Phase-selection algorithms to minimize cost and imbalance in U.S. synthetic distribution systems
Not Available
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Not Available
A novel system for real-time tumor tracking and motion compensation with a robotic HexaPOD treatment couch is described. The approach is based on continuous tracking of the tumor motion in portal images without implanted fiducial markers, using the therapeutic megavoltage beam, and tracking of abdominal breathing motion with optical markers. Based on the two independently acquired data sets the table movements for motion compensation are calculated. The principle of operation of the entire prototype system is detailed first. In the second part the performance of the HexaPOD couch was investigated with a robotic four-dimensional-phantom capable of simulating real patient tumor trajectories in three-dimensional space. The performance and limitations of the HexaPOD table and the control system were characterized in terms of its dynamic behavior. The maximum speed and acceleration of the HexaPOD were 8 mm/s and 34.5 mm/s{sup 2} in the lateral direction, and 9.5 mm/s and 29.5 mm/s{sup 2} in longitudinal and anterior-posterior direction, respectively. Base line drifts of the mean tumor position of realistic lung tumor trajectories could be fully compensated. For continuous tumor tracking and motion compensation a reduction of tumor motion up to 68% of the original amplitude was achieved. In conclusion, this study demonstrated that it is technically feasible to compensate breathing induced tumor motion in the lung with the adaptive tumor tracking system.
The Center for Renewable Energy and Alternative Transportation Technologies (CREATT) was established to advance the state of the art in knowledge and education on critical technologies that support a renewable energy future. Our research and education efforts have focused on alternative energy systems, energy storage systems, and research on battery and hybrid energy storage systems.This report details the Center's progress in the following specific areas: Development of a battery laboratory; Development of a demonstration system for compressed air energy storage; Development of electric propulsion test systems; Battery storage systems; Thermal management of battery packs; and Construction of a micro-grid to support real-world performance monitoring of a renewable energy system.
A wear test system has been assembled to conduct ASTM G 99, “Standard Test Method for Wear Testing with a Pin-on-Disk Apparatus,” testing in air or in gaseous hydrogen up to 13.8 MPa (2000 psig) at room temperature. Two separate disk materials, 316L and AUM10 stainless steels; and two separate pin materials, 316L and A286, were selected for testing. The objective of the testing is to evaluate hydrogen effects on wear characteristics of these materials when used in the design and fabrication of high pressure hydrogen storage vessels and equipment in automotive applications.
To effectively use “Hardware in the Loop” (HIL) methodologies in the development of test systems, the tester architecture must be capable of seamlessly switching between executing tests against simulations and real units. This report describes initial attempts to build an integrated system with these capabilities.
This presentation is to fulfil DOE commitment to GIF VHTR Materials PMB. Notched creep rupture testing: Weldment V-notch specimen test finished. 800C 60MPa, 15,716 hour rupture life. Two double V-notch specimen tests have finished. Crack growth tests: System modification was required for creep and creep-fatigue testing, Epsilon 3548COD Extensometer has been ordered, to allow load-line displacement measurements, to be paired with direct current potential drop already used to measure crack length, Sample redesigned in accordance to ASTM E2760 and E1457 to allow for both creep and creep-fatigue crack growth rate testing. Alloy 800H Weldments (1/2) and Alloy 800H Weldments (2/2), Variable Fatigue Testing, and Multi=axial Stress Relaxation. Continue work to finish 800H model, examine ?universal? constitutive model form.
These data and test descriptions comprise a chilled circulation test conducted at the 164' fracture in the EGS Collab Experiment 1 testbed on the 4850 ft level of the Sanford Underground Research Facility. Descriptions of the meta data, design drawings for the flow testing system, and evaluation of the thermistor data are provided here. The test ran from April 2019 through early March of 2020, when testing was concluded at the experiment 1 site. These data are are complementary to the stimulation data provided in another submission which is linked below (i.e. stimulation at the 164' notch). More information about the test itself as well as the rationale and process of data processing is available on the EGS Collab Experiment 1 Long Term Circulation Test wiki page which is also linked below.
Recent trends in power systems show increasing deployment of inverter-based distributed energy resources (DERs) at the distribution level. Efforts have also been made to use inverter-based DERs for system restoration of critical sections of distribution feeders. In the past few years, there has been active consideration of using local grid-forming (GFM) DERs, which can form their own voltage and frequency, to black-start microgrids instead of waiting for the bulk system for supply restoration. However, using current-limited inverter-based DERs for black-start operations with high inrush currents can pose some technical challenges. This paper presents detailed electromagnetic transient studies on a digital real-time simulator to assess the operational feasibility of using local inverter-based GFM DERs for microgrid black-start operations as a bottom-up approach instead of a top-down approach where the substation is used to restore critical sections of the feeder. The paper presents key modeling details for distribution system components for studying GFM DER-based microgrid black-start operations. The paper presents simulation results comparing different black-start approaches using GFM DERs for two test systems: i) a simple test microgrid and ii) a real-world utility microgrid currently being designed and deployed by Holy Cross Energy in Colorado.
By combining the top performing commercial laser beam stabilization system with the most ideal optical imaging configuration, the beamline for the Linear Accelerator Coherent Light Source II (LCLS-II) will deliver the highest quality and most stable beam to the cathode. To determine the optimal combination, LCLS-II beamline conditions were replicated and the systems tested with a He-Ne laser. The Guidestar-II and MRC active laser beam stabilization systems were evaluated for their ideal positioning and stability. Both a two and four lens optical imaging configuration was then evaluated for beam imaging quality, magnification properties, and natural stability. In their best performances when tested over fifteen hours, Guidestar-II kept the beam stable over ~ 70-110um while the MRC system kept it stable over ~ 90- 100um. During short periods of time, Guidestar-II kept the beam stable between 10-20um, but was more susceptible to drift over time, while the MRC system maintained the beam between 30-50um with less overall drift. The best optical imaging configuration proved to be a four lens system that images to the iris located in the cathode room and from there, imaged to the cathode. The magnification from the iris to the cathode was 2:1, within an acceptable tolerance to the expected 2.1:1 magnification. The two lens configuration was slightly more stable in small periods of time (<10 minutes) without the assistance of a stability system, ~ 55um compared to ~ 70um, but the four lens configuration’s beam image had a significantly flatter intensity distribution compared to the two lens configuration which had a Gaussian distribution. A final test still needs to be run with both stability systems running at the same time through the four lens system. With this data, the optimal laser beam stabilization system can be determined for the beamline of LCLS-II.
In this paper we investigate an Intelligent Computer Vision System applied for recognition and classification of commercially available cork tiles. The system is capable of acquiring and processing gray images using several feature generation and analysis techniques. Its functionality includes image acquisition, feature extraction and preprocessing, and feature classification with neural networks (NN). We also discuss system test and validation results from the recognition and classification tasks. The system investigation also includes statistical feature processing (features number and dimensionality reduction techniques) and classifier design (NN architecture, target coding, learning complexity and performance, and training with our own metaheuristic optimization method). The NNs trained with our genetic low-discrepancy search method (GLPtauS) for global optimisation demonstrated very good generalisation abilities. In our view, the reported testing success rate of up to 95% is due to several factors: combination of feature generation techniques; application of Analysis of Variance (ANOVA) and Principal Component Analysis (PCA), which appeared to be very efficient for preprocessing the data; and use of suitable NN design and learning method.
By combining the top performing commercial laser beam stabilization system with the most ideal optical imaging configuration, the beamline for the Linear Accelerator Coherent Light Source II (LCLS-II) will deliver the highest quality and most stable beam to the cathode. To determine the optimal combination, LCLS-II beamline conditions were replicated and the systems tested with a He-Ne laser. The Guidestar-II and MRC active laser beam stabilization systems were evaluated for their ideal positioning and stability. Both a two and four lens optical imaging configuration was then evaluated for beam imaging quality, magnification properties, and natural stability. In their best performances when tested over fifteen hours, Guidestar-II kept the beam stable over approximately 70-110um while the MRC system kept it stable over approximately 90-100um. During short periods of time, Guidestar-II kept the beam stable between 10-20um, but was more susceptible to drift over time, while the MRC system maintained the beam between 30-50um with less overall drift. The best optical imaging configuration proved to be a four lens system that images to the iris located in the cathode room and from there, imaged to the cathode. The magnification from the iris to the cathode was 2:1, within an acceptable tolerance to the expected 2.1:1 magnification. The two lens configuration was slightly more stable in small periods of time (less than 10 minutes) without the assistance of a stability system, approximately 55um compared to approximately 70um, but the four lens configurations beam image had a significantly flatter intensity distribution compared to the two lens configuration which had a Gaussian distribution. A final test still needs to be run with both stability systems running at the same time through the four lens system. With this data, the optimal laser beam stabilization system can be determined for the beamline of LCLS-II.
We present an integrated R&D plan aimed at demonstrating the ability to build a very large Liquid Argon Time Projection Chamber (LArTPC), on a scale suitable for use as a Far Detector for the LBNE neutrino oscillation experiment. This plan adopts current LArTPC R&D-related activities and proposes new ones to address questions that go beyond those being answered by the current efforts. We have employed a risk evaluation strategy to identify questions that can be answered (or risks that can be mitigated) through one or more R&D steps. In summary form, the plan consists of the following pre-existing components: (1) The Materials Test Stand program, now in operation at Fermilab, addressing questions pertaining to maintenance of argon purity; (2) Existing electronics test stands at FNAL and BNL; (3) The Liquid Argon Purity Demonstrator (LAPD) now being assembled at Fermilab; (4) The ArgoNeuT prototype LArTPC, now running in the NuMI beam; (5) The MicroBooNE experiment, proposed as a physics experiment that will advance our understanding of the LArTPC technology, now completing its conceptual design phase; (6) A software development effort that is well integrated across present and planned LArTPC detectors. We are proposing to add to these efforts the following: (1) A membrane cryostat mechanical prototype to evaluate and gain expertise with this technology; (2) An installation and integration prototype, to understand issues pertaining to detector assembly, particularly in an underground environment; (3) A {approx} 5% scale electronics systems test to understand system-wide issues as well as individual component reliability. (4) A calibration test stand that would consist of a small TPC to be exposed to a test beam for calibration studies, relevant for evaluation of physics sensitivities. We have developed a timeline and milestones for achieving these goals as discussed in Section 4. The proposed activities necessary for the final design of LAr20 are complete by CD3 in 2014.
This paper investigates residential rooftop photovoltaic (PV) systems for long-term thermoeconomic benefits from PV homeowners’ perspectives and for impacts on the electrical distribution network from grid operators’ perspectives. The costs of generating electricity from grid-connected PV systems are studied with and without energy storage at the PV homeowners’ sites. Three selling scenarios for excess PV energy conversion are considered: net metering, wholesale pricing, and no payback. PV systems in Utah are utilized as case studies in this analysis. The presence of PV systems gives homeowners economic benefits such as reduced annual electricity bills. However, the levelized costs of electricity are considerably higher than the weighted electricity price in Utah. Currently, the addition of energy storage only benefits customers in Utah under the no payback policy. The impacts of PV systems toward electrical distribution networks are then studied on a distribution test system. Excess PV generation from residential PV systems causes voltage rise in the electrical distribution network. The results from this paper can educate consumers about the lifetime benefit of integrating solar energy into their homes. For grid operators, residential PV systems with energy storage can reduce the negative impacts on the grid compared with high PV penetration alone.
Abstract A multi-order Adaptive Finite Differencing (AFD) method is developed for the kinetic energy operator in real-space, grid-based electronic structure codes. It uses atomic pseudo orbitals produced by the corresponding pseudopotential codes to optimize the standard finite difference (SFD) operators for improved precision. Results are presented for a variety of test systems and Bravais lattice types, including the well-known Δ test for 71 elements in the periodic table, the Mott insulator NiO, and borax decahydrate, which contains covalent, ionic, and hydrogen bonds. The tests show that an 8th-order AFD operator leads to the same average Δ value as that achieved by plane-wave codes and is typically far more accurate and has a much lower computational cost than a 12th-order SFD operator. The scalability of real-space electronic calculations is demonstrated for a 2016-atom NiO cell, for which the computational time decreases nearly linearly when scaled from 18 to 144 CPU-GPU nodes.
The resiliency, reliability and security of the next generation cyber-power smart grid depend upon efficiently leveraging advanced communication and computing technologies. Also, developing real-time data-driven applications is critical to enable wide-area monitoring and control of the cyber-power grid given high-resolution data from Phasor Measurement Units (PMUs). North American Synchrophasor Initiative Network (NASPlnet) provides guidance for PMU data exchanges. With the advancement in networking and grid operation, it is necessary to evaluate the performance of different data flow architectures suggested by NASPInet and analyze the impact on applications. Therefore, we need a cyber-power co-simulation framework that supports very large-scale co-simulation capable of running in parallel, high-performance computing platforms and capturing real-life network behavior. This work presents an end-to-end automated and user-driven cyber-power co-simulation using NS3 to model communication networks, GridPACK to model the power grid, and HELICS as a co-simulation engine. Comparative analysis of latency in synchrophasor networks and a performance evaluation of a power system stabilizer application utilizing PMU data in an IEEE 39 bus test system is presented using this cosimulation testbed.
BG28 and KG3 filter glasses were tested for use as attenuators in the NIF drive diagnostic (DrD) systems. Tests were performed in the Optical Sciences Laser facility with a 351 nm, 2-step, 3-nsec pulse at fluences ranging up to {approx} 1 J/cm{sup 2}. Single-shot measurements showed no solarization when the samples were allowed to relax for a week after exposure. KG3 filters exhibited no luminescence and no transient pulse distortion. BG28 filters luminesced appreciably and imposed a 'droop' (similar to 'square-pulse distortion') on the signals. The droop parameter is estimated at 0.50 {+-} 0.11 cm{sup 2}/J. Droop is explained in terms of known copper-doped-glass spectroscopy and kinetics (buildup of triplet-state populations, with excited-state absorption). Simulation of the distortion ({approx}1.6%) expected on a 1.8 MJ Haan pulse led to a minor redesign of the Drive Diagnostic with reduced fluence on the BG28 filters to reduce the droop distortion to 0.5%.
The intermittent nature of renewable energy sources poses challenges for electrical grids. This is due to the variable and uncertain nature of the power output from these resources. These features of renewable generation are more relevant to energy system planning as grids reach higher penetration levels of renewable energy. We present approaches for energy system planning based on scalable computational approaches which enable explicit consideration of operational uncertainties in the planning process. Using multi-stage stochastic programming and the progressive hedging algorithm, we compute energy system expansion decisions on modified versions of the RTS-GMLC test system.
The intermittent nature of power from renewable energy sources poses new challenges for electrical grids. This is due to the variable and uncertain nature of the power output from these resources. These features of renewable generation are becoming more relevant to energy system planning as grids reach higher penetration levels of renewable energy. In this presentation we present approaches for energy system planning based on scalable computational approaches which enable the explicit consideration of operational uncertainties in the planning process. Using multi-stage stochastic programming and the progressive hedging algorithm, we compute energy system expansion decisions on modified versions of the RTS-GMLC test system augmented with large amounts of renewable generation.