DOE OSTI · 1755582
LandRAY Final Report
Abstract
The overarching Project objective is to demonstrate the feasibility of using an innovative Power Take-Off (PTO) Module, to be used in the Columbia Power Technologies, Inc. (C·Power) utility-scale wave energy converter (WEC). The PTO Module uniquely combines a large-diameter, direct-drive, rotary permanent magnet generator; a patent-pending rail-bearing system; and a corrosion-resistant fiber-reinforced-plastic structure. The rail bearing system allows for: • A flexible non-rigid and low-cost generator frame as compared to conventional machines. • A reduction of air gap and consequently lower cost electromagnetic design • Ability to reduce costs by increasing diameter to much larger dimensions, while maintaining the small air gap. • A direct drive electro-mechanical solution that is the fastest and most precise approach for responding to the dynamic variability of forces from wave energy. The land-based test of the PTO Module (DDP1) will provide an important risk reduction phase, to demonstrate the reliability and feasibility of a large-diameter, small air-gap generator that is capable of delivering high efficiency, fault-tolerance and relatively simple "at-sea" maintenance capabilities – qualities that are essential for cost-effective wave energy devices. This is the first known test of such a system.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Prudell, Joseph. 2020-11-23. LandRAY Final Report. https://doi.org/10.2172/1755582
Cite the original work for its findings. Save a collection to share your selection of sources.