Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

PCOR Partnership Best Practices Manual for Subsurface Technical Risk Assessment of Geologic CO 2 Storage Projects

In 2003, the U.S. Department of Energy established the Regional Carbon Sequestration Partnerships (RCSP) Initiative to help develop technology, infrastructure, and regulations needed to facilitate large-scale carbon dioxide (CO 2 ) geologic storage (herein “storage”) and support deployment of commercial carbon capture and storage projects. The Plains CO 2 Reduction (PCOR) Partnership, led by the Energy & Environmental Research Center (EERC), is one of seven partnerships created by this program. The PCOR Partnership is publishing a series of best practices manuals for each of the four PCOR Partnership-defined primary technical elements of a storage site: site characterization; modeling and simulation; risk assessment; and monitoring, verification, and accounting. This document describes the risk assessment process for evaluating subsurface technical risks associated with a CO 2 storage project. This best practices manual identifies the key elements comprising a risk assessment for a CO 2 storage complex and defines important risk management terminology and technical factors that are unique to the geologic storage of CO 2 . It also provides best practices for implementing a risk assessment based on lessons learned from conducting risk assessments for storage complexes within the PCOR Partnership region. Case studies of these real-world examples, which highlight key aspects of applying the risk assessment process to storage projects, are provided to support the proposed best practices. The development of a best practice requires the execution of multiple projects where the knowledge gained and lessons learned are accumulated over time and integrated to yield a best practice. This development progression is an adaptive management process whereby best practices constantly evolve over time in response to knowledge gained and lessons learned. This document encompasses the current body-of-knowledge and best practices for applying a standardized risk assessment approach within risk management for storage projects. Application of these best practices will provide reliable and consistent standards for identifying project-related risks, analyzing the probabilities and potential impacts of these risks, evaluating which risks require treatment, and determining priority for treatment implementation. These best practices will continue to evolve and be refined over time as commercialization of the CO 2 storage industry proceeds.

54 ENVIRONMENTAL SCIENCES↗

Analysis of Benefits Associated With Projects and Technologies Supported by the Clean Transportation Program

The California Energy Commission's Clean Transportation Program (CTP) supports a wide range of alternative, low-carbon fuel and vehicle projects. This report improves upon the 2014 Alternative and Renewable Fuel and Vehicle Technology Program (ARFVTP) Benefits Report(the former name of the Clean Transportation Program), which focused on two components of benefit calculation: expected benefits and market transformation benefits. The "expected benefits" are defined as benefits that accrue because of the direct displacement of petroleum-based fuels or vehicle technologies. The "market transformation benefits" accrue because of CTP funding shifting the underlying market dynamics and accelerating the adoption of alternative fuel vehicles. This report documents the updated methods used in the benefits analysis in 2014 and applies them for this 2021 Clean Transportation Program Benefits Report. The project team used data collected from CTP projects funded from 2009 to the third quarter of 2021 to estimate the benefits between 2021 and 2030. CTP projects valued at $\$898.3 million$ were assessed (out of $\$1.04 billion$ funded) to estimate expected benefits of 249 million gallons per year petroleum reduction and 2.79 million metric tons per year of carbon dioxide equivalent greenhouse gas (GHG) reduction in 2030. Market transformation benefits are additive to the expected benefits and were estimated with high and low ranges for the 315 relevant projects evaluated. The market transformation benefits' GHG reductions are estimated as 2.2 million to 6.2 million metric tons of carbon dioxide equivalent per year and the petroleum reductions as 145.3 million to 671.5 million gasoline gallon equivalents per year in 2030. Combining both benefit types, the CTP projects can make significant progress toward meeting California's long-term GHG and petroleum fuel use reduction goals.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Housing Energy Connection Project (Final Technical Report)

This project expanded existing medium-voltage distribution to 33 households, a daycare, a mechanical shop, irrigation pumps, and a sewer lift station, all of which previously received electric service from the local electric utility. As part of the project, automatic meter reading (AMR) and advanced metering infrastructure (AMI) was installed to allow the Tribe to set up its own electric metering like a utility. The primary objective of this project was to expand the Tribe-owned electrical distribution to provide highly reliable electrical service to these existing loads. The objective was successfully met after project completion. The project reduced high costs for electric energy previously supplied by the utility, by supplanting utility-supplied electric power with Tribe-generated electric power. The project gave the Tribe greater independence from traditional power sources and provided jobs for the community.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Solar Canopy Expansion Project (Final Technical Report)

This project is a parking-lot canopy solar photovoltaic system, consisting of four canopy structures and 1,080 470-watt (W) modules. The nameplate rating of the project is 507.6 kilowatts direct current (kWDC) at Standard Test Condition (STC), and 448 kilowatts alternating current (kWAC). It is interconnected to the existing Tribe-owned medium-voltage micro-grid generation system via a step-up transformer and short medium-voltage line. This project offsets energy usage from more expensive existing sources, specifically the Tribe-owned gas-fired engine generators providing the primary power source for existing Tribal facilities and the electric utility, which provides an alternate source. The solar photovoltaic system is a renewable source, which has the benefit of reducing reliance on fossil-fuel burning sources. By reducing demand on existing Tribe-owned conventional generators, the project has avoided the need to add more conventional generation and has prolonged the lifespan of existing gas-fired engine generators. The project reduced energy costs and reliance on fossil-fuel burning power sources, increasing Tribe-owned generating sources and self-reliance, and prolonging the lifespan of existing generators. A side benefit to the project is the production of dozens of covered parking spaces in the existing parking lot.

14 SOLAR ENERGY↗

EGS Collab SIGMA-V Project: Stimulation Investigations for Geothermal Modeling Analysis and Validation Phase 1 Report. For the period February 2017 – March 2019

The EGS Collab project was initiated in March 2017 to enable the subsurface modelling and research community to establish validations against controlled, small-scale, in-situ experiments focused on rock fracture behavior and permeability enhancement. The EGS Collab project is to provide the opportunity for reservoir model prediction and validation, in coordination with in depth analysis of geophysical and other fracture characterization data with an ultimate goal of further elucidating the basic relationship between stress, seismicity and permeability enhancement. In addition, the project is to identify and quantify other key governing parameters that impact permeability as well as understanding how these parameters change throughout the three EGS development phases (identify/characterize site, create reservoir, operate power plant). The project is to use comprehensive instrumentation and data collection effort to inform baseline, predictive, and post stimulation reservoir modeling is essential. This report describes the activities performed in Phase 1 of the project. The work done to date is extensive, and a large number of participants have contributed significant effort to enable project success. From planning to execution, we have stayed on track to address the objectives established by the Department of Energy in the paragraph above.

15 GEOTHERMAL ENERGY↗

EGS Collab SIGMA-V Project: Stimulation Investigations for Geothermal Modeling Analysis and Validation: For the period February 2017 – March 2019 (Phase 1 Report)

The EGS Collab project was initiated in March 2017 to enable the subsurface modelling and research community to establish validations against controlled, small-scale, in-situ experiments focused on rock fracture behavior and permeability enhancement. The EGS Collab project is to provide the opportunity for reservoir model prediction and validation, in coordination with in depth analysis of geophysical and other fracture characterization data with an ultimate goal of further elucidating the basic relationship between stress, seismicity and permeability enhancement. In addition, the project is to identify and quantify other key governing parameters that impact permeability as well as understanding how these parameters change throughout the three EGS development phases (identify/characterize site, create reservoir, operate power plant). The project is to use comprehensive instrumentation and data collection effort to inform baseline, predictive, and post stimulation reservoir modeling is essential. This report describes the activities performed in Phase 1 of the project. The work done to date is extensive, and a large number of participants have contributed significant effort to enable project success. From planning to execution, we have stayed on track to address the objectives established by the Department of Energy in the paragraph above.

15 GEOTHERMAL ENERGY↗

Offshore Geologic Carbon Storage Data Collection and International Project Inventory

We present an interactive data collection to aggregate, understand, and disseminate the data that are publicly available to support offshore GCS which can be leveraged by stakeholders to understand where GCS may be viable offshore, create GCS project analogs, and address challenges to GCS in offshore environments. The Offshore Geologic Carbon Storage Data Collection is an Experience Builder web application of multiple web mapping applications, aggregated into a single tool for each data type for access, visualization, and exploration. We also present a spatial inventory of global offshore GCS efforts to visualize the scale and locations of actualized and potential offshore GCS. It includes project location, project type and stage, CO2 storage resource potential, injection rate, reservoir and seal geology, and key literature references. Quantitative and qualitative comparisons of the distribution and magnitude of projects by their attributes lends spatial insight into the status of global GCS operations and storage resource potential, thereby enabling comparative assessments and cross-cutting knowledge transfer for projects in development. These datasets illuminate trends in ongoing offshore projects and can be leveraged by stakeholders to estimate storage resources, identify subsurface analogs, review regulations, and address challenges to offshore GCS. Additionally, opportunities for concurrent decarbonization strategies can be identified.

Mulhern, Julia↗

International Offshore Geologic Carbon Storage Project Inventory and Data Collection

We present an interactive data collection to aggregate, understand, and disseminate the data that are publicly available to support offshore GCS which can be leveraged by stakeholders to understand where GCS may be viable offshore, create GCS project analogs, and address challenges to GCS in offshore environments. The Offshore Geologic Carbon Storage Data Collection is an Experience Builder web application of multiple web mapping applications, aggregated into a single tool for each data type for access, visualization, and exploration. We also present a spatial inventory of global offshore GCS efforts to visualize the scale and locations of actualized and potential offshore GCS. It includes project location, project type and stage, CO2 storage resource potential, injection rate, reservoir and seal geology, and key literature references. Quantitative and qualitative comparisons of the distribution and magnitude of projects by their attributes lends spatial insight into the status of global GCS operations and storage resource potential, thereby enabling comparative assessments and cross-cutting knowledge transfer for projects in development. These datasets illuminate trends in ongoing offshore projects and can be leveraged by stakeholders to estimate storage resources, identify subsurface analogs, review regulations, and address challenges to offshore GCS. Additionally, opportunities for concurrent decarbonization strategies can be identified.

Mulhern, Julia↗

Cost Projections for Utility-Scale Battery Storage: 2025 Update

In this work we describe the development of cost and performance projections for utility-scale lithium-ion battery systems, with a focus on 4-hour duration systems. The projections are developed from an analysis of recent publications that include utility-scale storage costs. The suite of publications demonstrates wide variation in projected cost reductions for battery storage over time. We present the suite of projected cost reductions collected from the literature as well as the low, mid, and high cost projections developed in this work. Storage cost projections are $\$$152/kWh, $\$$247/kWh, and $\$$349/kWh in 2035 and $\$$111/kWh, $\$$184/kWh, and $\$$333/kWh in 2050 for the low, mid, and high cases respectively. Battery variable operations and maintenance costs, lifetimes, and efficiencies are also discussed, with recommended values selected based on the publications surveyed.

25 ENERGY STORAGE↗

Optimizing Alabama’s CO 2 Storage in Shelby County (Project OASIS) Milestone 6.0: Evaluation of Class VI Readiness

Introduction. Project OASIS is approximately 30 miles southeast of Birmingham, Alabama, and approximately 5 miles north-northwest of Alabama Power Company's Plant Gaston. Geologically, the Project area is in the Alabama fold and thrust belt province. This work builds on the initiatives of the Southeast Regional Carbon Utilization and Storage Acceleration Partnership (SECARB-USA, DE-FE0031830) that identified nearly 500 million metric tonnes of CO 2 emitted on an annual basis that is not collocated with prospective storage geology (the Coastal Plain of the Southeastern US in this context). This observation suggests costly investments in connective infrastructure (e.g., pipelines) or exploratory well drilling campaigns to identify CO 2 storage opportunities in under explored areas. While not traditionally thought of for saline storage, these studies suggest that storage prospects in the Valley and Ridge Province occur in relatively flat lying structural panels between thrust faults. For the Project OASIS region, available geologic studies related to hydrocarbon exploration suggest that Cambro-Ordovician carbonates and Cambrian clastic units offer multiple potential storage intervals, and that regional confining systems are present, such as the tectonically thickened Floyd-Parkwood Shale. The Project OASIS surface property is owned by a timber and land stewardship company, The Westervelt Company, Inc., who worked with the Project Team to select and prepare adequate sites for geologic assessment. The purpose of drilling the Westover Stratigraphic Test Well #2 was to collect geologic data to model the feasibility of commercial scale CO 2 injection and storage in an under explored region. This initiative benefits the regions emitters as the data generated from this study can inform their own internal decision making. The field program included geological and geophysical evaluations, reservoir engineering analyses, and risk assessments. This report evaluates existing data, as well as a variety of modeling scenarios to evaluate project readiness. Importantly, the impact of this study is not limited to Alabama as there are numerous large emitters throughout Appalachia, in similar geologic settings, contemplating their decarbonization options.

20 FOSSIL-FUELED POWER PLANTS↗

Optimizing Alabama’s CO 2 Storage in Shelby County (Project OASIS) - Deliverable Task 7: Risk Assessment

The “Optimizing Alabama’s CO 2 Storage in Shelby County: Project OASIS” CarbonSAFE Phase II Project seeks to build on regional data sets that demonstrate that the subsurface within Shelby County, Alabama has the potential to store commercial volumes of CO 2 safely, permanently, and economically. The primary target CO 2 Storage Complex is the deep Ketona Dolomite located within a 140 square mile area of the Valley and Ridge Region of Alabama. This deep saline reservoir is beneath a confining system encompassing at least 6,500 ft of shales and other low permeability sediments. Project OASIS drilled a deep stratigraphic test well to confirm the geological properties of the confining system and storage reservoir(s) within the Storage Complex. The geological data was incorporated into numerical models to establish the areal extent of the CO 2 plume and help design the storage site and its monitoring system. The project is managed by the Southern States Energy Board (SSEB), an interstate compact organization consisting of governors and state legislative leaders from sixteen southern states, Puerto Rico, and the U.S. Virgin Islands, as well as an appointee by the President of the United States. The organizational compact provides it with access to state government organizations and legislatures. The Board also maintains an Associate Members program comprised of energy resource companies, utilities, trade groups, academic R&D science and technology experts and energy consultants. Further, the SSEB staff is experienced in managing and coordinating complex energy and environmental programs, from research programs to full-scale design and demonstrations of new and innovative technologies. Project OASIS is a public-private partnership of six entities with multiple principal investigators (PIs). SSEB’s Lead PI and Co-PI are responsible for all aspects of project performance in accordance with the DOE-NETL Cooperative Agreement. SSEB has issued subgrants to Advanced Resources International, Inc., Alabama A&M University, Auburn University, Crescent Resource Innovation, and Oklahoma State University. Advanced Resources International, Inc., issued subgrants to Baker Hughes and Loudon Technical Services for field services

20 FOSSIL-FUELED POWER PLANTS↗

Akiachak Energy Efficiency Retrofit Project

The goal of the project is to reduce the overall energy use of the Akiachak Native Community (ANC) by implementing energy efficiency measures in five high-use Tribal buildings. This project will have the following outcomes: Projected annual energy savings of $17,369; projected annual reduction in fuel oil #1 of 1,200 gallons and electricity of 17,751 kWh; annual reduction in carbon dioxide emissions of approximately 60,340 pounds/year. ANC will install energy efficiency measures in the Laundry, Tribal Indian Reorganization Act (IRA) Office, Clinic, Daycare, and Police Station. ANC obtained energy audits on these buildings in 2018, and this project will implement high-payback recommendations such as replacing lighting with LEDs, installing setback thermostats and occupancy sensors, replacing furnaces with more efficient models, replacing the circulation pumps with variable speed ones, air tightening, and adding insulation. Buildings will see energy cost reductions from 15% to 40%. These retrofits will help build ANC’s long-term vision for sustainable energy usage and address the first goal of the Tribal IRA Council’s Energy Efficiency and Conservation Strategy, to “create and maintain functionally appropriate, sustainable, accessible, high quality tribal infrastructure and facilities.” ANC intends to replicate this project by using the resulting energy savings to address audit recommendations in other buildings as well as to demonstrate the value of energy efficiency to community members. Other outcomes will include an increase in community resiliency, reduced dependence on outside shipments of fuel oil, training for maintenance staff, and no-touch control of building appliances to reduce transmission of diseases such as COVID-19.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Algae Hydrothermal Liquefaction: End-of-Project Report

This document is a close-out report for two Pacific Northwest National Laboratory (PNNL) projects funded by the Alternative Fuels and Feedstocks Office (formerly the Bioenergy Technologies Office) of the Department of Energy (DOE). The two projects are: • Thermochemical Interface (DOE ref. no. 1.3.4.101, PNNL ref. no. 64490) • HTL Model Development (DOE ref. no. 1.3.5.202, PNNL ref. no. 71612) At the end of fiscal year 2025, both projects ended. Additional activities related to the topics of algae, hydrothermal liquefaction (HTL), and the techno-economic assessment of HTL of algal feedstocks will be studied in other projects. Key technical findings of the projects were published in early 2025 and highlights will be summarized in this document. A summary of recent technical findings from 2025 are also included herein. This close-out report summarizes key outcomes from both projects highlighting the value and technical impact achieved.

09 BIOMASS FUELS↗

Advanced engineering environment collaboration project.

The Advanced Engineering Environment (AEE) is a model for an engineering design and communications system that will enhance project collaboration throughout the nuclear weapons complex (NWC). Sandia National Laboratories and Parametric Technology Corporation (PTC) worked together on a prototype project to evaluate the suitability of a portion of PTC's Windchill 9.0 suite of data management, design and collaboration tools as the basis for an AEE. The AEE project team implemented Windchill 9.0 development servers in both classified and unclassified domains and used them to test and evaluate the Windchill tool suite relative to the needs of the NWC using weapons project use cases. A primary deliverable was the development of a new real time collaborative desktop design and engineering process using PDMLink (data management tool), Pro/Engineer (mechanical computer aided design tool) and ProductView Lite (visualization tool). Additional project activities included evaluations of PTC's electrical computer aided design, visualization, and engineering calculations applications. This report documents the AEE project work to share information and lessons learned with other NWC sites. It also provides PTC with recommendations for improving their products for NWC applications.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Malheur River Wildlife Mitigation Project : 2008 Annual Report.

In 1998, the Burns Paiute Tribe (BPT) submitted a proposal to Bonneville Power Administration (BPA) for the acquisition of the Malheur River Wildlife Mitigation Project (Project). The proposed mitigation site was for the Denny Jones Ranch and included Bureau of Land Management (BLM) and Oregon Division of State Lands (DSL) leases and grazing allotments. The Project approval process and acquisition negotiations continued for several years until the BPT and BPA entered into a Memorandum of Agreement, which allowed for purchase of the Project in November 2000. The 31,781 acre Project is located seven miles east of Juntura, Oregon and is adjacent to the Malheur River (Figure 1). Six thousand three hundred eighty-five acres are deeded to BPT, 4,154 acres are leased from DSL, and 21,242 acres are leased from BLM (Figure 2). In total 11 grazing allotments are leased between the two agencies. Deeded land stretches for seven miles along the Malheur River. It is the largest private landholding on the river between Riverside and Harper, Oregon. Approximately 938 acres of senior water rights are included with the Ranch. The Project is comprised of meadow, wetland, riparian and shrub-steppe habitats. The BLM grazing allotment, located south of the ranch, is largely shrub-steppe habitat punctuated by springs and seeps. Hunter Creek, a perennial stream, flows through both private and BLM lands. Similarly, the DSL grazing allotment, which lies north of the Ranch, is predominantly shrub/juniper steppe habitat with springs and seeps dispersed throughout the upper end of draws (Figure 2).

13 HYDRO ENERGY↗

INL Wind Farm Project Description Document

The INL Wind Farm project proposes to install a 20 MW to 40 MW wind farm on government property, consisting of approximately ten to twenty full-sized (80-meter hub height) towers with 2 MW turbines, and access roads. This includes identifying the optimal turbine locations, building access roads, and pouring the tower foundations in preparation for turbine installation. The project successfully identified a location on INL lands with commercially viable wind resources (i.e., greater than 11 mph sustained winds) for a 20 to 40 MW wind farm. Additionally, the proposed Wind Farm was evaluated against other General Plant Projects, General Purpose Capital Equipment projects, and Line Item Construction Projects at the INL to show the relative importance of the proposed Wind Farm project.

17 WIND ENERGY↗

Yakima/Klickitat Fisheries Project Monitoring and Evaluation, Final Report For the Performance Period May 1, 2008 through April 30, 2009.

The Yakima-Klickitat Fisheries Project (YKFP) is a joint project of the Yakama Nation (lead entity) and the Washington State Department of Fish and Wildlife (WDFW) and is sponsored in large part by the Bonneville Power Administration (BPA) with oversight and guidance from the Northwest Power and Conservation Council (NPCC). It is among the largest and most complex fisheries management projects in the Columbia Basin in terms of data collection and management, physical facilities, habitat enhancement and management, and experimental design and research on fisheries resources. Using principles of adaptive management, the YKFP is attempting to evaluate all stocks historically present in the Yakima subbasin and apply a combination of habitat restoration and hatchery supplementation or reintroduction, to restore the Yakima Subbasin ecosystem with sustainable and harvestable populations of salmon, steelhead and other at-risk species. The original impetus for the YKFP resulted from the landmark fishing disputes of the 1970s, the ensuing legal decisions in United States versus Washington and United States versus Oregon, and the region's realization that lost natural production needed to be mitigated in upriver areas where these losses primarily occurred. The YKFP was first identified in the NPCC's 1982 Fish and Wildlife Program (FWP) and supported in the U.S. v Oregon 1988 Columbia River Fish Management Plan (CRFMP). A draft Master Plan was presented to the NPCC in 1987 and the Preliminary Design Report was presented in 1990. In both circumstances, the NPCC instructed the Yakama Nation, WDFW and BPA to carry out planning functions that addressed uncertainties in regard to the adequacy of hatchery supplementation for meeting production objectives and limiting adverse ecological and genetic impacts. At the same time, the NPCC underscored the importance of using adaptive management principles to manage the direction of the Project. The 1994 FWP reiterated the importance of proceeding with the YKFP because of the added production and learning potential the project would provide. The YKFP is unique in having been designed to rigorously test the efficacy of hatchery supplementation. Given the current dire situation of many salmon and steelhead stocks, and the heavy reliance on artificial propagation as a recovery tool, YKFP monitoring results will have great region-wide significance. Supplementation is envisioned as a means to enhance and sustain the abundance of wild and naturally-spawning populations at levels exceeding the cumulative mortality burden imposed on those populations by habitat degradation and by natural cycles in environmental conditions. A supplementation hatchery is properly operated as an adjunct to the natural production system in a watershed. By fully integrating the hatchery with a naturally-producing population, high survival rates for the component of the population in the hatchery can raise the average abundance of the total population (hatchery component + naturally-producing component) to a level that compensates for the high mortalities imposed by human development activities and fully seeds the natural environment. The objectives of the YKFP are to: use Ecosystem Diagnosis and Treatment (EDT) and other modeling tools to facilitate planning for project activities, enhance existing stocks, re-introduce extirpated stocks, protect and restore habitat in the Yakima Subbasin, and operate using a scientifically rigorous process that will foster application of the knowledge gained about hatchery supplementation and habitat restoration throughout the Columbia River Basin. The YKFP is still in the early stages of evaluation, and as such the data and findings presented in this report should be considered preliminary until results are published in the peer-reviewed literature. The following is a brief summary of current YKFP activities by species.

13 HYDRO ENERGY↗

C++ Coding Standards for the AMP Project

This document provides an initial starting point to define the C++ coding standards used by the AMP nuclear fuel performance integrated code project and a part of AMP's software development process. This document draws from the experiences, and documentation [1], of the developers of the Marmot Project at Los Alamos National Laboratory. Much of the software in AMP will be written in C++. The power of C++ can be abused easily, resulting in code that is difficult to understand and maintain. This document gives the practices that should be followed on the AMP project for all new code that is written. The intent is not to be onerous but to ensure that the code can be readily understood by the entire code team and serve as a basis for collectively defining a set of coding standards for use in future development efforts. At the end of the AMP development in fiscal year (FY) 2010, all developers will have experience with the benefits, restrictions, and limitations of the standards described and will collectively define a set of standards for future software development. External libraries that AMP uses do not have to meet these requirements, although we encourage external developers to follow these practices. For any code of which AMP takes ownership, the project will decide on any changes on a case-by-case basis. The practices that we are using in the AMP project have been in use in the Denovo project [2] for several years. The practices build on those given in References [3-5]; the practices given in these references should also be followed. Some of the practices given in this document can also be found in [6].

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗