Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “unreliability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Bi-alkali antimonide photocathode growth: An X-ray diffraction study

Bi-alkali antimonide photocathodes are one of the best known sources of electrons for high current and/or high bunch charge applications like Energy Recovery Linacs or Free Electron Lasers. Despite their high quantum efficiency in visible light and low intrinsic emittance, the surface roughness of these photocathodes prohibits their use as low emittance cathodes in high accelerating gradient superconducting and normal conducting radio frequency photoguns and limits the minimum possible intrinsic emittance near the threshold. Also, the growth process for these materials is largely based on recipes obtained by trial and error and is very unreliable. In this paper, using X-ray diffraction, we investigate the different structural and chemical changes that take place during the growth process of the bi-alkali antimonide material K{sub 2}CsSb. Our measurements give us a deeper understanding of the growth process of alkali-antimonide photocathodes allowing us to optimize it with the goal of minimizing the surface roughness to preserve the intrinsic emittance at high electric fields and increasing its reproducibility.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

System Study: Emergency Power System 1998–2012

This report presents an unreliability evaluation of the emergency power system (EPS) at 104 U.S. commercial nuclear power plants. Demand, run hours, and failure data from fiscal year 1998 through 2012 for selected components were obtained from the Equipment Performance and Information Exchange (EPIX). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. A statistically significant increasing trend was identified for unreliability (8 hour model) as a function of fiscal year. No statistically significant decreasing trend was identified in the EPS results.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: Emergency Power System 1998-2020

This report presents an unreliability evaluation of the emergency power system (EPS) at 104 U.S. commercial nuclear power plants. Demand, run hours, and failure data from 1998 through 2020 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS), formerly the INPO Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. Statistically significant decreasing trends were identified in the industry-wide estimates of EPS system start-only mission as well as EPS system unreliability (8-hour mission).

99 GENERAL AND MISCELLANEOUS↗

Peer-to-peer architectures for exascale computing : LDRD final report.

The goal of this research was to investigate the potential for employing dynamic, decentralized software architectures to achieve reliability in future high-performance computing platforms. These architectures, inspired by peer-to-peer networks such as botnets that already scale to millions of unreliable nodes, hold promise for enabling scientific applications to run usefully on next-generation exascale platforms ({approx} 10{sup 18} operations per second). Traditional parallel programming techniques suffer rapid deterioration of performance scaling with growing platform size, as the work of coping with increasingly frequent failures dominates over useful computation. Our studies suggest that new architectures, in which failures are treated as ubiquitous and their effects are considered as simply another controllable source of error in a scientific computation, can remove such obstacles to exascale computing for certain applications. We have developed a simulation framework, as well as a preliminary implementation in a large-scale emulation environment, for exploration of these 'fault-oblivious computing' approaches. High-performance computing (HPC) faces a fundamental problem of increasing total component failure rates due to increasing system sizes, which threaten to degrade system reliability to an unusable level by the time the exascale range is reached ({approx} 10{sup 18} operations per second, requiring of order millions of processors). As computer scientists seek a way to scale system software for next-generation exascale machines, it is worth considering peer-to-peer (P2P) architectures that are already capable of supporting 10{sup 6}-10{sup 7} unreliable nodes. Exascale platforms will require a different way of looking at systems and software because the machine will likely not be available in its entirety for a meaningful execution time. Realistic estimates of failure rates range from a few times per day to more than once per hour for these platforms. P2P architectures give us a starting point for crafting applications and system software for exascale. In the context of the Internet, P2P applications (e.g., file sharing, botnets) have already solved this problem for 10{sup 6}-10{sup 7} nodes. Usually based on a fractal distributed hash table structure, these systems have proven robust in practice to constant and unpredictable outages, failures, and even subversion. For example, a recent estimate of botnet turnover (i.e., the number of machines leaving and joining) is about 11% per week. Nonetheless, P2P networks remain effective despite these failures: The Conficker botnet has grown to {approx} 5 x 10{sup 6} peers. Unlike today's system software and applications, those for next-generation exascale machines cannot assume a static structure and, to be scalable over millions of nodes, must be decentralized. P2P architectures achieve both, and provide a promising model for 'fault-oblivious computing'. This project aimed to study the dynamics of P2P networks in the context of a design for exascale systems and applications. Having no single point of failure, the most successful P2P architectures are adaptive and self-organizing. While there has been some previous work applying P2P to message passing, little attention has been previously paid to the tightly coupled exascale domain. Typically, the per-node footprint of P2P systems is small, making them ideal for HPC use. The implementation on each peer node cooperates en masse to 'heal' disruptions rather than relying on a controlling 'master' node. Understanding this cooperative behavior from a complex systems viewpoint is essential to predicting useful environments for the inextricably unreliable exascale platforms of the future. We sought to obtain theoretical insight into the stability and large-scale behavior of candidate architectures, and to work toward leveraging Sandia's Emulytics platform to test promising candidates in a realistic (ultimately {ge} 10{sup 7} nodes) setting. Our primary example applications are drawn from linear algebra: a Jacobi relaxation solver for the heat equation, and the closely related technique of value iteration in optimization. We aimed to apply P2P concepts in designing implementations capable of surviving an unreliable machine of 10{sup 6} nodes.

99 GENERAL AND MISCELLANEOUS↗

System Study: High-Pressure Coolant Injection 1998–2013

This report presents an unreliability evaluation of the high-pressure coolant injection system (HPCI) at 25 U.S. commercial boiling water reactors. Demand, run hours, and failure data from fiscal year 1998 through 2013 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10-year period, while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the HPCI results.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

System Study: High-Pressure Core Spray 1998–2013

This report presents an unreliability evaluation of the high-pressure core spray (HPCS) at eight U.S. commercial boiling water reactors. Demand, run hours, and failure data from fiscal year 1998 through 2013 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10-year period, while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the HPCS results.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

System Study: Isolation Condenser 1998–2013

This report presents an unreliability evaluation of the isolation condenser (ISO) system at four U.S. boiling water reactors. Demand, run hours, and failure data from fiscal year 1998 through 2013 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10-year period, while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the ISO results.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

System Study: Reactor Core Isolation Cooling 1998–2013

This report presents an unreliability evaluation of the reactor core isolation cooling (RCIC) system at 31 U.S. commercial boiling water reactors. Demand, run hours, and failure data from fiscal year 1998 through 2013 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10-year period, while yearly estimates for system unreliability are provided for the entire active period. No statistically significant trends were identified in the RCIC results.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

System Study: Auxiliary Feedwater 1998–2013

This report presents an unreliability evaluation of the auxiliary feedwater (AFW) system at 69 U.S. commercial nuclear power plants. Demand, run hours, and failure data from fiscal year 1998 through 2013 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10-year period, while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the AFW results.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

System Study: High-Pressure Safety Injection 1998–2013

This report presents an unreliability evaluation of the high-pressure safety injection system (HPSI) at 69 U.S. commercial nuclear power plants. Demand, run hours, and failure data from fiscal year 1998 through 2013 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10-year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the HPSI results.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

System Study: Emergency Power System 1998–2013

This report presents an unreliability evaluation of the emergency power system (EPS) at 104 U.S. commercial nuclear power plants. Demand, run hours, and failure data from fiscal year 1998 through 2013 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10-year period, while yearly estimates for system unreliability are provided for the entire active period. No statistically significant trends were identified in the EPS results.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

System Study: Residual Heat Removal 1998–2013

This report presents an unreliability evaluation of the residual heat removal (RHR) system in two modes of operation (low-pressure injection in response to a large loss-of-coolant accident and post-trip shutdown-cooling) at 104 U.S. commercial nuclear power plants. Demand, run hours, and failure data from fiscal year 1998 through 2013 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10-year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant trends were identified in the RHR results.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: Residual Heat Removal 1998-2022

This report presents an unreliability evaluation of the residual heat removal (RHR) system in two modes of operation (low-pressure injection in response to a large loss-of-coolant accident and in response to post-trip shutdown cooling) at 93 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS), formerly the INPO Consolidated Events Database. The unreliability results are trended for the most recent 10-year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the RHR results.

99 GENERAL AND MISCELLANEOUS↗

System Study: Isolation Condenser 1998-2022

This report presents an unreliability evaluation of the isolation condenser (ISO) system at three U.S. commercial operating boiling water reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from calendar year 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the ISO results.

99 GENERAL AND MISCELLANEOUS↗

System Study: High-Pressure Coolant Injection 1998-2022

This report presents an unreliability evaluation of the high-pressure coolant injection (HPCI) system at 22 U.S. commercial operating boiling water reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the HPCI results.

99 GENERAL AND MISCELLANEOUS↗

System Study: High-Pressure Safety Injection 1998–2012

This report presents an unreliability evaluation of the high-pressure safety injection system (HPSI) at 69 U.S. commercial nuclear power plants. Demand, run hours, and failure data from fiscal year 1998 through 2012 for selected components were obtained from the Equipment Performance and Information Exchange (EPIX). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the HPSI results.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: High-Pressure Coolant Injection 1998-2012

This report presents an unreliability evaluation of the high-pressure coolant injection system (HPCI) at 69 U.S. commercial nuclear power plants. Demand, run hours, and failure data from fiscal year 1998 through 2012 for selected components were obtained from the Equipment Performance and Information Exchange (EPIX). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the HPCI results.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: Reactor Core Isolation Cooling 1998–2012

This report presents an unreliability evaluation of the reactor core isolation cooling (RCIC) system at 31 U.S. commercial boiling water reactors. Demand, run hours, and failure data from fiscal year 1998 through 2012 for selected components were obtained from the Equipment Performance and Information Exchange (EPIX). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing trend was identified in the HPCI results. Statistically significant decreasing trends were identified for RCIC start-only and 8-hour trends.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗