Engineering PapersSearch

NASA NTRS · 20160001425

Satellite Servicing Capabilities Office Testing

Abstract

While at the KSC, I was given the opportunity of assisting the Satellite Servicing Capabilities Office (SSCO) specifically the Propellant Transfer System (PTS) lead by my mentor, Brian Nufer. While waiting to test different components in the PTS, I was able to assist with testing for the Hose Management Assembly (HMA) and was able to work on a simulation in Labview. For the HMA, I was able to help with testing of a coating as well as to help test the durability of the pinch rollers in space. In Labview, I experimented with building a simulation for the PTS, to show where fluids and gases were flowing depending on which valves in the PTS were opened. Not all of the integrated parts required assembly level testing, which allowed me to test these parts individually by myself and document the results. I was also able to volunteer to assist project NEO, allowing me to gain some knowledge of cryogenic fluid systems.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Sanders, Sean. 2015-04-24. Satellite Servicing Capabilities Office Testing. https://ntrs.nasa.gov/citations/20160001425

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Restore-L Satellite Servicing Internship Final Report

This paper reviews the Restore-L mission purpose and the necessary research and simulations to meet mission specification for the Propellant Transfer Subsystem (PTS). It is essential the PTS undergoes functionality testing, environmental testing, and calculations to understand the capabilities of the system. For the testing of components from PTS, a proper test setup is required. It is vital for test hardware, such as hoses and valves, to stay in place while the test is being performed. For the test hardware to operate correctly, positioning, orientation, and alignment are critical as well. In addition to the testing, calculations for pressure drop were explored. To meet requirements for test setups, designs for test hardware mounts were sketched, 3D modeled, and manufactured. Using fluid mechanics for calculations, a pressure drop equation was applied with known variables from mission specification. With the test hardware mounts designed and manufactured, the test setup was assembled with mounts installed. Test hardware mounts met all design requirements. Calculation for pressure drop were concluded and an answer was achieved. Meeting design requirement, mission specification, and calculating correct results allow the Restore-L mission to make further progress and help understand the effectiveness of the Propellant Transfer Subsystem.

PTS

NASA’s Exploration and In-Space Services (NExIS) Division OSAM-1 and Related Propellant Transfer Subsystem Progress through FY 2024 Presentation

NASA’s Exploration and In-Space Services (NExIS) Division has been developing technologies for the on-orbit servicing of satellites for decades (Hubble servicing missions) On-Orbit Servicing, Assembly and Manufacturing mission 1 (OSAM-1) had plans to robotically refuel a heritage satellite on-orbit (a.k.a. non-cooperative) Future plans of the OSAM-1 flight hardware will not be discussed The OSAM-1 Space Infrastructure Dexterious Robot (SPIDER) payload is designed to assemble a 3-meter communications antenna OSAM-1 Propellant Transfer Subsystem (PTS) development supports the nascent in-space refueling ISAM goals Reference “National In-Space Servicing, Assembly, and Manufacturing Implementation Plan” (Dec 2022 from White House Office of Science and Technology Policy) ISAM fluid transfer technology shortfalls still exist and are actively being addressed at NASA

PTS