Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Software and System Safety”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

Integrating static PRA information with risk informed safety margin characterization (RISMC) simulation methods

The overall objective of the project was to develop a computationally feasible and user-friendly mechanized process to integrate traditional probabilistic risk assessment (PRA) and dynamic PRA (DPRA) results. Starting with the systematic identification of items in an existing PRA that need dynamic augmentation, the project used a generic 4-loop pressurized reactor (PWR) and 3-loop PWR as example plants. Station blackout (SBO) and large break loss of coolant accident SBLOCA) were selected as the example initiating events. Using the traditional event-tree (ET)/fault-tree (FT) methodology augmented by dynamic evet tree approach, the potential consequences of the initiating events were simulated with RELAP-3D and MELCOR/RASCAL codes to cover Level 1 through Level 3 of PRA. RAVEN and ADAPT software were used to generate Level 1 simulations with RELAP-3D and Level 2/3 simulations with MELCOR (Level 2)/RASCAL (Level 3), respectively. Example branching conditions (BCs) for SBO included AC power recovery time, valve repair failure time, reactor coolant pump leak time/break size and emergency power supply duration to a total of 9. Example BCs for LOCA included off-site power recovery time, diesel generator power recovery time, auxiliary feed water system operation time, safety relief valve failure to open upon demand, reactor coolant pump seal break time and size to a total of 21. Each RELAP-3D simulation (9,587 scenarios) was labelled OK or Core Damage based on the maximum allowed peak clad temperature (2,100oF). Each MELCOR simulation (4610 scenarios) was labeled as Bin over 10rem or Bin 0-10rem based on the dose at the site boundary. The scenarios were clustered based on the criteria above using the mean shift methodology. Classical PRA (CPRA) and DPRA results were compared to identify the ET sequences that need DPRA augmentation. Several approaches were proposed for the incorporation of these sequences into CPRA using clustering with the mean shift methodology, restructuring the CPRA ETs by adding new BCs/sequences, and using the concept of a limit surface. Procedures for decision making regarding the possible consequences of an initiating event (e.g. core damage or not, site evacuation or not) were developed using a convolutional neural network (CNN), a recurrent neural network (RNN) and a transformer neural network (TNN). The project has led to two PhD degrees, three archival journal papers and five refereed conference proceedings.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Simulated X-Ray Radiographic Performance of a Bismuth-Loaded PVT Array

Recent material advancements in organic plastic scintillators enable marked increases in material detection efficiency, light yield, and pulse shape discrimination properties. These advances may resolve significant capability gaps for lowcost, portable, and durable dual-particle imaging (DPI) systems for nuclear safety, security, and safeguard purposes. One such material, a 21% bismuth-loaded polyvinyl toluene (BiPVT), is computationally evaluated as a small, pixelated radiographic array using Monte Carlo N-Particle (MCNP) and Zemax OpticStudio, and it is compared to identical evaluations of EJ-200 and EJ-256 arrays. MCNP software enables estimates of particle interaction and energy deposition, while OpticStudio computes optical light transport within each material. Here, computational estimates of spatial resolution and relative light collection at 370 kVp are found to agree with experimental results for both EJ-200 and EJ-256 arrays, thereby validating predictions of the same for the BiPVT array. As such, for equivalent exposures at 370 kVp, a BiPVT array may provide ~20× the light collection expected from EJ-200 and ~10× that expected from EJ-256. Similar comparisons of estimated light collection are also computed at 150 and 270 kVp, and these results suggest that BiPVT will provide significantly improved performance over EJ-200 and EJ-256 across all energies practical for portable X-ray radiography.

42 ENGINEERING↗

Formal Methods in Air Traffic Management: The Case of Unmanned Aircraft Systems

As the technological and operational capabilities of unmanned aircraft systems (UAS) continue to grow, so too does the need to introduce these systems into civil airspace. Unmanned Aircraft Systems Integration in the National Airspace System is a NASA research project that addresses the integration of civil UAS into non-segregated airspace operations. One of the major challenges of this integration is the lack of an onboard pilot to comply with the legal requirement that pilots see and avoid other aircraft. The need to provide an equivalent to this requirement for UAS has motivated the development of a detect and avoid (DAA) capability to provide the appropriate situational awareness and maneuver guidance in avoiding and remaining well clear of traffic aircraft. Formal methods has played a fundamental role in the development of this capability. This talk reports on the formal methods work conducted under NASA's Safe Autonomous System Operations project in support of the development of DAA for UAS. This work includes specification of low-level and high-level functional requirements, formal verification of algorithms, and rigorous validation of software implementations. The talk also discusses technical challenges in formal methods research in the context of the development and safety analysis of advanced air traffic management concepts.

Munoz, Cesar A.↗

OASSIS: Onboard Adaptive Safe-site Identification System Y3

The OASSIS Year 3 project continues to innovate with three goals: 1) transition to a generic configuration compatible with GNC flight software, 2) implement a new, computationally-efficient TRN algorithm for lunar landing, and 3) integrate with the a HWIL testbed to validate lunar landing GNC systems. This project enables lunar lander GNC flight software to be tested dynamically without the need of a costly flight campaign and without the risk of catastrophic hardware loss. Additionally, the TRN algorithm development and testing enhances the state-of-the-art in pinpoint landing navigation, ultimately improving the overall landing accuracy, safety, and reliability of a crewed lunar landing mission.

James S Mccabe↗

TC3 Overview

This presentation gives an overview of the technology, methods and processes developed during the TC3 Technical Challenge of the System-Wide Safety (SWS) project. The presentation goes over the motivation for doing this research, gives an overview of the tool, methods and process developed under this program, and describes case studies and impact in industry.

Software assurance↗

AUTOMATED, HIGHLY ACCURATE VERIFICATION OF RELAP5-3D

Computer programs that analyze light water reactor safety solve complex systems of governing, closure and special process equations to model the underlying physics. In addition, these programs incorporate many other features and are quite large. RELAP5-3D[1] has over 300,000 lines of coding for physics, input, output, data management, user-interaction, and post-processing. For software quality assurance, the code must be verified and validated before being released to users. Verification ensures that a program is built right by checking that it meets its design specifications. Recently, there has been an increased importance on the development of automated verification processes that compare coding against its documented algorithms and equations and compares its calculations against analytical solutions and the method of manufactured solutions[2]. For the first time, the ability exists to ensure that the data transfer operations associated with timestep advancement/repeating and writing/reading a solution to a file have no unintended consequences. To ensure that the code performs as intended over its extensive list of applications, an automated and highly accurate verification method has been modified and applied to RELAP5-3D. Furthermore, mathematical analysis of the adequacy of the checks used in the comparisons is provided.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

MCNP 2020: Preparing LANL Monte Carlo for Exascale Computer Systems (White Paper)

The MCNP Monte Carlo code for simulating particle transport is the product of over 60 years of Monte Carlo code development at LANL. MCNP is the most-used code worldwide for particle transport in nuclear systems, with over 10,000 users in dozens of application areas. At LANL, MCNP is used extensively in applications for nuclear criticality safety, stockpile stewardship, homeland security, radiological safety, experiment design and analysis, etc., and is considered a critical technology resource for national defense. MCNP is often referred to as the “gold standard” for radiation transport calculations, based on the long development history and extensive validation work. Today, however, this critical technology and its well-deserved reputation are at risk. We propose a targeted effort over the next several years to upgrade the core software portions of the MCNP code. This effort will focus on fundamental structural changes to the underlying MCNP algorithms, data storage, and code architecture. These changes will directly improve code maintainability, reduce the development time for new features, improve the code performance, and make the code more flexible and adaptable for expected future computer systems. To move forward with new computer systems and additional new features, it is vital to have a solid base.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Integrated Hazard Analysis Integrator

Hazard analysis addresses hazards that arise in the design, development, manufacturing, construction, facilities, transportation, operations and disposal activities associated with hardware, software, maintenance, operations and environments. An integrated hazard is an event or condition that is caused by or controlled by multiple systems, elements, or subsystems. Integrated hazard analysis (IHA) is especially daunting and ambitious for large, complex systems such as NASA s Constellation program which incorporates program, systems and element components that impact others (International Space Station, public, International Partners, etc.). An appropriate IHA should identify all hazards, causes, controls and verifications used to mitigate the risk of catastrophic loss of crew, vehicle and/or mission. Unfortunately, in the current age of increased technology dependence, there is the tendency to sometimes overlook the necessary and sufficient qualifications of the integrator, that is, the person/team that identifies the parts, analyzes the architectural structure, aligns the analysis with the program plan and then communicates/coordinates with large and small components, each contributing necessary hardware, software and/or information to prevent catastrophic loss. As viewed from both Challenger and Columbia accidents, lack of appropriate communication, management errors and lack of resources dedicated to safety were cited as major contributors to these fatalities. From the accident reports, it would appear that the organizational impact of managers, integrators and safety personnel contributes more significantly to mission success and mission failure than purely technological components. If this is so, then organizations who sincerely desire mission success must put as much effort in selecting managers and integrators as they do when designing the hardware, writing the software code and analyzing competitive proposals. This paper will discuss the necessary and sufficient requirements of one of the significant contributors to mission success, the IHA integrator. Discussions will be provided to describe both the mindset required as well as deleterious assumptions/behaviors to avoid when integrating within a large scale system.

Morris, A. Terry↗

NASA's Space Launch System Program Update

Hardware and software for the world's most powerful launch vehicle for exploration is being welded, assembled, and tested today in high bays, clean rooms and test stands across the United States. NASA's Space Launch System (SLS) continued to make significant progress in 2014 with more planned for 2015, including firing tests of both main propulsion elements and the program Critical Design Review (CDR). Developed with the goals of safety, affordability, and sustainability, SLS will still deliver unmatched capability for human and robotic exploration. The initial Block 1 configuration will deliver more than 70 metric tons of payload to low Earth orbit (LEO). The evolved Block 2 design will deliver some 130 metric tons to LEO. Both designs offer enormous opportunity and flexibility for larger payloads, simplifying payload design as well as ground and on-orbit operations, shortening interplanetary transit times, and decreasing overall mission risk. Over the past year, every vehicle element has manufactured or tested hardware. An RS-25 liquid propellant engine was hotfire-tested at NASA's Stennis Space Center, Miss. for the first time since 2009 exercising and validating the new engine controller, the renovated A-1 test stand, and the test teams. Four RS-25s will power the SLS core stage. A qualification five-segment solid rocket motor incorporating several design, material, and process changes was scheduled to be test-fired in March at the prime contractor's facility in Utah. The booster also successfully completed its Critical Design Review (CDR) validating the planned design. All six major manufacturing tools for the core stage are in place at the Michoud Assembly Facility in Louisiana, and have been used to build numerous pieces of confidence, qualification, and even flight hardware, including barrel sections, domes and rings used to assemble the world's largest rocket stage. SLS Systems Engineering accomplished several key tasks including vehicle avionics software and hardware build and testing, scale model acoustic and base heating tests. Construction of the Interim Cryogenic Propulsion Stage (ICPS) began. Advanced development provided a look into the future of SLS. Shell buckling knockdown factor testing refined decades-old design margins that added thousands of pounds to rocket payloads. Adaptive manufacturing and structured light scanning development promised to cut the cost and time associated with manufacturing and testing. This paper will provide an overview of the progress made over the past year and provide a glimpse of 2015 milestones and beyond on the way to the first launch in 2018.

May, Todd↗

NASA's Space Launch System Program Update

Hardware and software for the world's most powerful launch vehicle for exploration is being welded, assembled, and tested today in high bays, clean rooms and test stands across the United States. NASA's Space Launch System (SLS) continued to make significant progress in 2014 with more planned for 2015, including firing tests of both main propulsion elements and the program Critical Design Review (CDR). Developed with the goals of safety, affordability, and sustainability, SLS will still deliver unmatched capability for human and robotic exploration. The initial Block 1 configuration will deliver more than 70 metric tons of payload to low Earth orbit (LEO). The evolved Block 2 design will deliver some 130 metric tons to LEO. Both designs offer enormous opportunity and flexibility for larger payloads, simplifying payload design as well as ground and on-orbit operations, shortening interplanetary transit times, and decreasing overall mission risk. Over the past year, every vehicle element has manufactured or tested hardware. An RS-25 liquid propellant engine was hotfire-tested at NASA's Stennis Space Center, Miss. for the first time since 2009 exercising and validating the new engine controller, the renovated A-1 test stand, and the test teams. Four RS-25s will power the SLS core stage. A qualification five-segment solid rocket motor incorporating several design, material, and process changes was scheduled to be test-fired in March at the prime contractor's facility in Utah. The booster also successfully completed its Critical Design Review (CDR) validating the planned design. All six major manufacturing tools for the core stage are in place at the Michoud Assembly Facility in Louisiana, and have been used to build numerous pieces of confidence, qualification, and even flight hardware, including barrel sections, domes and rings used to assemble the world's largest rocket stage. SLS Systems Engineering accomplished several key tasks including vehicle avionics software and hardware build and testing, scale model acoustic and base heating tests. Construction of the Interim Cryogenic Propulsion Stage (ICPS) began. Advanced development provided a look into the future of SLS. Shell buckling knockdown factor testing refined decades-old design margins that added thousands of pounds to rocket payloads. Adaptive manufacturing and structured light scanning development promised to cut the cost and time associated with manufacturing and testing. This paper will provide an overview of the progress made over the past year and provide a glimpse of 2015 milestones and beyond on the way to the first launch in 2018.

May, Todd↗

Close out the Critical Commitment for System Wide Safety’s Technical Challenge 3 (TC 3)

- Deliver validated methods and recommended practices to reduce certification costs for ground and onboard vehicle guidance and control systems through expanded acceptability of analysis as evidence for certification FY 2022. - Communicate results to maximize public awareness of the research and transfer capabilities via a set of on-demand training seminars and supporting materials including reports, publications and open source software codes where applicable.

Joseph C Coughlan↗

Autonomous Flight Safety System Road Test

On February 3, 2005, Kennedy Space Center (KSC) conducted the first Autonomous Flight Safety System (AFSS) test on a moving vehicle -- a van driven around the KSC industrial area. A subset of the Phase III design was used consisting of a single computer, GPS receiver, and UPS antenna. The description and results of this road test are described in this report.AFSS is a joint KSC and Wallops Flight Facility project that is in its third phase of development. AFSS is an independent subsystem intended for use with Expendable Launch Vehicles that uses tracking data from redundant onboard sensors to autonomously make flight termination decisions using software-based rules implemented on redundant flight processors. The goals of this project are to increase capabilities by allowing launches from locations that do not have or cannot afford extensive ground-based range safety assets, to decrease range costs, and to decrease reaction time for special situations.

Simpson, James C.↗

Runway Safety Monitor Algorithm for Runway Incursion Detection and Alerting

The Runway Safety Monitor (RSM) is an algorithm for runway incursion detection and alerting that was developed in support of NASA's Runway Incursion Prevention System (RIPS) research conducted under the NASA Aviation Safety Program's Synthetic Vision System element. The RSM algorithm provides pilots with enhanced situational awareness and warnings of runway incursions in sufficient time to take evasive action and avoid accidents during landings, takeoffs, or taxiing on the runway. The RSM currently runs as a component of the NASA Integrated Display System, an experimental avionics software system for terminal area and surface operations. However, the RSM algorithm can be implemented as a separate program to run on any aircraft with traffic data link capability. The report documents the RSM software and describes in detail how RSM performs runway incursion detection and alerting functions for NASA RIPS. The report also describes the RIPS flight tests conducted at the Dallas-Ft Worth International Airport (DFW) during September and October of 2000, and the RSM performance results and lessons learned from those flight tests.

Green, David F., Jr.↗

The NASA Integrated Vehicle Health Management Technology Experiment for X-37

The NASA Integrated Vehicle Health Management (IVHM) Technology Experiment for X-37 was intended to run IVHM software on-board the X-37 spacecraft. The X-37 is intended to be an unpiloted vehicle that would orbit the Earth for up to 21 days before landing on a runway. The objectives of the experiment were to demonstrate the benefits of in-flight IVHM to the operation of a Reusable Launch Vehicle, to advance the Technology Readiness Level of this IVHM technology within a flight environment, and to demonstrate that the IVHM software could operate on the Vehicle Management Computer. The scope of the experiment was to perform real-time fault detection and isolation for X-37's electrical power system and electro-mechanical actuators. The experiment used Livingstone, a software system that performs diagnosis using a qualitative, model-based reasoning approach that searches system-wide interactions to detect and isolate failures. Two of the challenges we faced were to make this research software more efficient so that it would fit within the limited computational resources that were available to us on the X-37 spacecraft, and to modify it so that it satisfied the X-37's software safety requirements. Although the experiment is currently unfunded, the development effort had value in that it resulted in major improvements in Livingstone's efficiency and safety. This paper reviews some of the details of the modeling and integration efforts, and some of the lessons that were learned.

Schwabacher, Mark↗

Tools Ensure Reliability of Critical Software

In November 2006, after attempting to make a routine maneuver, NASA's Mars Global Surveyor (MGS) reported unexpected errors. The onboard software switched to backup resources, and a 2-day lapse in communication took place between the spacecraft and Earth. When a signal was finally received, it indicated that MGS had entered safe mode, a state of restricted activity in which the computer awaits instructions from Earth. After more than 9 years of successful operation gathering data and snapping pictures of Mars to characterize the planet's land and weather communication between MGS and Earth suddenly stopped. Months later, a report from NASA's internal review board found the spacecraft's battery failed due to an unfortunate sequence of events. Updates to the spacecraft's software, which had taken place months earlier, were written to the wrong memory address in the spacecraft's computer. In short, the mission ended because of a software defect. Over the last decade, spacecraft have become increasingly reliant on software to carry out mission operations. In fact, the next mission to Mars, the Mars Science Laboratory, will rely on more software than all earlier missions to Mars combined. According to Gerard Holzmann, manager at the Laboratory for Reliable Software (LaRS) at NASA's Jet Propulsion Laboratory (JPL), even the fault protection systems on a spacecraft are mostly software-based. For reasons like these, well-functioning software is critical for NASA. In the same year as the failure of MGS, Holzmann presented a new approach to critical software development to help reduce risk and provide consistency. He proposed The Power of 10: Rules for Developing Safety-Critical Code, which is a small set of rules that can easily be remembered, clearly relate to risk, and allow compliance to be verified. The reaction at JPL was positive, and developers in the private sector embraced Holzmann's ideas.

Source record↗

Automating Bug Report Classification with Few Shot Learning

Orthogonal defect classification (ODC) is a method used to categorize software defects, providing valuable insights into the development process. This study focuses on automating the classification of software bug reports into different ODC defect types using few shot learning, a machine learning approach that requires minimal labeled data. Previous research has manually classified bug reports or used traditional machine learning algorithms like linear support vector machine, achieving limited success. Our approach uses few shot learning to improve classification accuracy and efficiency. The results show a harmonic mean of recall and precision (i.e., the F1 score) of around 0.6 which is a performance improvement over previous methods. The results highlight the potential benefit of few shot learning techniques and their application in enhancing the safety and reliability of nuclear digital instrumentation and control (DI&C) systems. Future work will explore incorporating advanced techniques to supplement the model's training data and achieve better results.

42 - ENGINEERING↗

Space Station Furnace Facility Management Information System (SSFF-MIS) Development

This report summarizes the chronology, results, and lessons learned from the development of the SSFF-MIS. This system has been nearly two years in development and has yielded some valuable insights into specialized MIS development. General: In December of 1994, the Camber Corporation and Science Applications International Corporation (SAIC) were contracted to design, develop, and implement a MIS for Marshall Space Flight Center's Space Station Furnace Facility Project. The system was to be accessible from both EBM-Compatible PC and Macintosh platforms. The system was required to contain data manually entered into the MIS as well as data imported from other MSFC sources. Electronic interfaces were established for each data source and retrieval was to be performed at prescribed time intervals. The SOW requirement that predominantly drove the development software selection was the dual-platform (IBM-PC and Macintosh) requirement. The requirement that the system would be maintained by Government personnel influenced the selection of Commercial Off-the-shelf software because of its inherent stability and readily available documentation and support. Microsoft FoxPro Professional 2.6 for Windows and Macintosh was selected as the development tool. This is a software development tool that has been in use for many years. It is stable and powerful. Microsoft has since released the replacement for this product, Microsoft Visual FoxPro, but at the time of this development, it was only available on the Windows platform. The initial contract included included the requirement for capabilities relating to the Work- and Organizational Breakdown Structures, cost (plan and actuals), workforce (plan and actuals), critical path scheduling, trend analysis, procurements and contracts, interface to manufacturing, Safety and Mission Assurance, risk analysis, and technical performance indicators. It also required full documentation of the system and training of users. During the course of the contract, the requirements for Safety and Mission Assurance interface, risk analysis, and technical performance indicators were deleted. Additional capabilities were added as reflected in the Contract Chronology below. Modification 4 added the requirement for Support Contractor manpower data, the ability to manually input data not imported from non-nal sources, a general 'health' indicator screen, and remote usage. Mod 6 included the ability to change the level of planning of Civil Service Manpower at any time and the ability to manually enter Op Codes in the manufacturing data where such codes were not provided by the EMPACS database. Modification 9 included a number of changes to report contents and formats. Modification 11 required the preparation of a detailed System Design Document.

Meade, Robert M.↗

TH-D-BRB-04: Pinnacle Scripting: Improving Efficiency While Maintaining Safety

Scripting capabilities and application programming interfaces (APIs) are becoming commonly available in modern treatment planning systems. These links to the treatment planning system (TPS) allow users to read data from the TPS, and in some cases use TPS functionality and write data back to the TPS. Such tools are powerful extensions, allowing automation of routine clinical tasks and supporting research, particularly research involving repetitive tasks on large patient populations. The data and functionality exposed by scripting/API capabilities is vendor dependent, as are the languages used by script/API engines, such as the Microsoft .NET framework or Python. Scripts deployed in a clinical environment must be commissioned and validated like any other software tool. This session will provide an overview of scripting applications and a discussion of best practices, followed by a practical introduction to the scripting capabilities of three commercial treatment planning systems. Learning Objectives: Understand the scripting capabilities available in several treatment planning systems Learn how to get started using scripting capabilities Understand the best practices for safe script deployment in a clinical environment R. Popple, Varian Medical Systems has provided research support unrelated to the topic of this session.R. Cardan, Varian Medical Systems for grant research, product evaluation, and teaching honorarium.

60 APPLIED LIFE SCIENCES↗