Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “pumps”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

REopt Lite Geothermal Heat Pump Design Requirements

This document describes the design requirements for the geothermal heat pump (GHP) module being added to the existing REopt Lite web tool. This document describes the purpose, users, and functional requirements to which the modified web tool shall conform. This document will be revised, as required, throughout the development phase with consensus between the Department of Energy (DOE) Geothermal Technologies Office (GTO) and NREL. The GHP module will expand existing REopt Lite capabilities to include techno-economic optimization of GHP systems, either stand alone, or integrated with the other existing technology types, namely solar photovoltaics (PV), wind power, battery energy storage, thermal energy storage, combined hear and power (CHP), and absorption chiller. Included in this submission are links to the REopt Lite web tool and open-source Git-Hub page. The REopt Lite tool can also be accessed directly via the NREL Developer Network. A link is also provided for the REopt report that overviews the module's capabilities.

15 GEOTHERMAL ENERGY↗

TEAMER: Numerical Modeling and Optimization of the iProTech Pitching Inertial Pump (PIP) Wave Energy Converter (WEC)

This project focused on developing an automated workflow to evaluate and optimize the iProTech Pitching Inertial Pump (PIP) wave energy converter (WEC) using open-source Python packages and the MATLAB/Simulink tool, WEC-Sim. The process involved parameterizing key design variables, running time-domain simulations, and performing sensitivity analyses to determine their impact on power output. The workflow, designed for the PIP device, is generalized and can be extended to optimize other WECs that can be simulated in WEC-Sim. This work establishes a foundation for future time-domain-based WEC design optimizations. Included in this submission are all figures from the final report and the model inputs required to generate them. This includes Python scripts with inputs that produce the meshes, boundary element method (BEM) models, hydrodynamic coefficients, and the WEC-Sim models used for time-domain analyses. Although data for every single run is not included to save space, all of it can be reproduced using the provided models. Detailed instructions for setting up the environment and running the codes are also included.

16 TIDAL AND WAVE POWER↗

Enhanced Component Performance Study: Turbine-Driven Pumps 1998–2018

This report presents an enhanced performance evaluation of turbine-driven pumps (TDPs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2018 as reported in the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The TDP failure modes considered are failure to start (FTS), failure to run less than or equal to one hour (FTR≤1H), failure to run more than one hour (FTR>1H), and normally running systems FTS and failure to run (FTR). The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period. A highly statistically significant decreasing trend was identified in the standby TDP unavailability estimates.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Basic Design Layout of a Modular Pumped Hydro Teaching Unit

This work was originally completed in July 2015 as a proposal to Santa Fe Community College (SFCC) for their engineering program and a follow up to a feasibility study completed for the Community College the year earlier as indicated below. The work was ahead of its time and funding was hard to obtain to implement a project. This work is now being formally released for distribution to a wider audience based on the evolving circumstances in greater society that now favor this approach with funding more readily available. Due to the distribution outside of SFCC, specific architectural drawing sets of the pertinent buildings called out in the design have been removed. No changes to the design have been made. The design layout utilizing a building is not meant to limit the implementation of the design. The elevation difference required may be obtained with a building, a small hill, jacking up the upper tank, or similar means. The design presented is a basic design, identifying major components and how they are connected together. The user may change components under their own liability. All local applicable codes and standards must be followed when building an actual unit, under the authority of a responsible engineer or owner. Appropriate measures must be followed to protect people from hazards such as electricity, water pressure, and general construction. A leak test to verify water tightness of the system should be conducted prior to any operations. The vision of this design is to allow a class of 10 to 15 students to construct the assembly within a month or so time period, and then learn to operate the assembly at their school location under the guidance of their instructor. This will allow the students to learn about the practical concept of storing electricity with water, and gain a hands on experience of the real world challenges faced with full Modular Pumped Hydro Projects.

13 HYDRO ENERGY↗

Pumped Storage Hydropower Valuation Guidebook: A Cost-Benefit and Decision Analysis Valuation Framework

As an energy storage technology, pumped storage hydropower (PSH) supports various aspects of power system operations. However, determining the value of PSH plants and their many services and contributions to the system has been a challenge. While there is a general understanding that PSH resources provide many services and benefits for the operation of power systems, estimating the value of these services—and especially the monetary value of some of those services—has been a challenge. The objective of this project, funded by the U.S. Department of Energy’s (DOE’s) Water Power Technologies Office (WPTO), is to advance the state of the art in assessing the value of PSH plants and their contributions to the power system. The specific goal is to develop detailed, step-by-step valuation guidance that PSH developers, plant owners or operators, and other stakeholders can use to assess the value of existing or potential new PSH plants and their services. The specific goals of this project are: (1) to develop comprehensive and transparent valuation guidance that will support consistent valuation assessments and comparisons of PSH projects or project design alternatives, (2) to test the PSH valuation guidance and its underlying methodology by applying it to two selected PSH projects, and (3) to transfer and disseminate the PSH valuation guidance to the hydropower industry, PSH developers, and other stakeholders. The authors believe that the application of a consistent, transparent, and repeatable valuation process will advance valuation assessments and allow stakeholders to compare valuation analyses performed for different PSH projects or design alternatives. It will also increase the acceptance of valuation results and enable better understanding of the true value that PSH technology brings to the grid.

13 HYDRO ENERGY↗

Electrical Systems of Pumped Storage Hydropower Plants: Electrical Generation, Machines, Power Electronics, and Power Systems

Adjustable-speed (AS) pumped storage hydropower (PSH) technology has the potential to become a large, consistent contributor to grid stability enabling higher penetrations of wind and solar energy on the future U.S. power system. AS-PSH has high-value characteristics, such as fast response to provide ancillary services to the grid, because it is a power converter interface with the grid (like battery storage), but at the same time it has the energy content large enough to supply both short-term (seconds-to-minutes) and long-term (minutes-to-hours) of energy needs, like more conventional power plants. However, designs must be optimized to lower the capital expenditure (CapEx) and to provide a high-quality grid interface capability (e.g. power quality, ancillary service provider, fault-tolerant or fault ride-through capability), which is a primary factor in the acceptance of AS-PSH into a utility’s generation mix. This CapEx will be greatly affected by the cost savings associated with the civil structure, turbine design, power electronics, control systems, or unique generator designs. A holistic design must be considered to get a full picture of the benefits of the technology proposed. The AS-PSH can be controlled to reduce the impact of transient disturbance on a power system and at the same time can be controlled to minimized subsequent component fatigue and potential oscillation modes within the plant, with the overall impact in reducing the operational expenditures (OpEx).Generating clean power to meet standards such as Institute of Electrical and Electronics Engineers (IEEE) 519 and International Electrotechnical Commission (IEC) 1000-3-2 will be a continuing challenge. For many technology developers, however, improved AS-PSH technologies will become a key component of generator-storage systems of the future given the prospects of increased performance and decreasing costs, and the ever-increasing penetration of renewables (e.g wind power and solar power).

13 HYDRO ENERGY↗

An Integrated Control Method for Supplemental Minisplit Heat Pumps in Existing Homes

The FSEC Energy Research Center(FSEC) at the University of Central Florida has investigated low-cost space-conditioning upgrade solutions for existing homes since 2014. The retrofits involve installing a modest capacity, centrally located, high efficiency, ductless, minisplit heat pump (MSHP) for use in conjunction with the home’s existing central space conditioning system (CSCS). This type of retrofit targets homes with older but not obsolete CSCSs that have not reached end of life, and presents a more cost-effective option to achieve space conditioning energy savings than outright CSCS replacement. This report describes results from investigating the energy savings potential, given adherence to comfort management, if the control of the MSHP and CSCS were integrated.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Value and Role of Pumped Storage Hydro under High Variable Renewables

A project team, led by GE Research, was tasked by the U.S Department of Energy (DOE) to study the value and role of pumped storage hydro (PSH) under high variable renewables. The study was majority funded by DOE’s Office of Energy Efficiency and Renewable Energy (EERE) through a program managed by EERE’s Water Power Technologies Office. The project team for the study consists of three organizations – GE Research, GE Energy Consulting, and GE Renewables.

13 HYDRO ENERGY↗

Integrated Heat Pump Thermal Storage and Power Cycle for CSP (Final Technical Report)

Pumped thermal energy storage (PTES) is a storage system that stores electricity in thermal reservoirs. In this project, methods of integrating PTES with concentrating solar power (CSP) systems were investigated and their feasibility evaluated. Hybrid "solar-PTES" devices can provide both flexible renewable power generation as well as a variety of electricity storage services. Techno-economic models of PTES and solar-PTES were developed and used to assess their performance, cost, and commercial viability. Systems were optimized using multi-objective optimization techniques. The value that these storage devices provide to the grid was estimated using production cost modelling. Key advances made in this project include the development of detailed techno-economic models that improve state-of-the-art assessments of these technologies. Off-design models were developed and used in grid-analysis models. This work describes for the first time how PTES and solar-PTES behave over a range of operating points and assesses the value that these systems can provide to the electrical grid. Feedback was obtained from experts in the field, which clarified key technological and economic barriers that must be addressed to improve the feasibility of these devices.

14 SOLAR ENERGY↗

A Review of Technology Innovations for Pumped Storage Hydropower

Although pumped storage hydropower (PSH) has been around for many years, the technology is still evolving. At present, many new PSH concepts and technologies are being proposed or actively researched. This study performs a landscape analysis to establish the current state of PSH technology and identify promising new concepts and innovations.

13 HYDRO ENERGY↗

Enhanced Component Performance Study: Turbine-Driven Pumps 1998-2020

This report presents an enhanced performance evaluation of turbine-driven pumps (TDPs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2020 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The TDP failure modes considered for standby systems are fail to start (FTS), fail to run (FTR) for one hour of operation (FTR≤1H), FTR after one hour of operation (FTR>1H), and for normally running systems FTS and FTR. An eight-hour unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period. No increasing trends were identified for TDPs for the most recent 10-year period: The following decreasing trends were identified for TDPs for the most recent 10-year period: • Standby TDP FTR>1H failure rate • Standby TDP unavailability • Standby MDP total unreliability (8-hour mission) • Standby TDP frequency of FTR>1H events (failures per reactor year) • Normally running TDP frequency of start demands (demands per reactor year) • Normally running TDP frequency of run hours (hours per reactor year).

99 GENERAL AND MISCELLANEOUS↗

Enhanced Component Performance Study: Motor-Driven Pumps 1998-2020

This report presents an enhanced performance evaluation of motor-driven pumps (MDPs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2020 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The MDP failure modes considered for standby systems are fail to start (FTS), fail to run (FTR) for one hour of operation (FTR≤1H), FTR after one hour of operation (FTR>1H), and for normally running systems FTS and FTR. An eight-hour unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period. The following increasing trends were identified for MDPs for the most recent 10-year period: • Standby MDP frequency of start demands (demands per reactor year) • Standby MDP frequency of FTR≤1H hours (hours per reactor year) • Standby MDP frequency of FTR>1H hours • Normally running MDP frequency of run hours. The following decreasing trends were identified for MDPs for the most recent 10-year period: • Standby MDP FTR≤1H failure probability • Normally running MDP FTR failure rate • Standby MDP unavailability • Normally running MDP total unreliability (8-hour mission) • Standby MDP frequency of FTR≤1H events (failures per reactor year) • Normally running MDP frequency of FTR events.

99 GENERAL AND MISCELLANEOUS↗

Reservoir Lining for Pumped Storage Hydropower: Scoping Study of Geomembrane Lining Systems

This report summarizes the results of a scoping study performed to research the use of geomembrane lining systems for pumped storage hydropower (PSH) reservoirs. The study consisted of a literature review for pertinent and publicly available information about geomembrane lining materials and their use in dams, reservoirs, and PSH as well as an assessment of the applicability of geomembrane lining systems to PSH reservoirs.

13 HYDRO ENERGY↗

Techno-Economic Studies for Pumped Storage Hydropower (Final CRADA Report)

The research focused on estimating the value of various services and contributions that pumped storage hydropower (PSH) provides to the grid, especially in locations characterized by high penetration of variable renewable energy resources. Under this CRADA, the Participant provided the Contractors with non-proprietary data and information on the proposed Banner Mountain PSH project that describe project’s technoeconomic and environmental characteristics, planned market and business models, and other relevant information necessary to describe the proposed project and its planned operations. The Contractors analyzed this information and performed various technoeconomic studies to estimate the value of different services and contributions that PSH project could provide to the grid. The outcome of this CRADA was a detailed technoeconomic analysis conducted in a comprehensive cost–benefit and decision analysis framework.

13 HYDRO ENERGY↗

The Prospects for Pumped Storage Hydropower in Alaska

Key Takeaways: The resource mapping analysis confirmed that numerous locations in Alaska are suitable for the development of pumped storage hydropower (PSH) projects, both larger grid scale projects and smaller projects that could be suitable for remote communities; The resource assessment for larger, grid-scale projects showed the potential for more than 1,800 closed-loop systems in Alaska, with a total energy storage capacity of about 4 terawatt hours (TWh); Because of their small reservoir sizes and dam heights, many locations were identified as potentially suitable for small-scale PSH systems. Nearly 50% of the identified potentially suitable small-scale PSH sites are in Southeast Alaska; PSH candidate sites were part of the optimal capacity expansion solution in all scenarios analyzed for the Railbelt system. Depending on the scenario, the new PSH capacity that the model selected for the analysis period until 2046 ranged from 300 MW to 600 MW. The locations and timing of new PSH investments vary in different scenarios; Lithium-ion batteries were also selected a source of new generating capacity in all analyzed scenarios for the Railbelt system, indicating that the system will need a mix of short- and long-duration energy storage to support variable renewable energy sources and provide system reliability in the future; For rural communities, analysis results showed that PSH suitability is very site-specific; in addition to diesel fuel costs and PSH capital costs, suitability depends heavily on available renewable resources and existing infrastructure (e.g., reservoirs, transmission access and construction road access); The analysis for rural communities also showed that PSH projects with 10-hour energy storage are likely to be more economical for remote community applications in Alaska than those with larger reservoirs that could provide 10 days of energy storage; Lithium-ion batteries seem to be an economically more viable energy storage option for small, remote communities in Alaska.

13 HYDRO ENERGY↗

High-Temperature Heat Pump Model Documentation and Case Studies

High temperature heat pumps (HTHPs) have the potential to serve two valuable functions in the U.S. industry. First, by valorizing and elevating waste heat streams, HTHPs can improve industrial energy efficiency. Second, by electrifying process heat generation, HTHPs can replace combustion technologies with less carbon-intensive sources of energy and reduce industrial greenhouse gas emissions. In certain applications, the combination of increased efficiency, cost savings, and emissions reduction makes HTHPs a promising component of strategies for industrial electrification and clean energy transition. Researchers at NREL have developed a HTHP model. This model has both a physics-based performance estimation component and an economic evaluation component designed to demonstrate the potential economic competitiveness of HTHPs. This document has three main sections. First, an overview of HTHPs is provided as a literature review of relevant information to provide the reader with state-of-the-art information. Second, a description of the HTHP model is provided along with detailed instructions about how to use the model. Third, case studies are provided to showcase the deployment of the HTHP model.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Enhanced Component Performance Study: Motor Driven Pumps 1998–2022

This report presents an enhanced performance evaluation of motor-driven pumps (MDPs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2022 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The MDP failure modes considered for standby systems are fail to start (FTS), fail to run (FTR) for one hour of operation (FTR=1H), FTR after one hour of operation (FTR>1H), and for normally running systems FTS and FTR. An eight-hour unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period. The following increasing trends were identified for MDPs for the most recent 10-year period: (1) Standby MDP frequency of start demands (demands per reactor year), (2) Standby MDP frequency of FTR=1H hours (hours per reactor year), (3) Standby MDP frequency of FTR>1H hours, and (4) Normally running MDP frequency of run hours. The following decreasing trends were identified for MDPs for the most recent 10-year period: (1) Standby MDP FTR=1H failure probability, (2) Normally running MDP FTR failure rate, (3) Standby MDP unavailability, (4) Standby MDP total unreliability (8-hour mission), and (5) Normally running MDP total unreliability (8-hour mission).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗