Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Requirements Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Model-based interface design for smart field-device integration

Operational complexity is ever-increasing for electric utilities that face challenges including integration of DERs, customer expectation of energy choices, the proliferation of non-utility-owned resources, new business models with energy service providers, and new technology with IT/OT convergence. To maintain and improve the quality of operations, planning, and decision-making in general, utilities need to manage and navigate the complexity. Managing complexity requires a modular, scalable, and flexible solution. Connecting large amounts of DERs and introducing new services requires increased grid control and evolving applications. In this paper, we show an approach utilizing model-based standardized interfaces that simplifies integration and deployment of new algorithms and smart field devices for interoperability across legacy or new systems. A modular design is presented for a reference implementation of widely used DNP3 and IEEE 2030.5 interfaces within an open-source, standards-based data integration platform for integration of smart field devices with independently developed, best-of-breed applications.

Model-driven development, system integration, smar↗

Development of a Bi2212 Dipole Insert at Fermilab

A goal of the U.S. Magnet Development Program (US-MDP) is high-field magnets for accelerators with magnetic fields larger than 15 T, i.e., above the limits of Nb 3 Sn accelerator magnets. Composite round wires and Rutherford cables made of high temperature superconductor Bi2212 may achieve this goal. Bi2212 is sensitive to transverse stresses and strains, and this requires stress management in the coil design. A stress management approach was developed at Fermilab for high-field large-aperture Nb 3 Sn accelerator magnets. Now it is being applied to high-field dipole insert coils based on Bi2212 Rutherford cable. Here this paper describes the insert coil design and main parameters, including the superconducting wire and cable. The coil will be installed inside a 60-mm bore Nb 3 Sn dipole outsert coil and cold iron yoke. The Bi2212 coil will be tested individually and in series with the Nb 3 Sn outsert coil. The expected Bi2212 insert test parameters are reported and discussed.

43 PARTICLE ACCELERATORS↗

The incorporation of environmentally derived 87 Sr / 86 Sr and Sr/Ca in early otolith formation of Chinook salmon

Abstract Effective species management often requires understanding patterns of movement and habitat use. A common approach in identifying where individuals reside relies upon chemical tracers from the environment that are incorporated into an individual's tissues. For fish, isotopes in their otoliths, specifically the portion of their otolith formed during their larval stage, have been used to identify the natal origin. Complicating this work, however, is the fact that during this life stage, there is a shift in the source of isotopes deposited onto the growing otolith from maternally to environmentally derived. The objective of this study was to identify the portion of the otolith representing this transition to environmentally derived isotopes so as to accurately investigate questions of natal origin for a threatened population of fall Chinook salmon ( Oncorhynchus tshawytscha ). We exposed developing larvae to four treatments that differed in terms of their water strontium isotope ratio ( 87 Sr/ 86 Sr) and used change‐point analysis of otolith 87 Sr/ 86 Sr and strontium to calcium ratio (Sr/Ca) to identify the otolith radius corresponding to the transition to environmentally derived isotopes. Our results indicated this transition occurred, on average, at 132 μm ( 87 Sr/ 86 Sr; ±50 μm standard deviation) and 127 μm (Sr/Ca; ±29 μm) from the otolith core, which corresponded to the developmental time between hatching and exogenous feeding. A substantial proportion of our otoliths (i.e., 61%) did not show convergence between otolith and water 87 Sr/ 86 Sr by the end of the 113‐day experiment, which was likely due to the dietary contribution of marine‐based feed. Therefore, we were unable to recommend an otolith radius to target for the purposes of reconstructing natal origin apart from being beyond approximately 130 μm.

Chittaro, Paul↗

Scenario development for safety assessment in deep geologic disposal of high-level radioactive waste and spent nuclear fuel: A review

Radiation and radioactive substances result in the production of radioactive wastes which require safe management and disposal to avoid risks to human health and the environment. To ensure permanent safe disposal, the performance of a deep geological repository for radioactive waste is assessed against internationally agreed risk-based standards. Assessing postclosure safety of the future system's evolution includes screening of features, events, and processes (FEPs) relevant to the situation, their subsequent development into scenarios, and finally the development and execution of safety assessment (SA) models. Global FEP catalogs describe important natural and man-made repository system features and identify events and processes that may affect these features into the future. By combining FEPs, many of which are uncertain, different possible future system evolution scenarios are derived. Repository licensing should consider both the reference or “base” evolution as well as alternative futures that may lead to radiation release, pollution, or exposures. Scenarios are used to derive and consider both base and alternative evolutions, often through production of scenario-specific SA models and the recombination of their results into an assessment of the risk of harm. Furthermore, while the FEP-based scenario development process outlined here has evolved somewhat since its development in the 1980s, the fundamental ideas remain unchanged. A spectrum of common approaches is given here (e.g., bottom–up vs. top–down scenario development, probabilistic vs. bounding handling of uncertainty), related to how individual numerical models for possible futures are converted into a determination as to whether the system is safe (i.e., how aleatoric uncertainty and scenarios are integrated through bounding or Monte Carlo approaches).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

vvtools v. 1.0

Vvtools is a suite of testing tools, with a focus on reproducible verification and validation. They are written in pure Python, and contain a test harness and an automated process management tool. Users of vvtools can develop suites of verification and validation tests and run them on small to large high performance computing resources in an automated and reproducible way. The test harness enables complex processes to be performed in each test and even supports a one-level parent/child dependency between tests. It includes a built in capability to manage workloads requiring multiple processors and platforms that use batch queueing systems.

Drake, RichardR.↗

TRU Waste Transportation Plan (Rev. 2)

This plan defines the requirements for managing the transportation of transuranic (TRU) and TRU mixed waste from a generator/storage site to the Waste Isolation Pilot Plant (WIPP) or to another generator/storage site (inter-site). This plan was developed in accordance with Department of Energy (DOE) Order 460.2A, Departmental Materials Transportation and Packaging Management.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LLNL Chronic Beryllium Disease Prevention Program (CBDPP): Implementation of 10 CFR 850, Revision 7

This document describes how Lawrence Livermore National Laboratory (LLNL) meets the requirements and management practices of federal regulation 10 CFR 850, 'Chronic Beryllium Disease Prevention Program (CBDPP).' This revision of the LLNL CBDPP incorporates clarification and editorial changes based on lessons learned from employee discussions, observations and reviews of Department of Energy (DOE) Complex and commercial industry beryllium (Be) safety programs. The information is used to strengthen beryllium safety practices at LLNL, particularly in the areas of: (1) Management of small parts and components; and (2) Communication of program status to employees. Future changes to LLNL beryllium activities and on-going operating experience will be incorporated into the program as described in Section S, 'Performance Feedback.'

99 GENERAL AND MISCELLANEOUS↗

Performance Analysis: Issues Tracking System Data through September 2011

This report presents the results from an analysis of issues and assessments in LLNL’s Issues Tracking System (ITS). The analysis is conducted to identify issues that may require additional management attention and noncompliances that may not have been previously identified that meet the threshold for reporting to the DOE Noncompliance Tracking System (NTS) or to the DOE Safeguards and Security Information Management System (SSIMS).

99 GENERAL AND MISCELLANEOUS↗

Performance Analysis: Issues Tracking System Data through June 2012

This report presents the results from an analysis of issues and assessments in LLNL’s Issues Tracking System (ITS). The analysis is conducted to identify issues that may require additional management attention and noncompliances that may not have been previously identified that meet the threshold for reporting to the DOE Noncompliance Tracking System (NTS) or to the DOE Safeguards and Security Information Management System (SSIMS).

99 GENERAL AND MISCELLANEOUS↗

Fielding the magnetically applied pressure-shear technique on the Z accelerator (completion report for MRT 4519).

The recently developed Magnetically Applied Pressure-Shear (MAPS) experimental technique to measure material shear strength at high pressures on magneto-hydrodynamic (MHD) drive pulsed power platforms was fielded on August 16, 2013 on shot Z2544 utilizing hardware set A0283A. Several technical and engineering challenges were overcome in the process leading to the attempt to measure the dynamic strength of NNSA Ta at 50 GPa. The MAPS technique relies on the ability to apply an external magnetic field properly aligned and time correlated with the MHD pulse. The load design had to be modified to accommodate the external field coils and additional support was required to manage stresses from the pulsed magnets. Further, this represents the first time transverse velocity interferometry has been applied to diagnose a shot at Z. All subsystems performed well with only minor issues related to the new feed design which can be easily addressed by modifying the current pulse shape. Despite the success of each new component, the experiment failed to measure strength in the samples due to spallation failure, most likely in the diamond anvils. To address this issue, hydrocode simulations are being used to evaluate a modified design using LiF windows to minimize tension in the diamond and prevent spall. Another option to eliminate the diamond material from the experiment is also being investigated.

Alexander, C. Scott↗

Performance Analysis: ITS Data through March 30, 2010

Data from ITS was analyzed to understand the issues at LLNL, to identify issues that may require additional management attention, to id entify noncompliances that meet the threshold for reporting to the DOE Noncompliance Tracking System (NTS) or to the DOE Safeguards and Security Information Management System (SSIMS). In this report we d iscuss assessments and issues entered in ITS and compare the number and type p resently entered in ITS to p revious time periods. Issues reported in ITS are evaluated and d iscussed. The results of the issue analysis are summarized in the table below. The analysis did identify one nuclear safety noncompliance that meets the threshold for reporting to the DOE NTS.

99 GENERAL AND MISCELLANEOUS↗

Performance Analysis: Issues Tracking System Data through June 2013

This report presents the results from an analysis of issues and assessments in LLNL’s Issues Tracking System (ITS). The analysis is conducted to identify issues that may require additional management attention and noncompliances that may not have been previously identified that meet the threshold for reporting to the DOE Noncompliance Tracking System (NTS) or to the DOE Safeguards and Security Information Management System (SSIMS). This report includes ITS data within the DOE Office of Enforcement regulated subjects through June 2013. The analysis in this report primarily focuses on deficiencies identified in the last twelve months. The analysis of issues concluded that data for 17 of the 25 Office of Enforcement regulated safety/security subjects were within expected variation. The data for eight met a common test and were discussed further. Three of the eight safety subjects met an action limit and were analyzed to resolution. Analysis of data from one of the safety subjects where a common test was met identified a potential safety related significant or programmatic (systemic) noncompliance with the LLNL work planning and control process. Additional analysis is needed to make a final determination. Note: Since the analysis of WPC deficiencies (through June 2013) was completed, a noncompliance evaluation was also completed in November 2013 and included more recent WPC deficiencies. The analysis of ITS data through June 2013, and the results of the noncompliance evaluation completed in November 2013 led to LLNL filing a programmatic noncompliance report to the NTS in January 2014 titled, Programmatic noncompliance with topical areas within LLNL’s Work Planning and Control process.

99 GENERAL AND MISCELLANEOUS↗

Idaho National Laboratory Emergency Readiness Assurance Plan - Fiscal Year 2015

Department of Energy Order 151.1C, Comprehensive Emergency Management System requires that each Department of Energy field element documents readiness assurance activities, addressing emergency response planning and preparedness. Battelle Energy Alliance, LLC, as prime contractor at the Idaho National Laboratory (INL), has compiled this Emergency Readiness Assurance Plan to provide this assurance to the Department of Energy Idaho Operations Office. Stated emergency capabilities at the INL are sufficient to implement emergency plans. Summary tables augment descriptive paragraphs to provide easy access to data. Additionally, the plan furnishes budgeting, personnel, and planning forecasts for the next 5 years.

99 GENERAL AND MISCELLANEOUS↗

Completion Report for Well ER-2-2 Corrective Action Unit 97: Yucca Flat/Climax Mine

Well ER-2-2 was drilled for the U.S. Department of Energy, Nevada National Security Administration Nevada Field Office in support of the Underground Test Area (UGTA) Activity. The well was drilled from January 17 to February 8, 2016, as part of the Corrective Action Investigation Plan (CAIP) for Corrective Action Unit 97: Yucca Flat/Climax Mine, Nevada Test Site, Nevada. The primary purpose of the well was to collect hydrogeologic data to evaluate uncertainty in the flow and transport conceptual model and its contamination boundary forecasts, and to detect radionuclides in groundwater from the CALABASH (U2av) underground test. Well ER-2-2 was not completed as planned due to borehole stability problems. As completed, the well includes a piezometer (p1) to 582 meters (m) (1,909 feet [ft]) below ground surface (bgs) installed in the Timber Mountain lower vitric-tuff aquifer (TMLVTA) and a 12.25-inch (in.) diameter open borehole to 836 m (2,743 ft) bgs in the Lower tuff confining unit (LTCU). A 13.375-in. diameter carbon-steel casing is installed from the surface to a depth of 607 m (1,990 ft) bgs. Data collected during borehole construction include composite drill cutting samples collected every 3.0 m (10 ft), geophysical logs to a depth of 672.4 m (2,206 ft) bgs, water-quality measurements (including tritium), water-level measurements, and slug test data. The well penetrated 384.05 m (1,260 ft) of Quaternary alluvium, 541.93 m (1,778 ft) of Tertiary Volcanics (Tv) rocks, and 127.71 m (419 ft) of Paleozoic carbonates. The stratigraphy and lithology were generally as expected. However, several of the stratigraphic units were significantly thicker then predicted—principally, the Tunnel formation (Tn), which had been predicted to be 30 m (100 ft) thick; the actual thickness of this unit was 268.22 m (880 ft). Fluid depths were measured in the borehole during drilling as follows: (1) in the piezometer (p1) at 552.15 m (1,811.53 ft) bgs and (2) in the main casing (m1) at 551.69 m (1,810.01 ft) bgs. As expected, field measurements for tritium were above the Safe Drinking Water Act limit (20,000 picocuries per liter). All Fluid Management Plan requirements were met.

54 ENVIRONMENTAL SCIENCES↗

TA-55 Glovebox Safety Program

This Requirements Document (RD) outlines the requirements for managing health and safety concerns associated with gloveboxes and glovebox work.

61 RADIATION PROTECTION AND DOSIMETRY↗

Completion Report for Well ER-2-2 Corrective Action Unit 97: Yucca Flat/Climax Mine, Revision 1

Well ER-2-2 was drilled for the U.S. Department of Energy, Nevada National Security Administration Nevada Field Office in support of the Underground Test Area (UGTA) Activity. The well was drilled from January 17 to February 8, 2016, as part of the Corrective Action Investigation Plan (CAIP) for Corrective Action Unit 97: Yucca Flat/Climax Mine, Nevada Test Site, Nevada. The primary purpose of the well was to collect hydrogeologic data to evaluate uncertainty in the flow and transport conceptual model and its contamination boundary forecasts, and to detect radionuclides in groundwater from the CALABASH (U2av) underground test. Well ER-2-2 was not completed as planned due to borehole stability problems. As completed, the well includes a piezometer (p1) to 582 meters (m) (1,909 feet [ft]) below ground surface (bgs) installed in the Timber Mountain lower vitric-tuff aquifer (TMLVTA) and a 12.25-inch (in.) diameter open borehole to 836 m (2,743 ft) bgs in the Lower tuff confining unit (LTCU). A 13.375-in. diameter carbon-steel casing is installed from the surface to a depth of 607 m (1,990 ft) bgs. Data collected during borehole construction include composite drill cutting samples collected every 3.0 m (10 ft), geophysical logs to a depth of 672.4 m (2,206 ft) bgs, water-quality measurements (including tritium), water-level measurements, and slug test data. The well penetrated 384.05 m (1,260 ft) of Quaternary alluvium, 541.93 m (1,778 ft) of Tertiary Volcanics (Tv) rocks, and 127.71 m (419 ft) of Paleozoic carbonates. The stratigraphy and lithology were generally as expected. However, several of the stratigraphic units were significantly thicker then predicted—principally, the Tunnel formation (Tn), which had been predicted to be 30 m (100 ft) thick; the actual thickness of this unit was 268.22 m (880 ft). Fluid depths were measured in the borehole during drilling as follows: (1) in the piezometer (p1) at 552.15 m (1,811.53 ft) bgs and (2) in the main casing (m1) at 551.69 m (1,810.01 ft) bgs. As expected, field measurements for tritium were above the Safe Drinking Water Act limit (20,000 picocuries per liter) for a portion of the Tertiary volcanic section near the water table. Tritium concentrations were at or near the field detection limit in the Lower carbonate aquifer (LCA) while drilling. During drilling, a sample was collected while circulating in the LCA. The sample was submitted for off-site laboratory analysis. The sample results indicated low but measurable tritium concentrations. All Fluid Management Plan requirements were met during drilling activities.

54 ENVIRONMENTAL SCIENCES↗

Development of ITM Oxygen Technology for Low-cost and Low-emission Gasification and Other Industrial Applications

Air Products carried out a scope of work under DOE Award No. DE-FE0012065 “Development of ITM Oxygen Technology for Low-cost and Low-emission Gasification and Other Industrial Applications” with subcontractors Ceramatec, Penn State, and WorleyParsons. The scope of work under this award was aimed at furthering the development of the Ion Transport Membrane (ITM) Oxygen production process toward a demonstration-scale facility known as the Oxygen Development Facility (ODF). Specific activities will help to enable design and construction of the ODF through advancement of a number of challenging technical elements that are required to manage risk in the initial deployment of ITM technology. Major objectives of the work included developing ITM Oxygen ceramic membrane materials with improved performance and reliability, optimizing ceramic module geometry and fabrication methods, testing module performance, trialing the improved fabrication process at commercial scale in the Ceramic Membrane Module Fabrication Facility (CerFab), and advancing engineering development of the ITM oxygen production process, including vessel design and contaminant control measures to prepare for deployment of the ODF. The comprehensive report that follows details the team’s work, which includes several notable accomplishments: 1) compressive creep, a likely limiter of ceramic module lifetime in service, was demonstrated to be retarded by an order of magnitude by changes in material formulation, module joining dimensions, and internal wafer geometry; 2) two promising new materials were shown to be superior to the incumbent ITM material in a key material parameter related to oxygen flux; 3) module degradation mechanisms were identified following operation in large pilot-scale equipment; 4) options for utilizing ITM in a coal-to-liquids (CTL) facility to enable liquids production with carbon capture were identified and studied; and 5) the benefits of potential improvements to the technology were assessed for their cost impact on ITM Oxygen applications to clean power, fuels, and other applications.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Development of ITM Oxygen Technology for Low-cost and Low-emission Gasification and Other Industrial Applications

Air Products carried out a scope of work under DOE Award No. DE-FE0012065 “Development of ITM Oxygen Technology for Low-cost and Low-emission Gasification and Other Industrial Applications” with subcontractors Ceramatec, Penn State, and WorleyParsons. The scope of work under this award was aimed at furthering the development of the Ion Transport Membrane (ITM) Oxygen production process toward a demonstration-scale facility known as the Oxygen Development Facility (ODF). Specific activities will help to enable design and construction of the ODF through advancement of a number of challenging technical elements that are required to manage risk in the initial deployment of ITM technology. Major objectives of the work included developing ITM Oxygen ceramic membrane materials with improved performance and reliability, optimizing ceramic module geometry and fabrication methods, testing module performance, trialing the improved fabrication process at commercial scale in the Ceramic Membrane Module Fabrication Facility (CerFab), and advancing engineering development of the ITM oxygen production process, including vessel design and contaminant control measures to prepare for deployment of the ODF. The comprehensive report that follows details the team’s work, which includes several notable accomplishments: 1) compressive creep, a likely limiter of ceramic module lifetime in service, was demonstrated to be retarded by an order of magnitude by changes in material formulation, module joining dimensions, and internal wafer geometry; 2) two promising new materials were shown to be superior to the incumbent ITM material in a key material parameter related to oxygen flux; 3) module degradation mechanisms were identified following operation in large pilot-scale equipment; 4) options for utilizing ITM in a coal-to-liquids (CTL) facility to enable liquids production with carbon capture were identified and studied; and 5) the benefits of potential improvements to the technology were assessed for their cost impact on ITM Oxygen applications to clean power, fuels, and other applications.

42 ENGINEERING↗