Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “corrective actions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Vibro-Acoustic Analysis of NASA's Space Shuttle Launch Pad 39A Flame Trench Wall

A vital element to NASA's manned space flight launch operations is the Kennedy Space Center Launch Complex 39's launch pads A and B. Originally designed and constructed In the 1960s for the Saturn V rockets used for the Apollo missions, these pads were modified above grade to support Space Shuttle missions. But below grade, each of the pad's original walls (including a 42 feet deep, 58 feet wide, and 450 feet long tunnel designed to deflect flames and exhaust gases, the flame trench) remained unchanged. On May 31, 2008 during the launch of STS-124, over 3500 of the. 22000 interlocking refractory bricks that lined east wall of the flame trench, protecting the pad structure were liberated from pad 39A. The STS-124 launch anomaly spawned an agency-wide initiative to determine the failure root cause, to assess the impact of debris on vehicle and ground support equipment safety, and to prescribe corrective action. The investigation encompassed radar imaging, infrared video review, debris transport mechanism analysis using computational fluid dynamics, destructive testing, and non-destructive evaluation, including vibroacoustic analysis, in order to validate the corrective action. The primary focus of this paper is on the analytic approach, including static, modal, and vibro-acoustic analysis, required to certify the corrective action, and ensure Integrity and operational reliability for future launches. Due to the absence of instrumentation (including pressure transducers, acoustic pressure sensors, and accelerometers) in the flame trench, defining an accurate acoustic signature of the launch environment during shuttle main engine/solid rocket booster Ignition and vehicle ascent posed a significant challenge. Details of the analysis, including the derivation of launch environments, the finite element approach taken, and analysistest/ launch data correlation are discussed. Data obtained from the recent launch of STS-126 from Pad 39A was instrumental in validating the design analysis philosophies outlined in this paper.

Margasahayam, Ravi N.↗

Qualitative Risk Assessment of Legacy Wells within the Estimated Prairie State Generating Company Area of Review

This report details the digitization of a legacy wellbore database, including data processing assumptions, parameter estimation, and risk assessment methodology. The database, comprising 6,454 documents, was provided by ISGS. It includes valuable data from the Prairie State Generating Company (PSGC) and One Earth Energy (OEE) sites of the CarbonSAFE Phase III – Illinois Storage Corridor project. The report focuses on wells within a 15-mile radius from the Lively Grove #1 (LG#1) well at PSGC site, evaluating subsurface conditions and potential risks. A total of 4,386 wellbores within 15 miles of the LG#1 well were filtered based on depth and formation codes. LG#1 is the stratigraphic well at the PSGC site drilled in 2021. Ninety-four (94) wells penetrating the Maquoketa Shale Group (the primary confining unit) within the estimated area-of-review (AoR) for the PSGC site were evaluated using a qualitative risk assessment (QRA) methodology. The QRA developed by Arbad et al. 2022 focuses on legacy wells within the AoR and categorizes them based on well construction details. The QRA identifies wells that need immediate attention by categorizing them based on penetration depth and protection. Wells within the AoR were categorized into nine groups based on penetrations and protections. These categories range from Type 1 wells, with no documentation, to Type 9 wells, which do not penetrate the primary confining unit or storage reservoir (unit). Well accessibility within the AoR varies based on well status, including Dry & Abandoned (DA), Plugged & Abandoned (PA), Injection (INJ), Oil/Gas Producing (PROD), and Observation (Obs) wells. Accessibility levels were determined by well construction, with DA wells being the least accessible and Observation wells the most accessible, impacting gas leakage detection possibilities. Remedial action priority of wells decreases from Type 1 to Type 9 wells. Type 1 to Type 6 wells with status DA and PA require immediate attention, while Type 7 and Type 8 wells are low priority. A risk matrix used to prioritize corrective actions for legacy wells is proposed to categorize wells within an AoR based on penetrations, protections, and accessibility. The methodology involves data acquisition, well categorization into nine types, and determining CO 2 leakage pathways using well schematics and geospatial mapping. This approach is particularly useful for managing the integrity of legacy wells throughout the lifecycle of a Carbon Capture and Storage (CCS) project. A qualitative risk assessment of 94 wells within the AoR of the PSGC site identified 54 wells with high priority for corrective action due to penetration of the primary containment seal. The assessment utilizes color-coded maps to categorize well types and prioritize corrective actions, providing a comprehensive analysis. Schematics of wells penetrating the primary confining unit were drawn, and leakage pathways were identified. Details of all wells penetrating the confining zone are provided in the appendix, including information on well types, plugging, and casing status.

01 COAL, LIGNITE, AND PEAT↗

Integrated Advanced Microwave Sounding Unit-A (AMSU-A). Performance Verification Report: METSAT Phase Locked Oscillator Assembly, P/N 1334360-1, S/N's F03 and F04

Two Flight Model AMSU-A Phase Locked Oscillators (P/N 1348360-1, S/Ns F03 and F04) have been tested per AES Test Procedure AE-26758. The tests included vibration testing, thermal cycle testing, AM/FM Noise testing, and full functional testing. EMI/REO 2 Testing was not performed. (See test data for S/N F01). Both AMSU-A Phase Locked Oscillators satisfactorily passed all performance requirements of the AE-26633 Product specification. During thermal cycling of PLO serial number F03, the oven and data logger momentarily lost power, including a loss of data. The unit did not experience any thermal stress. TAR 003134 describes the corrective action. Prior to testing PLO serial number FO4, power was applied to the unit. (+15v,-15v) the unit did not display the proper phase lock. Upon test equipment check out a connector was found to be defective. TAR 003133 describes the corrective action. After completion of testing of PLO serial number F04 was installed into Receiver Assembly F02. Upon testing F02 Receiver Assembly the unit was found not to phase lock at ambient temperature. Removal of PLO Assembly F04 was required. R2 was the real issue. Solithane was secondary. Troubleshooting revealed excessive solithane on inner PLL Assembly cover inhibiting optimum grounding. Also, R2 was reselected which increased the lock range from -30 C to +60 C. TAR 002737 describes the corrective action.

Pines, D.↗

Federal Facility Agreement and Consent Order: Nevada National Security Site Use Restriction Management Plan with ROTC 1

This Use Restriction Management Plan (URMP) provides the information needed to create, modify, and manage use restrictions (URs) for sites on the Nevada National Security Site (NNSS), and sites accessed through the NNSS main gate, that were closed using the corrective action alternative (CAA) of closure in place under the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended). (Note: This pertains to those FFACO sites not managed by the U.S. Department of Energy [DOE], Legacy Management.) The closure in place alternative is used for sites closed with residual contamination at levels requiring corrective action as determined using the FFACO process. The URs contain and control all requirements for long-term monitoring. This URMP also serves as the single repository of the URs implemented under the FFACO that identify use restricted areas and contain the current requirements for inspections, maintenance, and monitoring of the UR. The requirements in these URs replace all requirements listed in previous documentation. This consolidates post-closure monitoring requirements into a single source that ensures completeness and consistency of UR requirements and information. Standardized UR forms were developed to clearly document post-closure requirements that are consistent with current protocols and to ensure consistent information is contained in the URs. Standard notification, summary, and site controls statements were developed for all URs with provisions to insert site-specific options in the text. Current protocols for Industrial Sites and Soils URs are defined in this document and in the Soils Risk-Based Corrective Action (RBCA) Evaluation Process (DOE/EMNV, 2018). The standardized UR forms that have been approved to date are listed in Appendix A. Additional UR forms will be added once the review and approval process has been completed.

54 ENVIRONMENTAL SCIENCES↗

Cultural Variability in Crew Communication

In this study we examined what linguistic strategies pilots use when they have to challenge the actions of a colleague, and how their communications balance the need for informativeness with the need for assuring the other's cooperation. Two strategies emerged for captains. They either gave commands or they made suggestions that referred to actions of the crew. Both strategies explicitly state what action should be taken but they differ in their social implications. Commands are direct insofar as they entail a strong obligation for the listener to comply with the speaker' s request. Suggestions are less direct in this respect. However, by using the collegial "Let's do," speakers appeal to the solidarity between themselves and their listeners and seek compliance in this way. Commands, in contrast, are inherently authoritative and imply an asymmetry in status. Speakers by giving a command, express their belief that they are socially more powerful than their listeners and that they are thus licensed to command. That is, speakers seek listener compliance by appeal to their status. Status-based commands were more frequent among male captains than among female captains. Female captains instead were likely to shift the motivation for their commands away from their status to some objective necessity by referring to some problem or goal It remains to be seen, however, how captains' strategies were affected by the severity of a problem situation. Results in a preliminary study involving only male participants, suggests that pilots increased the directness of their utterances in situations that they perceived to be risky. Thus the observation that male captains used complex communications half of the time while female captains did so 75% of the time, could indicate that male captains were more likely than female captains to change their strategies with the severity of situations. Both male and female first officers in this study were less direct than captains. The most common strategy of first officers was to point to some problem or to remind the captain of a given goal. What corrective action should be taken and by whom was not explicitly stated but implied and left to the captain. In their other strategies, permission seeking and confirmation-seeking questions, first officers were more explicit about a corrective action. In the first case, they volunteered to do some course of action but left the final decision to the captain. In the latter case, they inquired or confirmed whether the captain wanted some action. Although all three strategies seek the compliance of the listener by appeal to his authority, there are important differences: By asking permission seeking and confirmation-seeking questions, first officers specify the action for which they want the captain's compliance. Compliance, however, is not demanded but requested. By alerting to a problem or to a goal, in contrast, first of officers seek the captain's compliance only with their assessment of the situation but not with a particular course of action. That is, they place the captain under no explicit obligation to initiate a corrective action but do so only indirectly by assuming that a course of action is self-evident once the problem has been acknowledged.

Fischer, Ute↗

Evaluating offshore legacy wells for geologic carbon storage: A case study from the Galveston and Brazos areas in the Gulf of Mexico

In this article, federal offshore waters in the Gulf of Mexico are of interest for large-scale geologic carbon storage (GCS). However, more than 80,000 offshore oil and gas wells exist in the region, which could impact the integrity of sealing intervals. In this study, we propose a screening methodology for ranking offshore legacy wells based on the challenge they may present to GCS. The methodology relies on the review of well regulatory records to 1) identify leakage pathways and assess the potential hazards that wells pose to planned GCS operations, 2) evaluate well features that impact the accessibility of wells to determine the feasibility of potential corrective actions, and 3) rank wells based on the overall challenge they may pose for GCS. We demonstrate our framework by evaluating the construction and abandonment of 156 wells across eight areas of interest (AOIs) in shallow federal waters along the Texas Gulf Coast. The majority (99.3 %) of wells considered were constructed and plugged in a manner that did not isolate prospective GCS targets in the Upper and Lower Miocene formations and may potentially require a challenging or uncertain corrective action prior to GCS. Dataset trends suggest that the observed well construction and plugging designs may be common in shallow offshore federal waters along the Texas Gulf Coast. Consequently, operators pursuing offshore GCS projects in the region may consider selecting areas that avoid challenging wells or performing robust evaluations of legacy well leakage risks to plan corrective action prior to CO 2 injection.

58 GEOSCIENCES↗

Independent Review Support for Phoenix Mars Mission Robotic Arm Brush Motor Failure

The Phoenix Project requested the NASA Engineering and Safety Center (NESC) perform an independent peer review of the Robotic Arm (RA) Direct Current (DC) motor brush anomalies that originated during the Mars Exploration Rover (MER) Project and recurred during the Phoenix Project. The request was to evaluate the Phoenix Project investigation efforts and provide an independent risk assessment. This includes a recommendation for additional work and assessment of the flight worthiness of the RA DC motors. Based on the investigation and findings contained within this report, the IRT concurs with the risk assessment Failure Cause / Corrective Action (FC/CA) by the project, "Failure Effect Rating "3"; Major Degradation or Total Loss of Function, Failure Cause/Corrective Action Rating Currently "4"; Unknown Cause, Uncertainty in Corrective Action."

McManamen, John P.↗

Supervisory Control of a Humanoid Robot in Microgravity for Manipulation Tasks

Teleoperation is the dominant form of dexterous robotic tasks in the field. However, there are many use cases in which direct teleoperation is not feasible such as disaster areas with poor communication as posed in the DARPA Robotics Challenge, or robot operations on spacecraft a large distance from Earth with long communication delays. Presented is a solution that combines the Affordance Template Framework for object interaction with TaskForce for supervisory control in order to accomplish high level task objectives with basic autonomous behavior from the robot. TaskForce, is a new commanding infrastructure that allows for optimal development of task execution, clear feedback to the user to aid in off-nominal situations, and the capability to add autonomous verification and corrective actions. This framework has allowed the robot to take corrective actions before requesting assistance from the user. This framework is demonstrated with Robonaut 2 removing a Cargo Transfer Bag from a simulated logistics resupply vehicle for spaceflight using a single operator command. This was executed with 80% success with no human involvement, and 95% success with limited human interaction. This technology sets the stage to do any number of high level tasks using a similar framework, allowing the robot to accomplish tasks with minimal to no human interaction.

Farrell, Logan C.↗

FORTRAN Automated Code Evaluation System (faces) system documentation, version 2, mod 0

A system is presented which processes FORTRAN based software systems to surface potential problems before they become execution malfunctions. The system complements the diagnostic capabilities of compilers, loaders, and execution monitors rather than duplicating these functions. Also, it emphasizes frequent sources of FORTRAN problems which require inordinate manual effort to identify. The principle value of the system is extracting small sections of unusual code from the bulk of normal sequences. Code structures likely to cause immediate or future problems are brought to the user's attention. These messages stimulate timely corrective action of solid errors and promote identification of 'tricky' code. Corrective action may require recoding or simply extending software documentation to explain the unusual technique.

Source record↗

Elimination of Potential Electrical Stress During EMC (CS01) Testing

This viewgraph presentation reviews possible ways to eliminate electrical stress during Electromagneticic Compatibility (EMC) testing. The presentation reviews tests that have had problems due to electrical stress. On December 5, 1995 Cassini Radar instrument failed a functional test in preparation for EMC conducted susceptibility (CSO 1 ) testing. The instrument power supply did not turn on as required, and failure occurred prior to injection of CS test stimulus. A investigation of the failure was conducted. A PSPICE simulation of Cassini Radar 30V line using the EMC test setup was performed; the result of the simulation was an oscillation on the 30V input of the power supply. In another case: on December 28, 1999 an oscillation occurred on the input power line of the SlRTF Infrared Array Camera (IRAC) while preparing to perform CSOI testing, Resulted in damage to flight hardware. Subsequent to failure, JPL provided GSFC history and corrective action from Cassini Radar CSOI test failure GSFC implemented the same corrective action as JPL, except that the value of the resistor connected across the isolation transformer primary winding is 2.5 ohms instead of 50 ohms. Three recommendations are made: (1) Make EMC test community aware of the problem and potential solutions by presenting papers at major environmental test conferences (2) Include warnings and safeguards in EMC test requirements and procedures (3) Try to convince EMC test equipment suppliers to design a CSOl test fixture similar to fixture shown in the diagram

Cassini radar↗

External Tank (ET) Bipod Fitting Bolted Attachment Locking Insert Performance

Following STS-107, the External Tank (ET) Project implemented corrective actions and configuration changes at the ET bipod fitting. Among the corrective actions, the existing bolt lock wire which provided resistance to potential bolt rotation was removed. The lock wire removal was because of concerns with creating voids during foam application and potential for lock wire to become debris. The bolts had been previously lubricated to facilitate assembly but, because of elimination of the lock wire, the ET Project wanted to enable the locking feature of the insert. Thus, the lubrication was removed from bolt threads and instead applied to the washer under the bolt head. Lubrication is necessary to maximize joint pre-load while remaining within the bolt torque specification. The locking feature is implemented by thread crimping in at four places in the insert. As the bolt is torqued into the insert the bolt threads its way past the crimped parts of the insert. This provides the locking of the bolt, as torque is required to loosen the joint after clamping.

Larsen, Curtis E.↗

Pogo summary report main propulsion test static firings 1-7 for shuttle development flight instrumentation

Problems concerning the shuttle main propulsion system Polar Orbit Geophysical Observatory (POGO) instrumentation and the actions taken to correct them are summarized. Investigations and analyses appear to be providing solutions to correct the majority of questionable measurements. Corrective action in the handling of cables and connectors should increase the POGO measurement quality. Unacceptable levels of very low frequency noise and data level shifts may be related to test stand grounding configuration, but further investigation is required.

Haddick, C. M., Jr.↗

NASA Audit Follow-up Handbook

This NASA Audit Follow-up Handbook is issued pursuant to the requirements of the Office of Management and Budget (OMB) Circular A-50, Audit Follow-up, dated September 29, 1982. It sets forth policy, uniform performance standards, and procedural guidance to NASA personnel for use when considering reports issued by the Office of Inspector General (OIG), other executive branch audit organizations, the Defense Contract Audit Agency (DCAA), and the General Accounting Office (GAO). It is intended to: specify principal roles; strengthen the procedures for management decisions (resolution) on audit findings and corrective action on audit report recommendations; emphasize the importance of monitoring agreed upon corrective actions to assure actual accomplishment; and foster the use of audit reports as effective tools of management. A flow chart depicting the NASA audit and management decision process is in Appendix A. This handbook is a controlled handbook issued in loose-leaf form and will be revised by page changes. Additional copies for internal use may be obtained through normal distribution channels.

Source record↗

Strategic Qualitative Risk Assessment of Thousands of Legacy Wells within the Area of Review (AoR) of a Potential CO2 Storage Site

The subsurface confinement of anthropogenic carbon dioxide (CO2) demands robust risk assessment methodologies to identify potential leakage pathways. Legacy wells within the Area of Review (AoR) represent one potential leakage pathway. Robust methodologies require enormous amounts of data, which are not available for many old legacy wells. This study strategically categorizes 4386 legacy wells within the AoR of a potential CO2 storage site in the Illinois basin and identifies the high-risk wells by leveraging publicly available data—reports and well logs submitted to state regulatory agencies. Wells were categorized based on their proximity to the injection well location, depth, the mechanical integrity of well barriers, and the accessibility to these wells throughout the project lifecycle. Wells posing immediate risks were identified, guiding prioritized corrective actions and monitoring plans. Out of 4386 wells, 54 have high priority for corrective action, 10 have medium priority, and the remainder are of low priority. Case study results from the Illinois basin demonstrate the effectiveness and applicability of this approach, to assess the risk associated with legacy wells within the AoR of potential CO2 storage site, strategically categorizing over 4000 such wells despite data limitations.

Arbad, Nachiket (ORCID:0000000215353656)↗

Risk matrix for legacy wells within the Area of Review (AoR) of Carbon Capture & Storage (CCS) projects

The success of CCS depends on the capacity, injectivity, and confinement by the storage medium. Thousands of wells drilled over the past century with the intention to find the trapped oil and gas may penetrate the containment seals. These wells may provide leakage pathways for the CO 2 to escape and contaminate the underground sources of drinking water (USDW) or reach the surface in the worst-case scenario. Identifying the risky wells penetrating the containment seals and predicting their current as well as future well integrity is the most challenging task when limited data is available. Here, this paper proposes a unique methodology for risk assessment of the wells penetrating the containment seals based on the proximity of these wells from the proposed injection location, mechanical integrity, and accessibility of these wells over the lifecycle of the CCS project. This helps in identifying the wells which need immediate attention from the wells that need little to no attention. It also highlights the corrective actions necessary for the success of the CCS project as well as help estimate the approximate cost required to perform the corrective actions. This methodology focuses on all wells (producers, injectors, orphan, abandoned, water, stratigraphic, etc) while the majority of the studies found in literature focused on wells with sustained casing pressure (SCP) reports and cement bond logs (CBL). The proposed risk matrix, if applied to future CCS projects across the globe, will uniformly categorize the wells within the Area of Review (AoR).

58 GEOSCIENCES↗

Microgrid Frequency Stability: A Proactive Scheme Based on Dynamic Predictions

The dynamic nature of microgrids introduces challenges in the context of frequency stability. This work presents a framework where the future state of microgrid frequency is predicted and corrective actions are optimized. Predictions are generated through Bayesian filters leveraging synchronized data acquired via PMUs. Taking a proactive approach makes it possible to optimize corrective actions considering dynamic system conditions. Testing is conducted via Matlab simulations. The performance of the solution presented in this work is compared to traditional load-shedding schemes and to predictive solutions found in literature. The results indicate that the proposed framework outperforms both. Some of the advantages of this framework include a reduction in amount of load dropped during compensation, the use of adaptive parameters which eliminates the need to simulate contingency conditions, and dynamic uncertainty quantification provided the particle filter.

Paramo, Gian↗

Government review of the Mod-2 wind turbine (as-built)

The findings and recommendations of the Government committee formed to conduct an as-built review of the three Mod-2 wind turbine units at Goldendale, Washington are given. The purpose of the review was to identify any critical deficiencies in machine components that could result in failure, and to recommend any necessary corrective action before resuming safe machine operation. The review concluded that one of the deficiencies identified would preclude planned attended or unattended operation, provided that certain corrective actions were implemented.

Johnson, W. R.↗

LANSCE Facility Longevity Assessment

This LANSCE Facility Longevity Assessment examined 34 total systems critical to the operation of the LANSCE accelerator complex. These systems are primarily owned, operated, and maintained by AOT Division. Based on the criteria used in this assessment, there are 12 AOT Division systems that are potential high risk as related to longterm LANSCE operations. These systems may also impact the success of LAMP. Also summarized in this report are the facility activities planned over the next decade. These include general facility maintenance and infrastructure upgrades, as well as planned electrical system upgrades. The LANSCE Facility Operations (LFO) Division is responsible for this activity scope and budget planning. Most of the planned activities are general in nature and should have little impact on accelerator operations or LAMP activities as currently envisioned. However, close coordination with between AOT, LFO, and LAMP would be prudent. A next step should be to develop an actionable plan to address the high-risk systems. Potential criteria for developing such a plan could include: (1) Evaluating the global impact of the system (operations, program, safety, etc.), (2) Ranking by impact (ranked now by risk), (3) Estimating cost to implement the corrective actions (Is there already a plan or not?), and (4) Estimating the time required for corrective actions. An alternative could include integration of the assessment data into both the Asset Management System and the Maintenance Analytics Risk Register.

43 PARTICLE ACCELERATORS↗