Engineering PapersSearch

SEARCH · Engineering Papers

Results for “accelerated lifetime testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

70 records · Page 4

High-intensity polarized electron gun featuring distributed Bragg reflector GaAs photocathode

The polarized electron source is a critical component in accelerator facilities such as the electron–ion collider, which requires a polarized electron gun with higher voltage and higher bunch charge than existing sources. One challenge we faced was the surface charge limit of the distributed Bragg reflector GaAs/GaAsP superlattice (DBR-SL-GaAs) photocathode. We suppressed this effect by optimizing the surface doping and heat cleaning procedures. We achieved up to 11.6 nC bunch charge of polarized electron beam. In this report, we discuss the performance of tests of a DBR-SL-GaAs photocathode in the high voltage direct current gun. Possible reasons for the observed peak quantum efficiency wavelength shift are analyzed, and we addressed it by using a wavelength tunable laser. In addition, the impact of the DBR layer and laser on the lifetime is investigated in this paper. The optimal DBR-SL-GaAs operating zone has been proposed, which gave us a long lifetime and high polarization at 30 μA operation. Finally, the success of this polarized gun will be key to the future of the nuclear sciences.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS

RaDIATE Collaboration for Material Studies

In the recent past, major accelerator facilities have been limited in beam power not by their accelerators, but by the beam intercepting device survivability. As next-generation accelerator target facilities (High Energy Physics, Spallation Sources, …) become increasingly more powerful and intense, high power target systems face key technical challenges. Beam-intercepting devices such as beam windows and secondary particle-production targets are continuously bombarded by high-energy high-intensity pulsed proton beams to produce secondary particles. Energy deposition from the primary beam induces near instantaneous heating (thermal shock) and microstructural changes (radiation damage) in the beam-intercepting materials. Both thermal shock and radiation damage ultimately degrade the performance and lifetime of targets and have been identified as the leading cross-cutting challenges of high-power target facilities. In order to operate reliable beam-intercepting devices in the framework of energy and intensity increase for next generation accelerators, the RaDIATE collaboration (Radiation Damage In Accelerator Target Environment) managed by Fermilab, brings together existing expertise in nuclear material and accelerator targets from 20 international institutions to execute a coordinated strategy for high power targetry R&D. This collaboration is generating new and useful materials data for application within the accelerator and the fission/fusion communities. I will give an overview of the RaDIATE R&D program and the achievement in the last few years on material studies in support of High Power Targetry development, including results obtained from irradiation test, development of novel materials and the prospective towards future irradiation campaign. A highlight will be given to the results in collaboration with our colleagues from J-PARC.

Pellemoine, Frederique

Enhancing lifetime, forecasting, and economic benefits of photovoltaic technologies undergoing UV-induced degradation with optical filtering

Ultraviolet-induced degradation (UV-ID) of various PV cell types was analyzed under optical UV filters with different cutoff wavelengths. Cell types studied included interdigitated back contact (IBC), passivated emitter and rear totally diffused (PERT), and heterojunction technology (HJT) based on crystalline Si (c-Si), and metal halide perovskite (MHP) cells. Analyzing degradation rates in two distinct regimes proved beneficial for all cell types. We used empirical linearizing functions ln(t) for c-Si technologies and 2 √t for MHP samples where t is time. These were applied to extrapolate UV-induced degradation over the lifetime of PV modules under various levels of optical UV filtering and used to predict the relative economic benefits for PV power plants. Degradation rates for all technologies were generally faster under the long pass optical filters having shorter cutoff wavelengths transmitting more UV irradiation and at elevated temperatures when testing MHP samples in the range between 60 °C and 90 °C.

14 SOLAR ENERGY

Gallium Arsenide Semiconductor Opening Switches: Enabling Nanosecond High Powering Pulsed Systems

The goal of this work awas to investigate design manufacturing semiconductor opening switches (SOS) in both silicon and gallium arsenide (GaAs). Solid-state opening switches are critical components for pulsed power systems and applications in directed energy, dielectric wall accelerators, and novel semiconductor manufacturing techniques. Under this funding, we have developed silicon SOS designs that suppresses an unwanted prepulse, increases the peak output voltage by about 10 percent, and reduces the pulse rise time by ~ 4x compared with more conventional profiles. Through this effort we have improved device fabrication and bonding techniques. Additionally, work on this the GaAs opening switch has defined a unique application space that these devices are suited for. GaAs opening switches have short risetimes and pulse widths compared to silicon devices, however the short carrier lifetime of GaAs makes the circuit design more challenging than in silicon. For high PRF operation, the lifetime of the GaAs is an advantage compared to silicon. TCAD simulations of GaAs devices have been used to optimize a GaAs profile. Additionally, we have designed pulsers with sub 50ns reserve pump times and tested GaAs COTs PIN diodes in them.

42 ENGINEERING

From Cell to System: Accelerated hpc Simulations of BESS Aging under Frequency Regulation and Arbitrage use cases

Lithium-ion battery energy storage systems (BESS) packs have emerged as a leading solution for grid-scale energy storage, enhancing resiliency and balancing load fluctuations. Yet, experimental characterization of large-format LIB packs-particularly to assess performance and degradation over hundreds of cycles - demands substantial hardware investment and multi-year testing campaigns. In this work, we couple a hierarchical, physics-based modeling framework agnostic to electrode chemistries with high-performance computing to accelerate systems level evaluation by upto two orders of magnitude. Building on the open-source liionpack platform, we implement cell, module, and pack-scale electrochemical models enriched with mechanistic aging mechanisms and deploy them on an HPC cluster to simulate 150−200kWh systems over 500 - 1,000 cycles with in days. We subject these virtual B ESS to both constant-current cycling and realistic grid service profiles spanning frequency regulation, ramp-rate support, and energy arbitrage-and quantify the resulting degradation patterns. Our results reveal that localized cell aging can induce substantial nonuniformity at module and pack levels, with service-specific cycling protocols driving distinct aging modes. This rapid, multiscale modeling approach provides a powerful design-space exploration tool for optimizing electrical architecture, control strategies, and operational schedules to prolong pack lifetime and lower total cost of ownership.

Ayalasomayajula, Surya [ORNL] (ORCID:0009000860788

RaDIATE Collaboration Thermal shock studies

As next-generation accelerator target facilities (High Energy Physics, Spallation Sources, ... ) become increasingly more powerful and intense, high power target systems face key technical challenges, such as radiation damage and thermal shock. Those ultimately degrade the performance and lifetime of targets and have been identified as the leading cross-cutting challenges of high-power target facilities. In order to operate reliable beam-intercepting devices in the framework of energy and intensity increase for next generation accelerators, the RaDIATE Collaboration (Radiation Damage In Accelerator Target Environment), established in 2012 and managed by Fermilab, brings together existing expertise in nuclear material and accelerator targets from 20 international institutions, including CERN, to execute a coordinated strategy for high power targetry R&D. In this context, several thermal shock studies were performed at CERN's HiRadMat (High-Radiation to Materials) facility, that took a key step towards improving our knowledge on target damage tolerance. The first experiment HRMT-24, supported by EURCARD2 and completed in 2015, successfully validated the Johnson-Cook strength model developed at SwRI on beryllium S200FH (used for beam window material), providing a better confidence in simulating the thermal shock response of current and future S200FH beryllium components. HRMT-43, supported by ARIES and completed in 2018, tested various materials (Be, C, SiC, Si, Ti and ceramic nanofiber). It was a first and unique test which included pre-irradiated specimens from high energy proton beam irradiation to identify thermal shock response differences between non-irradiated and previously irradiated materials. Real-time measurement of dynamic thermomechanical response of graphite helped to benchmark numerical simulations.

43 PARTICLE ACCELERATORS

Low RF loss DC conductive ceramic for RF windows

Charging of RF windows has historically been problematic, frequently resulting in damage to the window severe enough that the window needs to be replaced. Many attempts have been made to prevent charging and therefore improve window lifetime, the most successful and common of which is coating the window with titanium nitride (TiN). Surface coatings such as TiN rely on the secondary electron yield of the coating material being lower than that of the ceramic window material, reducing the number of electrons emitted from a variety of mechanisms. An alternative approach is to introduce a small amount of DC conductivity to the ceramic itself, turning the traditionally insulating window into a mildly conductive one. This allows any charge on the surface of the window to drain rather than build until a discharge happens. A magnesium titanate ceramic has been developed with a small DC conductivity and used to make RF windows. Several window assemblies have been produced and tested, including 1.3 GHz waveguide and 650 MHz coaxial designs. The results of the conductive ceramic window test program will be presented.

43 PARTICLE ACCELERATORS

Microstructural Engineering and Accelerated Test Method Development to Achieve Low Cost, High Performance Solutions for Hydrogen Storage and Delivery

This project made advancements in developing lower cost steel alloys with novel microstructural design for use in hydrogen refueling infrastructure such as storage, compressors, and dispensing components, and utilizing accelerated test methods to efficiently evaluate variations in alloy and microstructure design. The project specifically sought to design alloys with lower nickel contents to reduce alloy cost, which was accomplished through substituting manganese for nickel along with other alloy additions to control deformation characteristics known to be important for hydrogen embrittlement resistance. Through Mn substitutions for nickel, austenitic and duplex austenite-ferrite steels were successfully developed with lower cost than currently available commercial stainless steel products that are employed for hydrogen refueling infrastructure. The steels were processed to achieve comparable strength and toughness in hydrogen environments as the commercially available steels containing high Ni contents. To evaluate mechanical performance in hydrogen, a testing methodology was employed to compare ubiquitous laboratory testing using electrochemical hydrogen charging in a liquid electrolyte to less accessible high pressure gaseous testing. While the application of these steels is in high pressure gaseous environments, the electrochemical hydrogen charging tests produced comparable results. Additionally, the Los Alamos Neutron Scatting Center enabled characterization of deformation mechanisms of the steel alloys in the presence of hydrogen, which has been associated with steel alloy characteristics associated with hydrogen embrittlement. Finally, a fracture mechanics based test bed model was developed to predict the influence of hydrogen gas pressure and fatigue conditions on fatigue lifetimes of pressure vessel steels. Together, these developments can be employed to enable lower cost hydrogen fueling infrastructure and more reliable prediction of steel alloy components in hydrogen service conditions. In particular, the newly alloys have the potential to replace stainless steels, having demonstrated comparable performance at substantially reduced cost.

08 HYDROGEN

LAMP Project Facility and Space Requirements

The project will require significant space over the lifetime of the project to successfully execute design, technology maturation, component testing and verification, and final removal and installation. The types of space required falls into three general categories: office, storage, and laboratory. Figure 1 below summarizes the project space requirements by project lifecycle. The specific color coding indicates the availability (and potential risk to the project) of the particular type of space: green indicates space that is already allocated and in use by the LAMP project; yellow indicates space that is expected to be easily transitioned from its current use to the project; red indicates a space that is use by multiple users or other projects, and will most likely require high-level negotiations and planning to become available to the project. Figure 2 summarizes the LAMP Space Requirements by calendar year and type throughout the duration of the project. As can be seen in Fig. 2, the maximum space needed by the project exceeds 40,000 square feet, with an average space requirement over the lifetime of the project equal to approximately 25,000 square feet.

43 PARTICLE ACCELERATORS

Ensuring High-Purity Liquid Argon for the LBNF FDC: Collaborative Cryogenics Research Between UNICAMP and Fermilab

Ensuring High-Purity Liquid Argon for the LBNF FDC: Collaborative Cryogenics Research Between UNICAMP and Fermilab R. Doubnik1, M. Adamowski1, F. de M. Blaszczyk1, A. Hahn1, D. Montanari1, R. Mrowca1, Z. West1, C. Adriano2, T. P.M. Alegre2, D. Correia2, A. A. B. Machado2, E. Segreto2, R. G. Gonçalves3, E. M. Assaf6, J. M. Assaf3, D. Cardoso3, M. B. Fontes4, H. Da Motta4, D. Noriler5, P. J. G. Pagliuso2. 1 Fermi National Accelerator Laboratory, PO Box 500, Batavia IL 60510, United States. 2 “Gleb Wataghin” Institute of Physics, UNICAMP, Campinas-SP, 13083-859, Brazil. 3 CPqMAE - Research Center on Advanced Materials and Energy, Federal University of São Carlos (UFSCar), São Carlos, 13565-905, Brazil. 4 The Brazilian Center for Research in Physics (CBPF), Rio de Janeiro-RJ, 22290-180, Brazil. 5 School of Chemical Engineering, UNICAMP, Campinas-SP, 13083-859, Brazil. 6 São Carlos Institute of Chemistry, University of São Paulo, São Carlos-SP, 13566-590, Brazil. Email: rdoubnik@fnal.gov Abstract. The Long-Baseline Neutrino Facility (LBNF) located at the Sanford Underground Research Facility (SURF) in Lead, South Dakota, hosts the Deep Underground Neutrino Experiment (DUNE). This experiment employs cryostats containing nearly 70,000 metric tons of high-purity liquid argon (LAr). Ensuring LAr purity is critical for achieving the required electron lifetime, which directly impacts the experiment’s signal-to-noise ratio. The Horizontal Drift (HD) detector demands an electron lifetime exceeding 3 ms within its 3.5 m drift, equivalent to less than 100 parts-per-trillion (ppt) Oxygen contamination, while the Vertical Drift (VD) detector requires over 6 ms electron lifetime within its 6.0 m drift, corresponding to less than 50 ppt Oxygen contamination. To mitigate Nitrogen (N2) quenching of scintillation light, N2 contamination must remain below 1 ppm, as higher levels can result in up to a 20 % loss of light. The Brazil State University of Campinas (UNICAMP) significantly contributes to LBNF FDC through the development of argon purification and regeneration systems for HD and VD cryostats. UNICAMP designed and constructed the Purification Liquid Argon Cryostat (PuLArC), a small-scale test facility holding approximately 90 liters of LAr. Tests using PuLArC demonstrated that 1.2 kg of Li-FAU zeolite could reduce N₂ contamination from 20-50 ppm to 0.1-1.0 ppm within 1-2 hours. Tests at Fermilab’s Iceberg cryostat (2,596 liters) confirmed scalability, with 3 kg of Li-FAU reducing N₂ contamination from ~5 ppm to <1 ppm over 96 hours cycles without active circulation. This presentation will detail the research methods, test setups, and results, showcasing the potential of Li-FAU as an alternative to Molecular Sieve 4A for large-scale LAr systems. This advancement enhances DUNE's precision and demonstrates the impact of international collaboration on cryogenic research.

Doubnik, Roza [Fermilab]

Development of Transformative Preparation Methods to Push up High Q&G Performance of FRIB Spare HWR Cryomodule Cavities

The FRIB accelerator project construction, a top priority of US nuclear science, was completed in January 2022, and is now moving to user operation. The stable and reliable operation of the accelerating cryomodules is essential in achieving/fulfilling DOE and user expectations. So far, FRIB cryomodules meet all FRIB specifications for cavity performance. However, during the lifetime of machine operation, degradation of cryomodule performance is possible, as reported in similar operating facilities (CEBAF, SNS). If cryomodule degradation is observed at FRIB, the under-performing cryomodule will require replacement/maintenance. In effort to manage operational reliability, FRIB plans to construct a 0.53 half-wave cryomodule to serve as an active spare. In a parallel effort, FRIB will also work toward increasing operational Q and gradient of spare cryomodule cavities to gain an overall performance margin to support future operational reliability. The current FRIB cavity designs have a potential to operate at gradients higher than 8 MV/m, but are currently limited by field emission (FE) and/or high field Q slope (HFQS); known issue in buffered chemical polished (BCP) treated cavities. The proposal looks to develop transformative surface preparation treatments to improve the operational gradient of spare cryomodules higher than 10 MV/m while maintaining high Q. Thus, increasing operational margin by 30 - 50%. With the goal to improve operational reliability set, the proposal will investigate multiple objectives as possible paths forward to achieve an overall increase in cavity performance and gain a better understanding of SRF limiting mechanisms. The proposal will study the application of different chemical surface treatments to 0.53 half-wave cavities, with the addition of low temperature bakes (LTB), and measure their effects on accelerating performance. Proposed chemical treatments to be explored in this proposal include conventional EP acid mixtures, as well as innovated EP and BCP acid mixtures designed to simplify processing paths in migrating FE and HFQS. The proposed transformative treatment wet N-doping also has the potential to replicate recent advancements in SRF technology relating to nitrogen doping and high Q operation without the requirement for an ultra-high vacuum annealing furnace; currently being developed at FNAL and JLAB. In parallel, high Q performance relating to flux trapping will be investigated with the installation of a second layer of magnetic shielding in the vertical test Dewar. The research objectives presented in the proposal, and their corresponding effects on cavity performance, will provide essential knowledge and future guidance to the SRF community and provide possible paths for future SRF based projects and applications.

43 PARTICLE ACCELERATORS

CdTe Core: Final Technical Report (FTR)

CdTe is presently the cost-leading thin-film PV technology, directly competing with Si at scale, even when domestically manufactured. While an impressive technology, its efficiency remains much below the detailed balance limit with the largest cause due to its low photovoltage and fill factor. To realize gains, the carrier concentration, minority carrier lifetime, and interface recombination all need to be improved simultaneously over historic levels. Using a new defect chemistry (group V doping instead of copper) has been identified as a viable route using single crystal systems. This project focused on implementing this new defect chemistry in scalable, polycrystalline thin-film photovoltaic CdTe devices with tasks focusing improvements to the front interface, absorber, and rear interface as well as capability development & stakeholder engagement. The goal of the project was to establish a strategy using devices, test structures, detailed characterization, and modeling to quantify the sources of losses in state-of-the-art CdTe photovoltaic devices. Using this strategy and advanced synthesis, losses at the front interface, absorber, and rear interface were worked on in parallel. The final objective was to significantly improve the voltage deficit in CdTe devices to enable improvements in photovoltage and efficiency that can be implemented by industry in the near-term. Over the course of the project, the team developed new characterization techniques, analysis, and modeling which were then applied to state-of-the-art materials generated internally and collaboratively. In particular to enable rapid progress, NREL worked closely with First Solar where NREL grew complete devices as well as ones that interleaved process steps where First Solar had completed different steps such as absorber growth or absorber growth and activation using their baseline methods. Using detailed characterization and analysis including photoemission, photoluminescence, and scanning probe techniques enabled understanding of the loss pathways and area for improvements in our own and First Solar s materials. Ultimately, this contributed to the first series of new world record CdTe efficiencies since 2016, culminating in a 23.1% certified cell that was P-doped along with As-doped cells of similar performance. Internally, NREL improved the statistical variation in baseline As-doped devices and improved average photovoltage by over 100 mV. This was done through an improvement in absorber quality, changed front interface, and improved back contact. In addition to materially improving the fabrication processes at NREL, characterization, analysis, and modeling were developed and disseminated. NREL also played a pivotal role in community building over the course of this project working closely with the Cadmium Telluride Accelerator Consortium. NREL worked in a series of collaborations with academic and industry partners, leveraging knowledge and innovations from this project, as well as helped organize a series of workshops to ensure rapid progress in the field. Working closely with the academic community has led to a dissemination of knowledge; working with First Solar as increased US competitiveness First Solar expanded domestic production to ~10 GW and opened new facilities.

14 SOLAR ENERGY

Systematic feature design for cycle life prediction of lithium-ion batteries during formation

Optimization of the formation step in lithium-ion battery manufacturing is challenging due to limited physical understanding of solid-electrolyte interphase formation and the long testing time (∼100 days) for cells to reach the end of life. We propose a systematic feature-design framework that requires minimal domain knowledge for accurate cycle life prediction during formation. By only using two simple Q (V) features designed from our framework, extracted from formation data without any additional diagnostic cycles, we achieved an average of 9.87% error for cycle life prediction. Here, the physics-based investigation guided by the two designed features shows that the voltage ranges identified by our framework capture the effects of formation temperature and microscopic-particle resistance heterogeneity. By designing highly predictive, robust, and interpretable features, our approach can accelerate industrial battery formation research, leveraging the interplay between data-driven feature design and mechanistic understanding.

25 ENERGY STORAGE

HERO CarbonSAFE Phase 2 Project in the Columbia River Basalt Group

The Hermiston, Oregon Basalt CarbonSAFE Phase II project (HERO CarbonSAFE) seeks to accelerate the deployment of commercial carbon dioxide (CO2) storage projects in basaltic rocks. Basalt CO2 storage has several advantages to conventional saline storage reservoirs including 1. The potential for rapid mineralization of CO2, 2. Associated decreases in pressure and CO2 migration risks, 3. Reduced long-term monitoring requirements with respect to plume tracking, 4. Widespread geographic distribution and, 5. Large storage potential due to thickness, porosity, and CO2 interactions with basalt. And for locations such as the Pacific Northwest, Hawaii, Iceland, India and Japan, basalts may offer the only economically feasible option for local CO2 storage. However, there are limited field-scale assessments of CO2 storage in basalt, and current carbon capture utilization and storage (CCUS) permitting and regulatory frameworks were developed for conventional saline reservoirs. HERO CarbonSAFE is designed to address research gaps and uncertainties associated with basalt storage. Specifically, the project will assess the feasibility of CO2 injection in the deep layered basalts, long-term storage (mineralization), practical approaches for large-scale implementation (50+ million metric tons of CO2 over 30 years), lithology-specific risks, and the technoeconomic potential for CO2 storage in basalts. The HERO CarbonSAFE project will assess feasibility of developing a commercial-scale (50+ million metric tons of CO2) geological storage complex within the Columbia River Basalt Group (CRBG), a layered continental flood basalt complex that underlies Calpine’s natural gas-fired Hermiston Power Project (HPP) in Hermiston, OR (Figure 1). Under this 2-year CarbonSAFE Phase II project, the HERO team will conduct a data acquisition campaign that includes drilling a stratigraphic well to a total depth of ~1,500 m into the thick layered basalts proximal to HPP. A comprehensive well logging and hydrologic testing program will be augmented with new core collected from flow zones and sealing units, and comprehensive laboratory testing to help refine the kinetic rates of mineralization. The newly acquired information will be integrated with existing data from regional wells to correlate basalt injection zone properties to develop storage hub/commercial-scale models. Using these models, the project team will evaluate injection scenarios to define the technical and economic potential for storing a minimum of 50 million metric tons of CO2 over a 30-year period, along with a robust sensitivity analysis on key parameters governing reservoir viability for sustainable injection over a commercial project lifetime. Specific technical objectives of HERO are: (1) assessing the reservoir response of a series of stacked layered reservoir flowtop sequences occurring in this area of the CRBG to commercial-scale injection volumes; (2) extending prior efforts by the project team to characterize the deep layered basalts encountered in regional studies, to leverage prior investments by U.S. Department of Energy’s (DOE) Carbon Storage program; (3) leveraging DOE’s mineralization characterization efforts to advance model parametrization for commercial scale injection of CO2 in basalts; (4) conducting risk assessments associated with scaling up to commercial storage hub injection goals, while validating DOE’s National Risk Assessment Partnership (NRAP) tools, to identify potential constraints that would prevent the CRBG from serving as a commercial-scale storage complex; (5) developing mitigation plans to address identified risks; (6) developing a commercial-scale injection and monitoring, verification and accounting (MVA) strategy; (7) utilizing computational models to define and minimize, if possible, the Area of Review (AoR) under Class VI regulations; and (8) developing a robust CO2 management strategy for CRBG that also considers a regional source/sink approach that is responsive to stakeholder needs and industrial demand. Specific institutional objectives are: (1) identifying and developing plans to mitigate the nontechnical challenges associated with the build-out of a commercial-scale storage complex within the CRBG with integrated CO2 sources; (2) implementing the community outreach plan; (3) conducting regulatory research, including a survey of issues related to pore space ownership, MVA and long-term assurance of mineralization-based storage, to support an eventual application for a UIC Class VI permit; (4) advancing the project’s plan for CO2 liability management; and (5) continuing to refine and update the project’s economic model. The final objective is the preparation of a comprehensive Site Characterization Plan that draws upon the technical and institutional feasibility assessments to prepare the project for future commercialization efforts.

58 GEOSCIENCES

R&D to Ensure a Scientific Basis for Qualification Tests and Standards (Final Report)

Project return on investment in a photovoltaic (PV) system depends increasingly on maintaining high energy yields, and the system lifetime is a major factor in levelized cost of electricity (LCOE). Thus, the rate of PV deployment and the success of these assets depends upon reliable long-term power generation. The overarching objective of this program is to improve photovoltaic (PV) module reliability via development of tests and standards. Where reliability problems or risk are discovered, we can design tests to ensure that these liabilities don't affect future generations of products. Customers can use these tests to understand which products are susceptible to certain degradation mechanisms, and manufacturers can use the tests to design unwanted characteristics out of their products. The work under this program identifies PV reliability needs, performs characterization that provides scientific understanding of targeted degradation mechanisms, and translates those data into practical and predictive test protocols and standards. Major accomplishments include: A model for polarization-type potential induced degradation (PID-p) was developed and validated against experimental data. NREL is currently leading a new edition of IEC 62804-1 for PID detection. PID-p can cause large losses in current and voltage for some module designs on cloudy days. Finite element modeling (FEM) and experiment was used to determine when cells crack in a module. It was shown that cells in landscape orientation are much more likely to crack than those on portrait orientation. Shortly thereafter, the first products with portrait-oriented cells were introduced. Studies of how to test for light and elevated temperature degradation (LeTID) culminated with the publication of IEC TS 63342. Software to predict the progression of LeTID was developed, validated, and made publicly available. Field validated tests and international standards for durability of PV module coatings abrasion, backsheets, and encapsulants were developed. Examples are IEC 62788-1-1, IEC 62788-2 ED2, IEC TS 62788-7-2, IEC 62788-7-3 ED1, IEC 63209-2. NREL led the development a high-temperature testing technical specification, and published guidelines that enable installers to determine whether higher-temperature testing is needed, simply based on location and mounting configuration. In a number of our case studies, variations in the bills of materials or workmanship have been associated with variations in reliability. These observations emphasize the importance of quality assurance to reliability. A framework for criticality (i.e. Pareto) analysis was developed and published. The framework helps us and other researchers determine what problems should be addressed for reliability research to have the biggest industry impact. NREL continues to participate actively in international standards development and stakeholder engagement activities, including organizing an annual PV Reliability Workshop. These activities are important for ensuring we address issues that are relevant and timely, and that we convey our results to those who may benefit.

14 SOLAR ENERGY

The NEXT-100 Detector

The NEXT collaboration is dedicated to the study of double beta decays of 136 Xe using a high-pressure gas electroluminescent time projection chamber. This advanced technology combines exceptional energy resolution (≤ 1% FWHM at the Q ββ value of the neutrinoless double beta decay) and powerful topological event discrimination. Building on the achievements of the NEXT-White detector, the NEXT-100 detector started taking data at the Laboratorio Subterráneo de Canfranc (LSC) in May of 2024. Designed to operate with xenon gas at 13.5 bar, NEXT-100 consists of a time projection chamber where the energy and the spatial pattern of the ionising particles in the detector are precisely retrieved using two sensor planes (one with photo-multiplier tubes and the other with silicon photo-multipliers). The detector has been operating at stable conditions using argon and xenon gases at ~4 bar and drift fields of 74 V cm –1 and 118 V cm –1 , respectively. Alpha decays from the 222 Rn chain have been used to test and monitor the stability of the detector, showing a constant electron lifetime in the drift volume. In this paper, in addition to reporting the results of the commissioning run, we provide a detailed description of the NEXT-100 detector, describe its assembly, and present the current estimation of the radiopurity budget.

Adams, C. [Argonne National Laboratory; NVIDIA] (O