Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “coordinated operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

Task Load Management in Earth Independent Medical Operations

BACKGROUND: Medical care in spaceflight carries a high task load and can easily overwhelm a small crew. Present day operations in low Earth orbit (LEO) offload most medical tasks to ground teams in mission control. This team includes dozens of flight surgeons, specialists, and engineers and supports the on-orbit crew in monitoring environmental systems, tracking medications, guiding procedures, providing expert advice, and many other tasks. However, the physical limitations of the speed of light and technical limitations of bandwidth, channel capacity, and signal processing mean that missions beyond LEO cannot rely on this level of telemedical support. The further we travel from Earth the more these tasks will fall on the shoulders of the crew and the greater the risk of task saturation to the wellbeing of the crew and the success of the mission. Exploration class space crews will need progressively more robust systems for managing task load as they progress further out in space. OVERVIEW: Medical task management systems will need to assist with two broad categories of tasks; cognitively intensive tasks and procedure execution tasks. In both cases the goal is for the systems to operate in the background with minimal human-in-the-loop intervention. To accomplish this such systems will need to be designed with careful consideration for human factors and human systems integration to maximize efficiency, minimize alarm fatigue, and avoid inadvertently increasing task loads. Finally, the key domains of space medicine tasking can be used to map present day and near future technologies to the areas where they are best suited to support and identify gaps which can be targeted for research and development. DISCUSSION: Task load is a major challenge for Earth Independent Medical Operations to overcome. It will require careful coordination between experts in a variety of fields paying attention to human factors and human systems integration as well as technical and medical expertise. If done well medical task management systems can handle many of the tasks currently run by humans in mission control and enable human crews to maintain terrestrial standards of care in the extraterrestrial environment.

Dana Levin↗

Enabling a Weight Efficient Power System for an Electrified Turbofan Through Gearbox Design and Control

Electrified Aircraft Propulsion (EAP) concepts could enable various benefits through a variety of use-cases. Benefits are sought in the form of reduced fuel burn and emissions. Many of these concepts involve the electrification of gas turbine engines. Electrification is accomplished through the integration of electric machines (EMs) with the engine shafts, providing the ability to inject and/or extract power as desired. Energy storage is also a common feature. An often-overlooked feature of the analysis is the means of integrating the EMs with the engine shafts. A trivial solution is to allow each shaft to have its own dedicated EM through independent geartrains. However, non-trivial mechanical integration solutions could provide benefits when considered in coordination with control logic to manage the operation of the propulsion system. Here, such a solution is considered and is shown to have the potential to reduce weight for a relevant conceptual electrified propulsion system. Weight saving benefits are demonstrated for various EAP use-cases. In particular, the mild hybrid application was shown to benefit from a power system weight reduction of 47% and an overall system weight reduction of 29%.

Hybrid Electric Propulsion↗

Enabling a Weight Efficient Power System for an Electrified Turbofan Through Gearbox Design and Control

Electrified Aircraft Propulsion (EAP) concepts could enable various benefits through a variety of use-cases. Benefits are sought in the form of reduced fuel burn and emissions. Many of these concepts involve the electrification of gas turbine engines. Electrification is accomplished through the integration of electric machines (EMs) with the engine shafts, providing the ability to inject and/or extract power as desired. Energy storage is also a common feature. An often-overlooked feature of the analysis is the means of integrating the EMs with the engine shafts. A trivial solution is to allow each shaft to have its own dedicated EM through independent geartrains. However, non-trivial mechanical integration solutions could provide benefits when considered in coordination with control logic to manage the operation of the propulsion system. Here, such a solution is considered and is shown to have the potential to reduce weight for a relevant conceptual electrified propulsion system. Weight saving benefits are demonstrated for various EAP use-cases. In particular, the mild hybrid application was shown to benefit from a power system weight reduction of 47% and an overall system weight reduction of 29%.

Hybrid Electric Propulsion↗

DSO+T: Valuation Methodology and Economic Metrics (DSO+T Study: Volume 4)

This report summarizes a rigorous valuation analysis methodology used by the Distribution System Operator with Transactive (DSO+T) study to estimate the financial benefits and costs of adopting Transactive Energy coordination of distributed energy resources for key stakeholders (for example distribution system operators and customers). This was achieved by modeling the value exchanges between stakeholders and determining the annualized costs and revenues experienced by stakeholders, enabling the evaluation of overall impact on stakeholder’s annualized cash flow. Extensive work was conducted developing methods to estimate the operating costs of distribution system operators at a level of granularity that would allow the financial impact of implementing a transactive energy approach to be estimated. This work included developing parametric models for labor and software costs, distribution system capital and maintenance costs, growth rates, and factors to determine annualized costs of capital investments. Simulation results were used to calculate wholesale energy costs and revenues from retail sales. Valuation analysis methods were also developed for other stakeholders including customers, the transmission system operator, independent system operator, and generators. The resulting capability allows a complete mapping of the flow of financial value between stakeholders that can be directly integrated with the results of demand flexibility simulations. Example results are provided for a business-as-usual case and compared to a transactive energy case as well as to actual cost data.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Coupled-DC Module-Based Photovoltaic System With Power Mismatch-Tolerated Modulation

Here, this article presents a coupled-DC power module-based cascaded multilevel converter integrating utility-scale photovoltaic (PV) generations (coupled-DC-link power module (CDPM)-PV). CDPM-PV inherits merits such as modular structure, distributed maximum power point tracking (MPPT), direct distribution grid access, from cascaded H-bridge-based PV (CHB-PV) system. But, it supplies more flexible power routes than CHB-PV, through coupling different DC-links. Power routes are intended for enlarging the entire operating range including conditions of active power mismatch arising from nonideal elements such as partial shading and parameter variations. The system construction with its self-balancing principle is first introduced. Switching states for different operating regions are then derived based on the principle of easing implementation. Based on these, a modulation strategy including initial switching pattern selection and coordinated power routing is proposed to allow module-mismatches. Operating ranges are also analyzed and compared with conventional CHB-PV. Simulation results of a 3-MW/13.8-kV system developed in MATLAB/Simulink platform, and experiment results based on a 2.4-kW/311-V setup are presented and have demonstrated that the CDPM-PV topology with proposed modulation strategy can not only ride through a larger range of module mismatches, but also improve solar power utilization and system efficiency owing to noncompromised MPPT.

14 SOLAR ENERGY↗

An approximate solution to improve computational efficiency of impedance-type payload load prediction

The computational efficiency of the impedance type loads prediction method was studied. Three goals were addressed: devise a method to make the impedance method operate more efficiently in the computer; assess the accuracy and convenience of the method for determining the effect of design changes; and investigate the use of the method to identify design changes for reduction of payload loads. The method is suitable for calculation of dynamic response in either the frequency or time domain. It is concluded that: the choice of an orthogonal coordinate system will allow the impedance method to operate more efficiently in the computer; the approximate mode impedance technique is adequate for determining the effect of design changes, and is applicable for both statically determinate and statically indeterminate payload attachments; and beneficial design changes to reduce payload loads can be identified by the combined application of impedance techniques and energy distribution review techniques.

White, C. W.↗

Measuring the Effectiveness of Human Autonomy Teaming

Human-Automation Teaming (HAT), is now recognized as a promising solution to the problems of humans managing increasingly complex work systems. A human-automation team can be defined as the interdependent coupling between one or more human operators and one or more autonomous systems requiring collaboration and coordination to accomplish system and task goals (e.g., Langan-Fox et al., 2009). In this conception, automated agents are considered team members that can operate at various levels of automation, be focused on one or more human-information-processing stages, and the interactions with human operators may be adaptable, adjustable or mixed initiative. We investigated some metrics for assessing HAT effectiveness in a demonstration of a HAT tool used by ground station operators in a Reduced Crew Operations project that was conducted at NASA Ames Human Automation Teaming Laboratory. In this paper, we focus on operator metrics of HAT effectiveness, specifically workload and operator behaviors.

measurements↗

Development of Integrated Mechanical Pods

This presentation highlights early wins, updated progress, and upcoming developments on ‘national-scale shared development platform’ for rapid prototyping, testing and validation of various integrated Mechanical Pod solutions and form factors. Such pod solutions consist of a set of all-electric heat pump mechanical equipment that have integrated functionalities through built-in controls, with heating, cooling, hot water, ventilation (including energy recovery), electrical management, and battery storage within a single package. The presentation draws inspiration from the success of bathroom pods in the US modular construction industry, UK’s efforts with unitizing mechanical systems as ‘utility cupboards’, and VEIC’s early wins in design-build of all-electric Mechanical Pod solutions in Vermont. The presentation includes researchers and partners involved with NREL in Design for Manufacturing and Assembly (DfMA), Virtual Design and Construction (VDC), and digital twin based process optimization modeling of integrated Mechanical Pod solutions. The presentation aims to highlight early wins from such a platform and how various physical and virtual tools are currently being employed as part of NREL’s ongoing multi-year project funded by US DOE. Streamlined procurement, coordination, installation, and O&M of Mechanical Pods such that the majority of work is delegated to the off-site modular factory implies monetary savings. Such a seemingly basic shift in location of the construction process leads to great reduction in complexity, first cost, lead time, and waste, and greater opportunities for innovative compartmentalization and integration of mechanical systems appropriately sized for each apartment or hotel guest room. However, past studies on unitized combination systems show that high installation costs, maintenance issues, challenges with system integration, limitations in existing electrical infrastructure, and lack of architecturally appealing solutions are key barriers. NREL and partners aim to address key barriers through DfMA approach, rapid prototyping and testing, and digital twin process optimization modeling. The presentation is also a call for interested entities to partner with NREL as part of the national-scale development platform, help drive both product and process innovation, and encourage open source sharing of learnings. Learning objectives include (1) learn about the vision of national-scale shared development platform for process-product innovation on integrated mechanical pod solutions and how to get involved, (2) gain an understanding of the components of an all-electric, high performance home, design characteristics and equipment included in an all-electric mechanical pod, integration of mechanical systems within a modular factories’ assembly line, and the system’s commissioning, operation and maintenance. The pre-planning and coordination with the factory and sub-contractors are also highlighted, (3) gain an understanding of using process modeling tools to quantify resource-constrained performance of operations (such as integration of energy efficiency strategies) to manufacture modules of varying design, (4) gain insights on virtual design, rapid prototyping, and emulated testing of various form factors across different climatic conditions. The need for such preliminary testing with open source sharing of learnings will also be highlighted.

30 DIRECT ENERGY CONVERSION↗

Integrated Data Modeling and Simulation on the Joint Polar Satellite System Program

The Joint Polar Satellite System is a modern, large-scale, complex, multi-mission aerospace program, and presents a variety of design, testing and operational challenges due to: (1) System Scope: multi-mission coordination, role, responsibility and accountability challenges stemming from porous/ill-defined system and organizational boundaries (including foreign policy interactions) (2) Degree of Concurrency: design, implementation, integration, verification and operation occurring simultaneously, at multiple scales in the system hierarchy (3) Multi-Decadal Lifecycle: technical obsolesce, reliability and sustainment concerns, including those related to organizational and industrial base. Additionally, these systems tend to become embedded in the broader societal infrastructure, resulting in new system stakeholders with perhaps different preferences (4) Barriers to Effective Communications: process and cultural issues that emerge due to geographic dispersion and as one spans boundaries including gov./contractor, NASA/Other USG, and international relationships.

Roberts, Christopher J.↗

Processing EOS MLS Level-2 Data

A computer program performs level-2 processing of thermal-microwave-radiance data from observations of the limb of the Earth by the Earth Observing System (EOS) Microwave Limb Sounder (MLS). The purpose of the processing is to estimate the composition and temperature of the atmosphere versus altitude from .8 to .90 km. "Level-2" as used here is a specialists f term signifying both vertical profiles of geophysical parameters along the measurement track of the instrument and processing performed by this or other software to generate such profiles. Designed to be flexible, the program is controlled via a configuration file that defines all aspects of processing, including contents of state and measurement vectors, configurations of forward models, measurement and calibration data to be read, and the manner of inverting the models to obtain the desired estimates. The program can operate in a parallel form in which one instance of the program acts a master, coordinating the work of multiple slave instances on a cluster of computers, each slave operating on a portion of the data. Optionally, the configuration file can be made to instruct the software to produce files of simulated radiances based on state vectors formed from sets of geophysical data-product files taken as input.

Snyder, W. Van↗

Operational Experience with Long Duration Wildfire Mapping: UAS Missions Over the Western United States

The National Aeronautics and Space Administration, United States Forest Service, and National Interagency Fire Center have developed a partnership to develop and demonstrate technology to improve airborne wildfire imaging and data dissemination. In the summer of 2007, a multi-spectral infrared scanner was integrated into NASA's Ikhana Unmanned Aircraft System (UAS) (a General Atomics Predator-B) and launched on four long duration wildfire mapping demonstration missions covering eight western states. Extensive safety analysis, contingency planning, and mission coordination were key to securing an FAA certificate of authorization (COA) to operate in the national airspace. Infrared images were autonomously geo-rectified, transmitted to the ground station by satellite communications, and networked to fire incident commanders within 15 minutes of acquisition. Close coordination with air traffic control ensured a safe operation, and allowed real-time redirection around inclement weather and other minor changes to the flight plan. All objectives of the mission demonstrations were achieved. In late October, wind-driven wildfires erupted in five southern California counties. State and national emergency operations agencies requested Ikhana to help assess and manage the wildfires. Four additional missions were launched over a 5-day period, with near realtime images delivered to multiple emergency operations centers and fire incident commands managing 10 fires.

Hall, Philip↗

Implementation and Operation of Power Flow Control Solutions for Transmission Systems

Power-flow controls (PFCs) technologies provide a suite of alternatives to more-efficiently direct the flow of power on the grid, improving flexibility and enabling the grid to be more responsive and resilient. PFCs can be used in many cases to mitigate overloads and consequently defer the installation of grid-expansion projects. They can also be suitable options in situations where new transmission lines cannot be built because of environmental constraints, land use, or other types of restrictions. Other uses include mitigation of loop or unintended flows, forcing of contractual or scheduled flows, reduction of congestion, and mitigation solutions during large maintenance or construction projects. While many studies have demonstrated the potential economic benefits of PFC for different types of applications, the implementation implications of using multiple PFCs for system operation and reliability have not been analyzed in detail. The lack of information and practical experience on these aspects hinders adoption of this technology. One use case would be that multiple PFCs are required to coordinate congestion management. In such cases, multiple PFCs are deployed in a meshed power system to control power flows across a wide area. The challenges are associated with PFC interaction—namely, the self and mutual power-flow sensitivity of each PFC, which must be accounted for in the calculation of the respective operating setpoints. This report analyzes implementation and operation that must be considered in evaluating transmission solutions using PFCs. The report first analyzes attributes with which PFC-based solutions should comply, based on the objective and characteristics of each particular use case. It then describes different approaches for coordinated control of multiple PFC devices for different applications, including options to avoid adverse interactions and reduce risks due to inappropriate coordination. Control and operation are illustrated through case studies performed on both generic and actual power system models. This report provides insights for transmission planners and operation engineers about the implementation of PFC-based transmission solutions; consequently, it will help them make informed decisions about the adoption of the technology.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NASA ATD-2 Trajectory Option Set Prototype Capability for Rerouting Departures in Metroplex Airspace

This paper describes NASA’s Airspace Technology Demonstration 2 (ATD-2) Phase 3 prototype capability that is being tested in the North Texas region through summer 2021. For the first time, a shared Decision Support Tool (DST) provides opportunities for participating Flight Operators (FOs) and Air Traffic Controllers (ATCs) to coordinate using a Trajectory Option Set (TOS). When the metroplex airspace is impacted by demand/capacity imbalances, TOS enables departure flights to be rerouted to alternative departure routes with less surface delay.

trajectory option set↗

Science Planning for Multi-Spacecraft Coordinated Observations

Fulfilling the promise of an era of great observatories, NASA now has more than three space-based astronomical telescopes operating in different wavebands. This situation provides astronomers with a unique opportunity to simultaneously observe with multiple observatories. Yet scheduling multiple observatories simultaneously is highly inefficient when compared to single observatory observations. Thus, programs using multiple observatories are limited not due to scientific restrictions, but due to operational inefficiencies. Each year, a number of proposals are accepted by a space-based observatory for conduction of astronomical observations and gathering of science data for the study of galactic events. Since each space-based observatory uses a set of instruments designed to operate in specific energy regions, most such studies are conducted by submitting observation proposals to multiple observatories, with requests to coordinate among themselves. To assure that the proposed observations can be scheduled, each observatory's staff has to check that the observations are valid and meet all the constraints for their own observatory; in addition, they have to verify that the observations satisfy the constraints of the other observatories. Thus, coordinated observations require painstaking manual collaboration among the observatory staff at each observatory. In order to exploit new paradigms for observatory operation, the Goddard Space Flight Center's Advanced Architectures and Automation Branch has developed a prototype tool called the Visual Observation Layout Tool (VOLT). The main objective of VOLT is to provide a visual tool to automate the science planning of coordinated observations for multiple spacecraft, as well as to increase the scheduling probability of observations. However, VOLT is also useful for single observatory planning to optimize observatory control. Three space-based missions are interested in using VOLT (the Hubble Space Telescope, the Chandra X-Ray Observatory, and the Far Ultraviolet Spectroscopic Explorer). The VOLT team members have collaborated with these missions to gather requirements and obtain feedback on their mission planning processes. VOLT has been developed as a cross-platform Java client application for use by scientists and observatory science planning staff to visualize scheduling options and constraints. It also supports a lightweight graphical user interface for remote viewing via a Web front end. Additionally, it uniquely supports the ability to interact with multiple, diverse scheduling packages in order to determine windows of opportunity for observations and visually portray the constraints of each observation request. VOLT enables science data capture scenarios which are currently either impossible, or which require extensive time and manpower to coordinate amongst multiple observatories. it supports early detection of planning conflicts by generating coordinated solutions based on observatory schedulability and constraints. The project development approach has included frequent prototype demonstrations to our interested missions to obtain feedback after each release of the software. We will present an overview of our lessons learned in infusing the VOLT tool into the operations of the missions we have collaborated with and a brief demonstration of the software.

Maks, Lori↗

A data-driven network optimisation approach to coordinated control of distributed photovoltaic systems and smart buildings in distribution systems

The increasing integration of distributed energy resources, including demand-side resources and distributed photovoltaics (PVs), into distribution systems has resulted in more complicated power system operation. A data-driven network optimisation approach is proposed to coordinate the control of distributed PVs and smart buildings in distribution networks considering the uncertainties of solar power, outdoor temperature and heat gain associated with building thermal dynamics. These uncertain parameters have a significant impact on the operation and control of distributed PVs and smart buildings, bringing challenges to the distribution system operation. In the proposed data-driven distributionally robust optimisation (DRO) approach, the Wasserstein ball is used to construct an ambiguity set for the uncertain parameters, which does not require the probability distributions to be known. Furthermore, a conditional value-at-risk is incorporated into the Wasserstein-based DRO model and converted into a computationally tractable mixed-integer convex optimisation problem. Benchmarked with robust optimisation and chance-constrained programming, the proposed data-driven model can give a less conservative robust solution.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NASA ATD-2 Trajectory Option Set Prototype Capability for Rerouting Departures in Metroplex Airspace

This video recorded presentation is about the NASA’s Airspace Technology Demonstration 2 (ATD-2) Phase 3 prototype capability that is being tested in the North Texas region through summer 2021. For the first time, a shared Decision Support Tool (DST) provides opportunities for participating Flight Operators (FOs) and Air Traffic Controllers (ATCs) to coordinate using a Trajectory Option Set (TOS). When the metroplex airspace is impacted by demand/capacity imbalances, TOS enables departure flights to be rerouted to alternative departure routes with less surface delay.

Trajectory Option Set↗

Robust Scheduling of Networked Microgrids for Economics and Resilience Improvement

The benefits of networked microgrids in terms of economics and resilience are investigated and validated in this work. Considering the stochastic unintentional islanding conditions and conventional forecast errors of both renewable generation and loads, a two-stage adaptive robust optimization is proposed to minimize the total operating cost of networked microgrids in the worst scenario of the modeled uncertainties. By coordinating the dispatch of distributed energy resources (DERs) and responsive demand among networked microgrids, the total operating cost is minimized, which includes the start-up and shut-down cost of distributed generators (DGs), the operation and maintenance (O&M) cost of DGs, the cost of buying/selling power from/to the utility grid, the degradation cost of energy storage systems (ESSs), and the cost associated with load shedding. The proposed optimization is solved with the column and constraint generation (C&CG) algorithm. The results of case studies demonstrate the advantages of networked microgrids over independent microgrids in terms of reducing total operating cost and improving the resilience of power supply.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

LANSCE Facility Longevity Assessment

This LANSCE Facility Longevity Assessment examined 34 total systems critical to the operation of the LANSCE accelerator complex. These systems are primarily owned, operated, and maintained by AOT Division. Based on the criteria used in this assessment, there are 12 AOT Division systems that are potential high risk as related to longterm LANSCE operations. These systems may also impact the success of LAMP. Also summarized in this report are the facility activities planned over the next decade. These include general facility maintenance and infrastructure upgrades, as well as planned electrical system upgrades. The LANSCE Facility Operations (LFO) Division is responsible for this activity scope and budget planning. Most of the planned activities are general in nature and should have little impact on accelerator operations or LAMP activities as currently envisioned. However, close coordination with between AOT, LFO, and LAMP would be prudent. A next step should be to develop an actionable plan to address the high-risk systems. Potential criteria for developing such a plan could include: (1) Evaluating the global impact of the system (operations, program, safety, etc.), (2) Ranking by impact (ranked now by risk), (3) Estimating cost to implement the corrective actions (Is there already a plan or not?), and (4) Estimating the time required for corrective actions. An alternative could include integration of the assessment data into both the Asset Management System and the Maintenance Analytics Risk Register.

43 PARTICLE ACCELERATORS↗