Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Marching Methods”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

NASA Tech Briefs, March 2005

Topics covered include: Scheme for Entering Binary Data Into a Quantum Computer; Encryption for Remote Control via Internet or Intranet; Coupled Receiver/Decoders for Low-Rate Turbo Codes; Processing GPS Occultation Data To Characterize Atmosphere; Displacing Unpredictable Nulls in Antenna Radiation Patterns; Integrated Pointing and Signal Detector for Optical Receiver; Adaptive Thresholding and Parameter Estimation for PPM; Data-Driven Software Framework for Web-Based ISS Telescience; Software for Secondary-School Learning About Robotics; Fuzzy Logic Engine; Telephone-Directory Program; Simulating a Direction-Finder Search for an ELT; Formulating Precursors for Coating Metals and Ceramics; Making Macroscopic Assemblies of Aligned Carbon Nanotubes; Ball Bearings Equipped for In Situ Lubrication on Demand; Synthetic Bursae for Robots; Robot Forearm and Dexterous Hand; Making a Metal-Lined Composite-Overwrapped Pressure Vessel; Ex Vivo Growth of Bioengineered Ligaments and Other Tissues; Stroboscopic Goggles for Reduction of Motion Sickness; Articulating Support for Horizontal Resistive Exercise; Modified Penning-Malmberg Trap for Storing Antiprotons; Tumbleweed Rovers; Two-Photon Fluorescence Microscope for Microgravity Research; Biased Randomized Algorithm for Fast Model-Based Diagnosis; Fast Algorithms for Model-Based Diagnosis; Simulations of Evaporating Multicomponent Fuel Drops; Formation Flying of Tethered and Nontethered Spacecraft; and Two Methods for Efficient Solution of the Hitting- Set Problem.

Source record↗

The full-scale process and design changes for elimination of insulation edge separations and voids in tang flap area

Qualification of the full-scale process and design changes for elimination of redesigned solid rocket motor tang nitrile butadiene rubber insulation edge separations and voids was performed from 24 March to 3 December 1990. The objectives of this test were: to qualify design and process changes on flight hardware using a tie ply between the redesigned solid rocket motor steel case and the nitrile butadiene rubber insulation over the tang capture features; to qualify the use of methyl ethyl ketone in the tang flap region to reduce voids; and to determine if holes in the separator film reduce voids in the tang flap region. The tie ply is intended to aid insulation flow during the insulation cure process, and thus reduce or eliminate edge unbonds. Methyl ethyl ketone is intended to reduce voids in the tang flap area by providing better tacking characteristics. The perforated film was intended to provide possible vertical breathe paths to reduce voids in the tang area. Tang tie ply testing consisted of 270 deg of the tang circumference using a new layup method and 90 deg of the tang circumference using the current layup methods. Tie ply process success was defined as a reduction of insulation unbonds. Lack of any insulation edge unbonds on the tang area where the new process was used, and the presence of 17 unbonds with the current process, proves the test to be a success. Successful completion of this test has qualified the new processes.

Danforth, Richard A.↗

Mars Reconnaissance Orbiter Ka-band (32 GHz) Demonstration: Cruise Phase Operations

The X-band (8.41 GHz) frequency currently used for deep space telecommunications is too narrow (50 MHz) to support future high rate missions. Because of this NASA has decided to transition to Ka-band (32 GHz) frequencies. As weather effects cause much larger fluctuations on Ka-band than on X-band, the traditional method of using a few dBs of margin to cover these fluctuations is wasteful of power for Ka-band; therefore, a different operations concept is needed for Ka-band links. As part of the development of the operations concept for Ka-band, NASA has implemented a fully functioning Ka-band communications suite on its Mars Reconnaissance Orbiter (MRO). This suite will be used during the primary science phase to develop and refine the Ka-band operations concept for deep space missions. In order to test the functional readiness of the spacecraft and the Deep Space Network's (DSN) readiness to support the demonstration activities a series of passes over DSN 34-m Beam Waveguide (BWG) antennas were scheduled during the cruise phase of the mission. MRO was launched on August 12, 2005 from Kennedy Space Center, Cape Canaveral, Florida, USA and went into Mars Orbit on March 10, 2006. A total of ten telemetry demonstration and one high gain antenna (HGA) calibration passes were allocated to the Ka-band demonstration. Furthermore, a number of "shadow" passes were also scheduled where, during a regular MRO track over a Ka-band capable antenna, Ka-band was identically configured as the X-band and tracked by the station. In addition, nine Ka-band delta differential one way ranging ((delta)DOR) passes were scheduled. During these passes, the spacecraft and the ground system were put through their respective paces. Among the highlights of these was setting a single day record for data return from a deep space spacecraft (133 Gbits) achieved during one 10-hour pass; achieving the highest data rate ever from a planetary mission (6 Mbps) and successfully demonstrating Ka-band DDOR. In addition, DSN performed well. However, there are concerns with the active pointing of the Ka-band antennas as well as delivery of the monitor data from the stations. The spacecraft also presented challenges not normally associated with planetary missions mostly because of its very high equivalent isotropic radiated power (EIRP). This caused problems in accurately evaluating the in-flight EIRP of the spacecraft which led to difficulties evaluating the quality of the HGA calibration data. These led to the development of additional measurement techniques that could be used for future high-power deep space missions.

Mars Reconnaissance Orbiter (MRO)↗

ISS Payload Operations Training During the COVID-19 Pandemic: Impacts and Solutions

The onset of the COVID-19 pandemic brought a dramatic and rapid transformation to almost every aspect of humanity in 2020. The world’s space agencies and their missions were not immune to the wide-sweeping changes. One discipline principally affected was mission operations and the various groups supporting that function. Mission support teams, especially for complex and crewed missions like the International Space Station were forced to rapidly rethink how and where control center staff performed their vital work. Operations training – an essential element to mission ops, had unique hurdles to overcome. Operations training is responsible for preparing astronaut crews for their missions, providing training to flight controllers, as well as ensuring that new team members are ready to join their colleagues. Every element of training was impacted by COVID restrictions. From orientation and introductory classes for new controllers, simulations and advanced lessons, On the Job Training and final evaluations; all aspects faced new challenges. Trainers at NASA’s Marshall Space Flight Center in Huntsville, Alabama, were forced to become more efficient with trainees and resources to continue supporting payload operations. The pandemic started in the USA in March 2020. Immediately, NASA mandated that the support for ISS real-time operations was critical. As a result, physical access to key facilities was restricted. Trainers and trainees had to quickly shift to 100 percent remote learning. In the short term, this was not a problem. However, instructors discovered lessons that they were accustomed to delivering in a classroom environment did not translate to remote teaching. Another hurdle to operations training was the mandate that all simulations could only be held remotely. The logistics of even small simulations proved to be challenging due to IT restrictions and public internet limitations. With simulations essentially stopped, as well as the restrictions on most OJT, trainees were essentially stopped in their advancement towards certification. Once limitations were identified, trainers prioritized new options. Transitioning to all electronic learning materials was a relatively easy fix. Teaching to large groups took additional shifts in the training paradigm. Methods for preparing astronauts for their missions were revised. Simulation supervisors found more efficient techniques to provide realistic training experience. Communication and approvals from management was essential. In every case, the payload operations instructors found novel solutions to all functions listed. This paper will discuss the factors and solutions payloads operations trainers found to keep scientific research on the ISS flying forward to mission success.

ISS↗

The Quick Fire Emissions Dataset (QFED): Documentation of Versions 2.1, 2.2 and 2.4: Technical Report Series on Global Modeling and Data Assimilation - Volume 38

Biomass burning is an important source of particulates and trace gases and a major element of the terrestrial carbon cycle. Well constrained emissions from vegetation fires are needed to model direct and indirect effects of biomass burning aerosols, to model homogeneous and heterogeneous chemistry in the atmosphere, and to perform credible Earth system analysis, and climate and air pollution studies. To improve the performance of NASA Goddard Earth Observing System Model (GEOS) in the areas of atmospheric constituent modeling with a focus on biomass burning we developed the Quick Fire Emissions Dataset (QFED). The QFED emissions are based on the fire radiative power (top-down) approach and draw on the cloud correction method developed in the Global Fire Assimilation System (GFAS). Location and fire radiative power of fires are obtained from the Moderate Resolution Imaging Spectroradiometer (MODIS) Level 2 fire products (MOD14 and MYD14) and the MODIS Geolocation products (MOD03 and MYD03). QFED strengths are high spatial and temporal resolutions and near-real time availability. Daily mean emissions are available at 0.3125 times 0.25 degrees and in recent versions also at 0.1 times 0.1 degrees. QFED provides emissions of black carbon, organic carbon, sulfur dioxide, carbon monoxide, carbon dioxide, PM2.5, ammonia, nitrogen oxides, methyl ethyl ketone, propylene, ethane, propane, n- and i-butane, acetaldehyde, formaldehyde, acetone and methane. Two QFED product systems are maintained by the NASA Global Modeling and Assimilation Office (GMAO): one that produces near real-time daily emissions used operationally in the GEOS-5 Data Assimilation System, and one that produces an extended historical dataset with daily emissions from March 2000 to the present. The historical dataset also provides monthly mean and monthly climatological emissions.

Koster, Randal D.↗

ISS Payload Operations Training Throughout the COVID-19 Pandemic: Impacts, Opportunities and Solutions

The onset of the COVID-19 pandemic brought a dramatic and rapid transformation to almost every aspect of humanity. The world’s space agencies and their missions were not immune to the wide-sweeping changes. One discipline principally affected was mission operations and the various groups supporting that function. Mission support teams, especially for complex and crewed missions like the International Space Station (ISS) were forced to rethink how and where control center staff performed their vital work. Operations training – an essential element to mission ops, had unique hurdles to overcome. Operations training is responsible for preparing astronaut crews for their missions, training and certifying flight controllers, as well as ensuring that new team members are ready to join their colleagues. Every element of training was impacted during the pandemic. From orientation and introductory classes for new controllers, simulations, and advanced lessons, On the Job Training (OJT) and final evaluations; all aspects faced challenges. Trainers at NASA’s Marshall Space Flight Center in Huntsville, Alabama were forced to become more efficient with trainees and resources to continue supporting ISS payload operations. The pandemic arrived in the USA in March 2020. Immediately, NASA mandated that the support for ISS real-time operations was critical. As a result, physical access to key facilities was restricted. Trainers and trainees had to quickly shift to 100% remote learning. In the short term, this was not a problem. However, instructors discovered lessons they were accustomed to delivering in a classroom environment often did not translate to remote teaching. Another hurdle to operations training was the mandate that all simulations could only be held remotely. The logistics of even small simulations proved to be challenging due to Information Technology (IT) restrictions and public internet limitations. With simulations essentially halted, as well as the restrictions on most OJT, trainees were essentially stopped in their advancement towards certification. Once limitations were identified, trainers prioritized new options. Transitioning to all electronic learning materials was a relatively easy fix. Teaching to large groups took additional shifts in the training paradigm. Methods for preparing astronauts for their missions were revised. Simulation supervisors found efficient techniques to provide realistic training experiences. Communication and coordination with management was essential. In every case, the payload operations instructors found novel solutions to all functions listed. This paper discusses the factors and solutions payloads operations trainers found to keep scientific research on the ISS flying forward to mission success.

ISS↗

NASA’s Artemis Human Landing Systems: Enabling Lunar Exploration

On March 26, 2019, in keeping with Space Policy Directive-1, NASA was charged with landing the first woman and the next man on the South Pole of the Moon by 2024, followed by a sustained presence on and around the Moon by 2028. NASA’s Human Landing System (HLS) Program is responsible for the transportation in deep space to carry humans to and from the surface of the Moon, to be designed and developed by American companies for NASA’s Artemis lunar exploration program. On April 30, 2020, NASA announced the awardees for NASA’s Human Landing System contracts under Appendix H of the NextSTEP-2 Broad Agency Announcement: A Blue Origin-led team including Lockheed Martin, Northrup Grumman, and Draper; Dynetics (a Leidos company); and SpaceX. The companies began work in a multi-month base period during which NASA teams will work with the companies to streamline requirements, to establish standards and methods, to review required products and to share the NASA’s expertise in human spaceflight systems development. Following the base period, which ends in the spring of 2021, NASA will determine which company or companies will develop Artemis human landing systems for the initial demonstration missions, including the goal of landing on the Moon in 2024.This paper examines how the Human Landing System program is at the center of NASA’s Artemis lunar exploration program, designed to yield groundbreaking science, develop and utilize lunar surface resources and leverage the Moon as a proving ground for future Mars missions. While achieving the 2024 goal requires a focus on speed and the use of mature technologies, planning toward sustained operations to and from the lunar surface requires a focus on reliability and reusability.

Lisa Watson-Morgan↗

Launch Availability Analysis for the Artemis Program

On March 26, 2019, Vice President Pence stated that the policy of the Trump administration and the United States of America is to return American astronauts to the Moon within the next five years i.e., by 2024. Since that time, NASA has begun the process of developing concepts of operations and launch campaign options to achieve that goal as well as to provide a sustainable human presence on the Moon. Whereas the Apollo program utilized one Saturn V rocket to carry out a single lunar landing mission of short duration, NASA’s preliminary plans for the Artemis Program call for a combination of medium lift class rockets along with the heavy lift Space Launch System (SLS)to achieve a lunar landing by 2024 as well as subsequent missions. This paper describes how discrete event simulation is used to model the launch campaigns and provide metrics on launch availability and mission duration for each element being launched. Possible methods for improving launch availability are presented.

Grant Cates↗

Space Technology 5 Observations of Auroral Field-Aligned Currents

During its three month long technology validation mission, Space Technology 5 (ST-5) returned high quality multi-point measurements of the near-Earth magnetic field. Its three micro-satellites were launched into a 300 x 4500 km, dawn - dusk, sun synchronous orbit (inclination = 105.60) orbit with a period of 138 min by a Pegasus launch vehicle on March 22, 2006. The spacecraft were maintained in a "pearls on a sting" constellation with controlled spacings ranging from just over 5000 km down to under 50 km. The individual micro-satellites were 48 cm tall octagons with diameters of 50 cm. They were spin-stabilized at approximately 20 rpm at deployment and slowly spun-down to about 15 rpm by the end of the mission. Each spacecraft carried a miniature tri-axial fluxgate magnetometer (MAG) provided by the University of California at Los Angeles mounted at the end of a ultra-low mass 72 cm boom. These data allow, for the first time, the separation of temporal and spatial variations in field-aligned current (FAC) perturbations measured in low-Earth orbit on time scales of 10 sec to 10 min. The constellation measurements are used to directly determine field-aligned current sheet motion, thickness. and current density. Two multi-point methods for the inference of FAC current density that have not previously been possible in low-Earth orbit are demonstrated: 1) the -standard method." based upon s/c velocity, but corrected for FAC current sheet motion. and 2) the "gradiometer method" which uses simultaneous magnetic field measurements at two points with known separation. Future studies will apply these methods to the entire ST-5 data sct and expand to include horizontal ionospheric currents. ULF waves and geomagnetic field gradient analyses.

Slavin, James↗

Mercury's Na Exosphere from MESSENGER Data

MESSENGER entered orbit about Mercury on March 18, 2011. Since then, the Ultraviolet and Visible Spectrometer (UWS) channel of MESSENGER's Mercury Atmospheric and Surface Composition Spectrometer (MASCS) has been observing Mercury's exosphere nearly continuously. Daily measurements of Na brightness were fitted with non-uniform exospheric models. With Monte Carlo sampling we traced the trajectories of a representative number of test particles, generally one million per run per source process, until photoionization, escape from the gravitational well, or permanent sticking at the surface removed the atom from the simulation. Atoms were assumed to partially thermally accommodate on each encounter with the surface with accommodation coefficient 0.25. Runs for different assumed source processes are run separately, scaled and co-added. Once these model results were saved onto a 3D grid, we ran lines of sight from the MESSENGER spacecraft :0 infinity using the SPICE kernels and we computed brightness integrals. Note that only particles that contribute to the measurement can be constrained with our method. Atoms and molecules produced on the nightside must escape the shadow in order to scatter light if the excitation process is resonant-light scattering, as assumed here. The aggregate distribution of Na atoms fits a 1200 K gas, with a PSD distribution, along with a hotter component. Our models constrain the hot component, assumed to be impact vaporization, to be emitted with a 2500 K Maxwellian. Most orbits show a dawnside enhancement in the hot component broadly spread over the leading hemisphere. However, on some dates there is no dawn/dusk asymmetry. The portion of the hot/cold source appears to be highly variable.

Killen, Rosemary M.↗

NASA Tech Briefs, March 2012

The topics include: 1) Spectral Profiler Probe for In Situ Snow Grain Size and Composition Stratigraphy; 2) Portable Fourier Transform Spectroscopy for Analysis of Surface Contamination and Quality Control; 3) In Situ Geochemical Analysis and Age Dating of Rocks Using Laser Ablation-Miniature Mass Spectrometer; 4) Physics Mining of Multi-Source Data Sets; 5) Photogrammetry Tool for Forensic Analysis; 6) Connect Global Positioning System RF Module; 7) Simple Cell Balance Circuit; 8) Miniature EVA Software Defined Radio; 9) Remotely Accessible Testbed for Software Defined Radio Development; 10) System-of-Systems Technology-Portfolio-Analysis Tool; 11) VESGEN Software for Mapping and Quantification of Vascular Regulators; 12) Constructing a Database From Multiple 2D Images for Camera Pose Estimation and Robot Localization; 13) Adaption of G-TAG Software for Validating Touch and Go Asteroid Sample Return Design Methodology; 14) 3D Visualization for Phoenix Mars Lander Science Operations; 15) RxGen General Optical Model Prescription Generator; 16) Carbon Nanotube Bonding Strength Enhancement Using Metal Wicking Process; 17) Multi-Layer Far-Infrared Component Technology; 18) Germanium Lift-Off Masks for Thin Metal Film Patterning; 19) Sealing Materials for Use in Vacuum at High Temperatures; 20) Radiation Shielding System Using a Composite of Carbon Nanotubes Loaded With Electropolymers; 21) Nano Sponges for Drug Delivery and Medicinal Applications; 22) Molecular Technique to Understand Deep Microbial Diversity; 23) Methods and Compositions Based on Culturing Microorganisms in Low Sedimental Fluid Shear Conditions; 24) Secure Peer-to-Peer Networks for Scientific Information Sharing; 25) Multiplexer/Demultiplexer Loading Tool (MDMLT); 26) High-Rate Data-Capture for an Airborne Lidar System; 27) Wavefront Sensing Analysis of Grazing Incidence Optical Systems; 28) Foam-on-Tile Damage Model; 29) Instrument Package Manipulation Through the Generation and Use of an Attenuated-Fluent Gas Fold; 30) Multicolor Detectors for Ultrasensitive Long-Wave Imaging Cameras; 31) Lunar Reconnaissance Orbiter (LRO) Command and Data Handling Flight Electronics Subsystem; and 32) Electro-Optic Segment-Segment Sensors for Radio and Optical Telescopes.

Source record↗

Electron Temperatures and Flow Speeds of the Low Solar Corona: MACS Results from the Total Solar Eclipse of 29 March 2006 in Libya

An experiment was conducted in conjunction with the total solar eclipse on 29 March 2006 in Libya to measure both the electron temperature and its flow speed simultaneously at multiple locations in the low solar corona by measuring the visible K-coronal spectrum. Coronal model spectra incorporating the effects of electron temperature and its flow speed were matched with the measured K-coronal spectra to interpret the observations. Results show electron temperatures of (1.10 +/- 0.05) MK, (0.70 +/- 0.08) MK, and (0.98 +/- 0.12) MK, at 1.1 Solar Radius from Sun center in the solar north, east and west, respectively, and (0.93 +/- 0.12) MK, at 1.2 Solar Radius from Sun center in the solar west. The corresponding outflow speeds obtained from the spectral fit are (103 +/- 92) km/s, (0 + 10) km/s, (0+10) km/s, and (0+10) km/s. Since the observations were taken only at 1.1 Solar Radius and 1.2 Solar Radius from Sun center, these speeds, consistent with zero outflow, are in agreement with expectations and provide additional confirmation that the spectral fitting method is working. The electron temperature at 1.1 Solar Radius from Sun center is larger at the north (polar region) than the east and west (equatorial region).

Reginald, Nelson L.↗

Did Geomagnetic Activity Challenge Electric Power Reliability During Solar Cycle 23? Evidence from the PJM Regional Transmission Organization in North America

During solar cycle 22, a very intense geomagnetic storm on 13 March 1989 contributed to the collapse of the Hydro-Quebec power system in Canada. This event clearly demonstrated that geomagnetic storms have the potential to lead to blackouts. This paper addresses whether geomagnetic activity challenged power system reliability during solar cycle 23. Operations by PJM Interconnection, LLC (hereafter PJM), a regional transmission organization in North America, are examined over the period 1 April 2002 through 30 April 2004. During this time PJM coordinated the movement of wholesale electricity in all or parts of Delaware, Maryland, New Jersey, Ohio, Pennsylvania, Virginia, West Virginia, and the District of Columbia in the United States. We examine the relationship between a proxy of geomagnetically induced currents (GICs) and a metric of challenged reliability. In this study, GICs are proxied using magnetometer data from a geomagnetic observatory located just outside the PJM control area. The metric of challenged reliability is the incidence of out-of-economic-merit order dispatching due to adverse reactive power conditions. The statistical methods employed make it possible to disentangle the effects of GICs on power system operations from purely terrestrial factors. The results of the analysis indicate that geomagnetic activity can significantly increase the likelihood that the system operator will dispatch generating units based on system stability considerations rather than economic merit.

storms↗

Implementation of a Collision Probability Prediction Technique for Constellation Maneuver Planning

On March 22, 2006, the Space Technology 5 (ST5) constellation spacecraft were successfully delivered to orbit by a Pegasus XI, launch vehicle. An unexpected relative motion experienced by the constellation after orbit insertion brought about a problem. Soon after launch the observed relative position of the inert rocket body was between the leading and the middle spacecraft within the constellation. The successful planning and execution of an orbit maneuver that would create a fly-by of the rocket body was required to establish the.formation. This maneuver would create a close approach that needed to conform to predefined collision probability requirements. On April 21, 2006, the ST5 "155" spacecraft performed a large orbit maneuver and successfully passed the inert Pegasus 3rd Stage Rocket Body on April 30, 2006 15:20 UTC at a distance of 2.55 km with a Probability of Collision of less than 1.0E-06. This paper will outline the technique that was implemented to establish the safe planning and execution of the fly-by maneuver. The method makes use of Gaussian distribution models of state covariance to determine underlying probabilities of collision that arise under low velocity encounters. Specific numerical examples used for this analysis are discussed in detail. The mechanics of this technique are explained to foster deeper understanding of the concepts presented and to improve existing processes for use in future constellation maneuver planning.

Concha, Marco a.↗

NASA Tech Briefs, March 2004

Topics covered include: 1) Advanced Signal Conditioners for Data-Acquisition Systems; 2) Downlink Data Multiplexer; 3) Viewing ISS Data in Real Time via the Internet; 4) Autonomous Environment-Monitoring Networks; 5) Readout of DSN Monitor Data; 6) Parallel-Processing Equalizers for Multi-Gbps Communications; 7) AIN-Based Packaging for SiC High-Temperature Electronics; 8) Software for Optimizing Quality Assurance of Other Software; 9) The TechSat 21 Autonomous Sciencecraft Experiment; 10) Software for Analyzing Laminar-to-Turbulent Flow Transitions; 11) Elastomer Filled With Single-Wall Carbon Nanotubes; 12) Modifying Ship Air-Wake Vortices for Aircraft Operations; 13) Strain-Gauge Measurement of Weight of Fluid in a Tank; 14) Advanced Docking System With Magnetic Initial Capture; 15) Blade-Pitch Control for Quieting Tilt-Rotor Aircraft; 16) Solar Array Panels With Dust-Removal Capability; 17) Aligning Arrays of Lenses and Single-Mode Optical Fibers; 18) Automatic Control of Arc Process for Making Carbon Nanotubes; 19) Curved-Focal-Plane Arrays Using Deformed-Membrane Photodetectors; 20) Role of Meteorology in Flights of a Solar-Powered Airplane; 21) Model of Mixing Layer With Multicomponent Evaporating Drops; 22) Solution-Assisted Optical Contacting; 23) Improved Discrete Approximation of Laplacian of Gaussian; 24) Utilizing Expert Knowledge in Estimating Future STS Costs; 25) Study of Rapid-Regression Liquefying Hybrid Rocket Fuels; and 26) More About the Phase-Synchronized Enhancement Method.

Source record↗

Investigation of atmospheric waves on Neptune

This document constitutes the final report for grant NAGW-2442 of the Neptune Data Analysis Program, which supported research concerning atmospheric dynamics on Neptune. Professor Von R. Eshleman was the principal investigator. David P. Hinson was a Co-Investigator. The grant covered the period 1 March 1991 through 31 August 1994, including a six month no-cost extension. Funding from this grant resulted in publication of one journal article and one book chapter as well as presentation of results at two conferences and in numerous seminars. A complete bibliography is given below. A copy of the journal article is attached along with abstracts from the book chapter and the conference presentations. With support from this grant we extended our analysis and interpretation of the Voyager Project. This research contributed to an improvement in our basic understanding of atmospheric dynamics on Neptune. The highlight was the discovery and characterization of inertio-gravity waves in the troposphere and stratosphere. Results include measures of basic wave properties, such as amplitudes and vertical wavelengths, as well as estimates of the effect of the waves on the photochemistry and momentum balance of the stratosphere. This investigation also yielded a better understanding of the potential of radio occultation experiments for studies of atmospheric waves. At the same time we developed new methods of data analysis for exploiting these capabilities. These are currently being applied to radio occultation data obtained with the Magellan spacecraft to study waves in the atmosphere of Venus. Future planetary missions, such as Mars Global Surveyor and Cassini, will benefit from these accomplishments.

Eshleman, Von R.↗

Soil Interim Measures Implementation Report Q6 Radar Station – Solid Waste Management Unit 112 Locations of Concern 3 and 10 Kennedy Space Center, Florida

This report presents a summary of the soil interim measures (IM) implementation activities that occurred from January 23 through June 6, 2023, at the Q6 Radar Station (Q6RS) Solid Waste Management Unit (SWMU) 112, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program, which also meets the requirements of Chapter 62-780, Florida Administrative Code. Assessment activities have previously been performed at 10 Q6RS Locations of Concern (LOCs), identified during a SWMU assessment in 2013 (NASA 2013). Since the SWMU assessment, further confirmatory sampling and assessment was conducted for each LOC, and based on the data collected during these assessments, it was determined that Resource Conservation and Recovery Act Facility Investigation to further evaluate soil and groundwater was to be conducted at two LOCs: LOC 1 – Former Underground Storage Tanks (groundwater) and LOC 3 – Radar Antenna Refurbishment Area (soil). The LOC 1 groundwater assessment is ongoing, and the results will be presented under a separate cover. It was also determined that soil IM would be completed at two of the LOCs, LOC 3 and LOC 10 – Compressor Building Condensate Discharge. A Soil IM Work Plan was prepared and submitted in October 2021 (NASA 2021). The plan proposed excavation and disposal of barium and copper impacted soil in the LOC 3 and 10 areas. This report presents a summary and results of the soil IM implementation activities conducted at LOCs 3 and 10. The site contaminates of concern for this soil IM are barium and copper. The activities presented in this report includes soil IM implementation and groundwater sampling. From January 23 through March 24, 2023, AECOM Technical Services, Inc. (AECOM) field personnel conducted IM implementation activities in the LOC 3 and 10 areas. As presented in the IM Work Plan, shallow soils, impacted with metals, were excavated to a depth of 2 feet below land surface in the central area of the site around the radar antenna and associated equipment. AECOM personnel excavated 77.43 tons of soil using hand tools and, when able, heavy equipment. The soils were placed into lined roll-off containers, which were covered and transported under manifest to the Cedar Trail Landfill in Bartow, Florida. The site was restored to original condition using certified clean backfill material (sand), with filter fabric, and gravel. Areas outside of the excavation were restored with grass seed. On June 6, 2023, AECOM field personnel conducted groundwater sampling activities within the soil IM excavation area. AECOM personnel collected one groundwater sample from monitoring well Q6RS-MW0003. The sample was submitted to a fixed-based laboratory for analysis by United States Environmental Protection Agency Method 6020B for metals (barium and copper). Barium and copper were detected at 18 micrograms per liter (µg/L) and 14 µg/L, respectively, and were below the State of Florida Groundwater Cleanup Target Levels (GCTLs) for barium at 2,000 µg/L and copper at 1,000 µg/L.

Chadwick Sloan Lee↗

GEOSAT Follow-On (GFO) Altimeter Document Series, Volume 9. GFO and JASON Altimeter Engineering Assessment Report Update: GFO-Acceptance to December 18, 2006, JASON-Acceptance to December 24, 2006. Version 1: June 2007

The initial GFO Altimeter Engineering Assessment Report, March 2001 (NASA/TM-2001-209984/Ver.1/Vol.1) covered the GFO performance from Launch to Acceptance (10 February 1998 to 29 November 2000). The second of the series covered the performance from Acceptance to the end of Cycle 20 (29 November 2000 to 21 November 2001). The third of the series covered the performance from Acceptance to the end of Cycle 42 (29 November 2000 to 30 November 2002). The fourth of the series covered the performance from Acceptance to the end of Cycle 64 (29 November 2000 to 17 December 2003). The fifth of the series covered performance from Acceptance to the end of Cycle 86 (29 November 2000 to 17 December 2004). The sixth of the series covered performance from Acceptance to the end of Cycle 109 (29 November 2000 to 26 December 2005). In this year's GFO report, we have begun the inclusion of analyses of the JASON altimeter. In past years, JASON and TOPEX were compared during our assessment of the TOPEX altimeter; however, with the end of the TOPEX mission, we have developed methods to report on JASON as it relates to GFO. We see no change trend between the three altimeters and conclude all three are stable based on our cross comparison analyses.

Hayne, G. S.↗