Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Federal Energy Management Program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

The OpenEfficiency Initiative: Piloting an open source solution to overcome market barriers to commercial energy savings

The OpenEfficiency Initiative supported the deployment of federal energy efficiency tools and data standards into energy efficiency programs operated by utilities and local governments, with the goal of reducing the cost and improving the savings performance of whole buildings programs. Over more than three years, the effort supported a range of pilots testing the integration of these tools into a range of energy efficiency program types. The effort also produced a set of open source tools that can be used to support program management.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Future Transition of WIPP from EM to Another DOE Office - 19256

The U. S. Department of Energy (DOE) Carlsbad Field Office (CBFO) has a primary mission to assist federal government entities disposition transuranic (TRU) radioactive waste. The main resource for disposition is the deep geologic repository known as the Waste Isolation Pilot Plant (WIPP). Other resources include a complete transportation system and a program that assists in the certification and shipment of TRU waste to WIPP known as the National TRU Program (NTP). All of these resources are managed by CBFO, which currently is part of the DOE Environmental Management (EM) program. EM's primary mission for DOE is to clean up the legacy remaining from many years of nuclear weapons research and production. But, CBFO estimates the need for WIPP and NTP will continue beyond the mission of EM and will assist other entities such as the National Nuclear Security Administration (NNSA), the Office of Science (OS) and the Navy. As the inventory of legacy TRU waste is reduced, the inventory of new TRU waste will continue from ongoing missions. So, over the life span of WIPP the primary customers of CBFO will shift from legacy EM sites to newly-generated TRU waste sites. And, somewhere along the way CBFO estimates that it will transition, primarily from an EM support (legacy waste) entity to a primarily a NNSA support (newly-generated waste) entity to facilitate ongoing DOE missions. This paper will address the need for that change at a programmatic level and will include some ideas for conceptual planning for such a transition. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Module-OT: A Turnkey Solution for Securing Energy Systems

The Modular Security Apparatus for Managing Distributed Cryptography for Command-and-Control Messages on Operational Technology Networks (Module-OT) is a flexible and lightweight solution for grid-edge devices focusing on end-to-end security. It is a bump- in- the-wire solution acting as a secure conduit for data between devices or systems across a network. It improves the cybersecurity posture of DER systems by providing authentication, authorization, and data integrity to secure DER communications. Additionally, it performs key management, provides data security through whitelisting Internet Protocol addresses and ports, blocks unauthorized connections, controls user access, and allows serial or Ethernet connections for added flexibility. The core software is portable to various Linux-based operating systems and is developed to be customized by the developer and researcher communities. Module-OT has been validated in the lab, has been demonstrated at a 500-KW PV-plus-storage site, and has been proven ready to secure operational technology devices. Its core functionality meets current standards, including validation procedures of the NIST Cryptographic Algorithm Validation Program (CAVP) and the Federal Information Processing Standard (FIPS 140-2). Because of its capability to provide an accessible and affordable option for stepping up security across modern energy systems, Module-OT can serve as an effective technological option to standardize cybersecurity moving forward.

cryptography↗

Managing Climate-Driven Zoonotic Risk Interagency Workshop Report

In July 2022, Sandia National Laboratories hosted a workshop in Washington, D.C., bringing together representatives from eleven Federal Government agencies, responsible for public health, environmental security, and biodefense, as well as six Department of Energy (DOE) National Laboratories, to discuss how to work together to address climate-driven zoonotic disease risk. The primary goal of this workshop was to provide a forum for Federal and DOE National Lab attendees to share their missions, programs, and capabilities relevant to zoonotic disease emergence, to discuss how to best leverage these collective resources, identify key gaps, and to determine an effective path forward.

54 ENVIRONMENTAL SCIENCES↗

Engineering and Technology Road-map

Throughout its existence, the Environmental Management (EM) program has required a strong technology component to accomplish its mission, one that is focused on developing technologies to enhance safety, effectiveness, and efficiency. Although the Department of Energy (DOE) has made great progress toward safely disposing of the legacies of the Cold War, much remains to be done. These past accomplishments provide a guide for future success; however, the unique nature of many of the remaining challenges will require a strong and responsive applied research and engineering program. The Engineering and Technology Road-map was developed to address this need and guide the EM Engineering and Technology Program. The Road-map identifies the technical risks and uncertainties that the EM program faces over the next ten years; the strategies EM will use to reduce those risks; and the planned outcomes of implementing those strategies. Input for this Road-map was provided by EM Federal Project Directors, Stakeholders, Site Contractors, National Laboratories and the National Academy of Science. To accomplish this work, EM has designated federal Strategic Initiative Managers who will work with Federal Project Directors to develop, refine and implement a detailed scope and schedule for each initiative, as well as identify the point at which the technologies developed will be inserted into EM cleanup projects. The starting point for the Road-map was technical project risk and uncertainty. Risks are defined as known technical issues that could prevent project success. Uncertainties are indefinite or unpredictable technical aspects of a project. Risks included in the Road-map were identified in three ways: 1) By the Projects - EM's operations are performed within a culture of disciplined project management, based on DOE Order 413.3A, Program and Project Management for the Acquisition of Capital Assets. As such, technical risks and uncertainties affecting each cleanup project are identified early in the project life cycle, are captured in project risk assessments, and often lead to applied technology development activities. 2) By reviews and assessments - EM utilizes experts to review the progress of its major cleanup projects and to assess the maturity of evolving technologies. These reviews include External Technical Reviews and Technology Readiness Assessments. They transcend the project's baseline and often identify opportunities for reducing technical risk through development and deployment of innovative or enhanced technologies. 3) By the sites - EM periodically asks EM sites to identify technical risks and uncertainties in the form of technical needs. The Road-map divides EM risks into six program areas: Waste Processing, Groundwater and Soil Remediation, Deactivation and Decommissioning (D and D) and Facility Engineering, Spent Nuclear Fuel, Challenging Materials, and Integration. Tables 1-6 show those risks and uncertainties, as well as the 13 strategic initiatives established to address those risks. In conclusion, the Engineering and Technology Road-map presents an integrated approach to reducing the technical risks and uncertainties facing the EM program in a manner consistent with its disciplined approach to project management. The risks include challenges in waste processing, groundwater and soil remediation, deactivation and decommissioning, spent nuclear fuel, challenging materials, and integration. The EM Engineering and Technology Program will address these risks, and will use applied research and engineering to improve technologies and processes at sites across the country. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Audit Report on "The Office of Science's Management of Information Technology Resources"

The Department of Energy's Office of Science (Science) and its facility contractors are aggressive users of information technology (IT) to support fundamental research in areas such as energy, environmental remediation and computational sciences. Of its $4 billion Fiscal Year 2008 budget, Science spent about $287 million to manage its IT program. This included cyber security activities, acquisition of hardware and software, and support service costs used to maintain the operating environments necessary to support the missions of the program. Prior Office of Inspector General reports have identified various issues with Science's management of its IT programs and resources. For instance, our report on Facility Contractor Acquisition and Management of Information Technology Hardware (DOE/IG-0768, June 2007) noted that the Science sites reviewed spent more than necessary when acquiring IT hardware. In another example, our review of The Department's Efforts to Implement Common Information Technology Services at Headquarters (DOE/IG-0763, March 2007) disclosed that Science's reluctance to adopt the Department of Energy Common Operating Environment (DOE-COE) at Headquarters contributed to the Department's inability to fully realize potential cost savings through consolidation and economies of scale. In light of the magnitude of the Office of Science IT program and previously identified program weaknesses, we initiated this audit to determine whether Science adequately managed its IT resources. Science had taken a number of actions to improve its cyber security posture and align its program to Federal requirements. Yet, our review disclosed that it had not taken some basic steps to enhance security and reduce costs. In particular, we found that: (1) For their non-scientific computing environments, all seven of the field sites reviewed (two Federal, five contractor) had implemented security configurations that were less stringent than those included in the Federal Desktop Core Configuration. This configuration was designed by the National Institute of Standards and Technology and its use was mandated by the Office of Management and Budget; (2) Although we previously highlighted weaknesses and recommended corrective actions, Science still had not fully established or enforced IT hardware standards for acquiring hardware such as desktop and laptop computers or related peripherals, contributing to significant unnecessary expenditures; and (3) While we have noted in a series of past reports that significant savings could be realized from aggregating demand for IT services and products across the enterprise, Science had not implemented a common infrastructure for users at its Federal sites and continued to maintain an IT environment independent of the Department's Common IT Operating Environment. The weaknesses identified were attributable, at least in part, to a lack of adequate policies and procedures for ensuring effective cyber security and hardware acquisition practices. In addition, Science had not effectively monitored the performance of its field sites to ensure that previously reported internal control weaknesses were addressed and had not implemented an appropriate mechanism to track its IT-related costs. Without improvements, Science may be unable to realize the benefits of improved security over its information systems, reduce costs associated with hardware acquisition, and lower IT support costs through consolidation of services. In particular, we determined that Science could potentially realize savings of more than $3.3 million over the next three years by better controlling hardware costs and implementing standards for certain equipment. Furthermore, Science could continue to pay for duplicative IT support services and fail to take advantage of opportunities to lower costs and apply potential savings to mission-related work. During the course of our audit work, we learned from Science officials that they had initiated the process of revising the Program Cyber Security Plan to better clarify its policy for implementing Federal cyber security requirements. In addition, we noted that the Oak Ridge National Laboratory had taken action to establish and enforce hardware standards on both its administrative and scientific workforce. Although these actions are positive steps, additional action is needed to strengthen Science's IT program. To that end, our report contains several recommendations that, if fully implemented, should help Science improve the management of its IT resources.

99 GENERAL AND MISCELLANEOUS↗

Next Generation System Analysis Model Recently Added Features and Future Plans - Abstract

The Nuclear Waste Policy Act of 1982, as amended (NWPA 1982), established the federal government’s responsibility to accept spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from waste owners and generators for ultimate disposition. SNF generated by the current fleet of commercial nuclear reactors is being stored at the reactor sites in spent fuel pools (SFPs) and in dry independent spent fuel storage installations (ISFSIs). The US Department of Energy Office of Nuclear Energy (DOE-NE) is developing an Integrated Waste Management Program (IWMP) comprising a suite of options and supporting analyses to enable future informed choices. The IWMP is applying integrated waste management system architecture analysis, system engineering, and decision analysis principles to inform potential future decisions regarding potential nuclear waste management system architectures. Architecture analyses of the IWM system are being conducted to support the future deployment of a comprehensive system for managing nuclear waste that considers all major aspects of the back end of the nuclear fuel cycle (i.e., transportation, storage, and disposal). The Next Generation System Analysis Model (NGSAM) is an agent-based simulation software tool designed for the express purpose of modeling the IWM system. NGSAM imports data from the Oak Ridge National Laboratory (ORNL) Unified Database (e.g., historic assembly information, thermal profiles for assembly heat, at-reactor dry storage loadings) to ensure that the simulation initializes with a realistic representation of the state of commercial SNF in the United States. Recent major enhancements that have been implemented into NGSAM since NGSAM was last presented at the WM2019 conference include: • Tracking of railroad escort and buffer car acquisition. • Addition of heavy haul and barge routes for some sites, as well as support for user-defined inter-modal routes. • Updates to the logic that checks the thermal maps prior to package transport. • Addition of an allocation method that predicts when reactor sites will pack assemblies from their pools for dry storage and allocates packages to those reactor sites in the preceding periods, favoring direct transport packages and reducing the number of packages that reactor sites pack for dry storage at their ISFSIs. • Addition of reactor site family operational limits, which are used to limit the number of loads from the pool and from dry storage at a given reactor site per year. • Support has been added for multiple canister loading maps and packages having multiple compatible transportation overpacks. • Updates in the handling of non-commercial fuel, including a new database containing data to support the updates. • Support for repackaging at reactor sites. • Implementing additional output reports or modifying existing reports. • User edits can now be created and edited via the NGSAM website. • Ability to load packages for dry storage at ISF pools. • Same-type package blending at DOE sites. • Support for multi-mode transloading at reactor sites. These new features have improved NGSAM capabilities and/or improve the user experience with the model and will be discussed in more detail. The initial NGSAM requirements for advanced reactor fuels, reprocessing, treatment, and conditioning are preliminary and are described at a high level in this paper: analysts will provide more specific requirements to the NGSAM team in the future. Additionally, there are many data needs associated with modeling advanced reactors in NGSAM, but many of the data or plans are still in progress and/or yet to be fully defined. However, this document describes an initial exploration of the data relevant to this program. Advanced reactor data will likely require revision as concepts evolve and new considerations are made. This is a technical paper that does not take into account contractual limitations or obligations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). For example, under the provisions of the Standard Contract, spent nuclear fuel in multi-assembly canisters is not an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract governs the obligations of the parties, and this paper in no manner supersedes, overrides, or amends the Standard Contract. This paper reflects technical work which could support future decision making by DOE. No inferences should be drawn from this paper regarding future actions by DOE, which are limited both by the terms of the Standard Contract and Congressional appropriations for the Department to fulfill its obligations under the Nuclear Waste Policy Act including licensing and construction of a spent nuclear fuel repository.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Current Status of the Russian Research Reactor Fuel Return Program

In 1999, the U.S. Department of Energy (DOE), together with the International Atomic Energy Agency (IAEA) and the Russian Federation, agreed to start a new nuclear non-proliferation initiative to return Russian/Soviet-origin highly enriched uranium (HEU) back to its country of origin. Trilateral discussions among the U.S., the Russian Federation, and the IAEA identified more than 20 research reactors in 16 countries (Belarus, Bulgaria, China, Czech Republic, DPRK, Germany, Hungary, Kazakhstan, Latvia, Libya, Poland, Romania, Serbia, Ukraine, Uzbekistan, and Vietnam) that had Russian/Soviet-origin HEU. In 2000, the IAEA Director General sent a letter to 16 countries asking for their willingness to return this spent HEU fuel to the Russian Federation. Fourteen countries responded positively to the Director General’s letter. The primary goal of the Russian Research Reactor Fuel Return (RRRFR) program, managed by DOE’s National Nuclear Security Administration, Office of Material Management and Minimization, is to advance nuclear nonproliferation objectives by encouraging eligible countries to convert their research reactors from HEU to low-enriched uranium (LEU) fuel and to eliminate stockpiles of HEU. In May 2004, the United States and the Russian Federation signed a Government-to-Government Agreement that established the legal framework necessary for cooperation between the United States and the Russian Federation for the return of research/test reactor fuel from eligible countries. To date, the RRRFR program has completed sixty-three successful operations to repatriate almost 2,300 kg of Russian-origin HEU fresh and spent fuel. All Russian-origin HEU has been completely removed from 12 countries: Bulgaria, the Czech Republic, Hungary, Georgia, Latvia, Libya, Poland, Romania, Serbia, Ukraine, Uzbekistan, and Vietnam. At the present time Russian-origin HEU remains in Kazakhstan, Belarus, Germany, DPRK, and China. This paper describes the current status of the RRRFR program and preparations for upcoming HEU removal and down-blending activities.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Fusion Energy Sciences Network Requirements Review. Final Report, April - October 2021

The Energy Sciences Network (ESnet) is the high-performance network user facility for the US Department of Energy (DOE) Office of Science (SC) and delivers highly reliable data transport capabilities optimized for the requirements of data-intensive science. In essence, ESnet is the circulatory system that enables the DOE science mission by connecting all of its laboratories and facilities in the US and abroad. ESnet is funded and stewarded by the Advanced Scientific Computing Research (ASCR) program and managed and operated by the Scientific Networking Division at Lawrence Berkeley National Laboratory (LBNL). ESnet is widely regarded as a global leader in the research and education networking community. Throughout 2021, ESnet and the Office of Fusion Energy Sciences (FES) of the DOE SC organized an ESnet requirements review of FES-supported activities. Preparation for these events included identification of key stakeholders: program and facility management, research groups, and technology providers. Each stakeholder group was asked to prepare formal case study documents about their relationship to the FES program to build a complete understanding of the current, near-term, and long-term status, expectations, and processes that will support the science going forward.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Energy Savings from GSA's National Deep Retrofit Program

Under its National Deep Energy Retrofit (NDER) program, the U.S. General Services Administration (GSA) awarded 10 ESPC projects with the objectives of using innovative technologies and renewable energy technologies, and moving buildings toward net zero energy consumption. This report analyzes data on energy savings from the 10 NDER projects, and compares them with the savings of a sample of other recently awarded Federal ESPC projects. It is shown that by emphasizing the need for deeper energy savings, and by the establishment of a central Project Management Office (PMO) to provide authoritative contracting, technical and pricing assistance, the NDER projects achieved an average level of savings more than twice that of the other Federal ESPC projects. The level of savings achieved in each project seems to be dependent more on the availability of ECMs at the site than on energy price, energy cost per square foot, pre-retrofit EUI or the length of the contract term. This suggests that GSA can achieve similar results in a wide variety of building

ESPC↗

Geothermal Hydraulic Stimulation: Overview of Methods and Best Practices

This paper outlines important information related to the hydraulic stimulation of geothermal wells and considerations for regulators responsible for evaluating applications to conduct these operations. Hydraulic stimulation applied to geothermal wells is an evolving technology that is different from the hydraulic fracturing process widely used to complete unconventional oil and gas wells. Important differences relate to operating pressures, variations in rock and fracture processes, and characteristics and disposal of hydraulic fracture fluids. Hydraulic stimulation is not widely used in the geothermal industry; however, future development of enhanced geothermal systems (EGS) will require hydraulic stimulation in order to enhance and create fracture permeability to allow wells to deliver sufficient heat and fluid to power plants. Gigawatts of EGS potential have been identified (U.S. Department of Energy 2019), so it is expected that the use of hydraulic stimulation of geothermal wells will be more common in the future. At present, there are no formal regulations guiding drilling programs or sundry notices that propose hydraulic stimulation of geothermal wells. On federal lands, important constraints and oversight are embedded in the process for obtaining Geothermal Drilling Permits outlined in the Code of Federal Regulations (43 CFR Section 3262.11); in Geothermal Resource Order 2 (GRO 2) guidance for assessment and mitigation of impacts of geothermal operations as well as construction and testing of geothermal wells; and in a Bureau of Land Management (BLM) Induced Seismicity Instruction Memorandum (BLM 2018). Additionally, local knowledge from BLM field offices and expertise of BLM engineers, or that of state regulators for operations on private and state lands, will be applied to fully assess operator applications to conduct geothermal hydraulic stimulation activities. Significant research effort has been directed toward EGS, so geothermal hydraulic stimulation techniques, impacts, and results are evolving and becoming better understood, including adaptation of decades of oil and gas industry experience with hydraulic fracturing of unconventional reservoirs. Recent EGS activities in the United States provide details about hydraulic stimulation with respect to oversight, stimulation design, execution, and results. Based on experience to date, the important issues to address when hydraulically stimulating a geothermal well include the following: 1. Wellbore construction and integrity must be appropriate to protect groundwater and manage stimulation pressures. 2. Understanding of lithology, faults, fractures, and subsurface stress state is necessary to design stimulation plans and predict results. 3. Seismic monitoring allows for observation and mitigation of induced seismicity.

geothermal↗

Alternative Endpoints and Approaches for the Remediation of Contaminated Groundwater at Complex Sites - 13426

The goal of United States (U.S.) Department of Energy's (DOE)'s environmental remediation programs is to restore groundwater to beneficial use, similar to many other Federal and state environmental cleanup programs. Based on past experience, groundwater remediation to pre-contamination conditions (i.e., drinking water standards or non-detectable concentrations) can be successfully achieved at many sites. At a subset of the most complex sites, however, complete restoration is not likely achievable within the next 50 to 100 years using today's technology. This presentation describes several approaches used at complex sites in the face of these technical challenges. Many complex sites adopted a long-term management approach, whereby contamination was contained within a specified area using active or passive remediation techniques. Consistent with the requirements of their respective environmental cleanup programs, several complex sites selected land use restrictions and used risk management approaches to accordingly adopt alternative cleanup goals (alternative endpoints). Several sites used long-term management designations and approaches in conjunction with the alternative endpoints. Examples include various state designations for groundwater management zones, technical impracticability (TI) waivers or greater risk waivers at Superfund sites, and the use of Monitored Natural Attenuation (MNA) or other passive long-term management approaches over long time frames. This presentation will focus on findings, statistics, and case studies from a recently-completed report for the Department of Defense's Environmental Security Technology Certification Program (ESTCP) (Project ER-0832) on alternative endpoints and approaches for groundwater remediation at complex sites under a variety of Federal and state cleanup programs. The primary objective of the project was to provide environmental managers and regulators with tools, metrics, and information needed to evaluate alternative endpoints for groundwater remediation at complex sites. A statistical analysis of Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) sites receiving TI waivers will be presented as well as case studies of other types of alternative endpoints and alternative remedial strategies that illustrate the variety of approaches used at complex sites and the technical analyses used to predict and document cost, time frame, and potential remedial effectiveness. This presentation is intended to inform DOE program managers, state regulators, practitioners and other stakeholders who are evaluating technical cleanup challenges within their own programs, and establishing programmatic approaches to evaluating and implementing long-term management approaches. Case studies provide examples of long-term management designations and strategies to manage and remediate groundwater at complex sites. At least 13 states consider some designation for groundwater containment in their corrective action policies, such as groundwater management zones, containment zones, and groundwater classification exemption areas. Long-term management designations are not a way to 'do nothing' or walk away from a site. Instead, soil and groundwater within the zone is managed to be protective of human health and the environment. Understanding when and how to adopt a long-term management approach can lead to cost savings and the more efficient use of resources across DOE and at numerous other industrial and military sites across the U.S. This presentation provides context for assessing the use and appropriate role of alternative endpoints and supporting long-term management designations in final remedies. (authors)

54 ENVIRONMENTAL SCIENCES↗

Training activities at FSUE 'RADON' and Lomonosov's Moscow state university under practical arrangements with IAEA

The International Education Training Centre (IETC) at Moscow Federal State Unitary Enterprise (FSUE) 'Radon', in co-operation with the International Atomic Energy Agency (IAEA), has developed expertise and provided training to waste management personnel for the last 15 years. Since 1997, the educational system of the enterprise with the support of the IAEA has acquired an international character: more than 470 experts from 35 countries - IAEA Member States completed the professional development. Training is conducted at various thematic courses or fellowships for individual programs and seminars on IAEA technical projects. In June 2008 a direct agreement (Practical Arrangements) has been signed between FSUE 'Radon' and the IAEA on cooperation in the field of development of new technologies, expert's advice to IAEA Member States, and, in particular, the training of personnel in the field of radioactive waste management (RWM), which opens up new perspectives for fruitful cooperation of industry professionals. A similar agreement - Practical Arrangements - has been signed between Lomonosov's MSU and the IAEA in 2012. In October 2012 a new IAEA two-weeks training course started at Lomonosov's MSU and FSUE 'Radon' in the framework of the Practical Agreements signed. Pre-disposal management of waste was the main topic of the courses. The paper summarizes the current experience of the FSUE 'Radon' in the organization and implementation of the IAEA sponsored training and others events and outlines some of strategic educational elements, which IETC will continue to pursue in the coming years. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Site Environmental Report: 2013 (ASER) for the SLAC National Accelerator Laboratory

This report provides information about environmental programs during calendar year 2013 at the SLAC National Accelerator Laboratory (SLAC) in Menlo Park, California. Activities that overlap the calendar year - e.g., stormwater monitoring covering the winter season of 2013/2014 (October 2013 through May 2014) - are also included. Production of an annual site environmental report (ASER) is a requirement established by the United States Department of Energy (DOE) Order 231.1B for all management and operating (M&O) contractors throughout the DOE complex. SLAC is a federally funded research and development center managed and operated by Stanford University for the DOE. Under Executive Order (EO) 13423, Strengthening Federal Environmental, Energy, and Transportation Management, EO 13514, Federal Leadership in Environmental, Energy, and Economic Performance, and DOE Order 436.1, Departmental Sustainability, SLAC effectively implements and integrates the key elements of an Environmental Management System (EMS) to achieve the site’s integrated safety and environmental management system goals. For normal daily activities, SLAC managers and supervisors are responsible for ensuring that policies and procedures are understood and followed so that: • Worker safety and health are protected, • The environment is protected, and • Compliance is ensured.

SAFETY↗

Audit Report "Department of Energy Efforts to Manage Information Technology Resources in an Energy-Efficient and Environmentally Responsible Manner"

The American Recovery and Reinvestment Act of 2009 emphasizes energy efficiency and conservation as critical to the Nation's economic vitality; its goal of reducing dependence on foreign energy sources; and, related efforts to improve the environment. The Act highlights the significant use of various forms of energy in the Federal sector and promotes efforts to improve the energy efficiency of Federal operations. One specific area of interest is the increasing demand for Federal sector computing resources and the corresponding increase in energy use, with both cost and environmental implications. The U.S. Environmental Protection Agency reported that, without aggressive conservation measures, data center energy consumption alone is expected to double over the next five years. In our report on Management of the Department's Data Centers at Contractor Sites (DOE/IG-0803, October 2008) we concluded that the Department of Energy had not always improved the efficiency of its contractor data centers even when such modifications were possible and practical. Despite its recognized energy conservation leadership role, the Department had not always taken advantage of opportunities to reduce energy consumption associated with its information technology resources. Nor, had it ensured that resources were managed in a way that minimized impact on the environment. In particular: (1) The seven Federal and contractor sites included in our review had not fully reduced energy consumption through implementation of power management settings on their desktop and laptop computers; and, as a consequence, spent $1.6 million more on energy costs than necessary in Fiscal Year 2008; (2) None of the sites reviewed had taken advantage of opportunities to reduce energy consumption, enhance cyber security, and reduce costs available through the use of techniques, such as 'thin-client computing' in their unclassified environments; and, (3) Sites had not always taken the necessary steps to reduce energy consumption and resource usage of their data centers, such as identifying and monitoring the amount of energy used at their facilities. We concluded that Headquarters programs offices (which are part of the Department of Energy's Common Operating Environment) as well as field sites had not developed and/or implemented policies and procedures necessary to ensure that information technology equipment and supporting infrastructure was operated in an energy-efficient manner and in a way that minimized impact on the environment. For example, although required by the Department, sites had not enabled computer equipment power management features designed to reduce energy consumption. In addition, officials within Headquarters programs and at the sites reviewed had not effectively monitored performance or taken steps to fully evaluate available reductions in energy usage at their facilities. Without improvements, the Department will not be able to take advantage of opportunities to reduce energy consumption and realize cost savings of nearly $23 million over the next five years at just the seven sites reviewed. We noted that the potential for reduced energy consumption at these sites alone was equivalent to the annual power requirements of over 2,400 homes or, alternatively, removing about 3,000 cars from the road each year. Many of the available energy reduction strategies, such as fully utilizing energy-efficient settings on the many computers used by the Department and its contractors, are 'low hanging fruit' in that they will provide immediate tangible energy savings at little or no cost. Others, such as a shift to thin-client computing, an environment that transfers the processing capabilities from an individual's desk to a shared server environment, will require some level of investment which can, based on available literature, be successfully recovered through reduced acquisition and support costs. In our judgment, given its highly visible leadership in energy issues, aggressive action should be taken to make the Department's information technology operations as energy efficient as possible so that it can serve as a role model for both the Federal and private sector. To its credit, the Department had increased the number of energy-efficient computers purchased in recent years. In addition, the Office of the Chief Information Officer implemented an automated computer shutdown program at Headquarters that was estimated to save up to nearly $400,000 per year. Furthermore, we found that certain sites had initiated actions to review a potential transition to unclassified thin-client computing; however, implementation had not yet been completed. These are positive steps, but additional action is required, and our report contains several recommendations to this end.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

International Workshop on Next Generation Gamma-Ray Source

A workshop on The Next Generation Gamma-Ray Sources , sponsored by the Office of Nuclear Physics at the Department of Energy, was held November 17--19, 2016 in Bethesda, Maryland. The goals of the workshop were to identify basic and applied research opportunities at the frontiers of nuclear physics that would be made possible by the beam capabilities of an advanced laser Compton beam facility. To anchor the scientific vision to realistically achievable beam specifications using proven technologies, the workshop brought together experts in the fields of electron accelerators, lasers, and optics to examine the technical options for achieving the beam specifications required by the most compelling parts of the proposed research programs. An international assembly of participants included current and prospective $\gamma$-ray beam users, accelerator and light-source physicists, and federal agency program managers. Sessions were organized to foster interactions between the beam users and facility developers, allowing for information sharing and mutual feedback between the two groups. The workshop findings and recommendations are summarized in this report.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Annual Site Environmental Report: 2014 (ASER)

This report provides information about environmental programs during calendar year (CY) 2014 at the SLAC National Accelerator Laboratory (SLAC) in Menlo Park, California. Activities that overlap the calendar year - e.g., stormwater monitoring covering the winter season of 2013/2014 (October 2013 through May 2014) - are also included. Production of an annual site environmental report (ASER) is a requirement established by the United States Department of Energy (DOE) Order 231.1B for all management and operations (M&O) contractors throughout the DOE complex. SLAC is a federally funded research and development center managed and operated by Stanford University for the DOE.

54 ENVIRONMENTAL SCIENCES↗

Metering Plan: Intelligent Operational Strategies Through Enhanced Metering Systems

The Sustainability Program at Pacific Northwest National Laboratory (PNNL) has adopted a “triple-bottom-line” approach of environmental stewardship, social responsibility, and economic prosperity to its operations. Metering at PNNL works in support of all three, specifically to measure and inform building energy use and greenhouse gas emissions and minimize water use. The foundation for metering at PNNL is a core goal set, which consists of four objectives: providing accurate data without interruption, analyzing data while it is still new, providing actionable recommendations to operations management, and ensuring PNNL’s compliance with contract metering requirements. These core objectives guide the decisions that we make during annual planning and as we operate throughout the year. This 2016 edition of the Metering Plan conveys the metering practices for and vision of the Sustainability Program. Changes in this plan from the 2015 edition include updated tables and an enhanced discussion on energy tracking systems used at PNNL. This plan also discusses updated benchmarking strategies using PNNL’s graphics and analytics tool, BuildingOS by Lucid Design Group. This plan presents our progress toward the metering goals shared by all federal agencies and highlights our successful completion of metering requirements. Currently, PNNL is fully compliant with the applicable legislative and Executive Order metering requirements. PNNL’s approach to the installation of new meters will be discussed. Perhaps most importantly, this plan details the analysis techniques utilized at PNNL that rely on the endless streams of data newly available as a result of increased meter deployment over the last several years. Previous Metering Plans have documented specific meter connection schemes as PNNL focused on deploying meters in a first step toward managing energy and water use. This plan serves not only to highlight PNNL’s successful completion of agency metering goals, but also can be used as a guideline for meter installation and data analysis.

24 POWER TRANSMISSION AND DISTRIBUTION↗