Mercury Spacecraft Pre-Launch Preparations. Part II - At the Launch Site
Mercury capsule checkout and prelaunch testing
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Mercury capsule checkout and prelaunch testing
Spacecraft design and operations as learned from mercury project
Static & dynamic stability of mercury reentry capsule scale models at mach 3 & 9.5
Static aerodynamic characteristics of modified mercury escape and exit capsule configurations at mach numbers 0.30 to 1.4
Effects of transverse barycenter displacement, conical afterbody, curved front face on mercury capsule supersonic aerodynamic characteristics
Mercury project summary - results of fourth manned orbital flight
Mercury-redstone launch vehicle development and performance
At this time, the National Aeronautics and Space Administration (NASA) has successfully completed five manned space flights in Project Mercury. Two of these were suborbital, and of approximately 19 minutes duration, and each of these subjected the pilot to about 5 minutes of weightlessness. The remaining three manned flights were orbital. Two of these flights involved the completion of three orbital passes, or about hours of weightlessness. The last orbital flight was extended to six orbital passes with nearly 10 hours of weightlessness. As a result of these flights, we have gained a wealth of information about space and man's ability to function in this new environment. There is, however, much which is yet to be learned regarding both of these aspects.
Aerospace medicine and project mercury
Real-time applications of celestial mechanics in the mercury program
Discussion of project mercury and the information obtained from the manned spaceflights
Investigation of spray-type condensers with mercury and water suitable for operation in the absence of a gravity field
Description of flight monitoring and ground control systems for project mercury
Discussion of mercury prelaunch preparations at the launch site, including the checkout philosophies and procedures
Description of the gemini project and how this program used successfully the knowledge gained by project mercury
Astronauts experiences during the flights of the mercury spacecraft
Confirmation of the astronomical unit reported by muhleman, using radar observations of mercury