Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “heavy elements”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Shuttle-C heavy-lift vehicle of the 90's

An unmanned cargo version of the Shuttle is being defined with the objective of achieving early high-lift capability. This vehicle, Shuttle-C, is a low-cost evolution of the current Space shuttle that may be flying 100,000-170,000-pound payloads by late 1994. The only new element of the Shuttle-C will be a cylindrical payload carrier with a 15-foot diameter, 82-foot long payload bay. The discussion covers the advantages of Shuttle-C, Shuttle-C design, the main propulsion system, the power system and auxiliary power units, a typical mission, and candidate payloads.

Eudy, Robert G.↗

ECCO: Th/U/Pu/Cm Dating of Galactic Cosmic Ray Nuclei

The ECCO (Extremely-heavy Cosmic-ray Composition Observer) instrument is one of two instruments which comprise the HNX (Heavy Nuclei Explorer) mission. The principal goal of ECCO is to measure the age of galactic cosmic ray nuclei using the actinides (Th, U, Pu, Cm) as clocks. As a bonus, ECCO will search with unprecedented sensitivity for long-lived elements in the superheavy island of stability. ECCO is an enormous array (23 sq. m) of BP-1 glass track-etch detectors, and is based on the successful flight heritage of the Trek detector which was deployed externally on Mir. We present a description of the instrument, estimates of expected performance, and recent calibrations which demonstrate that the actinides can be resolved from each other with good charge resolution.

Westphal, A. J.↗

Accelerator Tests of the KLEM Prototypes

The Kinematic Lightweight Energy Meter (KLEM) device is planned for direct measurement of the elemental energy spectra of high-energy (10(exp 11)-10(exp 16) eV) cosmic rays. The first KLEM prototype has been tested at CERN with 180 GeV pion beam in 2001. A modified KLEM prototype will be tested in proton and heavy ion beams to give more experimental data on energy resolution and charge resolution with KLEM method. The first test results are presented and compared with simulations.

Bashindzhagyan, G.↗

Volatile Element Geochemistry in the Lower Atmosphere of Venus

We computed equilibrium abundances of volatile element compounds as a function of altitude in Venus lower atmosphere. The elements included are generally found in volcanic gases and sublimates on Earth and may be emitted in volcanic gases on Venus or volatilized from its hot surface. We predict: 1) PbS, Bi2S3, or possibly a Pb-Bi sulfosalt are the radar bright heavy metal frost in the Venusian highlands; 2) It should be possible to determine Venus' age by Pb-Pb dating of PbS condensed in the Venusian highlands, which should be a representative sample of Venusian lead; 3) The gases HBr, PbCl2, PbBr2, As4O6, As4S4, Sb4O6, BiSe, InBr, InCl, Hg, TlCl, TlBr, SeS, Se2-7, HI, I, I2, ZnCl2, and S2O have abundances greater than 0.1 ppbv in our nominal model and may be spectroscopically observable; 4) Cu, Ag, Au, Zn, Cd, Ge, and Sn are approx. 100 % condensed at the 740 K (0 km) level on Venus.

Schaefer, L.↗

Launch Availability Analysis for the Artemis Program

On March 26, 2019, Vice President Pence stated that the policy of the Trump administration and the United States of America is to return American astronauts to the Moon within the next five years i.e., by 2024. Since that time, NASA has begun the process of developing concepts of operations and launch campaign options to achieve that goal as well as to provide a sustainable human presence on the Moon. Whereas the Apollo program utilized one Saturn V rocket to carry out a single lunar landing mission of short duration, NASA’s preliminary plans for the Artemis Program call for a combination of medium lift class rockets along with the heavy lift Space Launch System (SLS)to achieve a lunar landing by 2024 as well as subsequent missions. This paper describes how discrete event simulation is used to model the launch campaigns and provide metrics on launch availability and mission duration for each element being launched. Possible methods for improving launch availability are presented.

Grant Cates↗

List of Commercial and Advanced Developmental Niobium-Based Alloys of the Space Age

This report compiles a list of commercial and developmental niobium-based alloys developed during the Space Age (late 1950s through mid-1970s) for extreme-temperature applications, including rocket engine thrust chambers, hypersonic re-entry thermal protection systems, and space fission reactor loops. Niobium (Nb) was widely pursued because it provided the lowest density (~8.6 g/cc) among the primary refractory metals, a high melting temperature (~2470°C), exceptional low-temperature ductility, good formability, and compatibility with liquid alkali metals. An evaluation of physical metallurgy mechanisms, focusing on solid-solution strengthening via heavy refractory solutes (W, Mo, Ta), dual-purpose reactive solutes (Hf, Zr, Ti), and dispersion strengthening using carbides, nitrides, and oxides is presented. Additionally, the report compares Western and Soviet Union metallurgical approaches, explaining how supply chain factors and manufacturing infrastructure influenced element selection, interstitial chemistry, and alloy identification/naming conventions. Cataloging these historical alloy chemical compositions serves as a foundational reference for modern alloy additive manufacturing, thermodynamic CALPHAD modeling, and machine-learning discovery pipelines for next-generation extreme-environment niobium-based alloys.

Physical Metallurgy↗

Integrated Simulation Design Challenges to Support TPS Repair Operations

During the Orbiter Repair Maneuver (ORM) operations planned for Return to Flight (RTF), the Shuttle Remote Manipulator System (SRMS) must grapple the International Space Station (ISS), undock the Orbiter, maneuver it through a long duration trajectory, and orient it to an EVA crewman poised at the end of the Space Station Remote Manipulator System (SSRMS) to facilitate the repair of the Thermal Protection System (TPS). Once repair has been completed and confirmed, then the SRMS proceeds back through the trajectory to dock the Orbiter to the Orbiter Docking System. In order to support analysis of the complex dynamic interactions of the integrated system formed by the Orbiter, ISS, SRMS, and SSMS during the ORM, simulation tools used for previous ‘nominal’ mission support required substantial enhancements. These upgrades were necessary to provide analysts with the capabilities needed to study integrated system performance. Prevalent throughout this ORM operation is a dynamically varying topology. In other words, the ORM starts with the SRMS grappled to the mated Shuttle/ISS stack (closed loop topology), moves to an open loop chain topology consisting of the Shuttle, SRMS, and ISS, and then, at the repair configuration, extends the chain topology to one consisting of the Shuttle, SMS, ISS, and SSRMS/EVA crewman. The resulting long dynamic chain of vehicles and manipulators may exhibit significant motion between the Shuttle worksite and the EVA crewman due to the system flexibility throughout the topology (particularly within the SRMS/SSRMS joints and links). Since the attachment points of both manipulators span the flexible structure of the ISS, simulation analysis may also need to take that into consideration. Moreover, due to the lengthy time duration associated with the maneuver and repair, orbital effects become a factor and require the ISS vehicle control system to maintain active attitude control. Several facets of the ORM operation make the associated analytical efforts different from previous mission support, including: (1) the magnitude of the SRMS handled payload (Le., Orbiter class), (2) the orbital effects induced on the integrated system consisting of the large Shuttle and ISS masses connected by a light flexible SRMS, (3) long duration environmental consequences due to the lengthy operational times associated with the maneuver and repair of the TPS, (4) active attitude control (as opposed to free drift) interacting with the SRMS and SSRMS manipulators (also due to the length of the maneuver and repair), (5) relative dynamics between the EVA crewman and thc worksite influenced by the extended flexible topology. In order to meet these analysis challenges, an ORM simulation architecture was developed leveraging upon numerous pre-existing simulation elements to analyze the various subsystems individually. For example, core manipulator subsystem simulations for both the SRMS and SSRMS were originally combined to provide the dual-arm dynamics topology simulation (in the absence of orbital dynamics and vehicle control). This capability was later merged with the simulation used to analyze SRMS loading with a heavy payload in the orbital environment with an active payload control system (in this case, the ISS Attitude Control System (ACS)), configured for the ORM. The resulting worksite dynamics simulation, based off of the modified ORM simulation, provided the extended topological chain of vehicles and manipulators, while taking into account the orbital effects of both the Shuttle and ISS (as well as its ACS). Verification and validation (V&V) of these integrated simulations became a challenge in itself. A systematic approach needed to be developed such that integration simulation results could be tested against previous constituent simulations upon which these simulations were built. General V&V categories included: (1) core orbital state propagation, (2), stand-alone SRMS, (3) stand-alone SSRMS, (4) stand-alone ISS ACS, (5) integrated Shuttle, SRMS, ISS (with active ACS) in the orbital environment, and (5) dual-arm SRMS/SSRMS dynamics topology. Integrated simulation V&V run suites were created and correlated to verification runs from subsystem simulations, in order to establish the validity of the results. This paper discusses the simulation design challenges encountered while developing simulation capabilities to mirror the ORM operations. The paper also describes the incremental build approach that was utilized, starting with the subsystem simulation elements and integration into increasing more complex simulations until the resulting ORM worksite dynamics simulation had been assembled. Furthermore, the paper presents an overall integrated simulation V&V methodology based upon a subsystem level testing, integrated comparisons, and phased checkout.

Thermal Protection System↗

Quantum mechanical theory of collisional ionization in the presence of intense laser radiation

The paper presents a quantum mechanical formalism for treating ionizing collisions occurring in the presence of an intense laser field. Both the intense laser radiation and the internal electronic continuum states associated with the emitted electrons are rigorously taken into account by combining discretization techniques with expansions in terms of electronic-field representations for the quasi-molecule-plus-photon system. The procedure leads to a coupled-channel description of the heavy-particle dynamics which involves effective electronic-field potential surfaces and continua. It is suggested that laser-influenced ionizing collisions can be studied to verify the effects of intense laser radiation on inelastic collisional processes. Calculation procedures for electronic transition dipole matrix elements between discrete and continuum electronic states are outlined.

Bellum, J. C.↗

Building on 50 Years of Systems Engineering Experience for a New Era of Space Exploration

Over the past 50 years, the National Aeronautics and Space Administration (NASA) has delivered space transportation solutions for America's complex missions, ranging from scientific payloads that expand knowledge, such as the Hubble Space Telescope, to astronauts and lunar rovers destined for voyages to the Moon. Currently, the venerable Space Shuttle, which has been in service since 1981, provides the United States (US) capability for both crew and heavy cargo to low-Earth orbit to construct the International Space Station, before the Shuttle is retired in 2010. In the next decade, NASA will replace this system with a duo of launch vehicles: the Ares I crew launch vehicle and the Ares V cargo launch vehicle. The goals for this new system include increased safety and reliability coupled with lower operations costs that promote sustainable space exploration for decades to come. The Ares I will loft the Orion crew exploration vehicle, while the heavy-lift Ares V will carry the Altair lunar lander, as well as the equipment and supplies needed to construct a lunar outpost for a new generation of human and robotic space pioneers. NASA's Marshall Space Flight Center manages the Shuttle's propulsion elements and is managing the design and development of the Ares rockets, along with a host of other engineering assignments in the field of scientific space exploration. Specifically, the Marshall Center's Engineering Directorate houses the skilled workforce and unique facilities needed to build capable systems upon the foundation laid by the Mercury, Gemini, Apollo, and Shuttle programs. This paper will provide details of the in-house systems engineering and vehicle integration work now being performed for the Ares I and planned for the Ares V. It will give an overview of the Ares I system-level testing activities, such as the ground vibration testing that will be conducted in the Marshall Center's Dynamic Test Stand to verify the integrated vehicle stack's structural integrity and to validate computer modeling and simulation, as well as the main propulsion test article analysis to be conducted in the Static Test Stand. Ultimately, fielding a robust space transportation solution that will carry international explorers and essential payloads will pave the way for a new era of scientific discovery now dawning beyond planet Earth.

Dumbacher, Daniel L.↗

Small engine technology programs

Small engine technology programs being conducted at the NASA Lewis Research Center are described. Small gas turbine research is aimed at general aviation, commutercraft, rotorcraft, and cruise missile applications. The Rotary Engine Program is aimed at supplying fuel flexible, fuel efficient technology to the general aviation industry, but also has applications to other missions. There is a strong element of synergism between the various programs in several respects. All of the programs are aimed towards highly efficient engine cycles, very efficient components, and the use of high temperature structural ceramics. This research tends to be generic in nature and has broad applications. The Heavy Duty Diesel Transport (HDTT), rotary technology, and the compound cycle programs are all examining approached to minimum heat rejection, or adiabatic systems employing advanced materials. The Automotive Gas Turbine (AGT) program is also directed towards ceramics application to gas turbine hot section components. Turbomachinery advances in the gas turbines will benefit advanced turbochargers and turbocompounders for the intermittent combustion systems, and the fundamental understandings and analytical codes developed in the research and technology programs will be directly applicable to the system projects.

Niedzwiecki, Richard W.↗

Search for solar-type nitrogen in the gas-rich Pesyanoe meteorite

An initial study carried out to isolate and characterize solar wind N in the dark portion of the enstatite achondrite Pesyanoe is presented. Nitrogen isotopic data obtained from a stepwise gas release of two grain-size fractions of the gas-rich meteorite are given. It is determined that more than one trapped N component is present and that indigenous N is released above 1000 C with an isotopic signature of delta N-15 = -33 per mil. A heavy N component is detected at 700-800 C, and coincides with a major release of solar-type noble gases. A lower limit of delta N-15 = -6 per mil is defined by the isotopic shifts at this range of temperature for the second element of a two-component mixture, whereas the delta N-15 signature depends on the adopted elemental abundances for a solar-type component. It is pointed out that the timing of solar wind loading of Pesyanoe is only constrained to correspond to the cosmic ray exposure age (less than 60 Ma), although it is generally assumed that this irradiation took place during an early stage.

Murty, S. V. S.↗

A portable x-ray analyzer for wearmetal particles in lubricants

An extensive program exists for the systematic sampling and analysis of lubricants in U.S. Air Force aircraft engines. The sudden development of excessive engine wear can usually be detected on the basis of monitoring the concentration of several key metallic elements for each aircraft engine. In many cases even the specific fault within an engine can be recognized. The two types of equipment which are currently being employed for the conduction of oil analyses make use of atomic emission or atomic absorption spectroscopy. In both cases, heavy, large, and relatively fragile pieces of equipment are involved. Difficulties concerning the transportation of these devices have led to the development of a small, sturdy, and easily portable wearmetal analyzer. The analyzer makes use of an X-ray fluorescence technique.

Clark, B. C.↗

Phosphates in pallasite meteorites as probes of mantle processes in small planetary bodies

Trace element analyses of the phosphates minerals in stony-iron pallasite meteorites are used here to investigate the magmatic history of the silicate portions of pallasites. In Eagle Station and seven other pallasites, the phosphates have relatively low concentrations of REEs and are strongly enriched in heavy relative to light REE. These patterns are consistent with formation of phosphate by subsolidus reactions between metal and silicate, in which phosphate inherits the REE pattern of olivine. In Springwater and Santa Rosalia, calcium-rich phosphates have higher concentrations of REE, are enriched in light relative to heavy REE, and have negative europium anomalies. These patterns are consistent with crystallization of phosphate from a europium-depleted chondritic liquid. This is unlikely to have happened near the base of the differentiating parent-body mantle; it suggests that some pallasites may come from regions of their parent bodies much nearer the surface than the core-mantle boundary.

Davis, Andrew M.↗

Modeling Solar-Wind Heavy-Ions' Potential Sputtering of Lunar KREEP Surface

Recent laboratory data suggest that potential sputtering may be an important weathering mechanism that can affect the composition of both the lunar surface and its tenuous exosphere; its role and implications, however, remain unclear. Using a relatively simple kinetic model, we will demonstrate that solar-wind heavy ions induced sputtering of KREEP surfaces is critical in establishing the timescale of the overall solar-wind sputtering process of the lunar surface. We will also also show that potential sputtering leads to a more pronounced and significant differentiation between depleted and enriched surface elements. We briefly discuss the impacts of enhanced sputtering on the composition of the regolith and the exosphere, as well as of solar-wind sputtering as a source of hydrogen and water on the moon.

Barghouty, A. F.↗

3D Woven Composite End Ring Structure: Design Development and Verification Testing

The National Aeronautics and Space Administration (NASA) Space Technology and Mission Directorate (STMD) is advancing composite technologies for exploration missions. The Composite Technology for Exploration (CTE) project goal is to advance lightweight joint concepts for Space Launch System (SLS) class structures. To this end CTE is developing and demonstrating a 3D woven carbon /epoxy composite joint design co-bonded in a circumferential end ring configuration, applied to a SLS sized conceptual payload attachment structure. This joint is a lightweight alternative to heavy and costly metallic joints. The 3D woven joint development advances lightweight joint technologies through material and structural design, material and joint analyses, and fabrication, as well as demonstration through building block testing. Prior limited building block tests are mentioned. In this paper, new sub-element-scale test results are described that demonstrate the structural capability well beyond design limit load. Then, results for a sub-component test article with a 889 mm joint subjected to combined loads are presented.

Kenneth N Segal↗

Space Launch System Spacecraft and Payload Elements: Making Progress Toward First Launch

Significant and substantial progress continues to be accomplished in the design, development, and testing of the Space Launch System (SLS), the most powerful human-rated launch vehicle the United States has ever undertaken. Designed to support human missions into deep space, SLS is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development directorate. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit, and the Ground Systems Development and Operations program is transforming Kennedy Space Center into next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. SLS will deliver a near-term heavy-lift capability for the nation with its 70 metric ton (t) Block 1 configuration, and will then evolve to an ultimate capability of 130 t. The SLS program marked a major milestone with the successful completion of the Critical Design Review in which detailed designs were reviewed and subsequently approved for proceeding with full-scale production. This marks the first time an exploration class vehicle has passed that major milestone since the Saturn V vehicle launched astronauts in the 1960s during the Apollo program. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS -- Exploration Mission-1 (EM-1), an un-crewed mission to orbit the moon and return. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress in on track to meet the initial targeted launch date in 2018. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. This paper will particularly focus on work taking place at Marshall Space Flight Center (MSFC) and United Launch Alliance in Alabama, where upper stage and adapter elements of the vehicle are being constructed and tested. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) Element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on EM-1. Construction is already underway on the EM-1 Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter is set to begin at the Friction Stir Facility located at MSFC while structural test articles are either completed (OSA) or nearing completion (Launch Vehicle Stage Adapter). An overview is provided of the launch vehicle capabilities, with a specific focus on SPIE Element qualification/testing progress, as well as efforts to provide access to deep space regions currently not available to the science community through a secondary payload capability utilizing CubeSat-class satellites.

Schorr, Andrew A.↗

Satellite Power Systems (SPS) concept definition study (Exhibit D). Volume 3: Transportation analysis

Additional analyses and investigations were conducted to further define transportation system concepts that will be needed for the developmental and operational phases of an SPS program. To accomplish these objectives, transportation systems such as the Shuttle and its derivatives were identified; new heavy lift launch vehicle (HLLV) concepts, cargo and personnel orbital transfer vehicles (EOTV and POTV), and intraorbit transfer vehicle (IOTV) concepts were evaluated; and, to a limited degree, the program implications of their operations and costs were assessed. The results of these analyses were integrated into other elements of the overall SPS concept definition studies.

Hanley, G. M.↗

Space Launch System Spacecraft and Payload Elements: Making Progress Toward First Launch

Significant and substantial progress continues to be accomplished in the design, development, and testing of the Space Launch System (SLS), the most powerful human-rated launch vehicle the United States has ever undertaken. Designed to support human missions into deep space, SLS is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development directorate. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit, and the Ground Systems Development and Operations (GSDO) program is transforming Kennedy Space Center (KSC) into next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. SLS will deliver a near-term heavy-lift capability for the nation with its 70 metric ton Block 1 configuration, and will then evolve to an ultimate capability of 130 metric tons. The SLS program marked a major milestone with the successful completion of the Critical Design Review in which detailed designs were reviewed and subsequently approved for proceeding with full-scale production. This marks the first time an exploration class vehicle has passed that major milestone since the Saturn V vehicle launched astronauts in the 1960s during the Apollo program. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS - Exploration Mission-1 (EM-1), an uncrewed mission to orbit the moon and return, and progress in on track to meet the initial targeted launch date in 2018. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility (MAF) in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. This paper will particularly focus on work taking place at Marshall Space Flight Center (MSFC) and United Launch Alliance (ULA) in Alabama, where upper stage and adapter elements of the vehicle are being constructed and tested. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) Element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on EM-1. Construction is already underway on the EM-1 Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter is set to begin at the Friction Stir Facility located at MSFC while structural test articles are either completed (OSA) or nearing completion (Launch Vehicle Stage Adapter). An overview is provided of the launch vehicle capabilities, with a specific focus on SPIE Element qualification/testing progress, as well as efforts to provide access to deep space regions currently not available to the science community through a secondary payload capability utilizing CubeSat-class satellites.

Schorr, Andrew A.↗