Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Federal Programs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Proposed roadmap for overcoming legal and financial obstacles to carbon capture and sequestration

Many existing proposals either lack sufficient concreteness to make carbon capture and geological sequestration (CCGS) operational or fail to focus on a comprehensive, long term framework for its regulation, thus failing to account adequately for the urgency of the issue, the need to develop immediate experience with large scale demonstration projects, or the financial and other incentives required to launch early demonstration projects. We aim to help fill this void by proposing a roadmap to commercial deployment of CCGS in the United States.This roadmap focuses on the legal and financial incentives necessary for rapid demonstration of geological sequestration in the absence of national restrictions on CO2 emissions. It weaves together existing federal programs and financing opportunities into a set of recommendations for achieving commercial viability of geological sequestration.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Beyond Widgets: Validated Systems Energy Savings and Utility Custom Incentive Program Systems Trends

Energy efficiency upgrades to buildings to date through avenues such as utility incentive programs have been largely limited to component-based products (e.g., lamps, RTUs). While some utilities do provide ‘custom’ incentive programs with whole building and system level technical assistance, these programs require deeper levels of analysis, resulting in higher program costs. This results in custom programs being restricted to utilities with greater resources, and are typically applied mainly to large or energy-intensive facilities, leaving much of the market without cost effective access and incentives for these solutions. In addition, with increasingly stringent energy codes, cost effective component-based solutions that achieve significant savings are dwindling. Integrated building systems (e.g., integrated façade, HVAC and/or lighting solutions) can deliver higher savings (Regnier et al. 2017) that translate into large sector-wide savings if deployed at the scale of these programs. However, systems application poses a number of challenges – energy savings assessments are inherently more complex and are not easily suited to the deemed measure model, and implementation of systems can be more disruptive. This paper presents the outcomes of a project to develop validated utility incentive program packages for three specific integrated building systems, in collaboration with ComEd, a consortium of California Public Owned Utilities (CA POUs) (Northern California Power Agency(NCPA) and the Southern California Public Power Authority(SCPPA)), and Xcel Energy (CO, MN). Previous work described the potential for energy savings of these systems at the individual and market level, early test findings for the task-ambient lighting system, and described the work products to develop utility incentive programs (Regnier et al. 2016). This paper presents validated end use energy savings of all three systems showing energy savings of ~20% for automated shading combined with daylight dimming (does not include light fixture retrofit savings); 30-46% for task-ambient lighting systems combined with plug load occupancy controls, depending on technology package and office building size (no daylight dimming impacts); and ~94% in the south-façade daylit zone for workstation specific lighting systems with daylight dimming (including lighting retrofit and task tuning). Using a U.S. Department of Energy (DOE) reference building model (DOE 2018), this translates to whole building savings of 2-5% (large-medium commercial), 12-23% (large-small commercial), and 13-15% (medium-large commercial) for these systems respectively. Early findings from the utilities in deploying these systems through their incentive programs indicate that deployment methods such as direct install programs might be best suited for these integrated systems. Further, early findings from a scoping study across custom utility programs and federal retrofit programs indicate that component level retrofits are still prevalent even in these programs, pointing towards an opportunity for deeper energy savings deployment. High performance retrofit case studies demonstrate that deeper energy savings is possible through integrated approaches. Market stakeholder interviews indicate however that there is generally a low level of awareness of the potential for energy savings of these three integrated systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Radiological Survey of Contaminated Installations of Research Reactor before Dismantling in High Dose Conditions with Complex for Remote Measurements of Radioactivity - 12069

Decontamination and decommissioning of the research reactors MR (Testing Reactor) and RFT (Reactor of Physics and Technology) has recently been initiated in the National Research Center (NRC) 'Kurchatov institute', Moscow. These research reactors have a long history and many installations - nine loop facilities for experiments with different kinds of fuel. When decommissioning nuclear facilities it is necessary to measure the distribution of radioactive contamination in the rooms and at the equipment at high levels of background radiation. At 'Kurchatov Institute' some special remote control measuring systems were developed and they are applied during dismantling of the reactors MR and RFT. For a survey of high-level objects a radiometric system mounted on the robotic Brokk vehicle is used. This system has two (4π and collimated) dose meters and a high resolution video camera. Maximum measured dose rate for this system is ∼8.5 Sv/h. To determine the composition of contaminants, a portable spectrometric system is used. It is a remotely controlled, collimated detector for scanning the distribution of radioactive contamination. To obtain a detailed distribution of contamination a remote-controlled gamma camera is applied. For work at highly contaminated premises with non-uniform background radiation, another camera is equipped with rotating coded mask (coded aperture imaging). As a result, a new system of instruments for remote radioactivity measurements with wide range of sensitivity and angular resolution was developed. The experience and results of measurements in different areas of the reactor and at its loop installations, with emphasis on the radioactive survey of highly-contaminated samples, are presented. These activities are conducted under the Federal Program for Nuclear and Radiation Safety of Russia. Adaptation of complex remote measurements of radioactivity and survey of contaminated installations of research reactor before dismantling in high dose conditions has proven successful. The radioactivity measuring devices for operation at high, non-uniform dose background were tested in the field and a new data of measurement of contamination distribution in the premises and installations were obtained. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Citizen Science: Potential New Opportunity for Consent-Based Siting Processes - 16608

Citizen science is a global phenomenon, as millions of volunteers are collecting, analyzing, and sharing data that contribute to scientific knowledge. Recognizing its potential, the U.S. 2013 Open Government National Action Plan encouraged Federal agencies to harness American ingenuity toward helping address a broad range of scientific and societal challenges, specifically invoking crowd-sourcing and citizen science. The October 2015 Plan reinforced this charge, calling on agencies to increase public participation through both means. Thus, citizen science opportunities are actively being sought across a wide range of Federal programs. Meanwhile, all nations with commercial nuclear reactors face the challenge of managing the spent nuclear fuel and high-level radioactive waste produced. Consent-based siting of facilities to manage these materials is considered an essential aspect of this shared challenge. A variety of other agency programs have illustrated the role citizens can play in strengthening engagement, empowerment, and scientific research. With these same themes important to planning for nuclear waste management, citizen science could represent a potential new opportunity for this national effort. Online resources were investigated to understand the nature and range of citizen science projects and seek insights for possible new applications. Results show that volunteers are contributing to research in areas from archaeology to zoology, and extending from the ocean floor to outer space. A large number of the collaborations involve characterizing local environmental conditions and monitoring changes over time. This paper highlights insights from several projects that illustrate the contributions citizen scientists can make to advance scientific knowledge and assist national and international programs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Regulatory Basis for Dry Spent Nuclear Fuel Storage Canister Inspections

Nuclear power plants in the United States began moving Spent Nuclear Fuel (SNF) from wet storage to dry storage in Independent Spent Fuel Storage Installations (ISFSIs) in 1986 at Surry station in Virginia. Dry storage represented an innovative solution to the problem created by the U.S. government's failure to fulfill its obligation to begin removing SNF from power plant sites. Today, about 70 ISFSIs have been placed into operation on the sites of current, or former nuclear power plants. There are currently over 2,200 SNF dry storage systems (DSSs) in service at these locations. Thirteen of these ISFSIs are located at sites with no operating reactor, and this number is due to increase in the coming years. Operating nuclear power stations use ISFSI storage to maintain wet storage capacity for recently discharged SNF. Permanently shutdown nuclear power plants use ISFSI storage to allow decommissioning and dismantlement of the power plant structures, systems, and components. The U.S. Nuclear Regulatory Commission (NRC) regulates the licensing, construction, and operation of ISFSIs under Title 10 of the U.S. Code of Federal Regulations, Energy, Part 72, Licensing Requirements for the Independent Storage of Spent Nuclear Fuel, High-Level Radioactive Waste, and Reactor-Related Greater than Class-C Waste (10 CFR 72). When the regulations in 10 CFR 72 were created around 1980, 20 years was chosen by the NRC as the license term for a specific ISFSI license and later, for a DSS Certificate of Compliance (CoC). Twenty years was, at the time, believed to be a sufficient time period for on-site interim dry storage of spent nuclear fuel before the U.S. government began moving the spent fuel away from the plant site for final disposal. Little, if any consideration was given to providing a regulatory framework for extending ISFSI licenses and DSS CoCs beyond 20 years at that time. However, shortly after the turn of the century, with still no federal program for removing SNF from reactor sites on the near-term horizon it became apparent that most DSSs would be required to remain in service at the ISFSIs beyond the initial 20-year license term. Operation beyond the original license term requires the specific license or the DSS CoC (used at a general license ISFSI) to be renewed. The requirements for renewal of a specific ISFSI license or a DSS CoC include addressing age-related degradation of structures, systems, and components that perform or support safety functions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The United States Federal Energy Management Program lighting energy efficiency 2017 update and impacts

Lighting consumes a great deal of electrical energy in buildings, and the U.S. federal government is the largest single energy consumer in the United States. Therefore, the way that the U.S. federal government manages its lighting energy use is of great importance. One important way that energy use is managed is through Federal Energy Management Program (FEMP) energy efficiency requirements. However, there is not much literature on how these requirements are set and how to value the resulting savings. This paper documents the methodology used to develop these for the 2017 FEMP lighting update. A methodology for calculating the total benefits is presented that goes beyond site energy saved, and includes full fuel cycle energy savings, energy cost savings, emissions offset and monetized emissions costs. The results show total benefits of $33 million USD including 475 kilotons of carbon dioxide (CO2) offset under the low compliance scenario, $104 million USD including 1494 kilotons of CO2 offset under the medium compliance scenario, and $217 million USD including 3124 kilotons of CO2 offset under the high compliance scenario.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Federal Workplace Charging Program Guide

The 2015 Fixing America's Surface Transportation (FAST) Act authorizes the installation, operation, and maintenance of electric vehicle supply equipment (EVSE) for the purpose of recharging employees' privately owned vehicles (POVs) under the custody or control of the General Services Administration (GSA) or a Federal agency. It requires the collection of fees to recover the costs of installing, operating, and maintaining this equipment and imposes reporting requirements. This program guide reviews those requirements, excerpts the relevant language in Appendix A, and describes when and how fees may be required to cover costs of electricity, network costs, EVSE units, and installations in various scenarios. This program guide is designed to support Federal agencies developing and refining workplace charging programs for employee POVs. While it provides guidance and best practices, it does not replace agencywide policies or agency-specific legal counsel. It contains a roadmap for agency workplace charging programs and defines roles and responsibilities. This guide explains how to determine the number of POVs likely to charge at a given site and contains a sample employee survey in Appendix B. It reviews EVSE planning, including unit selection and acquisition, charger location(s), accounting for available power capacity, using existing infrastructure, and funding an incentive program. It also discusses the costs associated with EVSE acquisition, installation, and network management. These costs inform the subsequently provided information, which describes how to amortize costs to determine appropriate fees for each charging session. The final two sections of this guide address aspects of ongoing program management that the facility coordinator should consider and the reporting requirements associated with the FAST Act. The insights in this guide are applicable to all agency-owned and GSA-leased buildings or facilities offering the use of EVSE or a 120-volt receptacle for the purpose of recharging an employee's POV. However, the FAST Act requirements typically do not apply to any building or facility operated and maintained by a third-party vendor offering the use of EVSE as part of a commercial building lease unless the agency is managing the station and/or energy on behalf of the building and collecting POV fees.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Federal Energy Management Program FY 2017 Budget At-A-Glance

With more than 350,000 buildings and 600,000 vehicles, the federal government is America’s largest single energy consumer. There is a tremendous opportunity and responsibility to lead by example in cutting energy waste and advancing America’s clean energy future. The progress the federal government has made to date, through public-private partnerships and successful approaches, should be leveraged to show leadership to the nation and continue to make significant contributions to our national energy and environmental goals.

FEMP, Budget, Finance, FY 2017, Federal Management↗

Data Center Energy Efficiency

Fact sheet describes how the Federal Energy Management Program helps federal agencies implement data center energy efficiency projects.

Kam, Kendall [US Department of Energy (USDOE) Fede↗

From Policy to Compliance: Federal Energy Efficient Product Procurement

Federal buyers are required to purchase energy-efficient products in an effort to minimize energy use in the federal sector, save the federal government money, and spur market development of efficient products. The Federal Energy Management Program (FEMP)’s Energy Efficient Product Procurement (EEPP) Program helps federal agencies comply with the requirement to purchase energy-efficient products by providing technical assistance and guidance and setting efficiency requirements for certain product categories. Past studies have estimated the savings potential of purchasing energy-efficient products at over $500 million per year in energy costs across federal agencies.1 Despite the strong policy support for EEPP and resources available, energy-efficient product purchasing operates within complex decision-making processes and operational structures; implementation challenges exist that may hinder agencies’ ability to comply with purchasing requirements. The shift to purchasing green products, including energy-efficient products, relies on “buy in” from a variety of potential actors throughout different purchasing pathways. Challenges may be especially high for EEPP relative to other sustainable acquisition programs given that efficient products frequently have a higher first cost than non-efficient ones, which may be perceived as a conflict with fiscal responsibility, or more simply problematic for agency personnel trying to stretch limited budgets. Federal buyers may also face challenges in determining whether a given product is subject to EEPP requirements. Previous analysis on agency compliance with EEPP, conducted by the Alliance to Save Energy (ASE), shows that federal agencies are getting better at purchasing energy-efficient products. ASE conducted two reviews of relevant solicitations for product and service contracts listed on Federal Business Opportunities (FBO), the centralized website where federal agencies are required to post procurements greater than $25,000. In 2010, ASE estimated a compliance rate of 46% in 2010, up from an estimate of 12% in 2008. Our work updates and expands on ASE’s 2010 analysis to gauge agency compliance with EEPP requirements.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗