Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Operator approximation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

Reassessing the Market—Computation Interface to Enhance Grid Security and Efficiency

The goal of this project is to reconsider core market and reliability processes that can potentially yield to transformative advances in power grid security, reliability, and efficiency. Current electric power market designs are strongly a function of computing capabilities and limitations that were available in the mid-to-late 1990s, circa deregulation. This includes constructs such as: (1) a 2-tiered day-ahead/real-time market construct; and (2) linearized (“DC”) real power flow approximations in dispatch and pricing. At that time, state-of-the-art computational capabilities could at the limit address deterministic mixed-integer programming formulations of unit commitment (UC) and linear programming formulations of economic dispatch (ED) at limited fidelity and scale. Such constraints forced limited look-ahead time-horizons, crude approximations of AC power flow physics and operations, and artificial partitioning between day-ahead markets, hour(s)-ahead reliability processes, and real-time markets. Consequently, these limitations have resulted in limited security and reliability with increasing out-of-market payments, particularly as uncertainty associated with renewables and distributed energy resources grows.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Simulations Supporting the Development of Northstar's Indirect Beam Parameters Monitoring System

NorthStar Medical Radioisotopes, LLC is planning to produce the important medical radioisotope molybdenum-99 (Mo-99), the parent of technetium-99m (Tc-99m), through photonuclear reactions in molybdenum-100 (Mo-100). In this approach, a target comprising multiple thin disks of enriched molybdenum metal is bombarded with a 40-MeV electron beam. Electrons impinged on the molybdenum target produce bremsstrahlung X-rays that cause the nuclear reaction. Because enriched Mo-100 is expensive, there is a desire to utilize as much beam power as possible to achieve maximum production yield and minimize the size of the target. This requirement leads to very high beam power density (and heat deposition in the target), which creates challenging requirements for the cooling of the target. The critical part of the target is the target window. It separates the high-pressure helium cooled target from the vacuum beamline and the subject of structural and thermal stress. The temperature of the target window is proportional to the energy density deposited by the beam, so it is critical to maintain the desired beam profile on the target window. The feasibility of indirectly monitoring the maximum energy density of the beam on the beam window through beam losses at the main collimator (Collimator) before the production target was verified. A model of the NorthStar beam transport line was constructed for this purpose using MAD-X and Tao/Bmad codes. Beam optics were computed for the standard operational scenario, followed by an investigation involving approximately 400 cases with parameter variations in the last tuning quadrupoles. This was done to assess the correlation between losses in the collimator and the peak energy density on the target. We developed a model to explore the potential application of Optical transition radiation (OTR) for controlling beam parameters in the NorthStar beam delivery system. This model was based on a generic formula derived from the fundamental solution of the inhomogeneous wave equation of the vector potential, and allowed us to consider various surfaces, even those with irregular or random features, using numerical integration. We applied the model to OTR generated by relativistic electrons impacting an Inconel® 718 beam window. We examined cases with different levels of the window’s surface roughness, ranging from 0.5 to 3.0 microns of root square mean (RMS) deviation. The results of the OTR simulations provided distributions of OTR photons that can be used to study the limitations of optical systems for controlling beam parameters.

43 PARTICLE ACCELERATORS↗

July 2023 Monthly Sewer Monitoring Report

The Sandia National Laboratories, in California (Sandia/CA) is a research and development facility, owned by the U.S. Department of Energy’s National Nuclear Security Administration agency (DOE/NNSA). The laboratory is located in the City of Livermore (the City) and is comprised of approximately 410 acres. The Sandia/CA facility is operated by National Technology and Engineering Solutions of Sandia, LLC (NTESS) under a contract with the DOE/NNSA. The DOE/ NNSA’s Sandia Field Office (SFO) oversees the operations of the site. North of the Sandia/CA facility is the Lawrence Livermore National Laboratory (LLNL), in which Sandia/CA’s sewer system combines with before discharging to the City’s Publicly Owned Treatment Works (POTW) for final treatment and processing. The City’s POTW authorizes the wastewater discharge from Sandia/CA via the assigned Wastewater Discharge Permit #1251 (the Permit), which is issued to the DOE/NNSA’s main office for Sandia National Laboratories, located in New Mexico (Sandia/NM). The Permit requires the submittal of this Monthly Sewer Monitoring Report to the City by the twenty-fifth day of each month.

99 GENERAL AND MISCELLANEOUS↗

Monthly Sewer Monitoring Report for June 2023

The Sandia National Laboratories, in California (Sandia/CA) is a research and development facility, owned by the U.S. Department of Energy’s National Nuclear Security Administration agency (DOE/NNSA). The laboratory is located in the City of Livermore (the City) and is comprised of approximately 410 acres. The Sandia/CA facility is operated by National Technology and Engineering Solutions of Sandia, LLC (NTESS) under a contract with the DOE/NNSA. The DOE/ NNSA’s Sandia Field Office (SFO) oversees the operations of the site. North of the Sandia/CA facility is the Lawrence Livermore National Laboratory (LLNL), in which Sandia/CA’s sewer system combines with before discharging to the City’s Publicly Owned Treatment Works (POTW) for final treatment and processing. The City’s POTW authorizes the wastewater discharge from Sandia/CA via the assigned Wastewater Discharge Permit #1251 (the Permit), which is issued to the DOE/NNSA’s main office for Sandia National Laboratories, located in New Mexico (Sandia/NM). The Permit requires the submittal of this Monthly Sewer Monitoring Report to the City by the twenty-fifth day of each month.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Monthly Sewer Monitoring Report for March 2023

The Sandia National Laboratories, in California (Sandia/CA) is a research and development facility, owned by the U.S. Department of Energy’s National Nuclear Security Administration agency (DOE/NNSA). The laboratory is located in the City of Livermore (the City) and is comprised of approximately 410 acres. The Sandia/CA facility is operated by National Technology and Engineering Solutions of Sandia, LLC (NTESS) under a contract with the DOE/NNSA. The DOE/ NNSA’s Sandia Field Office (SFO) oversees the operations of the site. North of the Sandia/CA facility is the Lawrence Livermore National Laboratory (LLNL), in which Sandia/CA’s sewer system combines with before discharging to the City’s Publicly Owned Treatment Works (POTW) for final treatment and processing. The City’s POTW authorizes the wastewater discharge from Sandia/CA via the assigned Wastewater Discharge Permit #1251 (the Permit), which is issued to the DOE/NNSA’s main office for Sandia National Laboratories, located in New Mexico (Sandia/NM). The Permit requires the submittal of this Monthly Sewer Monitoring Report to the City by the twenty-fifth day of each month.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Monthly Sewer Monitoring Report for February 2023

The Sandia National Laboratories, in California (Sandia/CA) is a research and development facility, owned by the U.S. Department of Energy’s National Nuclear Security Administration agency (DOE/NNSA). The laboratory is located in the City of Livermore (the City) and is comprised of approximately 410 acres. The Sandia/CA facility is operated by National Technology and Engineering Solutions of Sandia, LLC (NTESS) under a contract with the DOE/NNSA. The DOE/ NNSA’s Sandia Field Office (SFO) oversees the operations of the site. North of the Sandia/CA facility is the Lawrence Livermore National Laboratory (LLNL), in which Sandia/CA’s sewer system combines with before discharging to the City’s Publicly Owned Treatment Works (POTW) for final treatment and processing. The City’s POTW authorizes the wastewater discharge from Sandia/CA via the assigned Wastewater Discharge Permit #1251 (the Permit), which is issued to the DOE/NNSA’s main office for Sandia National Laboratories, located in New Mexico (Sandia/NM). The Permit requires the submittal of this Monthly Sewer Monitoring Report to the City by the twenty-fifth day of each month.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Monthly Sewer Monitoring Report for January 2023

The Sandia National Laboratories, in California (Sandia/CA) is a research and development facility, owned by the U.S. Department of Energy’s National Nuclear Security Administration agency (DOE/NNSA). The laboratory is located in the City of Livermore (the City) and is comprised of approximately 410 acres. The Sandia/CA facility is operated by National Technology and Engineering Solutions of Sandia, LLC (NTESS) under a contract with the DOE/NNSA. The DOE/ NNSA’s Sandia Field Office (SFO) oversees the operations of the site. North of the Sandia/CA facility is the Lawrence Livermore National Laboratory (LLNL), in which Sandia/CA’s sewer system combines with before discharging to the City’s Publicly Owned Treatment Works (POTW) for final treatment and processing. The City’s POTW authorizes the wastewater discharge from Sandia/CA via the assigned Wastewater Discharge Permit #1251 (the Permit), which is issued to the DOE/NNSA’s main office for Sandia National Laboratories, located in New Mexico (Sandia/NM). The Permit requires the submittal of this Monthly Sewer Monitoring Report to the City by the twenty-fifth day of each month.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Semiannual Categorical Process Report - January Through June 2023

The Sandia National Laboratories, in California (SNL/CA) is a research and development facility, owned by the U.S. Department of Energy’s National Nuclear Security Administration agency (DOE/NNSA). The laboratory is located in the City of Livermore (the City) and is comprised of approximately 410 acres. The SNL/CA facility is operated by National Technology and Engineering Solutions of Sandia, LLC (NTESS) under a contract with the DOE/NNSA. The DOE/ NNSA’s Sandia Field Office (SFO) oversees the operations of the site. North of the SNL/CA facility is the Lawrence Livermore National Laboratory (LLNL), in which SNL/CA’s sewer system combines with before discharging to the City’s Publicly Owned Treatment Works (POTW) for final treatment and processing. The City’s POTW authorizes the wastewater discharge from SNL/CA via the assigned Wastewater Discharge Permit #1251 (the Permit), which is issued to the DOE/NNSA’s main office for Sandia National Laboratories, located in New Mexico (SNL/NM). The Monitoring and Reporting Condition 2.B of the Permit requires compliance with the semiannual reporting requirements contained in federal categorical pretreatment standards regulations (40 CFR 403.12). These regulations set numerical limits on the concentration of pollutants allowed to discharge from certain categories of industrial processes. This report is submitted to the City to satisfy this reporting requirement.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Monthly Wastewater Report - May 2023

The Sandia National Laboratories, in California (Sandia/CA) is a research and development facility, owned by the U.S. Department of Energy’s National Nuclear Security Administration agency (DOE/NNSA). The laboratory is located in the City of Livermore (the City) and is comprised of approximately 410 acres. The Sandia/CA facility is operated by National Technology and Engineering Solutions of Sandia, LLC (NTESS) under a contract with the DOE/NNSA. The DOE/ NNSA’s Sandia Field Office (SFO) oversees the operations of the site. North of the Sandia/CA facility is the Lawrence Livermore National Laboratory (LLNL), in which Sandia/CA’s sewer system combines with before discharging to the City’s Publicly Owned Treatment Works (POTW) for final treatment and processing. The City’s POTW authorizes the wastewater discharge from Sandia/CA via the assigned Wastewater Discharge Permit #1251 (the Permit), which is issued to the DOE/NNSA’s main office for Sandia National Laboratories, located in New Mexico (Sandia/NM). The Permit requires the submittal of this Monthly Sewer Monitoring Report to the City by the twenty-fifth day of each month.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LAMP Emittance Budget, Rev. 1

This report summarizes the performance limits of the LANSCE Coupled-Cavity Linac (CCL). These results are captured or summarized directly from the references cited. This report was written in support of the LANSCE Modernization Project (LAMP). This brief report summarizes the emittance budget for the LANSCE Modernization Project (LAMP). While the project Key Performance Parameters (KPPs) specify threshold and objective requirements for charge delivered to each experimental area, no upper limits on beam emittances are specified. To maintain low losses in the high-energy section of the LANSCE linac and hands-on maintenance, some upper limits on beam emittance need to be specified for the new LAMP front-end performance. The scope of the LAMP project replaces the injector section and drift-tube linac (DTL) up to 100 MeV of the existing LANSCE linac. This new design replacement will be integrated with the remaining coupled cavity linac (CCL) which makes up most of the accelerator at LANSCE and accelerates the beam to a final energy of 800 MeV. The initial approach that has been used to define an emittance budget for the new LAMP front end is based on recent and historical measured beam emittances at 100 MeV for the three beam types accelerated at LANSCE: H+ (protons for isotope production), LBEG (H- beam for delivery to proton radiography and to the Lujan neutron spallation target, and MPEG (H- beam for delivery to the Weapons Neutron Research facility). The emittance budget (upper limit) for each beam type has been selected to maintain the losses in the CCL to a level approximately equivalent to those observed in present operations to first order. However, the goal of the LAMP project is to improve the quality of the beams injected into the CCL, if possible, thus allowing for higher average current operation while also lowering beam losses and activation at high beam energies. The table below summarizes the beam measurements evaluated and used to establish a conservative emittance budget for LAMP based on known historical beam losses and activation. However, based on estimates of the CCL admittance and the Isotope Production Facility (IPF) beamline acceptance, a more relaxed transverse emittance upper limit of 0.095 π-cm-mrad, rms, normalized may be acceptable at 100 MeV while still meeting the LAMP performance requirements for charge delivery to each LANSCE experimental area and maintaining hands-on maintenance. This upper limit is supported by a recent analysis of operational data. Additionally, the present conceptual LAMP front-end design meets this requirement.

43 PARTICLE ACCELERATORS↗

High Pressure Hydrogen Nozzle Assembly and Dispenser for Heavy Duty Vehicles (Final Technical Report)

Electricore, Inc. along with partners Bennett Pump Company (Bennett), WEH Technologies, Inc. (WEH), National Renewable Energy Laboratory (NREL), and Quong & Associates, Inc. (QAI) have developed a high-pressure hydrogen nozzle assembly and dispenser for heavy-duty (HD) vehicles. The system was installed, tested and demonstrated at NREL’s Hydrogen Infrastructure Testing and Research Facility (HITRF). The system was designed to have a maximum operating pressure of 87.5 MPa and an approximate average flow rate of 10 kg/min over 10 minutes at fuel temperatures of -40°C. To further develop the specifications and design of the system, the team performed an industry survey to ensure the system met the needs of potential users.

08 HYDROGEN↗

Cyber-Resilient Frequency Control of Power Grids with Energy Storage Systems

The integration of synchronous generators and energy storage systems operated through communication networks introduces new challenges and vulnerabilities to the electric grid, where cyber attacks can corrupt sensor measurements or control inputs and interrupt functions such as frequency regulation. This paper proposes a defense methodology for the design of resilient operating constraints imposed on each generation and storage unit in order to prevent any attack sequence from driving the system's frequency to unsafe conditions. The resilient operating constraints are found by using ellipsoidal approximations of the reachable set of the power system, leading to a convex optimization problem with linear matrix inequalities. Numerical results in a single-area power system with synchronous generation and energy storage demonstrate how the resilient constraints provide security guarantees against any type of attack affecting frequency measurements or controller setpoints.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Nonelectrolytic tantalum capacitors developed

Large area, nonelectrolytic tantalum foil capacitor has capacitance of approximately 1 microfarad and is capable of operating at 125 deg C at 150 volts with an insulation resistance of at least 1 megohm. In tests at a potential of 100 volts, capacitors remained stable through a temperature range from 25 deg to 125 deg C.

Source record↗

Thermionic reactor power conditioner design for nuclear electric propulsion.

Consideration of the effects of various thermionic reactor parameters and requirements upon spacecraft power conditioning design. A basic spacecraft is defined using nuclear electric propulsion, requiring approximately 120 kWe. The interrelationships of reactor operating characteristics and power conditioning requirements are discussed and evaluated, and the effects on power conditioner design and performance are presented.

Jacobsen, A. S.↗

Low-thrust mission risk analysis, with application to a 1980 rendezvous with the comet Encke

A computerized failure process simulation procedure is used to evaluate the risk in a solar electric space mission. The procedure uses currently available thrust-subsystem reliability data and performs approximate simulations of the thrust sybsystem burn operation, the system failure processes, and the retargeting operations. The method is applied to assess the risks in carrying out a 1980 rendezvous mission to the comet Encke. Analysis of the results and evaluation of the effects of various risk factors on the mission show that system component failure rates are the limiting factors in attaining a high mission relability. It is also shown that a well-designed trajectory and system operation mode can be used effectively to partially compensate for unreliable thruster performance.

Yen, C. L.↗

The 100-micron observations of galactic and extragalactic Southern Hemisphere objects

Far-infrared observations of the interstellar medium are reported by a balloon-borne telescope. With the 30-centimeter (12-in.) telescope operating at a wavelength of 100 microns, approximately forty new sources were observed in the galactic plane and in the large Magellanic Cloud. Patterns and some degree of understanding are beginning to emerge from the observations of objects in the far infrared.

Hoffmann, W. F.↗

Low-thrust mission risk analysis.

A computerized multi-stage failure process simulation procedure is used to evaluate the risk in a solar electric space mission. The procedure uses currently available thrust-subsystem reliability data and performs approximate simulations of the thrust subsystem burn operation, the system failure processes, and the retargetting operations. The application of the method is used to assess the risks in carrying out a 1980 rendezvous mission to Comet Encke. Analysis of the results and evaluation of the effects of various risk factors on the mission show that system component failure rates is the limiting factor in attaining a high mission reliability. But it is also shown that a well-designed trajectory and system operation mode can be used effectively to partially compensate for unreliable thruster performance.

Yen, C. L.↗

Design of a heat pipe governed thermal control system for the Solar Electric Propulsion Stage /SEPS/

A 2200-w capacity spacecraft heat rejection system designed for the SEPS and utilizing heat pipe radiator panels has been investigated. The total thermal control system consists of two radiator panels connected to the heat source by variable conductance heat pipes (VCHP's). The system was designed to operate in the 223 to 333 temperature range. The radiators have an emittance of 0.88 at their operational temperature and a fin efficiency of approximately 80 percent. The radiators are thermally isolated from the SEPS and environment by multilayer insulation and thermal shields. Butane was selected as the working fluid for the VCHP because of its low freezing point (135), which is necessary to prevent diffusion freezeout of the liquid during the cold outbond missions. Helium was selected for the control gas. This paper describes the VCHP system, discusses the system design parameters and presents the results of the analyses.

Ruttner, L. E.↗