DOE OSTI2024
Operational lifetime extensions of existing research reactors have emphasized the need for refurbishment, replacements, and upgrades to supporting equipment and instrumentation. The Advanced Test Reactor (ATR) at Idaho National Laboratory (INL), which entered service in 1967, has recently completed the sixth core internals change-out and has scheduled operations until at least 2040. Reactor maintenance and operational risk management is critically important in the research reactor community, however supporting measurement systems sometimes get overlooked when maintenance is planned. The Fission Wire Measurement System (FWMS) is a custom measurement system designed in the 1960s to measure the beta-particle activity of irradiated uranium-aluminum fission wires. This measurement is conducted to determine the fission rate profile of the Advanced Reactor Test Critical (ATR-C) facility. The ATR-C is an open-pool, low-power test reactor that was purpose driven to resemble ATR and is used to qualify experiment configurations and verify core models prior to full-power experiment irradiations in ATR. A power distribution measurement in ATR-C uses uranium-aluminum wires that are distributed throughout the ATR-C core to validate simulation and modeling results. These measurements require 340 to 1500 wires to be irradiated and measured within a 12-hour window. The activity of the wires is measured in the required time with the FWMS, which was put into service in 1965 at the Radiation Measurements Laboratory (RML). The system consists of 4 measurement channels and one reference channel, each with a 2-pi proportional gas flow detector and the measurement channels each have an automated sample changer. This legacy system is crucial to the continued operations of ATR and has undergone some minor hardware upgrades since 1965, however the system presently relies on custom control boards, custom gas ion chambers, analog amplifiers/discriminators, and a user interface (UI) for the system written in outdated code. Much of the equipment and software is custom with no commercial replacements or support and limited documentation. The existing control software requires an operating system that is no longer supported, creating more vulnerabilities to continued operations. A project is underway with a third-party vendor to design, build, and document a new control and data acquisition system (CDAS) for the FWMS. The new upgrade will replace the control system, computer, UI, sample changer motors, and main power supply while maintaining the interface with existing detector hardware. The upgraded system will be operated in parallel with the current hardware and software to conduct validation testing. This equipment upgrade demonstrates the commitment at ATR to ensuring successful operations and potential future research reactors at INL.
46 - INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AN↗