Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “groundwater pumping”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Predicting future well performance for environmental remediation design using deep learning

Here in this study, we developed a deep learning (DL) framework with a multi-channel three-dimensional convolutional neural network (MC3D-CNN) to predict well performance and thereby assist future environmental remediation design. Such prediction of extraction well performance at designated locations is critical for configuring pump-and-treat (P&T) well network design and operation, setting reasonable target closure dates for overall remedying, and estimating remedy costs. The framework is developed with operational and monitoring data routinely collected during P&T remedy operations, including well extraction and injection rates as well as in situ contaminant concentrations. Traditionally, the collected data were rarely used for purposes other than assessing past well performance and the accuracy of the conceptual site model. However, recent advances in data-driven computational approaches enable better use of the large datasets to inform future well performance, enhance site characterization, and improve remediation planning. In this study, we established a DL framework to integrate transient three-dimensional contaminant plumes and multiple aquifer properties (e.g., hydraulic conductivity and hydrostratigraphic maps) to identify characteristic patterns controlling and representing extraction well mass recovery, aiming at providing future mass recovery estimates for existing wells and candidate wells at any proposed locations. We evaluated our framework by using a realistic synthetic dataset generated from a well-calibrated flow and transport model used in the 200 West Area of the U.S. Department of Energy’s Hanford Site in southeastern Washington state. The multi-channel feature in our framework allows integration of various types and temporal densities of training datasets for DL model development. Overall, we found that the trained DL model achieved an accuracy of over 90% in ranking extraction well performance in validation datasets, and over 80% in predicting high-performance-ranking well locations. This data-informed approach provides a flexible tool to support adaptive site management, streamline decision-making, and potentially reduce remediation time and costs. Our DL framework can be used as a filtering tool to improve the current P&T network optimization design by reducing the number of candidate well locations.

54 ENVIRONMENTAL SCIENCES↗

Reduction and potential remediation of U(VI) by dithionite at an in-situ recovery mine: Insights gained by δ 238 U

In-situ recovery is a common method of mining U ore. This technique involves injecting an oxidant to oxidize U deposited as insoluble U(IV) to soluble U(VI) and a complexing agent to form mobile U(VI) compounds, which are extracted from mining waters. Unfortunately, U concentrations often remain elevated in groundwater following this mining process. One promising technique to decrease U concentrations to acceptable levels is in-situ remediation where a reductant is injected into the mined area to reduce U(VI) back to insoluble U(IV). Here we assess the efficacy of the chemical reductant dithionite to reduce U(VI) concentrations. While dithionite can reduce environmental Cr(VI), dithionite has previously never been tested for reducing U(VI) in the environment. We determine how effectively dithionite remediates U(VI) contamination using aqueous U concentration and δ 238 U data. U concentrations and δ 238 U decrease during the dithionite experiment, demonstrating that dithionite induces U(VI) reduction. As dithionite is removed by pumping, U concentrations and δ 238 U increase towards background levels, but U(VI) reduction continues for an extended period. In conclusion, measurements demonstrate that re-oxidation and remobilization does not appear to occur due to the reducing condition of groundwater.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Comparative performance assessment of air-source and ground-source heat pumps using CO₂ and R-410A with water well integration: A simulation study

This study investigates the performance and feasibility of heat pump systems for residential space heating in cold climates, with a particular focus on ground source heat pumps (GSHPs) with water wells. Four configurations are modeled and compared, a CO 2 air-source heat pump (ASHP), an R-410A ASHP, a CO 2 GSHP with water well integration, and an R-410A ground-source heat pump with water well integration. System simulations are conducted at both equipment and whole-building levels, followed by a nationwide analysis across ten representative cities using EnergyPlus. Results show that water-well-coupled GSHPs maintain approximately 87 % of their efficiency and 85.5 % of heating capacity as ambient temperature drops from 47 °F/8.3 °C to −15 °F/-26.1 °C, whereas ASHPs retain only 55 % efficiency and 44.5 % capacity. R-410A systems achieve higher efficiency, while CO 2 systems provide significant environmental advantages, including reduced risks of groundwater contamination from refrigerant leakage. On average, the CO 2 GSHPs deliver 35–45 % heating energy savings relative to ASHPs and demonstrate strong potential as a replacement for gas furnaces in cold climates. This work represents a systematic comparative assessment of CO 2 and R-410A air-source and ground-source heat pumps with water well integration. In conclusion, the findings highlight the technical viability, environmental benefits and deployment potential of CO 2 GSHPs, offering a pathway toward efficient and sustainable residential heating solutions in diverse U.S. climates.

CO 2 GSHP↗

The Use of Silver Chloride Injection in Remediation of Iodine-129 by In Situ Capture as Silver Iodide at the F-Area Seepage Basin - 20225

The Savannah River Site (SRS) produced tritium, plutonium, and special nuclear materials for national defense, medicine, and the space programs. As part of operations, the F-Area Seepage Basins operated until 1988 for the disposition of deionized acidic wastewater from the F Separations Facility. The wastewater contained dilute nitric acid and low concentrations of non-radioactive metals, and radionuclides, with the major isotopes being Cs-137, Sr-90, U-235, U-238, Pu-239, Tc-99, I-129, and tritium. The seepage basins were closed in 1988 and backfilled and capped by 1991. The groundwater emanating from beneath the closed and capped seepage basins is acidic and contains elevated levels of both chemical and radiological contaminants. Releases from the groundwater plumes sourced from the F-Area Seepage Basins have impacted the water quality of Fourmile Branch, which is a small tributary to the Savannah River, a regional water source. A large pump-and-treat system was constructed in 1997 and operated until 2003 in an attempt to capture the releases to Fourmile Branch. The system in F Area and a similar system in H Area were expensive (∼$1.3 M/month) to operate and produced large quantities of radioactive waste, with concentrations of I- 129 too high to be disposed of at the SRS. In 2004, SRS replaced pump-and-treat with a funnel and gate system that along with operation of a base injection system at the gates reduces the flux of contaminants to the wetlands adjacent to Fourmile Branch. The alkaline solution injected into the aquifer neutralizes the acidic plume and immobilizes many of the cationic constituents. However, base injection is not effective in managing the release of iodine-129, an anionic contaminant. To address iodine-129 SRS and the Savannah River National Laboratory developed an in situ technology that uses ultra-fine ground silver chloride (AgCl) as an injectable capture medium for the sequestration of iodine-129. The AgCl amendment has a very small particle size and is designed to be injected into the contaminated aquifer to capture iodine-129. Dissolved iodine-129 forms a stable and highly insoluble solid (silver iodide) upon contact with AgCl. Laboratory studies, a field scale pilot test (2009), and three deployments (2011, 2015 and 2019) of AgCl have been successfully performed at the F-Area Seepage Basins. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reproducibility of Radiokrypton in Deep Desert Aquifers: Insights from a Decade of Research

Great technical advances have been achieved since the first atom-trap trace analysis (ATTA) -based radiokrypton application in Egypt, where 1 Myr old groundwater was discovered. Beyond advances in ATTA measurement capabilities, including reduction in sample size, analysis duration, and analytical uncertainty, major progress has been achieved over the past two decades in the sample collection and preparation techniques. These advances paved the expansion of ATTA-based noble gas applications to many other aquifers worldwide, illuminating the nature and flow pattern of deep groundwater systems. While the potential of this new analytical technique for old groundwater dating is well recognized, another important aspect yet to be examined is the reproducibility of radiokrypton in aquifers over time, i.e., how representative is a discrete groundwater sample, collected at a specific time and location, for the natural groundwater system? The likelihood of a negative answer is increased by flow-field disturbance in aquifers following massive groundwater abstraction. Here, in this work, we present repeated 81 Kr sampling and measurements in twenty-one sites over Israel, mostly of deep (up to 1 km) wells tapping confined aquifers in the arid to hyperarid Negev desert. The results demonstrate that radiokrypton measurements are indeed reproducible, even in cases where samples were collected as long as nine years apart and from highly productive (∼1 Mm 3 /yr order) pumping wells. Furthermore, many of the repeated measurements in this study (17 out of the 21 sites) were conducted with different ATTA Instruments in two different laboratories using slightly different sampling, preparation, and analysis techniques, yet with an overall good agreement. The consistency in the ATTA-based 81 Kr-dating results over time highlights the robustness of this state-of-the-art technique as a tool to unravel groundwater flow patterns and encourages further applications to many other yet-to-be-explored deep aquifers.

atom-trap trace analysis↗

CY2019 Annual Closure Monitoring Report for Corrective Action Unit 98, Frenchman Flat, Underground Test Area, Nevada National Security Site, Nevada (January 2019–December 2019), Revision 1

Three types of monitoring are performed for CAU 98: water quality, water level, and institutional control. These are monitored to determine whether the URs remain protective of human health and the environment, and to ensure that the regulatory boundary objectives are being met. Monitoring data will be used in the future, once multiple years of data are available, to evaluate consistency with the groundwater flow and contaminant transport models because the contaminant boundaries calculated with the models are the primary basis of the UR boundaries. Six wells were sampled for water-quality monitoring in 2019. Contaminants of concern were detected only in the two source/plume wells already known to contain contamination as a result of a radionuclide migration experiment. Tritium concentrations in both of these wells, RNM-2S and UE-5n, remain above the Safe Drinking Water Act maximum contaminant level of 20,000 picocuries per liter but declined in 2019 as compared to measurements in 2018. All other contaminants of concern are below the minimum detection level plus analytical error. The water-level monitoring network includes 16 wells. Depth to water measured in 2019 is generally consistent with recent measurements for all wells. Many wells continue to exhibit a long-term downward trend in water level, though changes from 2018 to 2019 are minimal. The sharp 2016 decline in water level in Well ER-5-3-2 remains unexplained, with the lower level persisting through 2019. Rising water-level trends continue to be observed in Well ER-5-3 deep piezometer and former water supply Well WW-5A. Water supply Well WW-5B experienced a rise in water level as a result of an absence of pumping in the first part of the year (due to a mechanical problem), whereas water levels declined in WW-4 and WW-4A in response to greater pumping in 2019. Institutional control monitoring confirmed the URs are recorded in U.S. Department of Energy and U.S. Air Force land management systems, and that no activities within Frenchman Flat basin are occurring that could potentially affect the contaminant boundaries. Survey of groundwater resources in basins surrounding Frenchman Flat similarly identify no current or pending development that would indicate the need to increase monitoring activities or would otherwise cause concern for the closure decision. The URs continue to prevent exposure of the public, workers, and the environment to contaminants of concern by preventing use of potentially contaminated groundwater.

54 ENVIRONMENTAL SCIENCES↗

Adaptive Site Management Strategies for the Hanford Central Plateau Groundwater

Adaptive site management (ASM) is a systematic and iterative management approach that can be used to expedite the remediation of large and/or complex sites. ASM is defined as a formal and systematic project or site management approach centered on rigorous site planning and a firm understanding of site conditions and uncertainties, using science and technology to routinely re-evaluate and prioritize site remedial actions and characterization activities. The goal of the approach is to create a framework of structured and continuous planning, implementation, and assessment processes that accommodates new information and changing site conditions to develop effective and efficient cleanup approaches that achieves the required outcome(s) while optimizing costs, cleanup timeframe, and performance. Central to ASM is an evolving conceptual site model (CSM). Over time, incremental reductions in uncertainty associated with the CSM will occur, while supporting continued progress toward site cleanup and closure through remedy optimization and evaluation. ASM has the potential to expedite cleanup for the Central Plateau area at Hanford through a planned and systematic approach for reducing uncertainty with targeted characterization activities, while continuing remediation activities that advance cleanup for key risk-driving contaminants. A core component of cleanup within the Central Plateau is the 200 West Pump-and-Treat (P&T) system. Even with an active P&T remedy, uncertainty exists with respect to plume distributions, total mass in the aquifer, and currently known continuing sources. Additional uncertainty is associated with multiple contaminant source locations in the vadose zone, which have the potential to create new groundwater plumes in the absence of any source control measures, although not all contaminant fluxes to groundwater will result in contaminant concentrations above cleanup levels. Collectively, these uncertainties need to be addressed in the CSM to support effective and efficient site progress toward cleanup goal(s). Other nontechnical factors that may warrant an ASM approach at the Hanford Central Plateau are associated with the formation of operable units (OUs) used to manage cleanup. With the exception of the 200-ZP-1 OU, the three remaining groundwater OUs only have interim action records of decision. Nine vadose zone source area OUs are also in the early stages of the remedial investigation and feasibility study process, with pending characterization and technology identification activities. A set of proposed site objectives for the Central Plateau are provided in this document as an initial consideration/example and basis for discussion for ASM implementation. These example site objectives were selected with the goal of maintaining protectiveness at the Columbia River through confinement of contaminant plumes within an administratively controlled area below existing surface waste sites and waste disposal facilities. Although site decision makers and regulators need to provide concurrence, these site objectives are used in this document to describe the elements of an ASM approach, including selection of interim objectives and a long-term adaptive management plan. Interim objectives are also defined to yield measurable incremental progress toward the overall site goals. This document identifies initial technical considerations for developing an ASM framework for the Central Plateau cleanup decisions. These considerations are intended to facilitate more specific decisions, such as objectives, near- and long-term actions, and performance metrics, to develop an overall approach that maintains protectiveness but recognizes the uncertainty, long timeframe, and technical challenges that need to be considered in selecting, implementing, and managing remediation at the Hanford Central Plateau.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Guidance for Monitoring Passive Groundwater Remedies Over Extended Time Scales

Passive remediation can be appropriate where natural processes and actions such as institutional controls mitigate exposure to contaminated groundwater, achieving remedial action objectives and protectiveness of human health and the environment. Monitored natural attenuation (MNA) is a prevalent passive remediation strategy supported by a regulatory framework and monitoring design guidance. However, long-term passive remedies are usually selected in combination with at least one active remedy, such as source removal, in situ treatment, or pump-and-treat, functioning as a complementary method for achieving remediation objectives and meeting the applicable statutory and regulatory requirements. However, MNA and existing monitoring guidance primarily target situations where the remedial action objectives are met within a few decades. When time scales for passive remediation extend to many decades (50 years or more), a corresponding change in monitoring strategy is needed to adapt to the extended time scale. This document provides guidance for implementing an extended-scale monitoring (ESM) approach appropriate for long-duration passive remediation. Extended-scale is defined in this document with respect to time (i.e., a long duration of remediation) and a large enough physical scale such that downstream receptors will not be impacted within the remediation timeframe. ESM applies to slow-moving groundwater contaminant plumes and emphasizes monitoring primarily for potential exposure pathways. For this approach, the primary monitoring objective is to demonstrate that the plume diminishes before reaching the receptor zone or point of compliance and/or a receptor does not receive concentrations above the compliance limit. While the overall objectives of protecting human health and the environment are the same as for plumes where remediation can occur over a shorter time period, the time scales between decisions are longer and the dynamics of plume evolution are slower. To this end, a scenario-based strategy is described for different plume and source conditions, defining a containment and receptor zones. The containment zone is the area where the risk of exposure to groundwater contamination can be mitigated (e.g., through institutional controls) during the remediation time period. The receptor zone is defined as the area where exposure to groundwater contamination cannot be mitigated and compliance concentration standards must be met. Within the containment zone, slow plume migration may occur, leading to concentrations that exceed compliance standards. However, where distance to the receptor zone is large relative to plume migration and attenuation rate, this approach can be protective of the receptor zone. Selection of a long-duration passive remedy needs to be based on sufficient understanding of contaminant sources, hydrogeology, and contaminant plumes. A strong technical basis, supported by predictive analysis, is recommended to substantiate that contamination is expected to stay within the containment zone during the active remediation and attainment phase of the remedy, and diminish to meet compliance standards within the extended timeframe prior to reaching the receptor zone (e.g., many decades or even centuries). The ESM approach is based on verification of plume behavior and not on detailed plume dynamics. Monitoring is conducted to confirm expected behavior with an emphasis on exposure pathways to verify that plumes remain contained in areas where the protectiveness objectives can be met. ESM should not be adopted if there is significant risk of the plume extending beyond the containment zone. Given the slow movement within the containment zone, less frequent sampling is required relative to approaches used for conventional-scale remediation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Comparison of the Environmental Effects of Open-Loop and Closed-Loop Pumped Storage Hydropower

Pumped storage hydropower (PSH) capabilities are generally characterized as either open-loop or closed-loop. The U.S. Department of Energy (DOE) defines open-loop PSH as “continuously connected to a naturally flowing water feature,” and closed-loop PSH as “not continuously connected to a naturally flowing water feature.” All the PSH projects constructed in the United States to date are open-loop, so the potential environmental effects of closed-loop systems are not as well documented as the effects of open-loop systems. To address this knowledge gap, the DOE Water Power Technologies Office, under its HydroWIRES Initiative, has prepared this report to: (1) compare the potential environmental effects of open-loop PSH projects with those of closed-loop PSH projects; (2) describe how these effects are being avoided, minimized, or mitigated at existing projects in other countries and proposed projects in the United States; and (3) discuss the relative significance of the environmental issues. The report begins with a brief introduction on the current status of PSH development in the United States. Next, the report describes the current Federal Energy Regulatory Commission (FERC) hydropower licensing process, emphasizing some recent regulatory changes that affect closed-loop PSH development. The report then provides a summary comparison of the environmental effects of constructing and operating open-loop and closed-loop PSH systems and discusses the relative significance of those issues. This comparison and discussion are based on the results of a literature review and a review of FERC licensing records. The literature review includes journal articles, technical reports, and presentations on the environmental effects of PSH systems. It includes literature from the United States as well as countries where closed-loop PSH projects have been constructed. The FERC records review examines the FERC licensing record (e.g., National Environmental Policy Act documents and license orders) to identify the environmental effects anticipated and mitigation measures proposed for six of the closed-loop PSH projects currently licensed or permitted in the United States. For comparison, the FERC records review also discusses the environmental effects and mitigation measures for four open-loop PSH projects proposed or currently operating in the United States. The comparison of effects between open-loop and closed-loop projects is relative; that is, it characterizes the impacts of each project type as generally lower or higher than another project type. The comparison reflects general trends among project types because there are sometimes exceptions to the examples cited. The comparison is based on both spatial (location) and temporal (duration) factors and reflects both the severity and likelihood of effects. The report concludes that the environmental effects of closed-loop PSH projects are generally lower (i.e., more localized and of shorter duration) than those of open-loop PSH projects because they are located “off-stream,” minimizing aquatic and terrestrial impacts, and often have greater siting flexibility than open-loop PSH projects. For certain closed-loop project designs, however, impacts to groundwater may be higher relative to open-loop projects and should be considered in any environmental review.

13 HYDRO ENERGY↗

Vertical Characterization of Flow and Contaminant Concentration in New Hanford Extraction Wells

Effective groundwater remediation should focus on high-concentration, low-permeability zones within the aquifer, as these areas often present significant challenges to contaminant removal. Characterizing the vertical distribution of contamination in an aquifer is therefore critical for optimizing and monitoring pump-and-treat (P&T) systems to meet target cleanup timelines. Flow patterns driven by hydraulic gradients and variations in permeability are described to provide insight into contaminant mass removal from long-screened wells. The objective of this multi-phase work is to provide actionable recommendations for improving remedy performance monitoring and P&T operations, which ongoing evaluations will address. This report summarizes the preliminary results of vertical flow and contaminant distribution monitoring in new extraction wells at the Hanford Site.

54 ENVIRONMENTAL SCIENCES↗

Can Food–Energy–Water Nexus Research Keep Pace with Agricultural Innovation?

The interconnection among food–energy–water (FEW) systems in meeting societal demands is broadly acknowledged. Similarly, competitive or synergistic allocations of water and energy resources for agricultural production, manufacturing, and human consumption are understood, and their economic impacts can be predicted. Far less appreciated and understood are the outcomes of the FEW nexus in response to operation changes in agricultural practices and the associated technological innovations for future generations. Also, the inter-scale and feedback effects of emerging technology-driven resource reallocation and decision-making on FEW systems are largely unknown. For example, how do the agroeconomic feedbacks of intelligent technologies influence the FEW nexus of agricultural production under environmental and demographic changes? How does the necessary water allocation for powering non-powered dams and pumped-storage hydropower generation influence agricultural production and municipal water supply maintenance? How do solar and wind energy farms influence land use for agriculture and the rural economy? In turn, how can the generated solar and wind energy help reduce the cost of groundwater extraction or water desalination?

42 ENGINEERING↗

Guidance for Monitoring Passive Groundwater Remedies Over Extended Time Scales

Passive remediation can be appropriate where natural processes and actions such as institutional controls mitigate exposure to contaminated groundwater, achieving remedial action objectives and protectiveness of human health and the environment. Monitored natural attenuation (MNA) is a prevalent passive remediation strategy supported by a regulatory framework and monitoring design guidance. MNA can also be used after active remediation has been completed (e.g., pump-and-treat) as a polishing step to reach ultimate remedial action objectives. However, MNA and existing monitoring guidance primarily target situations where the remedial action objectives are met within a few decades. When timescales for passive remediation extend to many decades, a corresponding change in monitoring strategy is needed to adapt to the extended time scale. This document provides guidance for implementing an extended-scale monitoring (ESM) approach appropriate for long-duration passive remediation. Extended-scale is defined in this document with respect to time (i.e., a long duration of remediation) and a large enough physical scale such that receptors will not be impacted within the remediation timeframe.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In situ reductive dissolution to remove Iodine-129 from aquifer sediments

The use of an aqueous reductant (Na-dithionite) with pH buffer (K-carbonate, pH 12) was evaluated in this laboratory study as a potential remedial approach for removing Fe oxide associated iodine and enhancing pump-and-treat extraction from iodine-contaminated sediments in the unconfined aquifer in the 200 West Area of the Hanford site. X-ray fluorescence data of untreated sediment indicated that iodine was largely associated with Fe (i.e., incorporated into Fe oxides), however, XANES data was inconclusive as to valence state. During groundwater leaching, aqueous and adsorbed iodine was quickly released, then additional iodine was slowly released potentially from dissolution of one or more surface phases. The Na-dithionite treatment removed greater iodine mass (2.9x) at a faster rate (1 to 4 orders of magnitude) compared to leaching with groundwater alone. Iron extractions for untreated and treated sediments showed a decrease in Fe(III)-oxides, which likely released iodine to aqueous solution. Solid phase inorganic carbon and aqueous Ca and Mg analysis further confirmed that significant calcite dissolution did not occur in these experiments meaning these phases did not release significant iodine. Although it was expected that, after treatment, 127 I concentrations would eventually be lower than untreated sediments, leaching experiments showed continued, elevated iodine concentrations for treated samples over 750 hours. Stop flow events during 1-D column leaching suggested that some iodide precipitated within the first few pore volumes. In the survey of metals during leaching, some silver was detected which could have been solubilized by the elevated pH of initial Na-dithionite injection. Then, silver (or other metals) could have subsequently precipitated with iodide during the initial stop flow event forming a slowly dissolving source. Although significantly greater iodine is removed with treatment, the long-term leaching needs to be investigated further as it may limit dithionite treatment at the field scale.

54 ENVIRONMENTAL SCIENCES↗

Analysis of Microbial Communities as Indicators of Microbially Induced Corrosion Potential in Stainless Steel Piping

The 200 West Area Pump-and-Treat (200W P&T) facility is part of the final remedy decision for the 200 ZP-1 Operable Unit (OU) and is the interim remedial action for 200-UP-1 OU at the Hanford Site. The facility also treats water from other sources across the site, including 200-DV-1 OU perched water, groundwater from the 200-BP-5 OU, and leachate from the Environmental Restoration Disposal Facility. The facility originally operated a biological treatment process for nitrate that resulted in systemic biofouling and loss of injection well capacity, requiring frequent and costly well rehabilitation. Biofouling has also contributed to corrosion of welds and pitting of stainless-steel piping at the facility. The biological treatment for nitrate was suspended at the end of 2019 calendar year to eliminate negative impacts from biological treatments which improve facility operations and treatment of carbon tetrachloride. Evaluation of the 200W P&T facility’s response to operational improvements, specifically the suspension of the biological treatment, provides information on the potential for continued microbially induced corrosion (MIC). To this end, historical data sets (2015-2017) were compared with molecular biological analyses of 200W P&T water samples from 2018-2020 to quantify trends in total microbial biomass and specific microbial indicator species (iron, sulfate, nitrate, and manganese reducing bacteria) known to cause and enhance metal corrosion. Results showed unequivocal reductions (in excess of 90%) in all microbiological indicators measured following the suspension of the biological treatment. Although abundance measurements for all corrosive MIC populations initially declined after removal of the treatment system, nitrate-reducing bacteria (nirK) and sulfate-reducing bacteria remain highly abundant in the system, an order of magnitude higher than the number of cells present prior to the removal of the biological treatment system [5.14e (1.4) cells/L, vs. 1.14e (0.07) cells/L, reported as average (±SD) for n=3]. In addition, there was an unexpected inflection point in 2019 where all microbial indicators increased unexpectedly in abundance in 2020 by as much as two orders of magnitude compared to 2019 samples. Given the limited number of water samples available for this analysis, the cause of the increase in microbial indicators post-biological treatment has not yet been determined. Systematic sampling of the facility for continued monitoring is recommended so that the responses of MIC populations can be evaluated to ensure that further corrosion is avoided, allowing the 200W P&T facility to operate safely and efficiently at design capacity.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Seasonal to Decadal Variability in Focused Groundwater and Contaminant Discharge along a Channelized Stream

Abstract Focused groundwater discharge to streams is problematic at contaminated sites because high fluxes can limit natural attenuation in the hyporheic zone. However, information on location, spatial evolution, and temporal persistence of springs in unlithified sediments over multiyear time scales is limited. We examine discharge at point (~1‐m) to reach (~300‐m) scales along a stream that intercepts trichloroethene and technetium‐99 plumes from a Superfund site. During 2011 to 2012, we seasonally monitored stream and spring flow and contaminant concentrations, along with probing streambed temperatures on a grid in winter and summer, building on prior monitoring during 1999 to 2002. Baseflow measured by both gauging and dye dilution generally increased with distance downstream, and stream and spring discharge varied seasonally, from minima in October to January to maxima in February to June. Thermal anomalies identified by probing occupied approximately 3% to 6% of the reach and typically coincided with visible springs or seeps. Locations of anomalies were similar to those identified in summer 2002, although some orifices disappeared and others emerged. Vertical groundwater fluxes calculated from probing tended to be less than net fluxes calculated from stream discharge, perhaps in part because the assumption of one‐dimensional, steady‐state flow in calculating point fluxes was simplistic. Maximum contaminant concentrations and fluxes decreased between 1999 to 2001 and 2011 to 2012 as a result of partial capture by an upgradient pump‐and‐treat system. Our findings confirm that springs in unlithified sediments can remain stationary within a few meters over decadal time scales, and seasonal variability in discharge can be greater than decadal variability.

Tripathi, Ganesh N.↗

Evaluating Remediation Options for a Perched-Water Unit at the Hanford Site - 20378

At the U.S. Department of Energy's Hanford Site, liquid-phase waste was discharged using surface disposal features such as ponds, trenches, and cribs. These practices distributed contaminants in the subsurface, some of which are currently in the vadose zone above the groundwater. At the 200-DV-1 operable unit (OU) at the Hanford Site, a key feature is a perched-water zone. This perched-water zone contains several million liters of water contaminated with high concentrations of uranium, technetium-99 (Tc-99), and nitrate that serves as a continuing source of contamination to the underlying aquifer. Currently, a pumping system is used to remove contaminant mass from the perched-water zone. However, water extraction will become more challenging as the perched unit dewaters. As a result, residual contaminants remaining after pumping is no longer effective needs to be addressed with post-extraction mitigation approaches, appropriate monitoring, and selection of suitable remediation endpoints. Thus, a remedy evaluation needs to include the unique conditions of this perched-water zone. As part of the initial evaluation, a set of technologies have been preliminarily identified as potentially applicable to the perched-water zone, including in situ remediation technologies to sequester uranium and Tc-99 and to degrade nitrate. While there is sufficient information available for direct consideration of some of the reviewed technologies in a feasibility study, five in situ remediation technologies were identified as needing additional information on their effectiveness under the geochemical and contaminant conditions of the perched-water zone. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of a Potential Groundwater Tracer Test in the Ringold Upper Mud Aquifer at the 100-H Area of the Hanford Site

This document presents an evaluation of a potential groundwater tracer test in the uppermost RUM (Ringold Formation member of Wooded Island – upper mud unit) aquifer in the 100-H Area of the Hanford Site. The results from field electrical resistivity tomography (ERT) investigations, numerical flow and transport (F&T) modeling, coupled ERT-F&T model simulations, and laboratory resin experiments provide the technical basis for evaluating tracer test scenarios that minimize impacts to the 100-HX pump and treat (HX P&T) operations, and maximize hydrologic data acquisitions including the use of advanced surface geophysical techniques for monitoring tracer transport.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Aquifer Hydraulic Testing and Characterization Plan for the Ringold Formation Unit A in the Hanford 200-ZP-1 Groundwater Operable Unit and Vicinity

This document presents a plan for testing and characterizing the hydraulic properties of the Ringold Formation, member of Wooded Island – unit A (Rwia) in the 200-ZP groundwater operable unit. The testing approach includes multiple field methods and associated analyses designed to investigate and understand aquifer hydraulic properties over a range of scales. Testing was designed to achieve specific testing objectives identified previously in the 200 ZP-1 Groundwater Operable Unit Ringold Formation Unit A Characterization Sampling and Analysis Plan (Ringold A SAP). The test plan provides necessary technical and operational detail for writing subsequent field test instruction documents specific to each testing location. Hydraulic characterization activities will proceed in a phased manner focusing on areas identified to have knowledge gaps and also critical for remedy modifications and/or selection. These activities are designed to minimize impact to pump-and-treat (P&T) operations and to use existing P&T injection and extraction wells as stress wells, and include use of the new Rwia monitoring wells installed for Ringold A SAP activities. ZP-1 hydraulic testing will include slug testing in new Rwia wells, shutdown-recovery tests in multiple Rwia and composite Ringold Formation member of Wooded Island – unit E (Rwie)-Rwia aquifer test locations, installation of new Automated Water Level Network stations in Rwia monitoring wells, characterization of P&T and barometric responses, identifying the vertical distribution of hydraulic conductivity in the Rwia and Rwie units using electromagnetic borehole flowmeter tests, and single-well tracer testing in select Rwia monitoring wells. Slug testing to be conducted during drilling is described under the Ringold A SAP. The remaining testing activities are to be conducted after well drilling and completion and are described in this test plan.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗