Engineering Papers⌕ Search

DOE OSTI · 2537873

Evaluating Interconnection Queue Impacts Using Hosting Capacity Analysis

Abstract

The interconnection queue has been identified as a bottleneck in the efforts to shift the nations generation resources towards renewable sources and meet various state and federal goals. Efforts such as the interconnection innovation e-Xchange (i2X) are therefore trying to come up with ways in which the queue could be altered to make interconnection faster, cheaper, and fairer. This paper proposes using hosting capacity analysis methods to simulate the evolution of a power system as new resources are added. Modeling the interconnection process in this way enables simulation based study of various policy decisions for queue management and cost allocation. Sample results are presented to illustrate how some queue modifications might play out both in distribution and transmission systems.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Schweitzer, Eran, McDermott, Thomas E., Radatz, Paulo. 2024-10-04. Evaluating Interconnection Queue Impacts Using Hosting Capacity Analysis. https://doi.org/10.1109/pesgm51994.2024.10688458

Cite the original work for its findings. Save a collection to share your selection of sources.