DOE OSTI · 1925007
Fast simultaneous feasibility testing and applications for electrical power grids
Abstract
Fast simultaneous feasibility testing (SFT) for management of an electrical power grid is achieved through various innovations. The computation problem relates to evaluation of candidate solutions for external power flows into a power grid, with respect to predetermined constraints and contingencies. Storage and computations are reduced by formulating the problem in terms of transactional nodes (e.g. third party connections for generators and loads) instead of the larger number of bus nodes. Further advantages are achieved by precomputing matrices that can be reused across multiple SFT invocations, organizing matrices and operations to reduce storage and computation, and eliminating branches that have no contingency violations. The fast SFT further enables new applications for integrating SFT with a Security-Constrained Unit Commitment (SCUC) optimizer for efficient single pass solutions; operating SFT as a service to multiple SCUC solvers; or integration with Security-Constrained Economic Dispatch (SCED) optimization.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Holzer, Jesse T., Chen, Yonghong, Pan, Feng, Rothberg, Edward. 2022-08-16. Fast simultaneous feasibility testing and applications for electrical power grids. https://www.osti.gov/biblio/1925007
Cite the original work for its findings. Save a collection to share your selection of sources.