Engineering Papers⌕ Search

DOE OSTI · 1132021

Performance Analysis: Issues Tracking System Data through June 2013

Abstract

This report presents the results from an analysis of issues and assessments in LLNL’s Issues Tracking System (ITS). The analysis is conducted to identify issues that may require additional management attention and noncompliances that may not have been previously identified that meet the threshold for reporting to the DOE Noncompliance Tracking System (NTS) or to the DOE Safeguards and Security Information Management System (SSIMS). This report includes ITS data within the DOE Office of Enforcement regulated subjects through June 2013. The analysis in this report primarily focuses on deficiencies identified in the last twelve months. The analysis of issues concluded that data for 17 of the 25 Office of Enforcement regulated safety/security subjects were within expected variation. The data for eight met a common test and were discussed further. Three of the eight safety subjects met an action limit and were analyzed to resolution. Analysis of data from one of the safety subjects where a common test was met identified a potential safety related significant or programmatic (systemic) noncompliance with the LLNL work planning and control process. Additional analysis is needed to make a final determination. Note: Since the analysis of WPC deficiencies (through June 2013) was completed, a noncompliance evaluation was also completed in November 2013 and included more recent WPC deficiencies. The analysis of ITS data through June 2013, and the results of the noncompliance evaluation completed in November 2013 led to LLNL filing a programmatic noncompliance report to the NTS in January 2014 titled, Programmatic noncompliance with topical areas within LLNL’s Work Planning and Control process.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Kerr, C., McTyer, N., Holman, G., De Grange, C.. 2014-03-01. Performance Analysis: Issues Tracking System Data through June 2013. https://doi.org/10.2172/1132021

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Fire Protection Design

The purpose of this project is to design the demolition and installation of a deluge valve swap from a DV-5 to a DV-5A valve.

99 GENERAL AND MISCELLANEOUS↗