DOE OSTI · 1922671
Housing Energy Connection Project (Final Technical Report)
Abstract
This project expanded existing medium-voltage distribution to 33 households, a daycare, a mechanical shop, irrigation pumps, and a sewer lift station, all of which previously received electric service from the local electric utility. As part of the project, automatic meter reading (AMR) and advanced metering infrastructure (AMI) was installed to allow the Tribe to set up its own electric metering like a utility. The primary objective of this project was to expand the Tribe-owned electrical distribution to provide highly reliable electrical service to these existing loads. The objective was successfully met after project completion. The project reduced high costs for electric energy previously supplied by the utility, by supplanting utility-supplied electric power with Tribe-generated electric power. The project gave the Tribe greater independence from traditional power sources and provided jobs for the community.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Ahmann, Ken. 2023-01-24. Housing Energy Connection Project (Final Technical Report). https://doi.org/10.2172/1922671
Cite the original work for its findings. Save a collection to share your selection of sources.