Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “building management systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

2021 Corrective Measures Implementation and Interim Measures Annual Status Report: Summary of Biosparge System Operation and Maintenance, and Interim Groundwater Monitoring Mobile Launch Platform Rehabilitation Sites / Vehicle Assembly Building Area (SWMU 056) Kennedy Space Center, Florida

This report presents a summary of the Corrective Measures Implementation (CMI) and Interim Measure (IM) implementation activities that occurred from January 2021 through December 2021 at the Mobile Launch Platform Rehabilitation Sites (MLP)/Vehicle Assembly Building (VAB) Area, Solid Waste Management Unit 056 (SWMU 056), located at the John F. Kennedy Space Center, Florida. The following summaries briefly describe areas within SWMU 056 identified by historical site investigation activities where groundwater monitoring and remedial actions have been implemented to date.

Randall K. Sillan↗

2022 Through April 2023 Corrective Measures Implementation and Interim Measures Annual Status Report: Summary of Biosparge System Operation and Maintenance, Interim Measures and Monitoring Mobile Launch Platform Rehabilitation Sites / Vehicle Assembly Building Area (Swmu 056) Kennedy Space Center, Florida

This report presents a summary of the Corrective Measures Implementation (CMI) and Interim Measure (IM) implementation activities that occurred from January 2022 through April 2023 at the Mobile Launch Platform Rehabilitation Sites (MLP)/Vehicle Assembly Building (VAB) Area, Solid Waste Management Unit 056 (SWMU 056), located at the John F. Kennedy Space Center, Florida. The following summaries briefly describe areas within SWMU 056 identified by historical site investigation activities where groundwater monitoring and remedial actions have been implemented to date.

VOCs↗

Static Frequency Converter System Installed and Tested

A new Static Frequency Converter (SFC) system has been installed and tested at the NASA Glenn Research Center s Central Air Equipment Building to provide consistent, reduced motor start times and improved reliability for the building s 14 large exhausters and compressors. The operational start times have been consistent around 2 min, 20 s per machine. This is at least a 3-min improvement (per machine) over the old variable-frequency motor generator sets. The SFC was designed and built by Asea Brown Boveri (ABB) and installed by Encompass Design Group (EDG) as part of a Construction of Facilities project managed by Glenn (Robert Scheidegger, project manager). The authors designed the Central Process Distributed Control Systems interface and control between the programmable logic controller, solid-state exciter, and switchgear, which was constructed by Gilcrest Electric.

Brown, Donald P.↗

Modeling the Interaction Between Energy Efficiency and Demand Response on Regional Grid Scales: Preprint

With increasing penetration of intermittent renewable generation at grid and distributed scales, flexible building loads can provide significant system value and support the evolving needs of the grid. The growing value of load flexibility may complicate the traditional separation between energy efficiency (EE) and demand response (DR). EE measures may compete in some cases with a building’s DR capabilities but complement one another in other cases. EE can also increase or decrease the need for DR at the system level and change the availability of DR to meet system needs. In this study we present a bottom-up approach to modeling interactive effects between EE and DR in buildings within two regions of the US electricity grid. From a library of building simulation models for different buildings and climates, we synthesize system-level demand profiles and the impacts of potential future EE portfolios. Coupling the underlying building models with a database of DR-enabling technologies, we then compute the quantity of DR that can be delivered in each scenario. The results show that EE and DR interactions are largely driven by the timing of EE savings that are measure-specific and the coincidence with system peak demand that is region-specific. We also find that perspective of the impacts matters – for instance that some EE measures reduce the system need for DR but also reduce the DR potential. Our results imply that utility EE and DR programs developed without considering interactive effects may lead to increased grid-management challenges over the long term.

buildings↗

A Bioinformatics Facility for NASA

Building on an existing prototype, we have fielded a facility with bioinformatics technologies that will help NASA meet its unique requirements for biological research. This facility consists of a cluster of computers capable of performing computationally intensive tasks, software tools, databases and knowledge management systems. Novel computational technologies for analyzing and integrating new biological data and already existing knowledge have been developed. With continued development and support, the facility will fulfill strategic NASA s bioinformatics needs in astrobiology and space exploration. . As a demonstration of these capabilities, we will present a detailed analysis of how spaceflight factors impact gene expression in the liver and kidney for mice flown aboard shuttle flight STS-108. We have found that many genes involved in signal transduction, cell cycle, and development respond to changes in microgravity, but that most metabolic pathways appear unchanged.

Schweighofer, Karl↗

Mapping the User Journey: Building a User Persona and Story Repository to Improve NASA EOSDIS Application Development

Understanding the needs of the end user is vital to producing quality, usable software that solves real problems. Additionally, making sure those needs are communicated to managers, engineers, and designers at the project level is vital. On complex projects, it's important to build out resources for your team that make it easy to put yourself in the shoes of the specific user you're building for. NASA's Earth Observing System is a collection of data, applications, and a diverse user and scientific community that's trying to answer tough questions about our planet and its climate. Over the last few years, we've spoken to hundreds of users, performed many user testing sessions, and built a collection of user personas, user stories, and design assets that help guide new software and feature development within NASA EOSDIS. We've also developed methods for synthesizing this information and making it actionable for teams, and worked to foster a design first approach on new projects always starting from a core user need and working backward from interface development to software engineering. This process has allowed us to design better, more usable software and features that directly meet the needs of our user community.

Siarto, Jeff↗

2025 Intern Poster

The Hot Fuel Examination Facility (HFEF) at the Materials and Fuels Complex (MFC) houses the largest U.S. inert atmosphere hot cell for nuclear material research. Key features include the precision gamma scanning (PGS), Fuel Accident Condition Simulator (FACS), Neutron Radiography Reactor (NRAD), and the focus of this project, the Metallograph Loading Cell (MET Cell). The MET Cell performs tests on spent nuclear fuel, such as microhardness testing, microscopy, and neutron radiography. However, the MET Cell’s existing pressure and lighting control systems are outdated and inefficient, with inadequate documentation for system changes over time. This project aims to design a new automated control system for the MET Cell, ensuring longevity (minimum ten years), ease of troubleshooting/repair, and integration into the building monitoring system. The design process addressed challenges such as space restrictions, varied voltages within enclosures, sourcing new components, and security limitations. Compliance with NFPA 70, UL508A, MFC Physical Security, and INL Engineering standards was essential. The project involves repurposing an existing PLC to manage lighting and pressure control using digital and analog signals, simplifying wiring, and ensuring thorough documentation for future reference.

42 - ENGINEERING↗

Satellite Servicing Capabilities Office Testing

While at the KSC, I was given the opportunity of assisting the Satellite Servicing Capabilities Office (SSCO) specifically the Propellant Transfer System (PTS) lead by my mentor, Brian Nufer. While waiting to test different components in the PTS, I was able to assist with testing for the Hose Management Assembly (HMA) and was able to work on a simulation in Labview. For the HMA, I was able to help with testing of a coating as well as to help test the durability of the pinch rollers in space. In Labview, I experimented with building a simulation for the PTS, to show where fluids and gases were flowing depending on which valves in the PTS were opened. Not all of the integrated parts required assembly level testing, which allowed me to test these parts individually by myself and document the results. I was also able to volunteer to assist project NEO, allowing me to gain some knowledge of cryogenic fluid systems.

PTS↗

Building a COTS archive for satellite data

The goal of the NOAA/NESDIS Active Archive was to provide a method of access to an online archive of satellite data. The archive had to manage and store the data, let users interrogate the archive, and allow users to retrieve data from the archive. Practical issues of the system design such as implementation time, cost and operational support were examined in addition to the technical issues. There was a fixed window of opportunity to create an operational system, along with budget and staffing constraints. Therefore, the technical solution had to be designed and implemented subject to constraint imposed by the practical issues. The NOAA/NESDIS Active Archive came online in July of 1994, meeting all of its original objectives.

Singer, Ken↗

Hot Springs and Geysers: Exploring Historical and Modern Impacts of Geothermal Energy Production on Associated Natural Surface Systems and Standardizing Management Practices

Surface thermal features, most notably hot springs and geysers are increasingly being recognized for their importance to ecosystems, indigenous cultures, and in some cases agriculture, recreation, and tourism. Geothermal project development poses a potential risk to these natural features but current regulatory requirements for assessing and managing these risks during exploration, permitting and monitoring are somewhat inconsistent and unpredictable across different geothermal fields. This has resulted in uncertainty and increases in exploration risk for geothermal energy developers that have led to costly project delays, cancellations, or hesitation to commit. Varying regulatory requirements may also influence public perception, fostering confusion, distrust and ultimately opposition to geothermal projects, further contributing to project delays or cancellations. At a time when there is an increasing urgency for reliable baseload clean energy, geothermal is a net-zero, renewable solution that additionally provides access to more equitable and environmentally just clean power. Continued integration of geothermal energy into the national energy roadmap can be facilitated through consistent and predictable permitting, providing regulators the framework they need, developers a clear path forward, and transparency that the public deserves. This project, currently in its beginning phases, seeks to address this important issue by providing a technical basis from which to build a preliminary protocol for assessing and managing potential impacts from new or existing geothermal energy projects to surface thermal features and their associated ecosystems. Development of this preliminary protocol will be informed by (1) a literature review of well-documented case studies in the western U.S. and New Zealand to understand the range of conditions that exemplify geothermal-surface thermal systems; (2) development of generic illustrative conceptual-numerical models to quantify, understand, and predict the first-order controls (e.g., pressure and permeability) on surface flows; and (3) additional independent and scientifically rigorous evaluations of geothermal-surface thermal system case studies from the Basin and Range Province that incorporate publicly available data as well as data provided by industry through data-sharing agreements. Learning from the successes of the process used to develop the Induced Seismicity Management Protocol (ISMP), we ultimately aim to use these initial efforts as a springboard for establishing a surface thermal feature management working group that will work collaboratively to finalize the protocol as well as co-create recommended best practices for implementation. We envision that the working group will primarily be composed of representatives from regulatory entities, government agencies, Tribes, academia, national laboratories, and industry, and will include early and regular engagement with community organizations and environmental groups. This will help ensure broad acceptance and implementation of the protocol, which will facilitate a more consistent, predictable, and standardized regulatory process, and help to ensure that geothermal energy continues to provide a reliable source of clean energy, and a pathway to achieving greater energy equity in the U.S.

Best Practices↗

Overview of Model-Based Systems Engineering Efforts to Evolve the Airspace Research Roadmap

NASA’s Air Traffic Management-Exploration (ATM-X) UAM Airspace Subproject is conducting research that evolves UAM airspace towards a highly automated and operationally flexible system of the future. The complexity of UAM airspace evolution requires a plan to effectively organize, integrate, and communicate NASA’s research and development. The planning tool, called the UAM airspace research roadmap, or just roadmap, is key to the execution of NASA’s UAM airspace research over the next ten years. Implemented through Model-Based Systems Engineering (MBSE) methodology, the roadmap will help to prioritize and coordinate research efforts, and to integrate results that build towards NASA’s research goals of evolving UAM airspace for integration of UAM operations into the National Airspace System (NAS). This paper presents an overview of on-going MBSE efforts to meet these overarching goals.

Model-Based Systems Engineering↗

NASA's Space Launch System Progress Report

Exploration beyond Earth will be an enduring legacy for future generations, confirming America's commitment to explore, learn, and progress. NASA's Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is responsible for designing and developing the first exploration-class rocket since the Apollo Program's Saturn V that sent Americans to the Moon. The SLS offers a flexible design that may be configured for the MultiPurpose Crew Vehicle and associated equipment, or may be outfitted with a payload fairing that will accommodate flagship science instruments and a variety of high-priority experiments. Both options support a national capability that will pay dividends for future generations. Building on legacy systems, facilities, and expertise, the SLS will have an initial lift capability of 70 metric tons (mT) and will be evolvable to 130 mT. While commercial launch vehicle providers service the International Space Station market, this capability will surpass all vehicles, past and present, providing the means to do entirely new missions, such as human exploration of asteroids and Mars. With its superior lift capability, the SLS can expand the interplanetary highway to many possible destinations, conducting revolutionary missions that will change the way we view ourselves, our planet and its place in the cosmos. To perform missions such as these, the SLS will be the largest launch vehicle ever built. It is being designed for safety and affordability - to sustain our journey into the space age. Current plans include launching the first flight, without crew, later this decade, with crewed flights beginning early next decade. Development work now in progress is based on heritage space systems and working knowledge, allowing for a relatively quick start and for maturing the SLS rocket as future technologies become available. Together, NASA and the U.S. aerospace industry are partnering to develop this one-of-a-kind asset. Many of NASA's space centers across the country will provide their unique expertise to the Space Launch System endeavor. Unique infrastructure to be used includes the Michoud Assembly Facility for tank manufacturing, Stennis Space Center for engine testing, and Kennedy Space Center for processing and launch. As this panel will discuss, the SLS team is dedicated to doing things differently-from applying lean oversight/insight models to smartly using legacy hardware and existing facilities. Building on the foundation laid by over 50 years of human and scientific space flight--and on the lessons learned from the Apollo, Space Shuttle, and Constellation Programs-the SLS team has delivered both technical trade studies and business case analyses to ensure that the SLS architecture will be safe, affordable, reliable, and sustainable.

Singer, Joan A.↗

The SEL Adapts to Meet Changing Times

Since 1976, the Software Engineering Laboratory (SEL) has been dedicated to understanding and improving the way in which one NASA organization, the Flight Dynamics Division (FDD) at Goddard Space Flight Center, develops, maintains, and manages complex flight dynamics systems. It has done this by developing and refining a continual process improvement approach that allows an organization such as the FDD to fine-tune its process for its particular domain. Experimental software engineering and measurement play a significant role in this approach. The SEL is a partnership of NASA Goddard, its major software contractor, Computer Sciences Corporation (CSC), and the University of Maryland's (LTM) Department of Computer Science. The FDD primarily builds software systems that provide ground-based flight dynamics support for scientific satellites. They fall into two sets: ground systems and simulators. Ground systems are midsize systems that average around 250 thousand source lines of code (KSLOC). Ground system development projects typically last 1 - 2 years. Recent systems have been rehosted to workstations from IBM mainframes, and also contain significant new subsystems written in C and C++. The simulators are smaller systems averaging around 60 KSLOC that provide the test data for the ground systems. Simulator development lasts up to 1 year. Most of the simulators have been built in Ada on workstations. The SEL is responsible for the management and continual improvement of the software engineering processes used on these FDD projects.

Pajerski, Rose S.↗

Seasonal performance evaluation of zero-superheat active refrigerant charge control for variable-speed heat pumps

Heat pumps account for a significant portion of electricity consumption in buildings, making their energy efficiency a critical area of research. Control optimization is recognized as an effective approach for enhancing the efficiency of building HVAC systems. Specifically, since the efficiency of heat pumps increases with reduced superheat and the optimal refrigerant charge level varies with operating conditions, zero-superheat active charge control is a promising strategy to maximize the system’s COP. However, due to its complexity, this control strategy remains in the research phase and has only been tested under limited operating conditions. This paper proposes a methodology to evaluate the seasonal performance improvement of zero-superheat active charge control across a full range of heating conditions in buildings. The methodology includes the development of an optimal controller that utilizes an accumulator to store excess refrigerant and manages the active charge level at zero superheat through subcooling control, as well as the creation of a detailed physics-based heat pump model. Targeted a 3-ton variable-speed heat pump with R410A refrigerant, we selected ten U.S. cities representing different climate regions for seasonal performance evaluation. Our simulations indicate that, depending on the climate conditions, the optimal control strategy could achieve energy savings ranging from 5.8 % to 8.0 % over the entire heating season. These results suggest that zero-superheat active charge control, combined with coordinated compressor and fan speeds, could substantially improve the energy efficiency of heat pump systems while maintaining the required heating capacity.

Guo, Fangzhou↗

The Transactive Energy Network Template Metamodel

While transactive energy, which is defined as an allocation of electricity based on dynamically discovered values or prices, has been extensively studied, its uptake and use has been slow. This report describes a tool, the transactive network template, which should hasten the creation and uptake of transactive energy networks. Some basic principles of transactive energy are familiar from existing wholesale electricity markets. Locational prices are calculated today for zones within bulk electric transmission systems. Locational prices differ while accounting for the locational costs of electricity generation and the losses and constraints incurred when electricity is transmitted from generators and distributed to consumers. A transactive energy network might include these transmission zones. However, current research strives to apply transactive energy also in electricity distribution circuits, buildings, and even for individual generating and consuming devices. At the same time, researchers explore how to apply transactive energy in real time during increasingly shorter time intervals. Automated computational agents become necessary as transactive energy becomes applied to smaller circuit zones and at faster dynamic timescales. A transactive energy network is an example of a multi-agent system. Each zone in the network is represented by its transactive agent, which makes decisions for and acts on behalf of a business entity that is responsible for and manages one of the circuit regions. A transactive energy network is also an example of a decentralized, distributed control system. Control decisions and responsibilities are distributed among the network’s transactive agents. The transactive agents are independent; that is, there typically is no centralized authority or oversight function. Instead, transactive agents exchange transactive signals and thereby negotiate the prices and quantities of electricity that they will exchange. Initially, the circuit regions and responsibilities of transactive agents appear to be very dissimilar. Each circuit region may comprise transmission, distribution, or building-level circuits. Each has a unique position and electrical connectivity within the transactive energy network. Each possesses unique assets that either generate or consume electricity, and these (e.g., renewable energy generator, diesel generator, aggregate utility load, building load, space conditioning, refrigerator, etc.) may further differ in their price flexibility and in their strategies for responding to dynamic electricity prices. Given such diversity, an implementer’s first inclination might be to start from scratch to define all these devices and to engineer their seemingly unique interactions. Given that each implementer’s perspective may be narrow within a transactive energy network, it is unlikely that uniquely engineered systems would interact well. This is where the transactive network template is applicable. The transactive network template is a metamodel that has been developed to guide implementers as they configure their own transactive agent within a network of such agents. The object-oriented design of the transactive network template provides basic code object types that may be used and extended by implementers to represent each of the assets in their circuit region. These objects further facilitate the transactive agent’s necessary computations, which are divided among responsibilities to schedule power usage, balance electric supply and demand, and coordinate the exchange of electricity with the other transactive agents. This report addresses the conceptual transactive network template design. Implementers are directed to more formal design documents and reference implementations. A Python™-based1 reference implementation of the transactive network template has been coded, and three implementations have been configured to represent a national laboratory and two university campuses. Version 2 of the transactive node template generalizes the market class and its methods to facilitate multiple, and more diverse market coordination mechanisms than were facilitated by and demonstrated using Version 1. Version 3 includes new Appendix B, which addresses the designs of methods that would make dynamic prices track approved electricity rates. In the future, the author wishes to make the transactive network template more generally applicable to networks that require more accurate power flow. Development of the transactive network template is jointly funded by the U.S. Department of Energy (DOE) Energy Efficiency and Renewable Energy and the DOE Office of Electricity. In late 2015, one of the first projects to be funded by the DOE Grid Laboratory Modernization Laboratory Consortium was the Clean Energy and Transactive Campus project, led by Pacific Northwest National Laboratory. DOE funds were matched by an investment by the Washington Department of Commerce through its Clean Energy Fund. The transactive network template was developed to guide the implementation of transactive energy networks within this project’s scope.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Accrued Delay Application in Trajectory-Based Operations

The air traffic management system lacks integration among its elements often due to using inconsistent information, models, and metrics about the traffic. Transitioning to trajectory-based operations, whereby flights are managed by full trajectories in space and time, will enable more integration, with the help of increased automation. Building on trajectory-based operations, an "accrued delay" metric is proposed, which continuously measures the amount of delay that a flight has accumulated up to the current time, including delays incurred during the current flight and inherited from previous flights through the turnaround process. Through a time-based metering and scheduling example, we show how using accrued delay as a metric can help integrate the decision-making across multiple decision horizons, leading to more efficient and balanced access to airspace services. We show that when prioritizing flights that have already accrued high delay because of a constrained runway resource, significant gains are achieved in terms of reducing total delay and its variance. We studied the sensitivity of these gains to numerous factors, such as time-based versus distance-based horizons, horizon size, and errors in conformance to scheduled times.

delay; trajectory-based operations; time-based flo↗

Accrued Delay Application in Trajectory-Based Operations

The air traffic management system lacks integration among its elements often due to using inconsistent information, models, and metrics about the traffic. Transitioning to trajectory-based operations, whereby flights are managed by full trajectories in space and time, will enable more integration, with the help of increased automation. Building on trajectory-based operations, an "accrued delay" metric is proposed, which continuously measures the amount of delay that a flight has accumulated up to the current time, including delays incurred during the current flight and inherited from previous flights through the turnaround process. Through a time-based metering and scheduling example, we show how using accrued delay as a metric can help integrate the decision-making across multiple decision horizons, leading to more efficient and balanced access to airspace services. We show that when prioritizing flights that have already accrued high delay because of a constrained runway resource, significant gains are achieved in terms of reducing total delay and its variance. We studied the sensitivity of these gains to numerous factors, such as time-based versus distance-based horizons, horizon size, and errors in conformance to scheduled times.

Idris, Husni↗

Advanced eLectrical Bus (ALBus) CubeSat: From Build to Flight

The Advanced eLectrical Bus (ALBus) CubeSat project is a technology demonstration mission of a 3-U CubeSat with an advanced, digitally controlled electrical power system capability and novel use of Shape Memory Alloy (SMA) technology for reliable deployable solar array mechanisms. The objective of the project was to advance the state of power management and distribution (PMAD) capabilities to enable future missions requiring flexible and reliable power systems with higher output power capabilities. The goals of the mission were to demonstrate 100W distribution to a target electrical load, respond to continuous and fast transient power requirements, and show reliable deployment of solar arrays and antennas utilizing re-settable SMA mechanisms. The power distribution function of the ALBus PMAD system is unique in the total power to target load capability. Power is distributed from batteries to provide 100W of power directly to a resistive load. The deployable solar arrays utilize NASA Glenn Research Center’s Nickel-Titanium-Palladium-Platinum high-temperature SMAs for the retention and release mechanism, and a super-elastic binary NiTi alloy for the hinge component. The deployable solar array hinge design features the utilization of SMA material properties for a dual purpose. First, the hinge uses the super-elastic SMA properties to provide the spring force to deploy the arrays. Second, the electrical conductivity properties of the SMA enables the design to provide clean conduits for power transfer from the deployable arrays to the power management system. This eliminates the need for electrical harnesses between the arrays and the PMAD system in the ALBus system design. The uniqueness of the SMA retention and release mechanism design is the ability to reset the mechanism and reuse the same hardware. This allow functional tests of the mechanisms before flight with no degradation of performance and flying the hardware that is tested. The project launched as part of the CubeSat Launch Initiative Educational Launch of Nanosatellites (ELaNa) XIX mission on Rocket Lab’s Electron in December 2018. This paper summarizes the final launched design of ALBus and lessons learned from the technology and overall project from development through flight.

Deboshri Sadhukhan↗