Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “data quality”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Eastern North Atlantic (ENA) Aerosol Supplementary Site (S1) Data Analysis Report

We present strategies to identify time periods when local aerosol sources impact the data collected at the U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) user facility in the Eastern North Atlantic (ENA). Data from the aerosol observing system (AOS) at the Central Facility and a temporary aerosol Supplementary Site (S1) were evaluated. S1 instrumentation was deployed within 0.75 km of the ENA Central Facility (C1) for approximately one year. Two time periods, one during the summer and one during the winter, were examined in support of the Aerosol and Cloud Experiments in the Eastern North Atlantic (ACE-ENA) intensive operating periods (IOPs) in 2017 and 2018. As the criteria for identifying regionally representative data varies based on the specific needs of the user, we present and discuss different strategies using measured aerosol properties and their associated meteorological parameters to isolate periods in AOS data that were impacted by local aerosol at ENA. We identify high-concentration aerosol events at ENA using submicron number concentrations, size distributions, high-time-resolution measurements, and diurnal profiles. An improved understanding of local aerosol to select the optimal aerosol mask was obtained with an understanding of local meteorology during the different seasons. We developed a mathematical algorithm that employs AOS data to mask high-concentration aerosol events at ENA. We validated the ENA Aerosol Mask with aerosol data from C1 and S1 and associated meteorological data. The Supplementary Site was ideal to understand and constrain local aerosol sources within the region. In its absence, collocated data from the ENA AOS could be used to select appropriate parameters to develop an aerosol mask that would limit over- or underestimating the regional baseline aerosol data. When available, associated metadata, such as airport flight logs and visual identification with AOS cameras should also be used to validate the application of an aerosol mask at a new site. Our results confirm the importance of optimizing an aerosol mask prior its application. In the future, the application of an aerosol mask at ARM observatories and during mobile deployments could be used to increase the data quality of continuous AOS data and to reduce uncertainties when parameterizing regional aerosol processes and impacts on clouds for incorporation in models.

54 ENVIRONMENTAL SCIENCES↗

Building 151 NNMA Clean Laboratory Project Soil Sampling and Analysis Plan

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Function Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Building 151 NNMA Clean Laboratory Project (project) located immediately south of Building 154. The purpose of the SAP was to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction in accordance with Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL, 2022), which is consistent with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA, 2006). The SAP was developed in accordance with the SSMP and based on preliminary design information provided to EFA by PMO. In addition to environmental samples, geotechnical samples will be collected by Consolidated Engineering Laboratories (CEL) on behalf of PMO. Geotechnical samples will be collected from a dedicated geotechnical boring location or co-located with environmental samples. Collection of geotechnical samples is determined by CEL and is therefore not discussed in this SAP.

54 ENVIRONMENTAL SCIENCES↗

Lawrence Livermore National Laboratory Experimental Test Site 300 (Site 300): Site 300 Roadway Improvements - Chem Mag Loop Soil Sampling and Analysis Plan (May 2023)

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Function Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Roadway Improvements Project at the Chem Mag Loop (project). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on preliminary design information provided to EFA by PMO.

54 ENVIRONMENTAL SCIENCES↗

Lawrence Livermore National Laboratory Experimental Test Site 300 (S300): S300 Roadway Improvements - 817 Complex Soil Sampling and Analysis Plan (May 2023)

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Function Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Roadway Improvements Project at the 817 Complex (project). The purpose of the SAP was to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction in accordance with Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was developed in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The SAP was developed in accordance with the SSMP and based on preliminary design information provided to EFA by PMO.

54 ENVIRONMENTAL SCIENCES↗

Building 438 Drainage Channel Soil Sampling and Analysis Plan (February 2023)

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Function Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Building 438 Drainage Channel Project (project) located near Building 438 (B438) in the southern portion, Building 433 (B433) in the middle portion, and Building 543 (B543) in the northern portion (project area as shown on Figure 1). The purpose of the SAP was to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction in accordance with Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which is consistent with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006). The SAP was developed in accordance with the SSMP and based on preliminary design information provided to EFA by PMO.

54 ENVIRONMENTAL SCIENCES↗

Lawrence Livermore National Laboratory Experimental Test Site 300 (Site 300): Site 300 Roadway Improvements - 836 Complex Soil Sampling and Analysis Plan (May 2023)

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Functional Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Roadway Improvements Project at the 836 Complex (project). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on preliminary design information provided by PMO.

54 ENVIRONMENTAL SCIENCES↗

Lawrence Livermore National Laboratory Experimental Test Site, Site 300: Building 843 Corp Yard Redesign Soil Sampling and Analysis Plan (June 2023)

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Functional Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Building 843 (B843) Corp Yard Redesign project (project). The purpose of the SAP was to identify chemicals of concern, describe the procedures for collection and analysis of environmental samples, and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows the criteria established in Lawrence Livermore National Laboratory’s (LLNL’s) Soils Screening and Management Plan (SSMP) (LLNL 2022), which is consistent with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, U.S. DOD 2000). The scope of this SAP is based on the B843 Corp Yard Redesign drawing set dated December 3, 2021.

54 ENVIRONMENTAL SCIENCES↗

Lawrence Livermore National Laboratory Experimental Test Site, Site 300: S300 Roadway Improvements - 854 Complex Soil Sampling and Analysis Plan (June 2023)

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Functional Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Roadway Improvements Project at the Building 854 Complex (project). The purpose of the SAP was to identify chemicals of concern, describe the procedures for collection and analysis of environmental samples, and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on preliminary design information provided by PMO.

54 ENVIRONMENTAL SCIENCES↗

Lawrence Livermore National Laboratory Livermore Site: 4200 Block Development Project Soil Sampling and Analysis Plan (June 2023)

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Function Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Maintenance Shop Facility in the 4200 Block (project). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on design information provided by PMO.

54 ENVIRONMENTAL SCIENCES↗

Site 300 Roadway Improvements - 834 Complex Soil Sampling and Analysis Plan

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Functional Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Roadway Improvements Project at the 834 Complex (project) (Figure 1). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on preliminary design information provided by PMO.

54 ENVIRONMENTAL SCIENCES↗

Building 871 and 874 Retaining Wall Project Soil Sampling and Analysis Plan

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Functional Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed retaining wall near Buildings 871 and 874 (project) (Figure 1). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on preliminary design information provided by PMO.

54 ENVIRONMENTAL SCIENCES↗

CACTI Radar b1 Processing: Corrections, Calibrations, and Processing Report

The U.S. Department of Energy’s (DOE) Atmospheric Radiation Measurement (ARM) user facility deployed a large number of instruments to a region nearby the Sierra de Córdobas mountains in Argentina as part of the Cloud, Aerosol, and Complex Terrain Interactions (CACTI) field campaign (1). During this campaign, four radars were installed at a site outside of Villa Yacanto as shown in Figure 1. As part of a post-campaign effort to improve the usability of these data, a significant activity was undertaken towards the calibration, correction, and improvement of the data quality of these radar datastreams. This process in ARM nomenclature is referred to as generating a “b1” datastream. While these “b1” standards may imply different corrections or standards for various ARM instruments, for radars it refers to a datastream that has been calibrated (and cross-calibrated), including a serious effort to deliver the highest-quality (well-characterized) data possible. This report details (i) the status/quality of the original “a1” (raw) data, (ii) the corrections and calibrations that are applied to generate these b1 datastreams, (iii) the details of the applied algorithms and how radar offset/calibration numbers were determined for the eventual corrections, and (iv) the new and flexible plug-in-based processing system designed during CACTI for radar b1 activities (current, future) that interfaces with ARM’s Data Integrator (ADI) and high-performance computing (HPC) system.

47 OTHER INSTRUMENTATION↗

The Dark Energy Bedrock All-sky Supernova Program: Motivation, Design, Implementation, and Preliminary Data Release

Precise measurements of Type Ia supernovae (SNe Ia) at low redshifts (z) serve as one of the most viable keys to unlocking our understanding of cosmic expansion, isotropy, and growth of structure. The Dark Energy Bedrock All-Sky Supernovae (DEBASS) program will deliver a uniformly calibrated low-z dataset of more than 400 spectroscopically confirmed SNe Ia in the Southern Hemisphere. DEBASS utilizes the Dark Energy Camera to image supernovae in conjunction with the Wide-Field Spectrograph to gather comprehensive host-galaxy information. By using the same photometric instrument as both the Dark Energy Survey (DES) and the DECam Local Volume Exploration Survey, DEBASS not only benefits from a robust photometric pipeline and well-calibrated images across the Southern sky, but can replace the historic and external low-z samples that were used in the final DES supernova analysis. In this paper, along with a companion paper, we present an early data release of 77 DEBASS SNe within the DES footprint. We introduce the DEBASS program, discuss its scientific goals and the advantages it offers for supernova cosmology, and present our initial results demonstrating data quality. With this early data release, we find a robust median absolute standard deviation of Hubble diagram residuals of ∼0.10 mag and an initial measurement of the host-galaxy mass step of 0.06 ± 0.04 mag, both before performing bias corrections. This low scatter shows the promise of a low-z SN Ia program with a well-calibrated telescope and high signal-to-noise ratio across multiple bands.

Sherman, Nora F. [Boston U.] (ORCID:00000001539901↗

A Single-Feature Machine Learning Method for Detecting Multiple Types of Events from PMU Data

This paper describes simple and efficient machine learning (ML) methods for efficiently detecting multiple types of power system events captured by PMUs scarcely placed in a large power grid. It uses a single feature from each PMU based on a rectangle area enclosing the event in a given data window. This single feature is sufficient to enable commonly used ML models to detect different types of events quickly and accurately. The feature is used by five ML models on four different data-window sizes. The results indicated a tradeoff between the execution speed and detection accuracy in variety of data-window size choices. The proposed method is insensitive to most data quality issues typical for data from field PMUs, and thus it does not require major data cleansing efforts prior to feature extraction.

Dokic, Tatjana↗

Regulator Interface Strategies Implemented at the Y-12 National Security Complex Old Salvage Yard Soils Remediation Project, Oak Ridge, TN - 12162

The Oak Ridge Y-12 National Security Complex housed an area known as the Old Salvage Yard (OSY) that was approximately 7 acres. The OSY was used as an area for the accumulation, processing and storage of scrap metal and equipment from Y-12 operations extending from 1968 until 2009. Areas in the northern sections of OSY also have been used for the storage of used oils containing solvents and the accumulation and recycling or de-heading and crushing of 55-gal metal drums. Scrap metal operations historically involved the accumulation, sorting, storage, public sale or disposal of scrap metal and equipment. Non-containerised storage of scrap metal was routine until 1995 when scrap metal received at OSY was placed in B-24 and B-25 boxes. Under the American Recovery and Reinvestment Act (ARRA), approximately 26,759 cubic meters of scrap metal and debris were removed and disposed at both on and off-site disposal facilities including the on-site, Oak Ridge Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) landfill in 2010 and 2011. This removal action was performed in accordance with a CERCLA Record of Decision (ROD) and a close working relationship with both the U.S. Environmental Protection Agency (EPA) Region IV and Tennessee Department of Environment and Conservation (TDEC). Due to efficiencies and the excellent cooperative relationship forged with EPA Region IV and TDEC for Y-12 ARRA Cleanup Projects, a surplus of funding was available for additional remediation work that was completed in fiscal year (FY) 2011. The underlying OSY soils were targeted for characterization and potential remediation. To expedite these important activities, the U.S. Department of Energy Oak Ridge Environmental Management partnered with the regulators during detailed planning sessions through a variety of means to quickly and efficiently characterize and pinpoint areas requiring remediation according to previous ROD commitments. Data Quality Objectives (DQOs), data-sharing, real-time characterization reporting, surface and groundwater modeling and other interface planning activities were utilized to help facilitate and complete characterization and remediation activities. As a result of these strategies, the surgical extraction of one contiguous area of soil approximately 354 cubic meters is planned for FY12. The strategies discussed resulted in a major reduction of footprint remediation (i.e., 2.8% of the original estimate) which was originally estimated at over 26,759 cubic meters. The original estimate was developed using historical data collected at various times over the period of 20 years. By leveraging a hybrid sampling approach that involved both statistically-based and biased sampling locations, the area of contamination was significantly reduced resulting in both a compliant remedial design that is cost effective while mitigating a principle threat sources to surface and groundwater at the Y-12 plant. One remedial action boundary of 354 cubic meters was verified in the northern section of the Western OSY area known as the old drum de-header station for VOCs. The original estimate for disposal was in excess of 26,759 cubic meters. This area is scheduled for waste characterization and profile development in the first half of fiscal year 2012. The anticipated disposal facility is an on-site Oak Ridge CERCLA disposal landfill known as the Environmental Management Waste Management Facility (EMWMF). By utilizing the careful strategic planning, field-based screening and close cooperation of regulatory stakeholders as detailed in this paper, the total area of soil requiring remedial action within the Y-12 OSY footprint was 354 cubic meters or 2.8% of the original planned estimate. A potential waste reduction of 97.2% was realized over the original planned estimate for OSY Soils. Significant cost savings were achieved by - Minimizing the footprint of the remedial action; - Confirmatory analysis of soils instead of use of historical sampling results for waste profile development; - Targeting traditional laboratory analysis for soils that failed field screen protocols for radionuclides, heavy metals and VOCs; - Providing accurate and precise definition of RABs; and - Reduction of target contaminants for focused laboratory analysis instead of broad-range contaminants. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗