Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “VABS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Artemis 1 Radiation Modeling and Analysis Using Operational Methods

The successful completion of the Artemis 1 mission has provided NASA with a significant volume of space radiation dosimetry data that can be used to verify the accuracy of current operational SRAG dose computation models and methods for Beyond LEO missions. High-Fidelity CAD models of the Artemis 1 MPCV Orion were raytraced in 10,000 directions per sensor location, including the location of Artemis HERA sensors, Artemis RAMs (TLDs), and the crew active dosimetry (CADs). The full Artemis 1 mission was modelled using the as-flown trajectory, Ap9-Ae9 IRENE providing the VAB trapped proton and electron environment, and the Badhwar-O’Neill 2020 model providing the freespace GCR environment. IGRF 12 was used to compute cutoff rigidities for the GCR environment in LEO. 1DHZETRN was used to estimate point doses at each sensor position. Computed RAM doses were within 5% of measured values. The computed VAB transit and freespace GCR dose rates showed good qualitative agreement with measured HERA values. An estimate of normalized mean effective dose for a hypothetical male crew member on Artemis 1 using current standard operational methods was computed to be 22.3 mSv.

Artemis 1↗

2023 Annual Long-Term Monitoring Report Vehicle Assembly Building Area

This report presents a summary of the groundwater monitoring activities that occurred in February 2024 at two sites in the Vehicle Assembly Building (VAB) Area Long-Term Monitoring (LTM) program at the John F. Kennedy Space Center, Florida. The two sites are Fire Station 3 (formerly Fire Station 6) (FS3) – Solid Waste Management Unit (SWMU) 106 and Launch Complex 39 Observation Gantry Area (LC39OGA) – SWMU 107.

VAB Long-Term Groundwater Monitoring↗

A study of psychrophilic organisms isolated from the manufacture and assembly areas of spacecraft to be used in the Viking mission

The effect of storage of dry heat treated Teflon ribbons under nitrogen gas followed by high vacuum on the recovery of hardy organisms from the ribbons was studied. A similar experiment was performed on spore crops of hardy organisms recovered previously from Cape Canaveral. Hardy organisms have been inoculated onto slides and subjected to an artificial Martian environment in an attempt to demonstrate their growth in this environment. Additional experiments using the artificial Martian environment include response of soil samples from the VAB with both constant temperature and freeze-thaw cycles. These experiments were performed with dried soil and soil containing added water. Other investigations included the effect of heatshock on soil samples, psychrophilic counts of new soil samples from the manufacture area of the Viking spacecraft, effect of pour plate versus spread plate on psychrophilic counts, and preparation of spore crops of hardy organisms from Cape Canaveral.

Foster, T. L.↗

Tug fleet and ground operations schedules and controls. Volume 3: Program cost estimates

Cost data for the tug DDT&E and operations phases are presented. Option 6 is the recommended option selected from seven options considered and was used as the basis for ground processing estimates. Option 6 provides for processing the tug in a factory clean environment in the low bay area of VAB with subsequent cleaning to visibly clean. The basis and results of the trade study to select Option 6 processing plan is included. Cost estimating methodology, a work breakdown structure, and a dictionary of WBS definitions is also provided.

Source record↗

Investigation of a low NOx full-scale annular combustor

An atmospheric test program was conducted to evaluate a low NOx annular combustor concept suitable for a supersonic, high-altitude aircraft application. The lean premixed combustor, known as the vortex air blast (VAB) concept, was tested as a 22.0-cm diameter model in the early development phases to arrive at basic design and performance criteria. Final demonstration testing was carried out on a full scale combustor of 0.66-m diameter. Variable geometry dilution ports were incorporated to allow operation of the combustor across the range of conditions between idle (T(in) = 422 K, T(out) = 917 K) and cruise (T(in) = 833 K, T(out) - 1778 K). Test results show that the design could meet the program NOx goal of 1.0 g NO2/kg fuel at a one-atmospheric simulated cruise condition.

Source record↗

Overview od STS ground operations/orbiter turnaround STS-1 through STS-7

A review of STS-1 processing is presented as a reference for Shuttle processing time and the magnitude of the associated modifications, discrepancies, technical requirements, and ground systems activities. STS-1 processing provided the basis from which a plan to perform operational turnaround was established. Turnaround processing for Launch and Landing are treated separately to depict more clearly the progress made to reduce turnaround time and manhours expended. Turnaround time was reduced from 187 days for STS-2 to 60 days for STS-7 and landing turnaround was reduced from 14 days to 5 days. Modifications were reduced from 114 to 51. Requirements changes for launch readiness verification were reduced from 536 to 107. Special tests or inspections were reduced from 292 to 52. Anomalies resolved concurrent with processing were reduced from 13,000 to 4,000. Integration in the Vehicle Assembly Building (VAB) is about 10 percent of the flow, and Launch Pad operations comprise 40 percent of the turnaround. The work force has matured and has demonstrated the capability to perform planned and contingency operations. The turnaround program is fast approaching the goal of becoming operational.

Schwartz, R.↗

External tank processing from barge to pad

Delivery and launch readiness events for the External Tanks (ET) are discussed. The ET is off-loaded at the KSC Barge Turning Basin and towed to the Vertical Assembly Building (VAB), High Bay Transfer Aisle. It is erected vertically and placed in the ET Checkout Area of High Bay 2 or 4 for standalone checkout. At the completion of checkout the ET is transferred to storage or to the Integration Area of High Bay 1 or 3 for SRB and Orbiter Mate. A Systems Integration Test performed with the Orbiter and Solid Rocket Booster is described. Final checkout activities are also described.

Carpenter, J. E.↗

Mathematical models for space shuttle ground systems

Math models are a series of algorithms, comprised of algebraic equations and Boolean Logic. At Kennedy Space Center, math models for the Space Shuttle Systems are performed utilizing the Honeywell 66/80 digital computers, Modcomp II/45 Minicomputers and special purpose hardware simulators (MicroComputers). The Shuttle Ground Operations Simulator operating system provides the language formats, subroutines, queueing schemes, execution modes and support software to write, maintain and execute the models. The ground systems presented consist primarily of the Liquid Oxygen and Liquid Hydrogen Cryogenic Propellant Systems, as well as liquid oxygen External Tank Gaseous Oxygen Vent Hood/Arm and the Vehicle Assembly Building (VAB) High Bay Cells. The purpose of math modeling is to simulate the ground hardware systems and to provide an environment for testing in a benign mode. This capability allows the engineers to check out application software for loading and launching the vehicle, and to verify the Checkout, Control, & Monitor Subsystem within the Launch Processing System. It is also used to train operators and to predict system response and status in various configurations (normal operations, emergency and contingent operations), including untried configurations or those too dangerous to try under real conditions, i.e., failure modes.

Tory, E. G.↗

Shuttle Ground Operations Efficiencies/Technologies Study (SGOE/T). Volume 5: Technical Information Sheets (TIS)

The Technology Information Sheet was assembled in database format during Phase I. This document was designed to provide a repository for information pertaining to 144 Operations and Maintenance Instructions (OMI) controlled operations in the Orbiter Processing Facility (OPF), Vehicle Assembly Building (VAB), and PAD. It provides a way to accumulate information about required crew sizes, operations task time duration (serial and/or parallel), special Ground Support Equipment (GSE). required, and identification of a potential application of existing technology or the need for the development of a new technolgoy item.

Scholz, A. L.↗

Orbiter processing facility service platform failure and redesign

In a high bay of the Orbiter Processing Facility (OPF) at the Kennedy Space Center, technicians were preparing the space shuttle orbiter Discovery for rollout to the Vehicle Assembly Building (VAB). A service platform, commonly referred to as an OPF Bucket, was being retracted when it suddenly fell, striking a technician and impacting Discovery's payload bay door. A critical component in the OPF Bucket hoist system had failed, allowing the platform to fall. The incident was thoroughly investigated by both NASA and Lockheed, revealing many design deficiencies within the system. The deficiencies and the design changes made to correct them are reviewed.

Harris, Jesse L.↗

The Ames-Lockheed orbiter processing scheduling system

A general purpose scheduling system and its application to Space Shuttle Orbiter Processing at the Kennedy Space Center (KSC) are described. Orbiter processing entails all the inspection, testing, repair, and maintenance necessary to prepare the Shuttle for launch and takes place within the Orbiter Processing Facility (OPF) at KSC, the Vehicle Assembly Building (VAB), and on the launch pad. The problems are extremely combinatoric in that there are thousands of tasks, resources, and other temporal considerations that must be coordinated. Researchers are building a scheduling tool that they hope will be an integral part of automating the planning and scheduling process at KSC. The scheduling engine is domain independent and is also being applied to Space Shuttle cargo processing problems as well as wind tunnel scheduling problems.

Zweben, Monte↗

System requirements specification for SMART structures mode

Specified here are the functional and informational requirements for software modules which address the geometric and data modeling needs of the aerospace structural engineer. The modules are to be included as part of the Solid Modeling Aerospace Research Tool (SMART) package developed for the Vehicle Analysis Branch (VAB) at the NASA Langley Research Center (LaRC). The purpose is to precisely state what the SMART Structures modules will do, without consideration of how it will be done. Each requirement is numbered for reference in development and testing.

Source record↗

Multidisciplinary design optimization using response surface analysis

Aerospace conceptual vehicle design is a complex process which involves multidisciplinary studies of configuration and technology options considering many parameters at many values. NASA Langley's Vehicle Analysis Branch (VAB) has detailed computerized analysis capabilities in most of the key disciplines required by advanced vehicle design. Given a configuration, the capability exists to quickly determine its performance and lifecycle cost. The next step in vehicle design is to determine the best settings of design parameters that optimize the performance characteristics. Typical approach to design optimization is experience based, trial and error variation of many parameters one at a time where possible combinations usually number in the thousands. However, this approach can either lead to a very long and expensive design process or to a premature termination of the design process due to budget and/or schedule pressures. Furthermore, one variable at a time approach can not account for the interactions that occur among parts of systems and among disciplines. As a result, vehicle design may be far from optimal. Advanced multidisciplinary design optimization (MDO) methods are needed to direct the search in an efficient and intelligent manner in order to drastically reduce the number of candidate designs to be evaluated. The payoffs in terms of enhanced performance and reduced cost are significant. A literature review yields two such advanced MDO methods used in aerospace design optimization; Taguchi methods and response surface methods. Taguchi methods provide a systematic and efficient method for design optimization for performance and cost. However, response surface method (RSM) leads to a better, more accurate exploration of the parameter space and to estimated optimum conditions with a small expenditure on experimental data. These two methods are described.

Unal, Resit↗

Water quality modeling using geographic information system (GIS) data

Protection of the environment and natural resources at the Kennedy Space Center (KSC) is of great concern. The potential for surface and ground water quality problems resulting from non-point sources of pollution was examined using models. Since spatial variation of parameters required was important, geographic information systems (GIS) and their data were used. The potential for groundwater contamination was examined using the SEEPAGE (System for Early Evaluation of the Pollution Potential of Agricultural Groundwater Environments) model. A watershed near the VAB was selected to examine potential for surface water pollution and erosion using the AGNPS (Agricultural Non-Point Source Pollution) model.

Engel, Bernard A↗

Geometric modeling for computer aided design

Over the past several years, it has been the primary goal of this grant to design and implement software to be used in the conceptual design of aerospace vehicles. The work carried out under this grant was performed jointly with members of the Vehicle Analysis Branch (VAB) of NASA LaRC, Computer Sciences Corp., and Vigyan Corp. This has resulted in the development of several packages and design studies. Primary among these are the interactive geometric modeling tool, the Solid Modeling Aerospace Research Tool (smart), and the integration and execution tools provided by the Environment for Application Software Integration and Execution (EASIE). In addition, it is the purpose of the personnel of this grant to provide consultation in the areas of structural design, algorithm development, and software development and implementation, particularly in the areas of computer aided design, geometric surface representation, and parallel algorithms.

Schwing, James L.↗

Construction bidding cost of KSC's space shuttle facilities

The bidding cost of the major Space Transportation System facilities constructed under the responsibility of the John F. Kennedy Space Center (KSC) is described and listed. These facilities and Ground Support Equipment (GSE) are necessary for the receiving, assembly, testing, and checkout of the Space Shuttle for launch and landing missions at KSC. The Shuttle launch configuration consists of the Orbiter, the External Tank, and the Solid Rocket Boosters (SRB). The reusable Orbiter and SRB's is the major factor in the program that will result in lowering space travel costs. The new facilities are the Landing Facility; Orbiter Processing Facility; Orbiter Approach and Landing Test Facility (Dryden Test Center, California); Orbiter Mating Devices; Sound Suppression Water System; and Emergency Power System for LC-39. Also, a major factor was to use as much Apollo facilities and hardware as possible to reduce the facilities cost. The alterations to existing Apollo facilities are the VAB modifications; Mobile Launcher Platforms; Launch Complex 39 Pads A and B (which includes a new concept - the Rotary Service Structure), which was featured in ENR, 3 Feb. 1977, 'Hinged Space Truss will Support Shuttle Cargo Room'; Launch Control Center mods; External Tank and SRB Processing and Storage; Fluid Test Complex mods; O&C Spacelab mods; Shuttle mods for Parachute Facility; SRB Recovery and Disassembly Facility at Hangar 'AF'; and an interesting GSE item - the SRB Dewatering Nozzle Plug Sets (Remote Controlled Submarine System) used to inspect and acquire for reuse of SRB's.

Brown, Joseph Andrew↗

STS-51B/Challenger - Isolated Launch View

Live footage of various isolated launch views is seen. Views of the Space Shuttle Challenger are shown from different camera sites such as the VAB (Vehicle Assembly Building) Roof, Pad Perimeter, Helicopter, Convoy, and Midfield. Also shown from different cameras is the re-entry and landing of the shuttle at Kennedy Space Center (KSC). Footage also includes the ground recovery crew as they travel to the spacecraft. Challengers crew, Commander Robert F. Overmyer, Pilot Frederick D. Gregory, Mission Specialists Don L. Lind, Norman E. Thagard, and William E. Thornton, and Payload Specialists Lodewijk van den Berg, and Taylor G. Wang are also seen leaving the craft.

Source record↗

STS-26: Preparations for Launch

Preparations for launch of STS-26 are shown. They include: (1) VAB to OPF high bay rollover; (2) Main engine unpacking and installation; (3) OMS pod installation; (4) Crew hatch removal; (5) Modified crew hatch installation; (6) Nose cap installation; (7) 17 inch disconnect work; (8) Ku-band antenna stow and deploy; (9) Tile work; (10) Oasis payload installation; (11) Solid rocket boosters arrival, preps and stacking; (13) Modified SRB segments: Arrival via train at KSC RPSF; (14) AFT segment rotation to vertical in RPSF; (15) AFT skirt to AFT segment mating; (16) SRB grain inspection; (17) Lift AFT segment; and (18) Lift and mate external tank.

Source record↗