Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “EIC”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

High power coupler development for EIC

The synchrotron radiation loss in EIC Electron Storage Ring is as high as up to 10 MW. This energy loss will be compensated by 17 2K 591 MHz single-cell SRF cavities with a combined total of 34 high power fundamental power couplers. Each power coupler will operate 92% of revolution time CW and ~8% of revolution time with 400 kW forward power due to the beam abort gap. To satisfy the EIC needs, we developed two 500 kW standing-wave FPC designs at BNL based on either a BeO and an Al 2 O 3 RF window. This paper will briefly summarize test results of the BeO window FPC , and describe the design development of the Al 2 O 3 window based FPC.

43 PARTICLE ACCELERATORS↗

Thermal analysis of RHIC arc dipole magnet cold mass with EIC beam screen

The existing RHIC storage rings – including their superconducting magnet arcs – will be used for the hadron storage ring of the Electron-Ion Collider (EIC). The vacuum chamber of these magnets was not designed for the EIC hadron beams, with shorter bunches and of higher average current than the RHIC beams. With the current stainless steel beam pipe, the resistive-wall (RW) heating will exceed the dynamic heat load budget. Limiting the RW heating is important to prevent the superconducting magnets from quenching and to maintain a low screen temperature necessary to impede the rise of RW heating (higher resistance at higher temperature) as well as to achieve desired ultra-high vacuum. In addition, simulations predict the formation of electron cloud which would further contribute to the dynamic heat load and could compromise the quality and stability of the beam. To reduce the resistive-wall heating and suppress electron cloud, a beam screen will be installed in the vacuum chamber of the RHIC SC magnets. The screen will have a high RRR copper layer at its inner face – useful to reduce the resistive-wall impedance thanks to its high conductivity especially at cryogenic temperatures – and will be coated with a thin layer of amorphous carbon, a material with low secondary electron yield to suppress the formation of electron clouds. The baseline solution envisages a screen that will be cooled by thermal contact to the 4.55 K beam pipe. Detailed thermal analysis have been conducted in ANSYS 2020 for an arc dipole cold mass equipped with a beam screen in order to study the feasibility of a passively-cooled screen and guide its design. Temperature-dependent thermal conductivity properties of all materials in the operating (cryogenic) temperature range are considered. Suitable assumptions and simplifications are made to model the magnet coil and calculate its homogenized thermal conductivity. Sensitivity studies with respect to layer thicknesses and area of contact are carried out and results are presented.

43 PARTICLE ACCELERATORS↗

Radial-offset Optics in EIC Hadron Lattices: Trajectory Lengthening

This Tech. Note describes a method for a radial orbit offset in the arcs of the EIC hadron lattices, based on the perturbation dB/B of the magnetic field of the arc main bend magnets. This can be done independently for each arc (allowing multiple rigidities) and requires the use of pairs of orbit correctors at the extremities of the arc to ensure that the radially shifted orbit is on the zero-orbit (i.e. with the horizontal coordinates x = 0, p x = 0) at the exit and entry point of the respectively upstream and downstream interaction region (IR). The goal is to produce appropriate orbit lengthening as required for time of flight adjustments between the electron and hadron beams as part of EIC operations. An ad hoc parameter is introduced: a “geometric compaction factor” α B = (dC/C)/(dB/B), to quantify the orbit lengthening, or equivalently the radial orbit shift dR = R · α B · dB/B, from bending perturbation. Detailed numerical results are produced and discussed.

43 PARTICLE ACCELERATORS↗

Development and Test of Simulation Tools for EIC Beam-Beam Interaction (Final Technical Report)

This final technical report summarizes the work of the Michigan State University (MSU) team supported by grant # DE-SC0018973 awarded by the Office of Nuclear Physics, Department of Energy. The awarded proposal is a joint effort of Brookhaven National Laboratory (BNL, led by Dr. Yun Luo), Lawrence Berkeley National Laboratory (LBNL, led by Dr. Ji Qiang), Thomas Jefferson National Accelerator Facility (TJNAF, led by Dr. Yves Roblin) and MSU (led by Dr. Yue Hao). The MSU personnel supported by the grant include Dr. Yue Hao and Dr. Derong Xu, who is hired as a postdoctoral research fellow. MSU team ‘s work in this proposal focused on the beam dynamics study and numerical simulation of crabbed collision with crab cavities. Analytical calculations and numerous simulations have been done to identify beam dynamics effect out of numerical noises, study the synchro-betatron resonance in the crab crossing scheme, evaluate the effects of non-ideal settings for crab cavity and the effects of the crab crossing noises. The results have been published in journals and as conference proceedings. From the results of the proposal, we gained a clear understanding of the beam-beam interaction in the EIC designs and provided robust countermeasures to possible beam-beam interaction related to beam lifetime reduction, beam emittance growth, beam instabilities, and luminosity degradation, which significantly mitigate the technical risks associated with the EIC accelerator designs.

43 PARTICLE ACCELERATORS↗

Thermal simulation of the HSR arc BPM Module for EIC

The Electron Ion Collider (EIC) Hadron Storage Ring (HSR) will reuse most of the existing superconducting magnets from the RHIC storage ring. However, the existing stripline beam position monitors (BPM) used for RHIC will not be compatible with the planned EIC hadron beam parameters that include higher intensity, shorter bunches, and some operational scenarios with large radial offsets of the beam in the vacuum chamber. To address these challenges, the existing RHIC stripline BPMs will be shielded, and a new BPM design using button pick-ups and integrated in a new vacuum interconnect/bellows assembly that will be installed adjacent to the existing BPMs. A thermal analysis of the new arc BPM housing and button pick-up design has been conducted to assess the effects caused by beam induced resistive wall heating and signal propagation through the button pick-up cables for several operational scenarios. This report will describe the analysis results to quantify the heat transfer and temperature distribution that can be expected on the new HSR cryogenic arc BPM housings, button pick-ups, and cryo-signal cables.

43 PARTICLE ACCELERATORS↗

EIC impact on un/polarized collinear PDFs

We present an impact study of future EIC measurements on our knowledge of PDFs, using the JAM Monte Carlo global QCD analysis framework. We study the effect of EIC pseudo-data for polarization asymmetries on quark and gluon helicity distributions in the proton. An overview of the impact of future inclusive DIS and parity-violating DIS data on unpolarized PDFs is also shown.

Delcarro, Filippo↗

Thermal simulation of the EIC HSR interconnect module - RF fingers

The Electron Ion Collider (EIC) Hadron Storage Ring (HSR) will reuse most of the existing superconducting magnets from the RHIC storage ring. However, the existing beam vacuum chamber and stripline BPMs will not be compatible with the planned EIC hadron bunches that will have a 3x higher intensity and be 10x shorter, and some operational scenarios with large radial offsets of the beam in the vacuum chamber. To address these challenges, a copper coated beam screen will be implemented, the existing RHIC stripline BPMs will be shielded and an interconnect module design, including new BPM will be installed adjacent to the existing BPMs. A thermal analysis of the new arc BPM interconnect housing has been conducted to assess the heating caused by beam induced resistive wall heating and electron cloud heating. An analysis of the BPM module has been made and reported separately. This report will focus on the other side of the interconnect module, containing the RF fingers.

43 PARTICLE ACCELERATORS↗

Beams of polarized hadrons at EIC: Action plan to address acute challenges

In the recent years, more and more groups in the field of polarization instrumentation and technology have disappeared, taking their expertise in the experimental technologies with them. When the RHIC was conceived, there were numerous experimental and theoretical groups around the world from which experts could be recruited to build new instruments, powerful sources, specialized detector systems, investigate new approaches and concepts, and much more. We should recognize that we presently are in a critical situation regarding the availability of skilled individuals to provide and service the required instruments to make the EIC a success. We need to rejuvenate the field of polarization technology, especially for hadrons, and significantly expand education and training efforts. The document highlights a number of key areas that require attention. Three scientists/engineers/postdocs and at least one or two PhD students should be sought immediately to start building a group capable of tackling the future tasks and challenges in hadron polarimetry at the EIC.

43 PARTICLE ACCELERATORS↗

Optical Properties of Wigglers for EIC Ring Electron Cooler

Electron Ion Collider (EIC) requires cooling of protons at top energy (275 GeV) to achieve the average design luminosity. Such a cooler must be capable of counteracting an IBS-driven emittance growth in proton bunches. The Ring Electron Cooler (REC) is a candidate for the EIC top energy cooler. The REC is a non-magnetized RF-based 150 MeV electron cooler, in which electrons are kept in the storage ring and re-utilized for several million turns. The REC is equipped with 18 damping wigglers, which keep electrons’ emittance constant by counteracting both electrons’ IBS and a proton electron beam-beam scattering happening in the cooling section. These wigglers operate at a relatively low energy but must have a rather high field to provide the required radiation cooling of electrons. As a result of this unique range of parameters, the wigglers’ optics exhibits interesting features The actual design parameters of the wigglers will be finalized in the REC lattice optimization.

43 PARTICLE ACCELERATORS↗

Beam-Impedance Considerations for the EIC HSR Screen

The hadron storage ring (HSR) of the Electron-Ion Collider (EIC) will use the superconducting magnets from the Relativistic Heavy Ion Collider (RHIC). However, the beam pipes of these magnets show too large resistive-wall impedance and secondary electron yield to the HSR beams. The planned solution is to install beam screens that feature a thin film of amorphous carbon with low SEY on top of a high RRR copper layer for reduced impedance. This note discusses beam-impedance considerations that impact the EIC HSR beam screen design.

43 PARTICLE ACCELERATORS↗

Advancements in Accelerator Physics and System Developments for the EIC

The development and enhancement of the Electron-Ion Collider (EIC) are founded on extensive research and development efforts aimed at achieving rigorous performance goals. This document outlines the crucial research and development (R&D) efforts that underpin the various systems and components of the EIC, including the polarized electron source and linear accelerator (linac) systems. Achieving the collider’s operational benchmarks relies on meticulously enhancing these components to optimize performance.

43 PARTICLE ACCELERATORS↗

AI-Driven Detector Design for the EIC (Final Technical Report)

We developed an optimization workflow based on DNN-based fast-simulation and reconstruction algorithms. We used these methods to advance the design of calorimeter systems for the Electron-Ion Collider (EIC). This DNN-driven optimization provides a blueprint for integrating gradient-based methods into detector-design workflows. All software pipelines and methods have been released publicly and incorporated into the EIC collaboration’s physics studies, broadening their impact. Three journal articles detailing the methods developed here serve as a reference for the design and optimal use of next generation high-granularity calorimeter systems in nuclear and particle physics.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

High average current HVDC electron gun for EIC hadron cooling

A critical R&D initiative for the Electron Ion Collider (EIC) involves the design of an electron gun capable of gen erating a high average current and high-brightness electron beam for the hadron cooler. This is essential to preserve hadron beam quality and achieve the collider’s luminosity target of 1 × 10 34 s −1 cm −2 . For an energy recovery linac (ERL)-based hadron cooler, the gun must deliver a high average current of 98.5 mA, a normalized transverse emittance of less than 2 mm−mrad, and a bunch charge of up to 2.5 nC. This proceeding outlines the high-voltage design of a DC gun operating at 500 kV, with conditioning capability up to 600 kV. The design incorporates several unique fea tures, including the use of inverted ceramic at this voltage level, active cooling for the cathode, and large single-crystal multi-alkali cathodes grown on a silicon carbide substrate. High-brightness electron sources are also pivotal for other ad vanced applications, such as high-intensity gamma sources, future 𝑒 + 𝑒 − colliders, and ultra-deep UV sources for the semiconductor industry. Additionally, this paper provides an overview of the hadron cooling approaches planned or proposed for the EIC.

43 PARTICLE ACCELERATORS↗

Project FELICIA - A probe to survey the RHIC magnet beampipe diameter for EIC beam screen insertion

The Electron Ion Collider (EIC) Hadron Storage Ring (HSR) will reuse many of the existing superconducting (SC) magnets of the RHIC storage rings. To comply with the beamline vacuum requirements in more demanding operational scenarios, the beampipe of the RHIC SC magnets will be equipped with low surface impedance, low secondary electron yield (SEY) beam screens. The installation of these beam screens will be done with the SC magnets as installed today, thus making it a critical operation for a timely EIC installation. The beam screen inner dimensions must be maximized to retain enough aperture to the beam. On the other hand, keeping enough clearance between the screen and the beampipe is critical to ensure a smooth beam screen installation. A survey probe was designed and built to measure the inner diameter of several RHIC SC magnets in-situ and provide critical data for the beam screen design optimization. This paper reports on the design of the probe and the results from the survey campaign.

43 PARTICLE ACCELERATORS↗

California Bridge to the Electron-Ion Collider (EIC) (Final Technical Report)

This report summarizes the activities and outcomes of DOE Grant DE-SC0022358, a traineeship program designed to prepare students for future nuclear physics research at the Electron-Ion Collider. The project leveraged the California EIC Consortium and statewide academic networks to provide immersive research experiences spanning universities and national laboratories. Participants engaged in theoretical, computational, and experimental research related to EIC physics and took part in professional meetings and collaborative research activities. The program supported student preparation for advanced study and research careers in nuclear physics.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

RF Digitizer for EIC LLRF

With the shutdown of Relativisitc Heavy Ion Collider (RHIC) in FY26, the former RHIC facility will be upgraded to the new Electron-Ion Collider (EIC). An RF Digitizer for the EIC LLRF system has been developed and tested on a RHIC 197 MHz cavity in Q2 2026 for a baseline per formance. Firmware and software has been developed and validated during the 197 MHz cavity test. Preliminary data from the cavity test shows phase noise performance signifi cantly better than the RHIC LLRF system.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Intelligent Experiments Through Real-time AI: Fast Data Processing and Autonomous Detector Control for sPHENIX and Future EIC Detectors (Final Report)

The overall vision of this project was to integrate real-time artificial intelligence (AI) directly into the data acquisition and detector-control systems of nuclear physics experiments, including both fast online event selection and an autonomous detector-control feedback loop. The work carried out under the award focused on the fast online event-selection half of that vision: the efficient recording of low-momentum heavy-flavor (HF) hadron decays in proton-proton collisions at the sPHENIX experiment at the Relativistic Heavy Ion Collider (RHIC)—an observable that requires fast tracking and topological trigger selection not previously demonstrated at RHIC, and that is essential for QCD studies at future facilities such as the Electron-Ion Collider (EIC). The autonomous detector-control (GPU-based feedback) component named in the project title remained a design concept and was not implemented under this award. The Massachusetts Institute of Technology (MIT) group led the offline simulation and data processing needed to train the machine-learning (ML) models, the translation of trained models to Field-Programmable Gate Array (FPGA) firmware using the hls4ml framework, and the physics validation of heavy-flavor reconstruction. Over the award period, the team developed and hardware-tested the principal components of an AI-based heavy-flavor trigger on simulated and recorded sPHENIX tracker data: a software Bipartite Graph Attention Network (BiGAT) trigger model reaching > 95% signal efficiency at 99% background rejection; an FPGA-native hit clusterizer matching the offline clustering; smaller networks synthesized to FPGA within the required sub-10 µs latency; and an assembled decoder–clusterizer–inference firmware chain exercised on the FELIX readout board. A complete, fully integrated hardware demonstrator was not finished within the award period. This report documents the project goals, the MIT group’s contributions, the technical accomplishments, and the outlook toward applications at the future EIC ePIC detector.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Intelligent experiments through real-time AI: Fast Data Processing and Autonomous Detector Control for sPHENIX and future EIC detectors

This R&D project, initiated by the DOE Nuclear Physics AI-Machine Learning initiative in 2022, leverages AI to address data processing challenges in high-energy nuclear experiments (RHIC, LHC, and future EIC). Our focus is on developing a demonstrator for real-time processing of high-rate data streams from sPHENIX experiment tracking detectors. The limitations of a 15 kHz maximum trigger rate imposed by the calorimeters can be negated by intelligent use of streaming technology in the tracking system. The approach efficiently identifies low momentum rare heavy flavor events in high-rate p+p collisions (3MHz), using Graph Neural Network (GNN) and High Level Synthesis for Machine Learning (hls4ml). Success at sPHENIX promises immediate benefits, minimizing resources and accelerating the heavy-flavor measurements. The approach is transferable to other fields. For the EIC, we develop a DIS-electron tagger using Artificial Intelligence - Machine Learning (AI-ML) algorithms for real-time identification, showcasing the transformative potential of AI and FPGA technologies in high-energy nuclear and particle experiments real-time data processing pipelines.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗