Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites

A preliminary evaluation of removing spent nuclear fuel (SNF) from 13 shutdown nuclear power plant sites was performed. At these shutdown sites the nuclear power reactors have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The shutdown sites were Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, San Onofre, and Vermont Yankee. The evaluation was divided into four components: Characterization of the SNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory A description of the on-site infrastructure at the shutdown sites An evaluation of the near-site transportation infrastructure and transportation experience at the shutdown sites An evaluation of the actions necessary to prepare for and remove SNF and GTCC waste. The primary sources for the inventory of SNF and GTCC waste were the U.S. Department of Energy (DOE) spent nuclear fuel inventory database, industry publications such as StoreFUEL, and government sources such as the U.S. Nuclear Regulatory Commission. The primary sources for information on the conditions of on-site infrastructure and near-site transportation infrastructure and experience included information collected during site visits, information provided by managers at the shutdown sites, Facility Interface Data Sheets compiled for DOE in 2005, Services Planning Documents prepared for DOE in 1993 and 1994, industry publications such as Radwaste Solutions, and Google Earth. State staff, State Regional Group representatives, a Tribal representative, and a Federal Railroad Administration representative have participated in nine of the shutdown site visits. Every shutdown site was found to have at least one off-site transportation mode option for removing its SNF and GTCC waste; some have multiple options. Experience removing large components during reactor decommissioning provided an important source of information used to identify the transportation mode options for the sites. Especially important in conducting the evaluation were site visits, through which information was obtained that would not have been available otherwise. Extensive photographs taken during the site visits proved to be particularly useful in documenting the current conditions at or near the sites. Additional conclusions from this evaluation include: The 13 shutdown sites use designs from 4 different suppliers involving 11 different (horizontal and vertical) dry storage systems that would require the use of 9 different transportation cask designs to remove the SNF and GTCC waste from the shutdown sites. Although some changes to transportation certificates of compliance will be required, the SNF at the initial 9 shutdown sites (Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, and Zion) is in dual purpose dry storage canisters that can be transported, including a small amount of high-burnup fuel. Most sites indicated that 2-3 years of advance time would be required for its preparations before shipments could begin. Some sites could be ready in less time. As additional sites such as Fort Calhoun, Clinton, Quad Cities, Pilgrim, Oyster Creek, and Diablo Canyon shut down, these sites will be included in updates to the evaluation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

2016 Idaho National Laboratory Water Use Report and Comprehensive Well Inventory (Revision 25)

This 2016 Idaho National Laboratory Water Use Report and Comprehensive Well Inventory (Revision 25) provides water use information for production and potable water wells at the Idaho National Laboratory Site for Calendar Year 2016. It also provides detailed information for new, modified, and decommissioned wells. Four new wells were drilled and completed in Calendar Year 2016. Five storm water injection wells were decommissioned in Calendar Year 2016. Detailed construction and decommissioning information and location maps for the wells are provided. This report is being submitted in accordance with the Water Rights Agreement between the State of Idaho and the United States, for the United States Department of Energy (dated 1990), the subsequent Partial Decree for Water Right 34-10901 issued June 20, 2003, and the Final Unified Decree issued August 26, 2014.

2016 Water Use Report and Comprehensive Well Inven↗

Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites

A preliminary evaluation of removing spent nuclear fuel (SNF) from 14 shutdown nuclear power plant sites was performed. At these shutdown sites the nuclear power reactors have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The shutdown sites were Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, San Onofre, Vermont Yankee, and Fort Calhoun. The evaluation was divided into four components: (1) characterization of the SNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory, (2) a description of the on-site infrastructure at the shutdown sites, (3) an evaluation of the near-site transportation infrastructure and transportation experience at the shutdown sites, and (4) an evaluation of the actions necessary to prepare for and remove SNF and GTCC waste. The primary sources for the inventory of SNF and GTCC waste were the U.S. Department of Energy (DOE) spent nuclear fuel inventory database, industry publications such as StoreFUEL, and government sources such as the U.S. Nuclear Regulatory Commission. The primary sources for information on the conditions of on-site infrastructure and near-site transportation infrastructure and experience included information collected during site visits, information provided by managers at the shutdown sites, Facility Interface Data Sheets compiled for DOE in 2005, Services Planning Documents prepared for DOE in 1993 and 1994, industry publications such as Radwaste Solutions, and Google Earth. State representatives, State Regional Group representatives, Tribal representatives, and a Federal Railroad Administration representatives have participated in eleven of the shutdown site visits. Every shutdown site was found to have at least one off-site transportation mode option for removing its SNF and GTCC waste; some have multiple options. Experience removing large components during reactor decommissioning provided an important source of information used to identify the transportation mode options for the sites. Especially important in conducting the evaluation were site visits, through which information was obtained that would not have been available otherwise. Extensive photographs taken during the site visits proved to be particularly useful in documenting the current conditions at or near the sites. Additional conclusions from this evaluation include: The 14 shutdown sites use designs from 4 different suppliers involving 11 different (horizontal and vertical) dry storage systems that would require the use of 9 different transportation cask designs to remove the SNF and GTCC waste from the shutdown sites. Although some changes to transportation certificates of compliance will be required, the SNF at the initial 9 shutdown sites (Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, and Zion) is in dual purpose dry storage canisters that can be transported, including a small amount of high-burnup fuel. Most sites indicated that 2-3 years of advance time would be required for its preparations before shipments could begin. Some sites could be ready in less time. As additional sites such as Palisades, Pilgrim, Three Mile Island, Oyster Creek, Indian Point, and Diablo Canyon shut down, these sites will be included in updates to the evaluation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

2020 Idaho National Laboratory Water Use Report and Comprehensive Well Inventory (Rev. 29)

This 2020 Idaho National Laboratory Water Use Report and Comprehensive Well Inventory (Revision 29) provides water use information for production and potable water wells at the Idaho National Laboratory (INL) Site for calendar year 2020. It also provides detailed information for new, modified, and decommissioned wells Two new wells (TRA-2317 and USGS-150) were drilled in 2019 and are included in this report. One well (USGS-147) was modified in 2020. The location maps and detailed construction diagrams are provided.in the appendix. Fifty-six monitoring wells and boreholes were abandoned (decommissioned) in calendar year 2020. The location maps and construction diagrams, if available, for the decommissioned monitoring wells and boreholes are provided in the appendix. This report is being submitted in accordance with the Water Rights Agreement between the State of Idaho and the United States, for the United States Department of Energy (dated 1990), the subsequent Partial Decree for Water Right 34-10901 issued June 20, 2003, and the Final Unified Decree issued August 26, 2014.

99 GENERAL AND MISCELLANEOUS↗

Preliminary Environmental and Financial Viability Analysis of Circular Economy Scenarios for Satisfying PV System Service Lifetime

PV deployment has grown rapidly in recent decades, and this growth is expected to continue. At the same time, the rapid increase in PV panel efficiencies offers the opportunity to repower/revamp existing installations - replacing operational, lower-efficiency panels before the end of their 30-year service lifetime with newer, higher-efficiency panels. As a result, an increasing volume of PV panels could be decommissioned well before reaching the end of their 30-year service lifetime. Two broad strategies can be applied to manage the expected increase in decommissioned PV panels: (i) recycle prematurely decommissioned panels, and (ii) prevent recycling of these panels by satisfying the typical service lifetime of 30 years through circular economy strategies such as repair and reuse. Each strategy presents an environmental and economic trade-off. Retaining and satisfying the lifetime of the older, lower-efficiency panels avoids environmental burdens from recycling or landfilling but incurs burdens from additional repair and forgoing the opportunity to install newer panels with greater electricity-generation capabilities. This study assesses whether satisfying the expected service lifetime of a PV system through circular economy scenarios generates a greater environmental and financial benefit than recycling used panels and installing newer panels with higher efficiencies. The circular economy scenarios include repair and reuse of the PV system. Specifically, the study determines whether it is better for the environment to keep a PV panel in use for its 30-year service life after accounting for potential repair and additional transportation, or to replace older panels with more efficient new ones. In addition, we explore whether satisfying the service lifetime of PV panels proves competitive with the recycling route from a financial perspective.

14 SOLAR ENERGY↗

Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites

In this paper, a preliminary evaluation of removing used nuclear fuel (UNF) from 12 shutdown sites was conducted. Shutdown sites are defined as those commercial nuclear power reactor sites where the nuclear power reactors have been shut down and the site has been decommissioned or is undergoing decommissioning. The shutdown sites were Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, and San Onofre. The evaluation was divided into four components: • characterization of the UNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory • a description of the on-site infrastructure and conditions relevant to transportation activities • an evaluation of the near-site transportation infrastructure and experience relevant to shipping transportation casks containing UNF from the shutdown sites, including gaps in information • an evaluation of the actions necessary to prepare for and remove UNF and GTCC waste from the shutdown sites. The primary sources for the inventory of UNF and GTCC waste are the DOE RW-859 used nuclear fuel inventory database, industry sources such as StoreFUEL and SpentFUEL, and government sources such as the NRC. The primary sources for the information on the site conditions and near-site transportation infrastructure and experience include site visits to the Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, and Zion sites; information provided by managers at the shutdown sites; Facility Interface Data Sheets compiled for DOE in 2005; Services Planning Documents prepared for DOE in 1993 and 1994; industry publications such as Radwaste Solutions; and Google Earth. State and Regional Group representatives, a Tribal representative, and a Federal Railroad Administration representative participated in six of the shutdown site visits. All sites were found to have at least one off-site transportation mode option for removing their UNF and GTCC waste, and some sites have two options. Large component removals during reactor decommissioning provided an important source of information in determining transportation mode options. Especially important in conducting the evaluation were site visits, through which information was obtained that would not have been available otherwise. Extensive photographs taken during the site visits proved to be particularly useful in documenting the current conditions at or near the sites. Additional conclusions from this evaluation include: • Although there are common aspects, each site has some unique features and/or conditions. • The 12 sites use designs from 4 different suppliers, including 9 different (horizontal and vertical) storage systems that would require 8 different transportation cask designs. • Although some regulatory actions will be required, all UNF at the initial 9 shutdown sites (Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, and Zion) is in licensed systems that can be transported, including a small amount of high-burnup fuel. • Each site indicated that 2-3 years of advanced time is required for preparations prior to pick-up. • Most sites have multiple transportation options, e.g., rail, barge, or heavy haul truck, as well as constraints and preferences. It is expected that additional site visits will be conducted to update the information used in the evaluation. Additional sites may be added to the evaluation if further site closures are announced.

shutdown sites, used nuclear fuel, NFST, Nuclear F↗

Considerations for Safeguards Implementation in the Post-Operational Facility Life Cycle

Hundreds of facilities around the world under International Atomic Energy Agency (IAEA) safeguards are currently permanently shutdown or undergoing decommissioning. For facilities in States with a comprehensive safeguards agreement (CSA) in force, safeguards obligations under the CSA extend until the IAEA has determined for safeguards purposes that a facility has been decommissioned (i.e., the IAEA has verified that the nuclear material has been removed and residual structures and equipment essential for its use have been removed or rendered inoperable). The IAEA Department of Safeguards recently issued a report providing high-level guidance to States on IAEA safeguards implementation throughout the post-operational life cycle phases of facilities and locations outside facilities. These phases include permanent shutdown, closed-down, and decommissioned for safeguards purposes. Additional consideration is needed for how post-operational facilities might be consistently evaluated when developing State-level safeguards approaches. This work presents ideas about how the IAEA might implement the State-level concept and associated elements (e.g., State-specific factors) throughout the post-operational life cycle, focusing on maintaining effectiveness and gaining efficiencies where appropriate. Considerations include whether State-specific factors should influence facility status, how a change in a facility’s post-operational status might impact a State’s acquisition path analysis, and how rendering inoperable/removal of essential equipment could affect resources expended on safeguards implementation.

Hogue, Karen↗

A New Consolidated Storage Facility for Used Nuclear Fuel in Andrews County, Texas - 16418

On February 6, 2015, Waste Control Specialists LLC (WCS) announced its plan to file a license application with the U.S. Nuclear Regulatory Commission (NRC) to construct and operate a Consolidated Interim Storage Facility (CISF). Upon issuance of the license, WCS would be authorized to receive Used Nuclear Fuel (UNF) and reactor related Greater Than Class C Low Level Radioactive Waste (referred hence forth as UNF) at the CISF in late 2020. WCS based its decision to license a CISF based on strong support from the State of Texas and the local community's willingness to host such a facility in Andrews County, Texas. WCS' decision to license a CISF in a supportive community is consistent with the consent-based licensing approach recommended by the Blue Ribbon Commission on America's Nuclear Future. WCS intends to use existing technology developed by AREVA and NAC International that have already been approved by the NRC to transport UNF from existing commercial nuclear reactors across the nation for interim storage at its 14,000 acre site in Andrew County, Texas. In the pre-application licensing meetings held with the NRC, WCS underscored that UNF would be removed first from the shutdown decommissioned reactor sites and transported to the CISF. Approximately eighty percent of the UNF currently residing at the shutdown decommissioned reactor sites can be safely placed into the storage systems developed by AREVA and NAC International that are currently licensed by the NRC. WCS plans to store up to 40,000 Metric Tons of Heavy Metal (MTHM) at the CISF that would be constructed in eight phases over the next 20 years. WCS intends to submit its license application for the CISF to the NRC by April 2016. The license application will request authorization to possess up to 5,000 MTHM of UNF for Phase One which can accommodate storing the fuel located at over ten shutdown decommissioned reactor sites. As discussed with the NRC, the license application will be developed following NRC regulatory guidance to comply with the technical requirements specified in Title 10 of the Code of Federal Regulations (CFR) Part 72, Licensing Requirements for the Independent Storage of Spent Nuclear Fuel, High-Level Radioactive Waste, and Reactor-Related Greater Than Class C Waste. In addition, to filing the license application, WCS is also seeking legislative changes to the Nuclear Waste Policy Act of 1982 requiring the U.S. Department of Energy (DOE) to take title of the UNF at the commercial nuclear reactor sites. Under such legislative changes, the DOE would also be responsible for the transport of UNF to the CISF. In addition to preparing the CISF License Application, WCS and its partners AREVA and NAC International are prepared to work with DOE to facilitate the development of the UNF transportation infrastructure in the timeframe needed to support CISF operations. The WCS site and technical approach give it several advantages which uniquely position it to become the first successful commercial CISF in the U.S. These advantages include: broad consent-based support at the local, state, and Congressional level; an operating waste disposal site with an existing transportation infrastructure; and the use of already licensed systems to address 80% of the UNF currently in dry storage at shutdown sites in the U.S. WCS firmly believes this initiative will provide an economically viable option for consolidated interim storage of UNF until a permanent geologic repository becomes available. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Proven Technologies for the Solidification of Complex Liquid Radioactive Waste (LRW): Global Case Studies of Applications and Disposal Options - 20424

Legacy radioactive waste streams from the Cold War still exist and newly generated waste streams from nuclear power plants and research institutes go untreated and expose environmental hazards at many nuclear sites. The nature of the waste is diverse, depending upon the source or the process from which it originated. The most problematic waste streams include complex liquids such as organic (tri-butyl-phosphate TBP) solutions contaminated with Pu and U isotopes, mixed sludge types, high acid radioactive waste, H-3 contaminated organic and aqueous streams, etc. Technological, environmental and economic challenges exist for the treatment and disposal of such waste streams. A proven technology that has been applied to LRW on a global basis provides one option as a low-cost solution to legacy streams and small volume, highly complex LRW frequently found during decommissioning at nuclear power plants and weapons sites. The engineered polymer technology from Nochar, USA, is capable of solidifying standard and highly complex LLW and ILW waste streams for interim or final storage, or for incineration. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application of Information Technologies at the Final Stage of the Lifecycle of Reactor Facilities

The information technologies used at the final lifecycle stage of reactor facilities are reviewed for the purpose of increasing the safety and efficiency of their decommissioning. Databases on decommissioning and radwaste management, computer-aided design systems, multidimensional models, interactive simulation models, knowledge control systems, and communication systems are examined.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Communities in energy transition: exploring best practices and decision support tools to provide equitable outcomes

Abstract The U.S. coal industry has been in a state of decline for the past decade, a trend ushered by flat electricity demand, increased regulatory pressure, and market competition from cost-competitive clean energy sources. The receding economic viability of the coal industry has been acutely felt by the communities with immediate economic ties to coal-fired generation. With the energy transition underway, the question of how to engage communities as stakeholders in the decision-making process and address their needs through an equitable and just transition remains unresolved. To that end, this paper explores the economic, environmental, and social challenges presented by the energy transition at the community level, highlighting four case studies from transitioning coal-dependent communities across the United States to ultimately identify best practices in coal plant decommissioning processes. This paper weaves these community-identified best practices into two support tools—a decommissioning checklist and a redevelopment decision-making framework—that can be used to engage communities in the power plant retirement decision, the site reclamation phase, and eventual redevelopment of the site and revitalization of the surrounding community.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Integrated soft snake robot for gamma spectroscopy of radiologically contaminated ducting

Anticipated growth in the number and complexity of nuclear facilities entering the decommissioning phase of their lifespan requires innovative methods of mitigating radiological and safety hazards for workers. Advancements in robotics provide opportunities for remote characterization of radiologically contaminated ducts and pipes, reducing worker exposure. However, the nuclear decommissioning industry has shown a hesitancy in adopting new technology due to concerns regarding capital costs and a lack of demonstration data in representative environments. This work aims to leverage novel soft robotics to develop and demonstrate a sensor-integrated characterization tool for contaminated ducting systems. Two gamma spectrometers – one scintillation-based and one solid-state – were selected and integrated into a pneumatically-actuated snake-like soft robot using stretchable electronic cabling. The robot was then demonstrated at the Idaho National Laboratory’s Critical Infrastructure Test Range Complex. The robot maneuvered through a pseudo-constrained corridor containing several sealed sources and the integrated spectrometers collected spectra at various points along the path of travel. Both spectrometers successfully collected spectra with identifiable, isotope-specific peaks. To evaluate the effect of contamination buildup on the collected spectra, the robot with the integrated scintillation detector was tested using a liquid radioactive source. The resulting spectra showed little detection interference from the liquid contamination; however, a short-lived isotope was used which may not be representative of longer-lived contamination.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Evaluation on radiation protection aspect and radiological risk at Mukim Belanja repository

Asian Rare Earth (ARE) is a locally incorporated company that operated a mineral processing operation to extract rare earth element. ARE has received much attention from the public since the beginning of their operation until the work of decommissioning and decontamination of the plant. Due to the existence of Naturally Occurring Radioactive Material (NORM) in the residue, the decommissioning and disposal was done by the company in collaboration with the Perak State Government and the Atomic Energy Licensing Board (AELB). The main objective of this study is to review the level of compliance of the existing Radiation Protection Regulations enforced by AELB particularly in the achievement of allowed exposure dose limit. The next objective was to study the impact of the construction of the Mukim Belanja Repository to workers and public. This study was conducted by analyzing documents that were issued and conducting the area monitoring using a Geiger Muller detector (GM) and Sodium Iodide (NaI(Tl)) survey meters. The measurements were made at 5 cm and 1 m from the ground surface at 27 measurement stations. The external doses measured were within the background levels of the surrounding area. The annual effective dose using the highest reading at 5 cm and 1 m from ground surface by GM detector was calculated to be 1.36 mSv/year and 1.21 mSv/year respectively. Whereas the annual effective dose using the highest reading at 5 cm and 1 m from ground surface by using NaI(Tl) detector was calculated to be 3.31 mSv/year and 2.83 mSv/year respectively. The calculated cancer risks from the study showed that the risk is small compared with the risks derived from natural radiation based on global annual radiation dose to humans. This study therefore indicated that the repository is able to constrain the dose exposure from the disposed NORM waste. The study also revealed that the construction of the repository has complied with all the rules and regulations subjected to it. The exposed dose received by the radiation and the public workers during the construction of the repository were below the annual limit i.e. 20 mSv/year and 1mSv/year respectively.

61 RADIATION PROTECTION AND DOSIMETRY↗

Development of evaluation models of manpower needs for dismantling the dry conversion process-related equipment in uranium refining and conversion plant (URCP)

Evaluation models for determining the manpower needs for dismantling various types of equipment in uranium refining and conversion plant (URCP) have been developed. The models are widely applicable to other uranium handling facilities. Additionally, a simplified model was developed for easily and accurately calculating the manpower needs for dismantling dry conversion process-related equipment (DP equipment). It is important to evaluate beforehand project management data such as manpower needs to prepare an optimized decommissioning plan and implement effective dismantling activity. The Japan Atomic Energy Agency (JAEA) has developed the project management data evaluation system for dismantling activities (PRODIA code), which can generate project management data using evaluation models. For preparing an optimized decommissioning plan, these evaluation models should be established based on the type of nuclear facility and actual dismantling data. In URCP, the dry conversion process of reprocessed uranium and others was operated until 1999, and the equipment related to the main process was dismantled from 2008 to 2011. Actual data such as manpower for dismantling were collected during the dismantling activities, and evaluation models were developed using the collected actual data on the basis of equipment classification considering the characteristics of uranium handling facility. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

On evaluation of assessments of accruals of future dismantling costs

A major prerequisite in order for civilian commercial nuclear energy production to qualify as sustainable energy production is that systems for the management of the nuclear waste legacy are in operation. These waste types are present in a range from very low short lived waste (VLLW) to long lived high level waste (HLW) (including the used nuclear fuel). The second prerequisite is that financial responsibilities or other constraints must not be passed on to coming generations. The first condition for qualification corresponds to the Polluters Pays Principle (PPP) which demands that the responsibility for the waste management rests solely with the polluter. The second qualification corresponds to the principle of fairness between generations and thus concerns the appropriate distribution of responsibilities between the generations. It is important to note that these two conditions must be met simultaneously, and that compliance with both is a necessary prerequisite in order for commercial use of nuclear power to qualify as a semi-sustainable energy source. Financial and technical planning for dismantling and decommissioning of nuclear installations cannot be regarded as successful unless it rests upon a distinctive way to describe and explain the well-founded values of different groups of stakeholders. This cumbersome task can be underpinned by transparent and easy to grasp models for calculation and estimation of future environmental liabilities. It essential that a systematic classification is done of all types of costs and that an effort is done to evaluate the precision level in the cost estimates. In this paper, a systematic and transparent way to develop a parametric approach that rest upon basic accounting standards is combined with data about younger stakeholder's values towards decommissioning and dismantling of nuclear installation. The former entity rests upon theoretical and practical methods from business administration, whilst the latter is based on current survey data retrieved from 667 personal interviews in one town in Poland and one town in Slovakia with a near 100 % response rate. The main conclusions from this field study may be summarised as follows: - Sustainable energy sources are prioritised. - Around one quarter of the respondents regards nuclear power as a future semi-sustainable commercial energy production mode subject to that the waste is managed in a sustainable, environmental friendly and safe way - The values are to a significant degree positioned on health, safety and environmental (HSE) attributes. - The polluter pays principle is honoured. - There are doubts regarding the compliance with these principles due to risks for delays in the implementation phase of repositories for disposal of the nuclear residues. - 1/5. of the respondents expressed an openness to reprocessing (which is linked to the concept of 'new nuclear power'). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An overview of the draft for the amendment of 'nuclear materials and radioactive waste management act'

The 'Nuclear Materials and Radioactive Waste Management Act' (NMRWMA) in Taiwan has been in use since 2002. To promote further administrative efficiency and improve regulatory capacity, an amendment of the act has been initiated by the Atomic Energy Council (AEC). It is now being reviewed by outside experts and related communities so as to include the best understanding of risk management factors. For the future decommissioning challenges of nuclear facilities, the act is also being amended to comply with the regulatory requirements of the decommissioning mandates. Currently the Taiwan government is conducting government reorganization, and AEC will be reformed but will remain as an independent regulatory body. AEC will then be capable of improving the regulatory capacity for facilitating licensing and inspection, ensuring operational safety, environmental protection and public involvement, and giving a more flexible administrative discretion, such as expending the margin of penalty. The amendment is also required to provide a formal legal basis for the Nuclear Backend Fund, and to mandate the waste producers to take responsibility for any final debt repayment. In addition, this amendment promotes measures to prevent accidents or emergencies concerning radioactive materials and facilities and procedures to reduce the impact and effect of any unexpected events. Furthermore, this amendment intends to implement the concept of information transparency and public participation so as to meet the public needs. Finally, radioactive waste final disposal tasks have to be completed by waste producers under the supervision of the AEC. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

D and D projects of Tecnubel in Belgium and abroad

Safe decontamination is a regular requirement in the lifecycle of a nuclear plant and is integral to the careful maintenance of any nuclear installation for 4 key reasons: - To decrease the risk of radioactive contamination spreading; - To limit the radioactive doses contracted by maintenance personnel; - To limit the radioactive doses incurred during decommissioning; - To downgrade the class of radioactive waste The primary goal of decommissioning is to remove aged and/or contaminated and/or activated components of an installation, safely and securely, in as short a time as possible. There are several reasons why this may be necessary: - To eliminate the risk of radioactive contamination spreading; - To eliminate the risk of radiation; - To downgrade a site or a circuit to a point where it no longer is submitted to regular inspection; - To remove installations or parts that are no longer in service or have aged There are many different D and D techniques, tools and materials available today. What is important is knowing how best to use them. This paper describes the experiences and the future projects of Tecnubel in D and D projects in Belgium and abroad. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Unique and massive Chernobyl cranes for deconstruction activities in the new safe confinement

On 26 April 1986, the worst nuclear power plant accident in history occurred at the Chernobyl plant in Ukraine (then part of the Soviet Union). The destruction of Unit 4 sent highly radioactive fallout over Belarus, Russia, Ukraine, and Europe. The object shelter-a containment sarcophagus-was built in November 1986 to limit exposure to radiation. However, it has only a planned 25-year lifespan and would probably not survive even a moderate seismic event in a region that has more than its share of such events. It was time to take action. One of the largest tasks that are in progress is the design and construction of the New Safe Confinement (NSC). The NSC is an engineered enclosure for the entire object shelter that includes a suite of process equipment. The process equipment will be used for the dismantling of the destroyed Chernobyl Nuclear Power Plant Unit. One of the major mechanical handling systems to be installed in the new safe confinement is the Main Cranes System. The planned decontamination and decommissioning or dismantling activities will require the handling of heavily shielded waste disposal casks containing nuclear fuel as well as lifting and transporting extremely large structural elements. These activities, to be performed within the new safe confinement, will require large and sophisticated cranes. The article will focus on the current progress of the new safe confinement and of the main cranes system for the decommissioning or dismantling activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗