Enhanced Component Performance Study: Turbine Driven Pumps 1998–2022

This report presents an enhanced performance evaluation of turbine driven pumps (TDPs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2022 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The TDP failure modes considered for standby systems are fail to start (FTS), fail to run (FTR) for one hour of operation (FTR=1H), FTR after one hour of operation (FTR>1H), and for normally running systems FTS and FTR. An eight hour unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10 year period while yearly estimates for reliability are provided for the entire study period. No increasing trends were identified for TDPs for the most recent 10 year period: The following decreasing trends were identified for TDPs for the most recent 10 year period: • Standby TDP FTR>1H failure rate • Normally running TDP FTR failure rate • Standby TDP unavailability • Standby MDP total unreliability (8-hour mission) • Standby TDP frequency of start demands (demands per reactor year) • Standby TDP frequency of FTR=1H hours (hours per reactor year) • Standby TDP frequency of FTR>1H events (failures per reactor year) • Normally running TDP frequency of start demands • Normally running TDP frequency of run hours • Normally running TDP frequency of FTR events.

99 GENERAL AND MISCELLANEOUS↗

Enhanced Component Performance Study: Air Operated Valves 1998–2022

This report presents an enhanced performance evaluation of air operated valves (AOVs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2022 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The AOV failure modes considered are fail to open or close (FTOC), fail to operate or control (FTOP), and spurious operation (SO). The component reliability estimates and the reliability data are trended for the most recent 10 year period while yearly estimates for reliability are provided for the entire study period. The following increasing trends were identified for AOVs for the most recent 10 year period: • Low demand AOV frequency of FTOC demands (demands per reactor year) • High demand AOV frequency of FTOC demands. The following decreasing trends were identified for AOVs for the most recent 10 year period: • Low demand AOV FTOC failure probability • Low demand AOV FTOP failure rate • Low demand AOV frequency of FTOC events (failures per reactor year) • Low demand AOV frequency of FTOP events.

99 GENERAL AND MISCELLANEOUS↗

Enhanced Component Performance Study: Motor-Operated Valves 1998-2024

This report presents an enhanced performance evaluation of motor-operated valves (MOVs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2024 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The MOV failure modes considered are fail to open or close (FTOC), fail to operate or control (FTOP), and spurious operation (SO). The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period. The following increasing trend was identified for MOVs for the most recent 10-year period: • Low-demand MOV frequency of FTOC demands (demands per reactor year). The following decreasing trends were identified for MOVs for the most recent 10-year period: • Low-demand MOV FTOC failure probability • High-demand MOV SO failure rate • Low-demand MOV frequency of FTOC events (failures per reactor year) • High-demand MOV frequency of SO events (failures per reactor year).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Enhanced Component Performance Study: Motor Driven Pumps 1998-2024

This report presents an enhanced performance evaluation of motor-driven pumps (MDPs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2024 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The MDP failure modes considered for standby systems are fail to start (FTS), fail to run (FTR) for one hour of operation (FTR=1H), FTR after one hour of operation (FTR>1H), and for normally running systems FTS and FTR. An eight-hour unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Enhanced Component Performance Study: Turbine-Driven Pumps 1998-2024

This report presents an enhanced performance evaluation of turbine driven pumps (TDPs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2024 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The TDP failure modes considered for standby systems are fail to start (FTS), fail to run (FTR) for one hour of operation (FTR=1H), FTR after one hour of operation (FTR>1H), and for normally running systems FTS and FTR. An eight hour unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10 year period while yearly estimates for reliability are provided for the entire study period. No increasing trends were identified for TDPs for the most recent 10 year period.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Syracuse University Industrial Assessment Center (Final Report)

Syracuse University Industrial Assessment Center (SU-IAC) project is focused on the two primary objectives: (i) educate undergraduate and graduate students in engineering and associated disciplines on the concepts of energy sustainability and to provide hands-on training by performing energy assessment at industrial facilities to become future energy efficiency experts, and (ii) offer energy assessments to small and mid-sized manufacturing companies in SU-IAC 2 the greater New York State region, perform analytical engineering work in support of assessment recommendations, and to report the results of those analyses to the client companies, to DOE, and to Field office personnel Through this project period, SU-IAC successfully trained 77 engineering students who were undergraduate or graduate students at Syracuse University College of Engineering, or at SU- IAC’s satellite center at Clarkson University. Each of these students received comprehensive ‘in-class’ technical training, safety training, and hands-on field training. The students performed various tasks related to energy assessment at the manufacturing facilities, including billing analysis, energy use reduction recommendations, and report preparation. Through this project period, a total of 34 students have completed all requirements of the SU-IAC program and have received the US DoE Certificate on Energy Efficiency, with the remaining students continuing at various stages of field work or training. During this project period, due to Covid-related measures in New York State, Syracuse University campus and most of the manufacturing facilities were completely closed or were under severe restrictions for access, for an extended period from March 2020 through April 2021. The closures affected our project execution, with the project Sponsor offering structured relief to carry-out a modified project during the affected budget periods. During this project period, SU-IAC student teams, led by its Director, completed a total of 77 energy assessments at small- and medium-scale manufacturing facilities located in New York State. For these facilities, SU-IAC prepared and presented details for 569 assessment recommendations (ARs). The facilities implemented a total of 258 of these ARs, realizing annual average energy savings in the range of $\$ $3,300 to $\$ $55,000 per facility. Cumulatively, these facilities have reduced their “first year after implementation” energy use by a total of 4.37 million kwh, and fuel use by a total of 27.7 billion BTU. SU-IAC project has successfully met the two primary objectives (and the associated sub objectives) and helped the manufacturing facilities in New York State achieve quantitative energy use reductions as a result of this project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Defining an industrial heat pump: A review & synthesis

Clear and understandable definitions of advanced energy technologies are not common and often confuse those who are not experts. This review paper addresses a critical issue in the field of heat pumps: the ambiguity surrounding the term “industrial heat pump.” The term, as discussed in various literature and media, often leads to misconceptions about the capabilities and applications of heat pumps, particularly in industrial contexts. This review paper seeks to refine and unify the definition of industrial heat pumps by analyzing existing academic and commercial literature, industry reports, and classifications. Unique identifiers explored for the definition of an industrial heat pump include the use of waste heat, operating temperature ranges, size specifications, and specific end-use applications. The study reveals differences in how industrial heat pumps are defined in academic and commercial contexts, highlighting the need for a standardized definition to facilitate better communication among manufacturers, policymakers, and end users. This is especially important considering recent legislative efforts such as the HEAT Act, which seeks to promote industrial heat pump adoption. The proposed definition aims to provide clarity while supporting the effective deployment of industrial heat pumps. With proper adoption, the definition will help promote the role of industrial heat pumps in achieving energy efficiency goals in the industrial sector. The intended impact is for the definition to serve as a foundational reference for future research and policy development.

Heat pump characteristics↗

Energy Requirements for Integration of Nuclear Reactors with Iron and Steel Plants

This report identifies energy needs of heavy energy users within the domestic iron and steel industry and suggests solutions for integrating nuclear energy. The iron and steel industry, composed of several types of plants which perform different processes with varied energy demands and vectors, is a heavy consumer of electric power and fossil fuels including coke and natural gas. Almost all major process temperatures exceed the temperatures of direct heat available from advanced reactors, and so electricity and hydrogen were considered instead. Reference units were adopted and estimated energy demands computed for the blast furnace (BF), direct reduced iron (DRI) unit, electric arc furnace (EAF), and reheat furnaces. By utilizing production capacity data from industry reports, the ranges of power demands were estimated, including for hydrogen production by high temperature steam electrolysis (HTSE). For the EAF and DRI unit, more detailed integration studies with thermodynamic modeling were also conducted and determined a possible solution with a specific reactor design and number of modules. Furthermore, because many unit processes are co-located, entire plants were considered by adding the energy demands of the unit processes to form four hypothetical reference plants. The range of power needs for the reference plants is compatible with multi-unit banks of microreactors at the low end, and would create a need for multiple larger-capacity SMRs at the high end (1 GWe plus 0.14 GWt). Although the overall power need at the high end is well-matched with one present-day large reactor offering (1.1 GWe), redundancy considerations may require a minimum of two reactors, potentially eliminating the single large reactor from consideration. Auxiliary or house loads would increase the reference plant estimates. Finally, the report provides total estimated energy needs under integration of all U.S. units of each process (BF, DRI, EAF, and reheat furnaces), representing a national potential for nuclear energy in the industry. U.S. iron and steel plants may be candidates for integration with nuclear reactors via electricity and hydrogen, and many sites have energy requirements that correspond well to the capacities of several advanced nuclear power designs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Enhanced Component Performance Study: Emergency Diesel Generators 1998-2020

This report presents an enhanced performance evaluation of emergency power system (EPS) and high-pressure core spray (HPCS) emergency diesel generators (EDGs) at U.S. commercial nuclear power plants. This report evaluates component performance over time using (1) Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS) data from 1998 through 2020 and (2) maintenance unavailability performance data from Mitigating Systems Performance Index (MSPI) Basis Document data from 2002 through 2020. The objective is to show estimates of current failure probabilities and rates related to EDGs, trend these data on an annual basis, determine if the current data are consistent with the probability distributions currently recommended for use in NRC probabilistic risk assessments, show how the reliability data differ for different EDG manufacturers and for EDGs with different ratings; and summarize the subcomponents, causes, detection methods, and recovery associated with each EDG failure mode. The EDG failure modes considered are fail to start (FTS), fail to load and run (FTLR), and fail to run after one hour of operation (FTR>1H). Engineering analyses were performed with respect to time period and failure mode without regard to the actual number of EDGs at each plant. The factors analyzed are: subcomponent, failure cause, detection method, recovery, manufacturer, and EDG rating. The following increasing trends were identified for EDGs for the most recent 10-year period: • HPCS EDG FTS failure probability • EPS and HPCS EDG frequency of start demands (demands per reactor year) • EPS and HPCS EDG frequency of FTLR demands. The following decreasing trends were identified for EDGs for the most recent 10-year period: • EPS EDG FTS failure probability • EPS EDG FTLR failure probability • EPS EDG unavailability • EPS and HPCS EDG frequency of FTLR events (failures per reactor year).

99 GENERAL AND MISCELLANEOUS↗

Enhanced Component Performance Study: Emergency Diesel Generators 1998–2022

This report presents an enhanced performance evaluation of the emergency power system (EPS) and high-pressure core spray (HPCS) emergency diesel generators (EDGs) at U.S. commercial nuclear power plants. This report evaluates component performance over time using (1) Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS) data from 1998 through 2022 and (2) maintenance unavailability performance data from Mitigating Systems Performance Index (MSPI) Basis Document data from 2002 through 2022. The objective is to show estimates of current failure probabilities and rates related to EDGs, trend these data on an annual basis, determine if the current data are consistent with the probability distributions currently recommended for use in Nuclear Regulatory Commission (NRC) probabilistic risk assessments, show how the reliability data differ for different EDG manufacturers and for EDGs with different ratings; and summarize the subcomponents, causes, detection methods, and recovery associated with each EDG failure mode. The EDG failure modes considered are fail to start (FTS), fail to load and run (FTLR), and fail to run after one hour of operation (FTR>1H). Engineering analyses were performed with respect to time-period and failure mode without regard to the actual number of EDGs at each plant. The factors analyzed include subcomponent, failure cause, detection method, recovery, manufacturer, and EDG rating. The following increasing trends were identified for EDGs for the most recent 10-year period: (1) HPCS EDG FTS failure probability, (2) EPS and HPCS EDG frequency of start demands (demands per reactor year), and (3) EPS and HPCS EDG frequency of FTLR demands. The following decreasing trends were identified for EDGs for the most recent 10-year period: (1) EPS EDG FTS failure probability, (2) EPS EDG FTLR failure probability, (3) EPS EDG unavailability, and (4) EPS and HPCS EDG frequency of FTLR events (failures per reactor year).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Enhanced Component Performance Study: Emergency Diesel Generators 1998-2024

This report presents an enhanced performance evaluation of the emergency power system (EPS) and high-pressure core spray (HPCS) emergency diesel generators (EDGs) at U.S. commercial nuclear power plants. This report evaluates component performance over time using (1) Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS) data from 1998 through 2024 and (2) maintenance unavailability performance data from Mitigating Systems Performance Index (MSPI) Basis Document data from 2002 through 2024. The objective is to show estimates of current failure probabilities and rates related to EDGs, trend these data on an annual basis, determine if the current data are consistent with the probability distributions currently recommended for use in Nuclear Regulatory Commission (NRC) probabilistic risk assessments, show how the reliability data differ for different EDG manufacturers and for EDGs with different ratings; and summarize the subcomponents, causes, detection methods, and recovery associated with each EDG failure mode. The EDG failure modes considered are fail to start (FTS), fail to load and run (FTLR), and fail to run after one hour of operation (FTR>1H). Engineering analyses were performed with respect to time-period and failure mode without regard to the actual number of EDGs at each plant. The factors analyzed include subcomponent, failure cause, detection method, recovery, manufacturer, and EDG rating. The following increasing trends were identified for EDGs for the most recent 10-year period: • EPS and HPCS EDG frequency of start demands (demands per reactor year) • EPS and HPCS EDG frequency of FTLR demands • EPS and HPCS EDG frequency of run>1H hours. The following decreasing trends were identified for EDGs for the most recent 10-year period: • EPS EDG FTR>1H failure rate • EPS EDG unreliability • EPS and HPCS EDG frequency of FTR>1H events (failures per reactor year).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: Emergency Power System 1998-2022

This report presents an unreliability evaluation of the emergency power system (EPS) at 93 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the industry-wide estimates of EPS system start-only unreliability, but a highly statistically significant decreasing trend was identified in the industry-wide estimates of EPS system 8-hour mission unreliability.

99 GENERAL AND MISCELLANEOUS↗

Operating Experience Data Analysis for Digital Instrumentation and Control System Reliability and Risk Assessment in Nuclear Power Plants

The implementation of advanced digital instrumentation and control (DI&C) systems in U.S. nuclear power plants (NPPs) can bring significant advancements in reliability, monitoring, and control capabilities. However, these systems also introduce new challenges, particularly in assessing risks such as common-cause failures (CCFs) and establishing robust reliability estimates for DI&C components. Addressing these challenges is critical for ensuring the safe and efficient operation of NPPs. Recently, Idaho National Laboratory was tasked by the U.S. Nuclear Regulatory Commission (NRC) to conduct a DI&C reliability study using operating experience data from the nuclear industry. The two operating experience data sources for the study are the Institute of Nuclear Power Operations’ Industry Reporting and Information System (IRIS) and the NRC’s Licensee Event Report database which is hosted at Idaho National Laboratory at https://lersearch.inl.gov/LERSearchCriteria.aspx. This report provides a comprehensive examination of DI&C systems, including their architecture, operational advantages, and associated challenges. It reviews existing industry DI&C studies and failure mode taxonomies, along with reliability data from various industries. Through a detailed analysis of these databases, the study provides insights into DI&C system performance. Considerations should be given to incorporate DI&C failure data into the NRC's Integrated Data Collection and Coding System and updating the Reliability and Availability Data System to support ongoing DI&C reliability studies. Recommendations are also provided for modeling DI&C reliability and CCF in probabilistic risk assessment, thereby supporting risk-informed decision-making and enhancing the reliability and safety of NPPs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: Emergency Power System 1998-2024

This report presents an unreliability evaluation of the emergency power system (EPS) at 93 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998 to 2024 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the industry-wide estimates of EPS system start-only unreliability, but a statistically significant decreasing trend was identified in the industry-wide estimates of EPS system 24-hour mission unreliability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: Auxiliary Feedwater 1998-2022

This report presents an unreliability evaluation of the auxiliary feedwater (AFW) system at 62 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from calendar year 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the industry-wide estimates of AFW system start-only unreliability, but a highly statistically significant decreasing trend was identified in the industry-wide estimates of AFW system 8-hour mission unreliability.

99 GENERAL AND MISCELLANEOUS↗

System Study: Auxiliary Feedwater 1998-2024

This report presents an unreliability evaluation of the auxiliary feedwater (AFW) system at 62 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from calendar years 1998 to 2024 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period and yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the industry-wide estimates of AFW system start-only unreliability, but a statistically significant decreasing trend was identified in the industry-wide estimates of AFW system 24-hour mission unreliability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: High-Pressure Core Spray 1998-2022

This report presents an unreliability evaluation of the high-pressure core spray (HPCS) at eight U.S. commercial operating boiling water reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10-year period while yearly estimates for system unreliability are provided for the entire active period. Statistically significant increasing trends were identified in both the HPCS system start-only unreliability and 8-hour mission unreliability.

99 GENERAL AND MISCELLANEOUS↗

System Study: High-Pressure Coolant Injection 1998-2022

This report presents an unreliability evaluation of the high-pressure coolant injection (HPCI) system at 22 U.S. commercial operating boiling water reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the HPCI results.

99 GENERAL AND MISCELLANEOUS↗