Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “contingency”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Earth Independent Medical Operations (EIMO)

Inherent in interplanetary space travel are unprecedented challenges that could threaten mission success and negatively impact crew health and performance. Return to definitive care is essentially untenable and resources will be constrained with practically no re-supply capability. Access to ground-based medical expertise will be significantly delayed under nominal conditions with exacerbation during conjunction or prolonged dust storms. Taken together, these challenges necessitate the development of a progressively autonomous medical operational support system to assist the crew medical officer (CMO). While support from ground based medical experts will remain indispensable for pre-mission planning, the approach to management of acute/emergent medical contingencies will require a gradual transition of medical care and decision making from terrestrial to space-based assets, enabling support of astronaut health and performance and reducing overall mission risk. To progressively enable EIMO, a series of meetings were convened with subject matter experts from within NASA, academia and industry to facilitate mapping of the path to support autonomous medical operations. Topics explored in these meetings included the scope of data (storage capacity, usage, transmission rate and bandwidth, computing capacity), CMO training, supply and resource management and task load balance. Recommendations from these meetings will inform the EIMO Concept of Operations and definition of the associated requirements culminating in updates to the NASA 3001 standards. The EIMO project team will work with stakeholders to conceptualize a clinical decision support system (CDSS) to assist the CMO in response to medical contingencies when terrestrial support is delayed or otherwise unavailable. The CDSS will be a system of systems that will utilize data from numerous input vectors. Successful deployment of the CDSS will facilitate medical decision making while decreasing the cognitive load leading to an improvement in task load balancing. Additional benefits of the envisioned CDSS include assistance with inventory management, locating resources, storage/retrieval of medical records, highlighting trends in recorded data, in addition to providing a consult for diagnosis and treatment. More advanced features might include passive monitoring to identify early warning signs of behavioral or medical anomalies to possibly pre-empt onset of conditions that would compromise crew health and performance.

Benjamin Easter↗

Benchmark Problem for Autonomous Urban Air Mobility

This paper introduces a Community Benchmark Problem (CBP) for Intelligent Contingency Management (ICM) for Urban Air Mobility (UAM) aircraft. The CBP aims to provide a common framework for measuring and comparing the progress of autonomy solutions for UAM aircraft in handling emergency situations. The paper proposes a methodology for defining and quantifying five measures of complexity that capture the challenges and requirements of ICM for UAM: Mission, Environmental, Autonomy, Decision-Making, and Mission Fault. In addition, it proposes a methodology for defining and quantifying mission risk acceptability with the same goals: Contingency Management, Mission Success, Operational, Mission Redefinition, and Environmental. We describe how to use these measures to track progress of the development of ICM capability, as well as to create scenarios and evaluate the performance of different autonomy solutions.

autonomy↗

Earth Independent Medical Operations (EIMO) Datascope: Challenges and Potential Solutions

Data flows and storage/retrieval capacity are severely constrained during missions in space and challenges will become even greater during exploration class missions. There is a need for an artificial intelligence (AI)-based clinical decision support system (CDSS) to monitor and analyze data to provide real-time consultative support for crew medical officer (CMO) decision-making. EIMO is defined as the gradual transition of medical care and decision making from terrestrial to space-based assets, enabling support of astronaut health and performance and reducing overall mission risk. While a hallmark of this paradigm shift from low-earth orbit is that on-board care will increasingly become the responsibility of the astronauts for primary management and decision making, terrestrial assets will continue to be paramount in pre-mission screening and planning, as well as prevention, health maintenance and long-term care contingencies. New capabilities and systems that enable progressively more robust and resilient systems and crews will be necessary to reduce risk and increase probability of deep space exploration mission success. An aspiration for EIMO is to develop AI-enhanced solutions for analysis of crew health & performance data and to facilitate clinical decision support for autonomous medical operations. A “system of systems” approach is envisioned whereby EIMO will deploy AI-supported natural language processing and machine learning (ML) techniques to utilize embedded reference databases and real-time data streams [input vectors] from multiple data sources. Constituent input vectors may include environmental controls, countermeasures data, behavioral data, physiologic wearables, point-of-care laboratory tests, personalized medical records, inventory trade space risk assessments, COTS medical databases, and ground support inputs. An ideal AI capability would possess trained fusion algorithms to cross reference input vectors with medical ‘knowledge’ [cultivated database] to stratify relevant data streams for predictive and actionable capabilities. In addition, EIMO will feature mobility, in that it can be accessed and can push/pull data within and between multiple vehicles/habitats. Large amounts and variable sources of data can be leveraged to diagnose, inform treatment strategies, and potentially predict medical events and performance decrements. Inclusion of advanced training tools using extended reality will enable increasingly autonomous medical care to aid a CMO when ground support is unavailable or time-delayed beyond required action window, e.g., emergent medical situations. EIMO CDSS would require very large datasets to train pre-flight and significant amounts of data are needed to support ML via in-flight CDSS operations. An additional challenge will be to find sufficient data to train a model relevant to astronaut demographics. The rapid, accelerating evolution of this field creates a propitious solution space to leverage multi-modal AI through public-private partnership(s). The status of multi-modal AI systems today would preclude their use for long duration missions as they remain unreliable and are subject to “digital hallucinations” and other errors that could pose operational risk. A federated labs structure is being considered to test and optimize data flow from the multiple input vectors leading to field testing in suitable ground/flight analogs. Critical to the success of an EIMO CDSS will be integration and interoperability and success will be defined by a system that can serve as an in-flight medical consult for the CMO providing critical support during medical contingencies. Benefits to terrestrial medicine may be significant as an outflow of the EIMO medical system, particularly for remote areas and communities lacking significant infrastructure, personnel and resources.

Medical Operations↗

Lessons Learned in Risk Management on NCSX

The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative stellarator design developed by Princeton Plasma Physics Laboratory and Oak Ridge National Laboratory. Construction of some of the major components and subassemblies was completed, but the estimated cost and schedule for completing the project grew as the technical requirements and risks became better understood, leading to its cancellation in 2008. The project's risks stemmed from its technical challenges, primarily the complex component geometries and tight tolerances that were required. The initial baseline, which was established in 2004, was supported by a risk management plan and risk-based contingencies, both of which proved to be inadequate. Technical successes were achieved in the construction of challenging components and subassemblies, but cost and schedule growth was experienced. As part of an effort to improve project performance, a new risk management program was devised and implemented in 2007-2008. It led to a better understanding of project risks, a sounder basis for contingency estimates, and improved management tools. Although the risks were ultimately unacceptable to the sponsor, valuable lessons in risk management were learned through the experiences with the NCSX project.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Metrics for Assessment of Smart Grid Data Integrity Attacks

There is an emerging consensus that the nation’s electricity grid is vulnerable to cyber attacks. This vulnerability arises from the increasing reliance on using remote measurements, transmitting them over legacy data networks to system operators who make critical decisions based on available data. Data integrity attacks are a class of cyber attacks that involve a compromise of information that is processed by the grid operator. This information can include meter readings of injected power at remote generators, power flows on transmission lines, and relay states. These data integrity attacks have consequences only when the system operator responds to compromised data by redispatching generation under normal or contingency protocols. These consequences include (a) financial losses from sub-optimal economic dispatch to service loads, (b) robustness/resiliency losses from placing the grid at operating points that are at greater risk from contingencies, and (c) systemic losses resulting from cascading failures induced by poor operational choices. This paper is focused on understanding the connections between grid operational procedures and cyber attacks. We first offer two examples to illustrate how data integrity attacks can cause economic and physical damage by misleading operators into taking inappropriate decisions. We then focus on unobservable data integrity attacks involving power meter data. These are coordinated attacks where the compromised data are consistent with the physics of power flow, and are therefore passed by any bad data detection algorithm. We develop metrics to assess the economic impact of these attacks under re-dispatch decisions using optimal power flow methods. These metrics can be use to prioritize the adoption of appropriate countermeasures including PMU placement, encryption, hardware upgrades, and advance attack detection algorithms.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Geographic Visualization of Power-Grid Dynamics

The visualization enables the simulation analyst to see changes in the frequency through time and space. With this technology, the analyst has a bird's eye view of the frequency at loads and generators as the simulated power system responds to the loss of a generator, spikes in load, and other contingencies. The significance of a contingency to the operation of an electrical power system depends critically on how the resulting tansients evolve in time and space. Consequently, these dynamic events can only be understood when seen in their proper geographic context. this understanding is indispensable to engineers working on the next generation of distributed sensing and control systems for the smart grid. By making possible a natural and intuitive presentation of dynamic behavior, our new visualization technology is a situational-awareness tool for power-system engineers.

Sukumar, Sreenivas R.↗

Fast simultaneous feasibility testing and applications for electrical power grids

Fast simultaneous feasibility testing (SFT) for management of an electrical power grid is achieved through various innovations. The computation problem relates to evaluation of candidate solutions for external power flows into a power grid, with respect to predetermined constraints and contingencies. Storage and computations are reduced by formulating the problem in terms of transactional nodes (e.g. third party connections for generators and loads) instead of the larger number of bus nodes. Further advantages are achieved by precomputing matrices that can be reused across multiple SFT invocations, organizing matrices and operations to reduce storage and computation, and eliminating branches that have no contingency violations. The fast SFT further enables new applications for integrating SFT with a Security-Constrained Unit Commitment (SCUC) optimizer for efficient single pass solutions; operating SFT as a service to multiple SCUC solvers; or integration with Security-Constrained Economic Dispatch (SCED) optimization.

97 MATHEMATICS AND COMPUTING↗

A systematic approach to the analysis of double faults within design basic accident methodology - 14501

Within the UK there is a general trend towards adopting Design Basis Accident (DBA) methodology for the assessment of radiological hazards, including criticality. DBA is a single fault methodology and comprises identifying the initiating event, its frequency and consequence. A fault with a very low initiating event frequency will not require further analysis. A fault sequence that terminates in a sub-critical configuration would also not require further analysis; although the identified passive features ensuring sub-criticality are subjected to engineering substantiation. Where faults do not pass this initial screening, two safety measures are generally required to ensure the fault does not progress to a criticality incident. This methodology provides a robust approach to single faults ensuring that an appropriate level and range of plant measures are identified and subjected to appropriate substantiation. However, a criticality is a cliff-edge effect and is dependent on multiple parameters. It is entirely possible under DBA to evaluate several single fault sequences and conclude that no measures are required because the single faults terminate in a sub-critical configuration. Importantly, for criticality safety, under DBA, there is no requirement to prevent important parameters from deviating from normal or upper bound 'safe' levels leaving the plant at greater risk in the event that further faults initiate. The combination of two faults could lead to a criticality incident but there is no current driver within DBA methodology to analyze these coincident or double faults. There is, therefore, potential to significantly under estimate the risk of criticality. This understanding is embodied within other methodologies such as the Double Contingency Principle. However, within the UK the DBA methodology has so significantly improved the analysis of single faults that, in some instances, consideration of double faults has taken a back seat. This is despite the UK regulator stating that 'criticality safety cases should employ the double contingency approach'. This paper presents a systematic approach to ensure that the potential for double faults or multiple parameter deviations to result in a criticality is effectively evaluated within the wider DBA methodology. The methodology determines which faults may be screened out from double fault analysis on the grounds of being 'unlikely' to initiate and being present for a 'short' duration. For those faults screened into double fault analysis, this guidance sets out the potential means of determining acceptable risk. These means include the specific evaluation of the risk of two criticality control parameters deviating simultaneously, the definition of additional safety measures and the definition of the boundary of safety for multiple parameters and the risk of exceeding this boundary. (authors)

42 ENGINEERING↗

Data-Driven Unit Commitment Refinement - a Scalable Approach for Complex Modern Power Grids

Integration of renewable generation, which is often intermittent and decentralized, substantially increases the stochasticity and complexity of power grid operations. Future power systems planning will require significant computational capability to evaluate balance between demand and supply under varying conditions, both temporally and spatially. The standard approach for generation unit commitment is to use mixed-integer linear programming to find the optimal generation schedule considering ramping and generator constraints. In the future grid this poses computational scalability challenges because generation and demand are not known with certainty due to stochasticity in weather and complexity of the grid. To address this challenge, we present a data-driven unit commitment approach that can efficiently include stochastic weather impacts and contingency considerations to improve unit commitment. Our approach uses graph-based data analytics techniques on solutions to the security constrained (and possibly stochastic) economic dispatch problem to identify potential improvements to a given unit commitment. Recent breakthroughs in fully-parallel stochastic economic dispatch software allow this approach to be scalably deployed. Simulations on synthetic South Carolina and Texas grids show this method can improve grid reliability with security constraints over a set of contingencies, while also meaningfully lowering total generation cost.

Holt, Timothy↗

A Scalable Transmission and Distribution Co-simulation Platform for IBR-heavy Power Systems

The integration of Inverter-Based Resources (IBRs) into power systems, including both transmission and distribution networks, poses challenges for studying grid dynamic behaviours under various operating conditions and system events. This paper addresses the urgent need to investigate the influence of IBRs on grid dynamics, and their potential to enhance power system reliability and resilience. We propose a flexible, scalable transmission and distribution co-simulation platform, using opensource tools only for assessing the impact of grid-following (GFL) and grid-forming (GFM) IBRs on dynamic stability at various renewable penetration levels (up to 100%). This platform enables researchers to explore different contingencies at transmission, distribution, or both, providing a comprehensive evaluation of grid status. A series of case studies, including both small and large T&D systems with varying GFL/GFM configurations and contingencies, have been conducted. The results not only robustly validate our co-simulation framework, but also provide invaluable insights for effective IBR management in the power grid.

grid management↗

Evaluating Protection System Performance for a Real-World Weak Grid Area With High Inverter-Based Resources: Preprint

This paper evaluates an existing protection scheme implemented in a real-world weak grid area with a high penetration of inverter-based resources (IBRs). The study aims to assess the reliability and adequacy of protection schemes originally designed for traditional synchronous machine systems and determine whether they can continue to operate reliably in systems with high levels of IBRs. Hardware relays are tested using a controller-hardware-in-the-loop setup. PSCAD electromagnetic transient simulation with an IBR original equipment manufacturer black-box model is used to perform fault studies and generate COMTRADE data, which are replayed by a real-time digital simulator (RTDS) to feed input to the hardware relays. Three scenarios are analyzed: normal operation, an N-1 contingency, and an IBR-only scenario. The evaluation results reveal the following: 1) the protection scheme remains reliable under normal conditions and N-1 contingencies and 2) in IBR-only scenarios, differential protection (87L) continues to operate reliably, whereas local protection elements, such as distance and directional elements, fail because of the lack of regulated negative sequence current contributed by IBRs. These findings provide utilities with valuable insights for improving their protection systems in high-IBRs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

U.S. Department of Energy Consequence Management Under the National Response Framework

Under the Nuclear/Radiological Incident Annex of the National Response Framework, the U.S. Department of Energy (DOE) has specific responsibilities as a coordinating agency and for leading interagency response elements in the Federal Radiological Monitoring and Assessment Center (FRMAC). Emergency response planning focuses on rapidly providing response elements in stages after being notified of a nuclear/radiological incident. The use of Home Teams during the field team deployment period and recent advances in collecting and transmitting data from the field directly to assessment assets has greatly improved incident assessment times for public protection decisions. The DOE’s Remote Sensing Laboratory (RSL) based in Las Vegas, Nevada, has successfully deployed technical and logistical support for this mission at national exercises such as Top Officials Exercise IV (TOPOFF IV). In a unique response situation, DOE will provide advance contingency support to NASA during the scheduled launch in the fall of 2009 of the Mars Science Laboratory (MSL). The MSL rover will carry a radioisotope power system that generates electricity from the heat of plutonium’s radioactive decay. DOE assets and contingency planning will provide a pre-incident response posture for rapid early plume phase assessment in the highly unlikely launch anomaly.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Lessons Learned in Risk Management on NCSX

The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative stellarator design developed by the Princeton Plasma Physics Laboratory and Oak Ridge National Laboratory. Construction of some of the major components and sub-assemblies was completed, but the estimated cost and schedule for completing the project grew as the technical requirements and risks became better understood, leading to its cancellation in 2008. The project's risks stemmed from its technical challenges, primarily the complex component geometries and tight tolerances that were required. The initial baseline, established in 2004, was supported by a risk management plan and risk-based contingencies, both of which proved to be inadequate. Technical successes were achieved in the construction of challenging components and subassemblies, but cost and schedule growth was experienced. As part of an effort to improve project performance, a new risk management program was devised and implemented in 2007-08. It led to a better understanding of project risks, a sounder basis for contingency estimates, and improved management tools. Although the risks ultimately were unacceptable to the sponsor, valuable lessons in risk management were learned through the experiences with the NCSX project.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Lessons Learned in Risk Management on NCSX

The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative stellarator design developed by the Princeton Plasma Physics Laboratory and Oak Ridge National Laboratory. Construction of some of the major components and sub-assemblies was completed, but the estimated cost and schedule for completing the project grew as the technical requirements and risks became better understood, leading to its cancellation in 2008. The project's risks stemmed from its technical challenges, primarily the complex component geometries and tight tolerances that were required. The initial baseline, established in 2004, was supported by a risk management plan and risk-based contingencies, both of which proved to be inadequate. Technical successes were achieved in the construction of challenging components and subassemblies, but cost and schedule growth was experienced. As part of an effort to improve project performance, a new risk management program was devised and implemented in 2007-08. It led to a better understanding of project risks, a sounder basis for contingency estimates, and improved management tools. Although the risks ultimately were unacceptable to the sponsor, valuable lessons in risk management were learned through the experiences with the NCSX project.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Impact of climate change on adaptive management decisions in the face of water scarcity

Reoccurring drought through the early 2000s has caused a serious water scarcity issue in the Colorado River Basin. Previous modeling studies have focused on the impact of climate change without considering the adaptive behaviors of farmers and under-utilized Indian water rights. Here, we use a coupled agent-based water resource model (ABM) to investigate how the adaptive decisions of farmers can affect water resource management under both climate change impacts and fully utilized Indian water right conditions. We used five General Circulation Model projections with RCP8.5 scenarios for the study. The results of farm-level decision-making showed different responses in irrigated areas that were changing due to climate change impact. While winter precipitation changes might partially explain the behavior changes, no specific pattern could be concluded based on their location. Also, farmers’ responses about annual water diversion showed more significant inter-year variation compared to irrigated areas. Basin-level metrics showed that climate change impacts will generally worsen water scarcity issues as measured in Navajo Reservoir storage, flow to Lake Powell, and instream flow requirement. But these basin-level water scarcity metrics cannot reflect individual farm-level impacts under climate change, which is why modeling the bottom-up management actions is necessary. When the under-utilized Indian water rights are fully used, it is more likely to trigger the shortage sharing agreement due to the higher tribal water depletion. Evaluation of model uncertainty and a more realistic setup for adaptive actions under drought contingency plans are suggested for future research.

54 ENVIRONMENTAL SCIENCES↗

Quantifying Transmission Fault Voltage Influence and its Potential Impact on Distributed Energy Resources

With increasing shares of distributed energy resources (DERs) on the electric grid, the power system is transitioning from having fewer large generators with relatively simple dynamics to many small generators with aggregate responses to system disturbances that are difficult to predict. In particular, voltage fluctuations might cause large losses of generation via DER operation/interconnection compliance. To understand orchestral DER dynamics, a first step is to determine the influence of a disturbance on the overall bulk power system. This work introduces metrics that allow for the classification and comparison of a variety of system faults with respect to their influences on voltage profiles. These metrics are applied to standardized fault simulations on the Western Interconnection Paths with a full-scale Positive Sequence Load Flow model. The results are presented with a highlight on Path 61, which has the potential for DER generation reduction exceeding the current credible contingency of a double Palo Verde loss.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Computational Challenges for Power System Operation

As the power grid technology evolution and information technology revolution converge, power grids are witnessing a revolutionary transition, represented by emerging grid technologies and large scale deployment of new sensors and meters in networks. This transition brings opportunities, as well as computational challenges in the field of power grid analysis and operation. This paper presents some research outcomes in the areas of parallel state estimation using the preconditioned conjugated gradient method, parallel contingency analysis with a dynamic load balancing scheme and distributed system architecture. Based on this research, three types of computational challenges are identified: highly coupled applications, loosely coupled applications, and centralized and distributed applications. Recommendations for future work for power grid applications are also presented.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Data Privacy for the Grid: Toward a Data Privacy Standard for Inverter-Based and Distributed Energy Resources

The traditional approach to planning the distribution grid has focused on reliability in the context of gradual and reasonably predictable load growth. Forecasts of load growth, combined with asset management practices, were used by system planners to identify upgrades to the system to maintain or improve reliability. The decisions, typically based within load flow analysis tools, included considerations about contingency scenarios and corporate forecasts (i.e., top-down predictions at a summary level of what would happen in a particular area that could impact load growth and behavior). As a result, today, this traditional approach no longer fits all purposes.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗