Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Feasibility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

Side Channel Considerations for SHA-512

We consider a theoretical side-channel attack on SHA-512; the attack should easily generalize to other algorithms in the SHA-2 family. Rather than looking at a side-channel attack on an HMAC, which has been done in various papers, we assume that the targeted device is applying the hash function as a pseudo-random function (prf) in order to generate a secret key from a secret seed, as recommended by NIST. The analyst uses side-channel information to try to recover the secret seed. We use entropy/information theory to show how one might judge whether or not a side-channel attack might be possible and/or feasible, and we show how the design of the implementation can affect the feasibility of an attack.

97 MATHEMATICS AND COMPUTING↗

Mobile Sorption-based Thermal Battery for Harvesting Low-Temperature Geothermal Energy

Around 20% of the total primary energy in the United States is consumed for thermal demands of buildings such as space cooling, dehumidification, and space heating (EIA 2018). Low-temperature geothermal energy is abundant and can effectively satisfy buildings’ thermal demands. However, low-temperature geothermal energy is underutilized because the energy density of geothermal fluid is too low to justify the costs associated with transporting it between existing geothermal resources and buildings. The mobile sorption-based thermal battery (MSTB) system has been developed using three-phase (i.e., vapor–liquid, solution–solid, crystal) sorption technology to harvest low-temperature heat and store it with a much higher energy density than the geothermal fluid. The energy density of salt crystals is over six times higher than geothermal fluid, which makes long-distance transportation of salt crystals economically feasible. Salt crystals can be used to dehumidify air or provide space cooling in buildings, which alleviates peak demand on the electricity grid by offsetting electricity use for these end uses. This helps improve the grid’s stability and resilience. High-energy storage density, fast crystallization, and dissolution of salt crystals are all critical to the viability and performance of the MSTB system. Therefore, the design and operation of MSTB systems need to ensure effective generation and dissolution of salt crystals inside the MSTB. To achieve this target, this seedling project developed an experimental apparatus for characterizing the crystallization and dissolution processes. The energy density and potential latent cooling capacity of the MSTB are also evaluated based on lab test results. The crystallization results showed that the generated lithium chloride hydrate crystals are fluffy, the crystallization process lasts about 50 min, and the maximum crystal fraction (i.e., the ratio of crystal mass to the mass in the MSTB) can be up to 51.1% of the total mass in the MSTB at a solution flow rate of 1.58 g/s. The dissolution results show that the salt crystals in the MSTB can be fully dissolved within 15–28 min, based on different test conditions. Reducing solution flow rate and cooling water temperature can achieve increased energy storage density and crystal fraction. While the increase in the discharge rate (i.e., latent cooling capacity for dehumidifying air) is achieved by increasing flow rate and temperature of inlet diluted solution, as well as by using a pump for internal solution circulation, the discharge rate increases by 38%, from 0.95 kW to 1.31 kW. Compared with increasing the inlet solution flow rate, power consumption of salt solution transportation can be reduced by using a pump for internal solution circulation. The crystallization test results also showed that the maximum energy storage density is 981.8 kJ/kg, and the maximum discharge rate of the dissolution tests is ≤1.79 kW. Both are above the target values of 900 kJ/kg and 1.75 kW) for this project. The work reported here proves the feasibility and advancement of the MSTB system, which is helpful to the further study and improvement of the MSTB system.

15 GEOTHERMAL ENERGY↗

A Graphene Enhanced SiC-SiC Ceramic Composite Bonding Solution for Generation IV Nuclear Reactors

The feasibility of an effective bonding methodology for SiC/SiC Ceramic Matrix composites using a graphene base brazing compound was established under pressure less conditions. The feasibility demonstration during this program identified the further need to improve the composition of the brazing compound and the processing conditions to enhance the joint strength.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Cognition at the Point of Sensing

Over the last 15 years, compressive sensing techniques have been developed which have the potential to greatly reduce the amount of data collected by systems while preserving the amount of information obtained. A cost of this efficiency is that a computationally-intensive optimization routine must be used to put the sensed data into a form that a person can interpret. At the same time, machine learning techniques have experienced tremendous growth as well. Machines have demonstrated the ability learn how to effectively perform tasks such as detection and classification at speeds much faster than humanly possible. Our goal in this project was to study the feasibility of using compressive sensing systems "at the edge." That is, how can compressive sensing sensors be deployed such that information is created at the remote sensor rather than sending raw data to a central processing location? Studies were performed to analyze whether machine learning could be done on the compressively sensed data in its raw form. If a machine is performing the task, is it possible to do so without putting the data into a human interpretable form? We show that this is possible for some systems, in particular a compressive sensing snapshot imaging spectrometer. Machine learning tasks were demonstrated to be more effective and more robust to noise when the machine learning algorithm worked on data in its raw form. This system is shown to outperform a traditional spectrometer. Techniques for reducing the complexity of the reconstruction routine were also analyzed. Techniques for such as data regularization, deep neural networks, and matrix completion were studied and shown to have benefits over traditional reconstruction techniques. In this project we showed that compressive sensing sensors are indeed feasible at the edge. As always, sensors and algorithms must be carefully tuned to work in the constrained environment. In this project we developed tools and techniques to enable those analyses.

47 OTHER INSTRUMENTATION↗

LandRAY Final Report

The overarching Project objective is to demonstrate the feasibility of using an innovative Power Take-Off (PTO) Module, to be used in the Columbia Power Technologies, Inc. (C·Power) utility-scale wave energy converter (WEC). The PTO Module uniquely combines a large-diameter, direct-drive, rotary permanent magnet generator; a patent-pending rail-bearing system; and a corrosion-resistant fiber-reinforced-plastic structure. The rail bearing system allows for: • A flexible non-rigid and low-cost generator frame as compared to conventional machines. • A reduction of air gap and consequently lower cost electromagnetic design • Ability to reduce costs by increasing diameter to much larger dimensions, while maintaining the small air gap. • A direct drive electro-mechanical solution that is the fastest and most precise approach for responding to the dynamic variability of forces from wave energy. The land-based test of the PTO Module (DDP1) will provide an important risk reduction phase, to demonstrate the reliability and feasibility of a large-diameter, small air-gap generator that is capable of delivering high efficiency, fault-tolerance and relatively simple "at-sea" maintenance capabilities – qualities that are essential for cost-effective wave energy devices. This is the first known test of such a system.

16 TIDAL AND WAVE POWER↗

Cold Testing for Characterization of Oxide Feed Impurities in Support of the ARIES Program

The Advanced Recovery and Integrated Extraction System (ARIES) Program converts surplus plutonium metal components into an oxide powder form and packages the material for final disposition. In support of the ARIES program, over a metric ton (MT) of plutonium has been removed from surplus nuclear weapons since 1998 and packaged for long-term storage in 3013 cans. The oxide production rate is anticipated to increase substantially over the next decade in support of dilute and dispose goals. Analytical chemistry data from destructive analysis of the resulting 70+ blend lots to date has been reported for contaminants in the product oxide. Changes in the Pu product specification for Pu oxide product, induced by a different pit mix, the LANL swap program and processing Alternate (non-Pit Pu) Feed Stock (AFS) metals, will affect the level and the mix of these contaminants in the upcoming years. With these changes in feed material, it will be important to provide fast and efficient measurement of elemental impurities in the oxide to be certain that the process is under control and to monitor the anticipated changes from the historical blend lot data. Non-destructive methods need to be evaluated for the characterization of the plutonium oxide product and the quantification of the impurities at the current and anticipated levels. A feasibility study has begun to investigate the applicability of new spectroscopic methods for oxide impurity characterization. To this end, here we describe the preparation of surrogate materials to support these investigations, and the results of a feasibility study investigating the use of LIBS (Laser Induced Breakdown Spectroscopy) to characterize the surrogate materials as calibration standards.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Establishing an Early CO 2 Storage Complex in Kemper County, Mississippi (ECO 2 S) (CarbonSAFE Phase II, Final Report)

The CarbonSAFE Phase II: Storage Complex Feasibility project, entitled “Establishing an Early CO 2 Storage Complex in Kemper County, Mississippi: Project ECO 2 S,” demonstrates that the subsurface adjacent to the Kemper County energy facility can safely and permanently store commercial-scale volumes of carbon dioxide (CO 2 ). Project ECO 2 S is led by the Southern States Energy Board (SSEB). Mississippi Power Company (MPC) serves as the site host. The project includes technical and field implementation support from Advanced Resources International (ARI) and obtains analytical support from two national laboratories (Los Alamos and Lawrence Berkeley), a host of universities, and other key participants. A 30,000-acre area of interest was established. Three new characterization wells were drilled to facilitate the detailed geologic analyses, characterization, and modeling of three prospective storage reservoirs. The results verify and validate that the subsurface reservoirs examined have gigatonne CO 2 storage potential. This final report documents the achievements of the project team in successfully attaining the goals and objectives set forth for the project and summarizes the results of the feasibility study.

01 COAL, LIGNITE, AND PEAT↗

DPC Disposal Concepts of Operations. Final Report

The U.S. Department of Energy supports an R&D program for evaluating approaches to direct disposal of commercial spent fuel in dual-purpose canisters (DPCs). The major thrusts include alternative measures for treating the possibility of internal criticality events in DPC-based waste packages after thousands of years in a repository. These measures include: 1) injectable fillers, 2) analysis of the consequences of criticality events in a repository should they occur, and 3) options for modifying fuel assemblies or baskets in DPCs at the time they are loaded. This report presents a snapshot of progress in each of these areas drawing on deliverable reports generated during FY18 through FY20. Another aspect of the R&D program is to develop concepts of operations for repositories that would permanently dispose of DPC-based waste packages, considering different generic host media (not site-specific). The idea is to examine whether the disposal of large, heavy, heat-generating waste packages is technically feasible, and to identify the engineering challenges that would arise during implementation of the different disposal concepts. Descriptions of repository features are presented for repositories in salt media, argillite (clay/shale) media, crystalline (e.g., granitic) media, and unsaturated media (considering either alluvium or hard rock). Thermal management criteria for each concept are presented in terms of the maximum waste package thermal power at emplacement, when the repository could be opened, and the duration of repository emplacement operations. The overall message of this report is that direct disposal of commercial spent fuel is technically feasible in different types of geologic host media, but that thermal management and postclosure criticality impose different constraints on each concept. Engineering challenges are recognized and discussed. Treatment of postclosure criticality is identified as an important technical question that receives the majority of attention in the R&D program.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Alternative 3V0 Development for Ground Fault Overvoltage Protection with DERs/Renewables Interconnection (Final Report)

The ground fault overvoltage (GFOV) and the required traditional 3V0 installation has become a concerned issue for renewable/DER integration. Based on the alternative 3V0 methodology proposed by the PI and the feasibility study awarded by DOE SBIR/STIR project (Award No. DE-SC0018888), APS and RPI investigated development of a low-cost alternative 3V0 product based on the surge arrester current monitoring. The alternative 3V0 feasibility study completed by APS and RPI has verified that the alternative 3V0 is an effective solution (possibly the only one) under various circuit conditions and is competitive to traditional 3V0 methods.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Supercritical Treatment Technology for Water Purification (Annual Final Report)

This project continued the development of the Supercritical Water Extraction – Enhanced Targeted Recovery (SWEETR™) technology, a novel desalination process for treating hypersaline brines. The overall objective is to demonstrate the technical and economic feasibility of an innovative, energy efficient, and robust supercritical desalination technology to treat hypersaline solutions and separating saltwater into a pure water stream and valuable recovered solids, resulting in zero liquid discharge (ZLD). The proposed technology, focuses on innovative methods of applying supercritical water to treat highly concentrated brine solutions without incurring a high energy penalty. Integrating the technology with solar energy reduces the energy cost for the system. The results obtained during the proof-of-concept testing demonstrate that the SWEETR™ concept is technically feasible and that supercritical water treatment is a viable option with strong merit for treating high salinity waters. The strategic design of the system provides the opportunity to localize the supercritical zone, which helps reduce the overall energy cost associated with the desalination process. The process can be tuned to remove only the amount of salts required to make the treated water “fit for purpose”, providing further opportunities to minimize energy costs. The ability to destroy organic compounds associated with the water while simultaneously being able to desalinate makes SWEETR™ uniquely fitted for treating aqueous streams such as produced water from oil and gas extraction which contain small amounts of organics. Such mixed contaminant streams pose an extreme challenge for other treatment options. Future work will further develop the SWEETR™ technology to take it from the bench-scale to the pilot-scale, and ready the technology for commercial application.

04 OIL SHALES AND TAR SANDS↗

AGGREGATE: dAta-driven modelinG preservinG contRollable dEr for outaGe mAnagemenT and rEsiliency (Report for Task 11 & 12: Components and Capabilities of the Resiliency Driven Outage Management and Feeder Restoration System (Deliverable D8))

This report provides progress update for the development of a outage management, feeder restoration, and restoration action feasibility check modules as part of the AGGREGATE project. Details for integration with controllability module, data driven situational awareness of network and distributed energy resources as well cyber security plan for these modules integrated with GE ADMS are also presented in the report. These three modules for outage management, feeder restoration, and restoration action feasibility check modules are developed in MATLAB and validated with a modified IEEE 123-node feeder. Results demonstrate ability of these new modules to improve the restoration process post-disaster to enhance the system resilience.

42 ENGINEERING↗

Development of Repair Techniques for Cast Iron Engine Blocks by Additive Manufacturing

ORNL partnered with Cummins Inc to demonstrate the feasibility of using additive manufacturing techniques to deposit large volume of new material on cast iron in the context of remanufacturing. Remanufacturing at Cummins Inc is carried out to repair any field damage and, in some cases, provide additional value by adding new features. Large volume deposition on difficult to weld materials is a challenging problem due to involved metallurgy. Phase-1 of this work evaluated the feasibility of using laser directed energy deposition technique to deposit new material layer by layer on cast iron engine blocks. During phase-1 deposits were made using Inconel-718, Nickel, Nr-Cr-B braze filler. Leveraging the knowledge gained during Phase-1, Phase-2 focused on developing a low- cost crack resistant ferrous alloy to repair cast iron via volume deposition techniques without preheating. Three different alloy chemistries were identified, and trials were performed on cast iron substrates to identify the optimal chemistry that provided adequate resistance to cracking in both, the deposits as well as the cast iron substrate.

42 ENGINEERING↗

Business Environment Study (Subtask 5.1)

In 2016, WVR acquired the Wabash Integrated Gasification Combined Cycle (IGCC) Plant north of Terre Haute, Indiana. Initially, WVR intended to use the plant to produce ammonia using syngas converted to hydrogen. Part of the business plan was to capture and sequester the CO 2 byproduct with the goal of a net-zero carbon emitting plant. Now, with the demand for clean hydrogen-based power and fuel cell energy, the plant intends to produce power and sell hydrogen as a fuel source, still with the intent to sequester CO 2 and achieve net-zero emissions. The Wabash CarbonSAFE project’s objectives are to establish the feasibility of developing a commercial-scale geological storage complex at the WVR plant in Vigo County, Indiana, for storage of 50 million tonnes or more of CO 2 . The plant is expected to produce up to 2 million tons (1.82 million tonnes) of CO 2 annually as a byproduct of hydrogen production. Wabash CarbonSAFE has examined the feasibility of geologic storage of the CO 2 in the Potosi Dolomite Storage Complex of the Illinois Basin via an onsite characterization well at the WVR plant site. This document explores the business requirements to undertake such a project, outlining the outside influences on a business venture such as legislation, legal, regulatory, and business climate factors. This document then discusses the CO 2 source, potential partner sources, and the business financials that allow CCS to be commercially viable for Wabash Valley Resources.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Converter-Interfaced CHP Plant for Improved Grid-Integration, Flexibility and Resiliency

GE Research and its partner GE Renewables have proposed the use of an interface converter solution to increase the penetration of small to medium-sized CHP (1MWe to 20MWe) into distribution grids and improve their flexibility and grid support capability. Indeed, the proposed interface converter solution thanks to presence of the grid-ready inverter, allows to streamline the compliance to grid codes requirements, reduce the interconnection delays and costs and ultimately one of the main barriers for CHP adoption by commercial and industrial facilities. An additional benefit provided by the interface converter is the use of the grid-ready inverter for reactive power which eliminates the need of sizing the generator for that capability. These two benefits highly favor the economic feasibility of converter-interfaced CHP. Five user cases, each in one of the leading U.S states for CHP potential reported by the DOE in its estimation of the U.S Technical Potential of CHP, were selected to compare the economic performances of converter-interfaced CHP as compared with directly-coupled. They include a college campus in California, a hospital in New York, a water reclamation plant in Texas, a hotel in Minnesota, and a large office building in Pennsylvania. Results showed that, the presence of the interface converter allows to increase the return on investment (ROI) by 0.5 to 2 percentage points in most of the cases (4 of 5). Indeed, the interface converter by shortening the interconnection process allows to accelerate revenues while reducing interconnection costs. Added to the reduced cost of the required generator these savings trade favorably the capital cost of the converter. The analysis also showed that the profitability of the converter-interfaced CHP is highly sensitive to the energy price, interconnection delay, and converter cost. However, it appears that if the interface converter can shorten the interconnection process by at least 6 months, adopting this solution will be more economically viable than directly-coupled configuration in almost all the +23,000 sites of the U.S Technical Potential CHP. The evaluation of the benefits of a converter-interfaced CHP also showed that it enables higher ROI when coupled with other distributed energy resources (DER) such as battery energy systems (BESS) or solar photovoltaic (PV). Indeed, in those scenario, the grid-ready inverter included in the interface converter eliminates the need of separate inverters if DC-coupling is used. On the technical performance, it has been verified that the presence of the interface converter allows to reduce by 70% to 80% the CHP short-circuit contribution to grid faults. This not only reduces the mechanical and thermal stresses exposed to the CHP electrical components but also increases the grid hosting capacity which ultimately enables higher penetrations CHP. Another key benefit of the interface converter validated with hardware-in-the-loop simulations and testing is its superior capability for reactive power support. Indeed, using a power hardware testbed with two +700kW inverters configured in back-to-back, a microgrid controller and actual facilities loads it was demonstrated that the presence of the interface converter can help maintain a power factor near ~1 or regulate the voltage to ~1.0pu at the point of common coupling. This benefit can be highly valuable if in the future, due to higher penetration of renewable distributed energy resources (DER), utilities start billing demand charge based on kVA instead of kW as currently. It was also validated that converter-interfaced CHP can dispatch heat and power commands and seamlessly switch between the two modes while consistently controlling the power factor or voltage at PCC. Indeed, the power hardware testing showed that grid-connected converter-interfaced CHP can follow either the power or heat demand while maintaining a unity power factor at converter output. This research proved that the adoption of an interface converter as the solution for interconnection of CHP system into the distribution grid can greatly improve the economic feasibility of small to medium-sized CHP as well as the plant power quality, flexibility and resiliency. Additionally, it allows increased penetrations of CHP into the distribution grid, extends their grid support capability, and facilitates the integration of BESS and PV DER by streamlining their collocation within the same facilities. This ultimately provides an opportunity for commercial and small industrial facilities in the U.S to accelerate their energy transition thanks to the high energy efficiency of CHP systems and its reliable, flexible, and resilient microgrid operation when interconnected with an interface converter.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Coal-dependent Communities in Transition: Identifying Best Practices to Ensure Equitable Outcomes

The U.S. coal industry is experiencing a sharp increase in the numbers of retired and/or decommissioned coal-fired power plants across the U.S. In the years between 2010-2019, around 102 gigawatts (GW) of coal-fired generating capacity has been announced to be decommissioned, representing more than 546 coal-fired power plant units, and an additional 17 GW is planned to be decommissioned by 2025. This change in the energy production landscape presents an impact on the social, environmental, and economic prospects of coal-dependent communities. This report examined the role of communities in the coal power plant decommissioning process and provided community-identified best practices to ensure an equitable process. The experiences of four coal-dependent communities—Wise County, VA, Muskegon, MI, Anderson County, TN, and Becker, MN—are presented as case studies to understand the impacts of the decommissioning process, and associated best practices, from the communities’ perspective. The report results highlight the need to recognize that the decommissioning decision-making process must be community-based to be equitable. Each community’s input is key to the transition away from coal power because there is no one-size-fits-all development plan. In other words, each community’s trajectory through the decommissioning process—from the retirement decision-making stage to the final site redevelopment phase—is unique because each community has distinct needs and wants from the energy transition. What is best for one community may not be suited for another. Ultimately, the framework for site development and community revitalization post-decommissioning cannot be universal because each community’s profile—from a social, cultural, and economic perspective—is different. Community impacts of power plant decommissioning are not limited to job and revenue losses. Communities are likely to be impacted culturally, socially, environmentally, and have long-term health-based impacts that should be acknowledged and addressed in post-retirement plans. Commonly identified decommissioning best practices include: Early and continued engagement throughout, with a number of mediums for communication and feedback (e.g., in-person sessions, virtual meetings, written comment opportunities); Early planning of post-decommissioning projects to replace lost jobs, revenue, and economic activity; Recognition (and mitigation, if possible) of social impacts on the community due to plant closure; Transparency throughout the process, with trusted information being provided about the decommissioning process and timeline; potential impacts on the workforce, economy, and environment; and the feasibility of alternative site uses; Identification of funding sources, technical experts, and/or strategic partnerships to support decommissioning and the affected communities upfront; and, Acknowledgment of communities as stakeholders who have a role in the conversation and right to determine their futures. Three key areas for assisting coal-dependent communities affected by the energy transition: Technical assistance: assessment of site feasibility for alternative uses or to repower with new technologies; Cross-partnership engagement and collaboration: facilitate knowledge-sharing of “lessons learned” about the decommissioning process between communities and provide guidance for decision-making processes; and, Financial assistance: access to grant and/or loan programs to assist with redevelopment survey, bolster community economic security through job creation, and cover environmental clean-up costs. Technical assistance, cross-partnership engagement, and financial aid can be mobilized to help communities throughout various stages of the decommissioning process, including the retirement decision, the site reclamation phase, and eventual revitalization of the site and surrounding community.

01 COAL, LIGNITE, AND PEAT↗

AGGREGATE: dAta-driven modelinG preservinG contRollable dEr for outaGe mAnagemenT and rEsiliency (Final Report)

The AGGREGATE project team successfully developed and validated various modules for outage management. Brief summaries of each module are provided to showcase their strength for outage management and restoration for a distribution system with a high penetration of connected distribution energy resources (DERs). In recent years, inverter-based DERs have been widely deployed in distribution system. A most of behind-the-meter (BTM) solar power generation is not visible to the utility. The data-driven DER and load estimation modules are using machine learning (ML) and artificial intelligence (AI) to manage this issue, which provides an opportunity for distribution system operators (DSOs) to operate systems and make decisions in real-time for a distribution system with a high penetration of DERs deployed. Also, the estimated DER and true load can be further leveraged in network aggregation and cold-load pick up estimation for reducing the computing complexity and providing for fast restoration. After load demand and DER power generations have been estimated, the information will support topology and state estimation (SE). The topology estimation module demonstrated the viability of mixed integer linear programming (MILP) formulation to estimate the most likely operational radial topology and outage sections using power flow measurements, historical/estimated load and DERs data and smart meter ping measurements. Formulation includes continuous (power flow, load and DERs data) and binary measurements (smart meter ping measurements) in a single formulation. Errors in continuous data and binary data are modeled as normal distribution and Bernoulli distribution, respectively. In the future distribution grid, the power injection from controllable DERs will be essential for efficient and resilient grid operation. However, determining the optimal DER injections and restoration actions is dependent on knowledge of the system states. State estimation (SE), already the cornerstone of transmission energy management systems, will become commonplace in distribution management systems as more measurements become available from deployment of automated metering infrastructure (AMI). Observability analysis is the first step in SE, as it determines the sufficiency of the available measurements for accurately estimating the current system states. A new type of pseudo-measurement called a Correlational Measurement (CM) is introduced in this module, to enhance the observability of the system to enable more accurate SE. CMs encapsulate knowledge of correlation between demand patterns for similar classes of loads as well as injection patterns for same-technology renewable DERs. During grid contingency scenarios, DERs have been traditionally disconnected, without any fault ride-through capabilities. However, with new regulations and better technology, it is feasible for these resources to contribute to the grid’s restoration after an adverse event and hence enhance resilience. The controllability module proposes a two-step restoration scheme for the power system restoration process by leveraging additional degrees of freedom in power electronics interfaced DERs for mitigating voltage problems. In a resilience mode without the utility system, the distribution grid relies on DERs to serve critical load. In such a severe event with multiple faults on the distribution feeders, actuation of various protective devices (PDs) divides the distribution system into electrical islands. The undetected actuated PDs due to fault current contributions from DERs can delay the restoration process, thereby reducing the system resilience. The Advanced Outage Management (AOM) and the Advanced Feeder Restoration (AFR) modules developed in this project provide improved system resilience with multiple DERs. AOM identifies the faulted sections and actuated PDs in a distribution system with DERs by incorporating smart meter data. The most credible outage scenario including fault locations, PD actuations, and fault indicator (FI) failures is identified by a set of binary integer linear programming incorporating hypotheses. The AFR module serves to restore a distribution system with available energy resources taking into consideration the availability of utility sources and DERs. By partitioning the system into islands, critical load will be served with the available generation resources within islands based on the solution of a MILP. When the utility systems become available, the optimal path will be determined by a spanning tree search algorithm that reconnects these islands back to substations and restores the remaining load. The transmission and distribution (T&D) co-simulation module was used to validate the effect of a control action performed on the distribution side assets as it propagates to the transmission side. This ensures that the control action performed results in a feasible operating point on both the transmission and the distribution system. In addition to validation, the team used the T&D co-simulation module to demonstrate how distribution system assets can be used to mitigate issues on the transmission system. Specifically, the team demonstrated that appropriate switching operations on the distribution side can alleviate the line overload condition on the transmission side without causing new operational constraint violations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cross Section Measurements of Photonuclear Reaction Pathways Towards Promising Medical Radioisotopes

Project Objectives: The goal of this project was to generate data relevant to radioisotope production while developing innovative technologies that foster and enhance novel production of radioisotopes, and, also, while providing opportunities for cultivating and training future generations of scientists. This work has provided the foundation for methodologies for determination of photonuclear cross sections over multiple energies in a single irradiation. Simultaneously, the feasibility of electron LINAC production of several in-demand radioisotopes such as 47 Sc, 67 Cu, 77 As, and 186 Re has been demonstrated. To accomplish these objectives a collaboration was formed between two complimentary facilities, the Low Energy Accelerator Facility (LEAF) at Argonne National Laboratory and the High Intensity Gamma-ray Source (HIGS) at Triangular Universities Nuclear Laboratory (TUNL). The involvement of the research group from North Carolina Central University gave students at this Historically Black University experience in forefront nuclear-physics research relevant to addressing a high-priority interdisciplinary issue. Project Description: HIGS provides a nearly monoenergetic gamma-ray beam by intra-cavity Compton backscattering of free-electron photons from electrons circulating in a storage ring. This beam can be collimated to produce a very precise energy beam. If the beam is un-collimated a calculated and precise energy spread of the beam occurs radially. The γ-flux can be evenly distributed over the radial distribution of energy and used to perform activation experiments on concentric ring targets. Thus providing multiple energy ranges in a single irradiation. Each concentric ring target can be counted separately in order to determine activation at the given energy and successively be correlated to the activation cross section. Targets were activated to determine production feasibility using electron beams at LEAF. Potential Impact: The Nuclear Science Advisory Committee recently named production of radioisotopes with electron LINACs as one of the most compelling and largest-impact opportunities for the production of high specific activity radioisotopes. Improving the photonuclear cross sectional data base with experimentally verified results will greatly enhance a researcher’s ability to rationalize electron LINAC production routes towards desired radioisotopes. This work will provide the foundation for methodologies for determination of photonuclear cross sections over multiple energies and multiple targets in a single irradiation. The techniques developed in this project will enable future studies to continue verifying theoretically predicted photonuclear cross section with experimental results. These data will also enable adaptation of models and support more precise theoretical calculation of photonuclear cross sections. This research will involve undergraduates, graduate students, and post-docs to give them a valuable research experience leading towards the next generation of scientists in the field of medical isotopes.

07 ISOTOPE AND RADIATION SOURCES↗

Evaluation of Electrical Resistivity Tomography to Monitor the Transport of Past Releases Beneath Tank Farms

Underground storage tanks at the Hanford Site, in southeastern Washington State, hold radioactive waste generated from four decades of plutonium production. The 149 single-shell tanks and the 28 double-shell tanks have all exceeded their initial design life of approximately 25 years. At least 67 tanks are assumed to have leaked in the past, resulting in radioactive releases into the vadose zone. Gamma ray logging within dry monitoring wells is currently the primary method for tracking the migration of leaked tank waste through the vadose zone. While this approach provides an accurate assessment of radioactive contamination, that information is only provided near (within ~1m) the borehole, leaving most of the vadose zone unmonitored, particularly the important region directly beneath the tank. This report describes a numerical study that investigates the feasibility and performance of time-lapse 3D electrical resistivity tomography (ERT) for long-term monitoring of a hypothetical tank waste location and migration through the vadose zone. ERT is a method of remotely imaging the bulk electrical conductivity (EC) of the subsurface, which is significantly impacted by the presence of conductive solid and liquid tank waste. The release of liquid tank wastes increases subsurface fluid conductivity and saturation over time, creating a target to use time-lapse ERT for long-term monitoring. Although the presence of metallic infrastructure can cause ERT interference, recent advancements in ERT data processing enable the deleterious effects of buried metallic infrastructure (e.g. pipes, wellbore casings, tanks) to be removed to better determine the liquid tank waste migration over time. Three hypothetical realistic scenarios were simulated in the ERT evaluation. The first two scenarios assume the same leak amount and rate (i.e., between 1/1/1951 and 12/31/1951 at the rate of 347 m 3 per year) but different leaky tanks. Scenario 1 assumes leaks under tank B-102, which is located on the edge of the B-tank farm and surrounded by a few metallic infrastructure including cased pipes/wells/tanks. Scenario 2 assumes leaks under tank B-108, which is located near the center of the B-tank farm and surrounded by larger amount of metallic infrastructure than B-102. Scenario 3 assumes the same metallic infrastructure as B-102, with a more recent contaminant leak that was simulated to have occurred between 1/1/2018 and 12/31/2023 at a rate of 1.89 m 3 per year. The leak time in Scenarios 1 and 2 corresponds to a historical overfill event in 1951 and Scenario 3 corresponds to a recent found tank leak in 2019. In each scenario, a “true” bulk EC model vs. time reflecting contaminant migration was generated. ERT data was simulated from these “true” bulk EC models and a time-lapse ERT inversion produced “imaged” bulk EC vs. time. Three electrode configurations in two, four and eight boreholes surrounding the leak tank were used in the ERT simulations in each scenario. These borehole configurations were considered logistically feasible and cost-effective for monitoring. The hypothetical ERT boreholes are assumed to have non-metallic casing. By comparing the “imaged” bulk EC with the “true” bulk EC, it was demonstrated that the three configurations of wells used (two, four, and eight wells) were able to successfully monitor the migration of tank leaks through the vadose zone, with bulk EC resolution increasing with the number of down borehole ERT arrays for all scenarios. Therefore, the use of eight boreholes to perform ERT monitoring beneath the tanks provided the best spatiotemporal information.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗