Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “interconnections”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Evolution of Distributed Energy Resource Grid Interconnection Standards for Integrating Emerging Storage Technologies

Grid interconnection standards facilitate safe and reliable grid integration of distributed energy resources (DERs). Evolution of a standard for DERs is expected to capture and accommodate widely different characteristics of DER and minimize unique grid integration challenges. This makes development of a uniform grid interconnection standard for all types of DERs a challenging and an ever-evolving consideration. This paper presents a detailed timeline of evolution, from the early 2000s to 2018, of DER interconnection standards and the research that informed their development. This is followed by a review of the research topics being considered in the grid integration of Energy Storage Systems (ESSs) which are expected to have the most significant growth amongst all DER types. These help in highlighting the need for a new standard to accommodate the unique characteristics of ESSs, and where the existing DER interconnection standard frameworks may be leveraged.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluating Interconnection Queue Impacts Using Hosting Capacity Analysis

The interconnection queue has been identified as a bottleneck in the efforts to shift the nations generation resources towards renewable sources and meet various state and federal goals. Efforts such as the interconnection innovation e-Xchange (i2X) are therefore trying to come up with ways in which the queue could be altered to make interconnection faster, cheaper, and fairer. This paper proposes using hosting capacity analysis methods to simulate the evolution of a power system as new resources are added. Modeling the interconnection process in this way enables simulation based study of various policy decisions for queue management and cost allocation. Sample results are presented to illustrate how some queue modifications might play out both in distribution and transmission systems.

Distributed Energy Resources, Interconnection↗

Use of Operating Agreements and Energy Storage to Reduce Photovoltaic Interconnection Costs: Conceptual Framework

This report explores one integrated technical and process concept designed to manage interconnection costs and streamline interconnection timelines to support near-term renewable energy deployment. We describe a new agreement between renewable energy developers and utilities, informed by the technical analysis. The agreement defines the operational parameters for a renewable energy system, with the goal of reducing risk and cost to all parties. This work provides a foundation upon which other states and utilities may build proof of concept. This report is supported by a technical analysis that is detailed in a companion report, "Use of Operating Agreements and Energy Storage to Reduce Photovoltaic Interconnection Costs: Technical and Economic Analysis" (McLaren et al. 2022).

14 SOLAR ENERGY↗

Regional inertia dynamics of U.S. interconnections: An event-based measurement approach

Power grid inertia plays a vital role in frequency stability following large disturbances, yet its distribution across the U.S. grid is highly uneven. While interconnection-wide inertia benchmarks are useful, they can mask regional variability driven by resource mix, network coupling, and geographic separation. This paper extends event-driven inertia estimation to the regional scale using field measurements from the Frequency Monitoring Network (FNET/GridEye). Starting from balancing authority and independent system operator footprints, candidate regions are refined using a composite coherency score that combines frequency-trajectory shape similarity, timing spread, and lead/lag behavior to ensure dynamic consistency. A filtered sliding difference method (FSDM) is then used to construct regional frequency trajectories, detect disturbance onset, and compute robust regional rate-of-change of frequency (RoCoF). Regional, local, and interconnection inertia are estimated by combining RoCoF with event power imbalance, and additional indicators (regional-to-system inertia ratio and inertial-support arrival time) quantify regional-to-interconnection coupling and relative regional contributions. The method is demonstrated on eleven regions across the Eastern Interconnection (EI) and the Western Electricity Coordinating Council (WECC), with the Electric Reliability Council of Texas (ERCOT) used for validation. In ERCOT, estimates compared against energy management system (EMS) values achieve a mean absolute percentage error of 17.94%. WECC exhibits consistently shorter inertial-support arrival times (0.15–0.3 s) than EI (0.7–1.1 s), highlighting contrasting coupling and disturbance-propagation behavior. Overall, the results reveal pronounced spatial heterogeneity in inertia and coupling, underscoring the value of regional monitoring for both operational decision-making and long-term system planning.

Disturbance events↗

High-bandwidth density silicon photonic resonators for energy-efficient optical interconnects

The growth of artificial intelligence applications demands ever larger and more complex deep learning models, dominating today's—and tomorrow's—data center and high-performance computing systems. While traditional electronics are failing to keep pace with application demands, silicon photonic (SiPh) interconnects have emerged as a necessary technology to support these systems. SiPh-driven wavelength-division multiplexing (WDM) offers a particularly promising path toward supporting incredibly high-aggregate link bandwidth in a compact and efficient form factor. One of the basic building blocks of these integrated WDM interconnects is the SiPh resonator. Their inherent wavelength selectivity and compact footprint allow for efficient data transmission multiplexed across dozens of carrier wavelengths. Used as add-drop (AD) filters, SiPh resonators are critical to constructing integrated tunable wavelength-selective optical circuit switches as well as for demultiplexing the different carrier wavelengths toward independent wavelength-insensitive photodiodes in a dense wavelength-division multiplexing receiver. Resonators in the all-pass (AP) configuration are widespread as well, allowing for wavelength-selective modulation to drive aggregate link bandwidths far beyond the individual channel data rate. Unlike SiPh Mach–Zehnder modulators (MZM), resonant modulators can be driven using low, complementary metal-oxide-semiconductor drive voltages, allowing for tight co-integration between photonic integrated circuits, fabricated with larger process node technologies, and electronic integrated circuits, designed to exploit the advantages of the latest node. To push toward practical peta-scale interconnects, a comprehensive review of SiPh resonators is required, addressing bottlenecks and design constraints at both the architecture and device levels. We first describe the predominant integrated link architectures and identify their limits. We then discuss the device-level design considerations that can be made for both AD and AP configuration resonators to overcome the system level limits with novel resonator device designs. Analytical models and numerical simulation of resonators are validated by experimental measurement of devices fabricated in a commercial 300-mm foundry, showing a clear path toward volume manufacturing. The demonstrated resonant modulators and filters support the feasibility of increasing the aggregate bandwidth of resonator-driven SiPh interconnects into the peta-scale regime.

42 ENGINEERING↗

Inertia Estimation and Trend Analysis of the United States Power Grid Interconnections

The transition from conventional to modern power systems is causing an increase in integration of inverter-based resources (IBRs). This generally leads to a decrease in total system inertia, which in-turn increases the system’s rate-of-change-of-frequency (RoCoF) during disturbances. This poses a threat to the frequency stability of the system and may falsely trigger protective devices. To monitor system status and plan for integrating renewable energy sources like photovoltaic, wind, and energy storage systems, a realistic study of inertia estimation and analysis in the United States (US) over the past decade is needed. This paper uses field-measured phasor measurement unit (PMU) data collected throughout the US from 2013 to 2023 via the Frequency Monitoring Network (FNET/GridEye) operated by the University of Tennessee, Knoxville (UTK) and Oak Ridge National Laboratory (ORNL). The collected PMU frequency data is utilized to estimate the system inertia of the three US interconnections: Eastern, Western, and Texas. Various RoCoF time windows are investigated for estimating the inertia of each interconnection by maximizing the correlation coefficient between the measured RoCoF and power mismatch. The resulting inertia trends over the past decade show approximately a 6% decline in inertia in the Eastern interconnection, a 15% decline in inertia in the Western interconnection, and a 16% increase in inertia in Texas. Key insights into how inertia is changing amidst the complex energy landscape are extracted using the fuel mix trend data. This provides valuable information for future energy strategies and planning.

30 DIRECT ENERGY CONVERSION↗

Resilient Communication Scheme for Distributed Decision of Interconnecting Networks of Microgrids

Networking of microgrids can provide the operational flexibility needed for the increasing number of DERs deployed at the distribution level and supporting end-use demand when there is loss of the bulk power system. But, networked microgrids are vulnerable to cyber-physical attacks and faults due to the complex interconnections. As such, it is necessary To design resilient control systems to support the operations of networked microgrids in responses to cyber-physical attacks and faults. This paper introduces a resilient communication scheme for interconnecting multiple microgrids to support critical demand, in which the interconnection decision can be made distributedly by each microgrid controller even in the presence of cyberattacks to some communication links or microgrid controllers. This scheme blends a randomized peer-to-peer communication network for exchanging information among controllers and resilient consensus algorithms for achieving reliable interconnection agreement. The network of 6 microgrids divided from a modified 123-node test distribution feeder is used to demonstrate the effectiveness of the proposed resilient communication scheme.

Vu, Thanh Long↗

Automating the Solar Interconnection Technical Evaluation Process: PREconfiguring and Controlling Inverter SEt-Points (PRECISE)

Utilities are receiving an increasing number of interconnection requests for distributed solar photovoltaic (PV) systems from their customers, requiring a solution to quickly and intelligently perform technical assessments of these requests and to manage these new renewable energy assets. In this paper, we present a stand-alone interconnection tool, PREconfiguring and Controlling Inverter SEt-points (PRECISETM), and how it overcomes the challenges of accelerating technical evaluations and leverages smart inverter functionality to provide local voltage support on an as-needed basis. The paper details the purpose and architecture of PRECISE, including tools, data source requirements, the model-based interconnection evaluation process, and technical results. PRECISE is an integrated software tool that customizes PV inverter settings for utilities by modeling and assessing impacts on local voltages and the need for advanced inverter functions (AIFs) (e.g., volt-VAR and volt-watt). PRECISE maximizes the use of readily available utility data sets to make fast online assessments of incoming PV interconnection requests and makes accept/reject recommendations along with custom settings for AIFs.

ENERGY PLANNING, POLICY, AND ECONOMY,SOLAR ENERGY↗

Beyond the Bridge: Contention-Based Covert and Side Channel Attacks on Multi-GPU Interconnect

Recently, high-speed interconnects like NVLink have become a standard integration in modern multi-GPU systems, serving as a crucial bridge between CPUs and GPUs. This study highlights the vulnerability of multi-GPU systems to covert and side-channel attacks arising from congestion on these interconnects. An adversary, operating without special permissions, can extract private information about a victim's activities by monitoring NVLink congestion. Specifically, we leverage this insight to develop a covert channel attack across two GPUs, achieving a respectable bandwidth of 33 Kbps. Additionally, we introduce a side-channel attack that allows attackers to fingerprint applications on a remote GPU by probing the shared NVLink interconnect. We underscore the urgent nature of the threats posed by these attacks and advocate for heightened awareness within both industry and academia to implement multi-GPU interconnects with enhanced security measures.

Zhang, Yicheng↗

Phase-field simulations of fission gas bubble growth and interconnection in U-(Pu)-Zr nuclear fuel

Abstract The growth and interconnection of fission gas bubbles in the hotter central regions of U-(Pu)-Zr nuclear fuel has been simulated with a phase-field model. The Cahn-Hilliard equation was used to represent the two-phase microstructure, with a single defect species. The volume fraction of the bubble phase and surface area of the bubble-matrix interface were determined during growth and interconnection. Surface area increased rapidly during the initial stages of growth, then slowed and finally decreased as bubble interconnection began and coarsening acted to reduce surface area. The fraction of the bubbles vented to a simulation domain boundary, f V , was quantified as a measure of the microstructure’s interconnectivity and plotted as a function of porosity p . The defect species diffusivity was varied; although changes in diffusivity significantly affected the microstructure, the plots of f V vs. p did not change significantly. The percolation threshold p c was calculated to be approximately 0.26, depending on the assumed diffusivity and using an initial bubble number density based on experimental observations. This is slightly smaller than the percolation threshold for continuum percolation of overlapping 3D spheres. The simulation results were used to parameterize two different engineering-scale swelling models for U-(Pu)-Zr in the nuclear fuel performance code BISON.

Aagesen, Larry K. (ORCID:000000034936676X)↗

Low loss fiber-coupled volumetric interconnects fabricated via direct laser writing

Photonic integrated circuits (PICs) are vital for high-speed data transmission. However, optical routing is limited in PICs composed of only one or a few stacked planes. Further, coupling losses must be low in deployed systems. Previously, we developed the subsurface controllable refractive index via beam exposure (SCRIBE) technique to write accurate 3D gradient refractive index (GRIN) profiles within a mesoporous silica scaffold. Here, we apply SCRIBE to fabricate low loss, broadband, polarization insensitive, fiber-coupled, single-mode volumetric interconnects that include waveguides traversing arbitrary 3D paths. By seamlessly integrating mode-matching subsurface lenses and GRIN waveguide tapers, calibrating for positional writing errors, implementing multipass exposure, automating alignment, and switching to antireflection coated fibers, we reduced the insertion loss for a fiber-PIC-fiber interconnect from 50 to 2.14 dB, or 1.47 dB, excluding the fiber array’s loss. Further, we establish an upper bound of 0.45 dB loss per coupler. We report quality factors of 27,000 and 77,000 and bending losses of 6 and 3 dB/cm for 15 and 30 µm radii microrings, respectively. We also demonstrate Bézier escalators, polarization-rotating and polarization-splitting interconnects, and a seven-channel 25 µm pitch volumetric interconnect. The SCRIBE platform presents a clear path toward realizing 3D PICs with unique functionality.

Optics↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2020

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While many projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2020, as well as data on "completed" and "withdrawn" projects for five of the ISOs (CAISO, ISO-NE, MISO, NYISO, PJM). We find that the total capacity active in the queues is growing year-over-year, with over 750 GW of generation and an estimated 200 GW of storage capacity as of the end of 2020. Solar (462 GW) accounts for a large – and growing – share of generator capacity in the queues. Substantial wind (209 GW) capacity is also in development, 29% of which is for offshore projects (61 GW). In total, about 680 GW of zero-carbon capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 159 GW of solar hybrids (primarily solar+battery) and 13 GW of wind hybrids are currently active in the queues. However, much of this proposed capacity will not ultimately be built. Among a subset of queues for which data are available, only 24% of the projects seeking connection from 2000 to 2015 have subsequently been built. Completion percentages appear to be declining, and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: in four ISOs, the typical duration from connection request to commercial operation increased from ~1.9 years for projects built in 2000-2009 to ~3.5 years for those built in 2010-2020. There are growing calls for queue reform to reduce cost, lead times, and speculation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Seamless Hybrid-integrated Interconnect NEtwork (SHINE)

Large-scale date centers are becoming increasingly limited by the capacity of interconnects due to the rapid increasing power consumption and bandwidth demands driven by the rigorous down scaling of CMOS critical dimensions in according with the Moore’s Law. As a result of the continuing bandwidth scaling, optical interconnects based on parallel optics, where data are simultaneously transmitted along more than one lane, have becoming a preferred interconnected solution over copper cables. To building an efficient optical interconnect system, optical coupling between different elements, such as optical fibers, photonics chips, is a critical step, which is challenging due to the mode mismatch of varies optical ports. In this project, we proposed and demonstrated an optical interfacing scheme, which provided a light coupling approach with low energy loss, broadband operation, high alignment tolerance and compatible with scalable fabrication and testing. Here, the mode transformation is achieved by a total internal reflection from a chip integrated microscale freefrom surface. Due to the enormous light wavefront manipulating ability associated with the gigantic design space, the freeform couplers platform is universally applicable to a wide range of optical coupling scenarios, such as the interfacing between a waveguide to a fiber, another waveguide, surface normal device, or free space.

42 ENGINEERING↗

Distributed Energy Resource Interconnection Roadmap

Adopting strategic reforms to DER interconnection can help reduce interconnection delays, fairly allocate costs, improve transparency and equity, and support efficient and strategic investment in distribution and sub-transmission grids that can accommodate a rapidly evolving energy landscape. The Interconnection Innovation e-Xchange envisions this roadmap and its transmission system companion volume as collaborative resources to facilitate continued stakeholder discussions, problem-solving, and innovation as the U.S. works together to enable simpler, faster, and fairer interconnection of clean energy resources all while enhancing the reliability, resiliency, and security of our electric grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

IM3 Projected U.S. Western Interconnection Grid Stress Dataset

This dataset provides projected grid stress and reliability results (including all model inputs and outputs from GO WEST and TEP) for Integrated Multisector, Multiscale Modeling (IM3) Phase 2 simulations across eight different scenarios for the U.S. Western Interconnection through 2055. The scenarios include combinations of two Shared Socioeconomic Pathways (SSP3 and SSP5) with four high-resolution climate projections specific to the United States from a set of Thermodynamic Global Warming (TGW) simulations. These climate projections include "hotter" and "cooler" variants for two Representative Concentration Pathways (RCP4.5 and RCP8.5). The resulting eight simulations are: rcp45cooler_ssp3 rcp45cooler_ssp5 rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85cooler_ssp3 rcp85cooler_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 GO WEST is an open-source power grid modeling framework for the U.S. Western Interconnection, which allows users to tailor the model depending on their research study and science questions. It covers 28 balancing authorities (BAs) and 12 states in U.S. Western Interconnection. GO WEST allows users to select different number of nodes and come up with a simplified network by utilizing 10,000 nodal topology of the U.S. Western Interconnection (ACTIVSg10k). Users can select different number of nodes, mathematical formulations (linear programming vs. mixed-integer linear programming), transmission line limit scaling factors, and hurdle rate scaling factors. GO WEST offers a unit commitment and economic dispatch (UC/ED) module to simulate grid operations on an hourly scale. In this sense, users can calibrate and validate their model versions by comparing model outputs to historical datasets. TEP is an open-source transmission capacity expansion model, built on the GO WEST framework. It utilizes linear programming to optimize transmission capacity addition investment on existing lines within the GO WEST framework. The TEP model only increases the thermal capacity of existing transmission lines and does not add new lines to the system, which leaves the topology preserved. In order to use TEP model, users need to create scenarios with the GO WEST framework. Please refer to README file for a detailed description of the dataset including individual files and references.

Capacity Expansion Model↗

Encoding of symbols for a computer interconnect based on frequency of symbol values

Data are serially communicated over an interconnect between an encoder and a decoder. The encoder includes a first training unit to count a frequency of symbol values in symbol blocks of a set of N number of symbol blocks in an epoch. A circular shift unit of the encoder stores a set of most-recently-used (MRU) amplitude values. An XOR unit is coupled to the first training unit and the first circular shift unit as inputs and to the interconnect as output. A transmitter is coupled to the encoder XOR unit and the interconnect and thereby contemporaneously sends symbols and trains on the symbols. In a system, a device includes a receiver and decoder that receive, from the encoder, symbols over the interconnect. The decoder includes its own training unit for decoding the transmitted symbols.

SeyedzadehDelcheh, SeyedMohammad↗

Foundations for the Future Power System: Inverter-Based Resource Interconnection Standards

As power systems evolve to become reliant on solar, wind, batteries, and other inverter-based resources (IBRs), it is essential that those resources meet certain minimum performance and capability criteria designed to ensure the power system operates stably and reliably. Because those criteria, as enshrined in interconnection standards, take years to develop and are very long lived, they need to account for not only the present state of the power system but also its expected future state over the lifetime of the power plants to which they will apply. In addition, they need to be specific enough to ensure reliability without over specifying and, thereby, impeding innovation. Because power systems are shifting rapidly from a state where IBRs make up a small to medium portion of generation to one where the generation will, at times, come predominantly from IBRs, interconnection standards are especially challenging to develop today. Good interconnection standards can make the power system more reliable and less costly to operate, whereas poorly designed standards can lead to major problems, like the famous German 50.2-Hz problem, which introduced a risk of losing many gigawatts of solar on a frequency excursion and resulted in many IBRs being retrofitted at great cost to mitigate a major system reliability risk. Readying the power system by specifying forward-looking technical minimum functional capabilities for IBRs can be an effective approach to avoid future retrofits.

data models↗

The Value of Increased HVDC Capacity Between Eastern and Western U.S. Grids: The Interconnections Seam Study

The Interconnections Seam Study examines the potential economic value of increasing electricity transfer between the Eastern and Western Interconnections using high-voltage direct-current (HVDC) transmission and cost-optimizing both generation and transmission resources across the United States. The study conducted a multi-model analysis that used co-optimized generation and transmission expansion planning and production cost modeling. Four transmission designs under eight scenarios were developed and studied to estimate costs and potential benefits. The results show benefit-to-cost ratios that reach as high as 2.9, indicating significant value to increasing the transmission capacity between the interconnections under the cases considered, realized through sharing generation resources and flexibility across regions.

13 HYDRO ENERGY↗