging and discharging power to 15 kW in each direction. A control computer was installed in the EWOC and connected to an existing monitor. The V2G control communication network was a completely stand-alone closed system that did not have any connection to any other networks on the base. A cybersecure remote communication connection was created with a cellular modem, firewall hardware, and a virtual private network configuration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Wood-to-Fuel Demonstration Project for California's Transportation Sector using Autothermal Pyrolysis (Non-Proprietary Summary Process Hazard Assessment)

Frontline has prioritized personnel safety, equipment preservation, and environmental protection throughout the design process of the autothermal pyrolysis unit. To facilitate a safe design, Frontline completed an informal hazards and operability (HAZOP) study and a formal HAZOP study, and employ management of change procedures. The result of these safety procedures is a plant that will function in a safe manner with a limited and acceptable amount of risk. Frontline took an approach it used in previous projects to execute a preliminary, internally facilitated hazards and operability (HAZOP) study. While this HAZOP study was performed without any subsequent change tracking, it enables a group of well-trained engineers to consider the safety implications of each part of the plant in a thorough and methodical manner. Frontline chose to bring in a pyrolysis consultant (Daren Daugaard of Burning Oak Energy) to participate in the review. Following the preliminary HAZOP and once the detailed design work was nearing completion, Frontline performed a formal HAZOP with a third-party facilitator, Jason Stittleburg of Novetus Engineering. Although the plant is not subject to process safety management (PSM) requirements, this formal HAZOP was performed in accordance with OSHA regulations deemed reasonable for PSM. Finally, after the formal HAZOP was conducted, Frontline maintained a safe system by implementing and following management of change procedures on each substantial change to the process. Frontline has kept a record of each subsequent change made to the formal HAZOP P&IDs. The process hazard assessment process allowed Frontline to find and correct several unacceptable configurations within the plant.

09 BIOMASS FUELS↗

Assessing the Effectiveness of Large-Scale Environmental Restoration: Challenges and Opportunities

A recent National Academies consensus report addresses monitoring and assessment of cumulative effects of large-scale and multiple restoration projects within the context of long-term environmental change. Fines and penalties from the Deepwater Horizon oil spill in the Gulf of Mexico (GoM) have supported hundreds of restoration projects at spatial scales not often possible in the past. Here, in this paper, the report committee members and staff provide personal reflections from our time working on the study. We found that gaps in data collection, issues with data accessibility, and a lack of synthesis and analysis are hindering the ability to answer a basic question: What are the impacts of these many restoration efforts on improving ecosystem health and productivity in the GoM at the regional and Gulf wide scale? Restoration efforts are occurring in environments where many trends are changing and exhibiting higher variability than in the past, suggesting that previously successful restoration practices may no longer be adequate to compensate for the effects of environmental changes and variability. Our proposed approach to these challenges includes employing emerging monitoring technologies; using conceptual models; devising an adaptive management framework; rethinking restoration outcome goals; assessing cumulative effects; and undertaking rigorous synthesis and analysis of existing information on long-term environmental trends and restoration efforts. Restoration scientists and practitioners working in the GoM have an unprecedented opportunity to demonstrate large-scale environmental recovery if advances in monitoring, synthesis, assessment, and action are taken quickly. We are cautiously optimistic that, with mid-course adjustments, continued progress toward large-scale environmental recovery is possible.

54 ENVIRONMENTAL SCIENCES↗

Investigation of Non-Nuclear Plowshare and Vela Uniform Sites - 20447

The Plowshare Program was initiated by the Atomic Energy Commission, a predecessor agency to the US Department of Energy (DOE), to investigate peaceful uses of nuclear devices. 'Vela Uniform,' part of the broader Project Vela, was designed to use nuclear and other explosions to increase the capability of the United States to detect nuclear tests through seismicity. There were underground nuclear tests conducted off the Nevada National Security Site (NNSS) as part of the Plowshare Program (e.g., the Gnome-Coach, New Mexico, Site) and the Vela Uniform Program (e.g., Project Shoal, Nevada, Site) at which the DOE Office of Legacy Management (LM) has been conducting long-term surveillance and maintenance since fiscal year (FY) 2006. There are many additional locations, particularly for the Plowshare Program, that were considered for nuclear tests or used for non-nuclear tests off the NNSS. Some were only named on paper, but at 30 sites, field work such as drilling test wells and conducting tests using conventional explosives was done. A Plowshare nuclear explosion had been proposed at Project Chariot but was canceled in 1962. In 1992, the discovery of soils contaminated with radionuclides from tracer experiments led to a cleanup by the DOE Office of Environmental Management (EM) of the Project Chariot, Alaska, Site, which was completed in 1994. Following the cleanup of the Project Chariot site, EM was concerned that there might be environmental liabilities at other Plowshare or Vela Uniform sites where field investigations were done, even if the nuclear test was never conducted. The EM Program at the Nevada Site Office began examining records and visiting selected locations that were evaluated for Plowshare and Vela Uniform non-nuclear tests. In total, 161 Plowshare and 14 Vela Uniform sites or proposed projects were identified. The Desert Research Institute (DRI) created summaries of the work carried out at these sites and developed a collection of unclassified documents for them. Preliminary investigations had been conducted at these sites by both LM and EM since the early 2000's. In 2016, in preparation for accepting responsibility for the sites, LM started a program to determine if there were any environmental or safety liabilities associated with them. In 2019, LM formally accepted responsibility for these sites off the NNSS where non-nuclear explosive tests were conducted or where underground nuclear tests were proposed as part of the Plowshare and Vela Uniform programs but were never conducted. LM responsibilities will include maintaining institutional knowledge of the sites, responding to public inquiries, and addressing any concerns at each site. To minimize risk associated with site management, LM has archived all historical records compiled by DRI and has performed limited investigations at sites identified by the prior studies as having a higher potential liability. Preserving records related to site operations reduces the risk of doing unnecessary site investigations in the future caused by the loss of institutional knowledge. During the investigations, some maintenance needs were identified and will be addressed by the end of FY 2021. At the end of FY 2021, investigations, maintenance, and archiving activities will be complete. Remnants of test activities found at sites include craters, mud pits, debris, and open boreholes. Open boreholes are being plugged and abandoned in accordance with state regulatory standards. Other issues are being addressed in accordance with land owner requests and preferences as well as state regulations. Archiving activities include the development of project summaries identifying key operational details and current condition to allow site managers to be easily briefed. The LM experience at non-nuclear Plowshare and Vela Uniform sites applies to other programs where there is the potential for liability associated with the non-nuclear aspects of nuclear programs. This may include support activities or early phases of planned nuclear projects. Preserving institutional knowledge enables land managers to adequately address any concerns associated with operations and lowers risk. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗