Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “procedures”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

January 2022 Semiannual Saltstone Toxicity Characteristic Leaching Procedure (TCLP) Results

The aqueous waste from Tank 50 (salt solution) is sampled semiannually for transfers to the Saltstone Production Facility (SPF). Salt solution is treated at SPF and disposed of in the Saltstone Disposal Facility (SDF). Per request of customer, X-TTR-Z-00025, Revision 0, two SDF waste form (saltstone) samples were prepared in the Savannah River National Laboratory (SRNL) from the Tank 50 Waste Acceptance Criteria (WAC) sample and Z-Area premix material for the January 2022 semiannual Toxicity Characteristic Leaching Procedure (TCLP) samples. One sample contained a Full Premix which included 10:45:45 (by weight) of cement, slag and fly ash. The second sample contained 60:40 (by weight) of slag and fly ash only referred to as the “Cement-Free grout sample.” Results from this technical report support Task 2: ‘Grout Leaching Analyses’ of the Task Technical Request (TTR) prepared by Savannah River Mission Completion (SRMC). After at least 28 days cured, a sample of each of the SDF waste forms was collected and shipped to a certified laboratory for analysis using the Toxicity Characteristic Leaching Procedure (TCLP). The January 2022 semiannual saltstone (Full Premix) and the Cement-Free grout samples met the South Carolina (SC) Code of Regulations for Hazardous Waste Management Regulations (HWMR) 61-79.261.24 and 61-79-268.48 requirements for a non-hazardous waste form with respect to Resource Conservation and Recovery Act (RCRA) metals and Underlying Hazardous Constituents (UHCs), and also met the SPF WAC that was in effect at the time of the tank sampling.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

July 2022 Semiannual Saltstone Toxicity Characteristic Leaching Procedure (TCLP) Results

The aqueous waste from Tank 50 (salt solution) is sampled semiannually for transfers to the Saltstone Production Facility (SPF). Salt solution is treated at SPF and disposed of in the Salstone Disposal Facility (SDF). Per request of customer, X-TTR-Z-00025, Revision 0, two SDF waste form (salstone) samples were prepared in the Savannah River National Laboratory (SRNL) from the Tank 50 Waste Acceptance Criteria (WAC) sample and Z-Area premix material for the July 2022 Semiannual Toxicity Characteristic Leaching Procedure (TCLP) samples. One sample contained a Full Premix which included 10:45:45 (by weight) of cement, slag and fly ash. The second sample contained 60:40 (by weight) of slag and fly ash only referred to as the "Cement-Free grout sample." Results from this technical report support Task 2: 'Grout Leaching Analyses' of the Task Technical Request (TTR) prepared by Savannah River Mission Completion (SRMC). After at least 28 days cured, a sample of each of the SDF waste forms was collected and shipped to a certified laboratory for analysis using Toxicity Characteristic Leaching Procedure (TCLP). The July 2022 semiannual salstone (Full Premix) and the Cement-Free grout samples met the South Carolina (SC) Code of Regulations for Hazardous Waste Management Regulations (HWMR) 61-79.261.24 and 61-79-268.48 requirements for the non-hazardous waste form with respect to Resource Conservation and Recovery Act (RCRA) metals and Underlying Hazardous Constituents (UHCs), and also met the SPF WAC that was in effect at the time of the tank sampling.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Gaussian Process Modeling For Experimental Procedure Uncertainty

Many laboratory experiments generate data that are characterized by a form of uncertainty that differs from noise: experimental procedure uncertainty. The origin of this type of uncertainty is the difficulty in controlling a subset of experimental conditions in such a way that the experiment is perfectly reproducible within noise. In this report, we describe a Gaussian Process modeling-based method that accounts for experimental procedure uncertainty. The method accounts for variations in conditions from experiment to experiment that are independent between experiments, but correlated within each experiment, and incorporates the resulting uncertainty into predictions at future experimental settings. The method is discussed in the context of a specific chemistry application in which Raman scattering spectra are measured from three-component mixtures.

42 ENGINEERING↗

January 2023 Semiannual Saltstone Toxicity Characteristic Leaching Procedure (TCLP) Results

The aqueous waste from Tank 50 (salt solution) is sampled semiannually for transfers to the Saltstone Production Facility (SPF). Salt solution is treated at SPF and disposed of in the Saltstone Disposal Facility (SDF). Per request of customer, X-TTR-Z-00027, Revision 0, two SDF waste form (saltstone) samples were prepared in the Savannah River National Laboratory (SRNL) from the Tank 50 Waste Acceptance Criteria (WAC) sample and Z-area premix material for January 2023 semiannual Toxicity Characteristic Leaching Procedure (TCLP) samples. One sample contained a Full Premix which included 10:45:45 (by weight) of cement, slag, and fly ash. The second sample contained 60:40 (by weight) of slag and fly ash only referred to as the “Cement-Free grout sample.” Results from the technical report support Task 2: ‘Grout Leaching Analyses’ of the Task Technical Request (TTR) prepared by Savannah River Mission Completion (SRMC). After at least 28 days cured, a sample of each of the SDF waste forms was collected and shipped to a certified laboratory for analysis using the Toxicity Characteristic Leaching Procedure (TCLP). The January 2023 semiannual saltstone (Full Premix) and the Cement-Free grout samples met the South Carolina (SC) Code of Regulations for Hazardous Waste Management Regulations (HWMR) 61-79.261.24 and 61-79.268.48 requirements for a non-hazardous waste form with respect to the Resource Conservation and Recovery Act (RCRA) metals and Underlying Hazardous Constituents (UHCs), and also met the SPF WAC that was in effect at the time of the tank sampling.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

April 2024 Semiannual Composite Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) Toxicity Characteristic Leaching Procedure (TCLP) Results

The aqueous waste from the Salt Waste Processing Facility (SWPF) is sampled semiannually for transfers to the Saltstone Production Facility (SPF). Salt solution is treated at SPF and disposed of in the Saltstone Disposal Facility (SDF). Per request of customer, X-TTR-Z-00027, Revision 0, one SDF waste form (saltstone) sample was prepared in the Savannah River National Laboratory (SRNL) from the SWPF Decontaminated Salt Solution (DSS) Waste Acceptance Criteria (WAC) sample and Z-area premix material for the April 2024 semiannual Toxicity Characteristic Leaching Procedure (TCLP) sample. The sample contained 60:40 (by weight) of slag and fly ash (referred to as the “Cement-Free grout sample”). Results from the technical report support Task 2: ‘Grout Leaching Analyses’ of the Task Technical Request (TTR) prepared by Savannah River Mission Completion (SRMC). After at least 28 days cured, a sample of the SDF waste form was collected and shipped to a certified laboratory for analysis using the Toxicity Characteristic Leaching Procedure (TCLP). The April 2024 semiannual Cement-Free grout sample met the South Carolina (SC) Code of Regulations for Hazardous Waste Management Regulations (HWMR) 61-79.261.24 and 61-79.268.48 requirements for a non-hazardous waste form with respect to the Resource Conservation and Recovery Act (RCRA) metals and Underlying Hazardous Constituents (UHCs), and met the SPF WAC that was in effect at the time of the tank sampling.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

October 2024 Semiannual Composite Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) Toxicity Characteristic Leaching Procedure (TCLP) Results

The aqueous waste from the Salt Waste Processing Facility (SWPF) is sampled semiannually for transfers to the Saltstone Production Facility (SPF). Salt solution is treated at SPF and disposed of in the Saltstone Disposal Facility (SDF). Per request of customer, X-TTR-Z-00027, Revision 0, one SDF waste form (saltstone) sample was prepared in the Savannah River National Laboratory (SRNL) from the SWPF Decontaminated Salt Solution (DSS) Waste Acceptance Criteria (WAC) sample and Z-area premix material for the October 2024 semiannual Toxicity Characteristic Leaching Procedure (TCLP) sample. The sample contained 60:40 (by weight) of slag and fly ash (referred to as the “Cement-Free grout sample”). Results from the technical report support Task 2: ‘Grout Leaching Analyses’ of the Task Technical Request (TTR) prepared by Savannah River Mission Completion (SRMC). At 64 days cured, a sample of the SDF waste form was collected and shipped to a certified laboratory for analysis using the Toxicity Characteristic Leaching Procedure (TCLP). The October 2024 semiannual Cement-Free grout sample met the South Carolina (SC) Code of Regulations for Hazardous Waste Management Regulations (HWMR) 61-79.261.24 and 61-79.268.48 requirements for a non-hazardous waste form with respect to the Resource Conservation and Recovery Act (RCRA) metals and Underlying Hazardous Constituents (UHCs), and met the SPF WAC that was in effect at the time of the sample collection at SWPF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DC Fast Charging Test Procedures

This report has been drafted as an initial effort to develop a standardized test procedure for DCFC for LD EVs. The proposed test procedures are designed to be time-efficient, aligned with EV discharge tests, and practical to implement, thereby minimizing the testing and computational efforts required by OEMs and testing authorities.

33 ADVANCED PROPULSION SYSTEMS↗

April 2025 Semiannual Composite Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) Toxicity Characteristic Leaching Procedure (TCLP) Results

The aqueous waste from the Salt Waste Processing Facility is sampled semiannually for transfers to the Saltstone Production Facility. Salt solution is treated at the Saltstone Production Facility and disposed of in the Saltstone Disposal Facility. Per request of customer, X-TTR-Z-00027, Revision 0, one Saltstone Disposal Facility waste form was prepared at Savannah River National Laboratory using the Salt Waste Processing Facility Decontaminated Salt Solution and Z-area premix material for the April 2025 semiannual Toxicity Characteristic Leaching Procedure sample. The sample contained 60:40 (by weight) of slag and fly ash (referred to as the “Cement-Free grout sample”). Results from the technical report support Task 2: ‘Grout Leaching Analyses’ of the Task Technical Request prepared by Savannah River Mission Completion. At 43 days cured, the Saltstone sample was collected and shipped to a certified laboratory for analysis using the Toxicity Characteristic Leaching Procedure. The April 2025 semiannual Cement-Free grout sample met the South Carolina Code of Regulations for Hazardous Waste Management Regulations 61-79.261.24 and 61-79.268.48 requirements for a non-hazardous waste form with respect to the Resource Conservation and Recovery Act metals and Underlying Hazardous Constituents, and met the Saltstone Production Facility Waste Acceptance Criteria that was in effect at the time of the sample collection at the Salt Waste Processing Facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

October 2025 Semiannual Composite Salt Waste Processing Facility Decontaminated Salt Solution Toxicity Characteristic Leaching Procedure Results

The aqueous waste from the Salt Waste Processing Facility is sampled semiannually for transfers to the Saltstone Disposal Facility. Salt solution is treated at the Saltstone Production Facility and disposed of in the Saltstone Disposal Facility. Per request of customer, X-TTR-Z-00027, Revision 0, one Saltstone Processing Facility Decontaminated Salt Solution and Z area premix material for the October 2025 semiannual Toxicity Characteristic Leaching Procedure sample. The sample contained 60:40 (by weight) of slag and fly ash (referred to as the “Cement-Free grout sample”). Results from the technical report support Task 2: ‘Grout Leaching Analyses’ of the Task Technical Request prepared by Savannah River Mission Completion. At 51 days cured, the Saltstone sample was collected and shipped to a certified laboratory for analysis using the Toxicity Characteristic Leaching Procedure. The October 2025 Semiannual Cement-Free grout sample met 61 79.268.48 requirements for a non-hazardous waste form with respect to the Resource Conservation and Recovery Act metals and Underlying Hazardous Constituents and met the Saltstone Production Facility Waste Acceptance Criteria that was in effect at the time of the sample collection at the Salt Waste Processing Facility.

Hsieh, Madison [Savannah River National Laboratory↗

Impact of intense sanitization procedures on bacterial communities recovered from floor drains in pork processing plants

Pork processing plants in the United States (US) cease operations for 24–48 h every six or twelve months to perform intense sanitization (IS) using fogging, foaming, and further antimicrobial treatments to disrupt natural biofilms that may harbor pathogens and spoilage organisms. The impact such treatments have on short-term changes in environmental microorganisms is not well understood, nor is the rate at which bacterial communities return. Swab samples were collected from floor drains to provide representative environmental microorganisms at two US pork processing plants before, during, and after an IS procedure. Samples were collected from four coolers where finished carcasses were chilled and from four locations near cutting tables. Each sample was characterized by total mesophile count (TMC), total psychrophile count (TPC), and other indicator bacteria; their biofilm-forming ability, tolerance of the formed biofilm to a quaternary ammonium compound (300 ppm, QAC), and ability to protect co-inoculated Salmonella enterica. In addition, bacterial community composition was determined using shotgun metagenomic sequencing. IS procedures disrupted bacteria present but to different extents depending on the plant and the area of the plant. IS reduced TPC and TMC, by up to 1.5 Log 10 CFU only to return to pre-IS levels within 2–3 days. The impact of IS on microorganisms in coolers was varied, with reductions of 2–4 Log 10 , and required 2 to 4 weeks to return to pre-IS levels. The results near fabrication lines were mixed, with little to no significant changes at one plant, while at the other, two processing lines showed 4 to 6 Log 10 reductions. Resistance to QAC and the protection of Salmonella by the biofilms varied between plants and between areas of the plants as well. Community profiling of bacteria at the genus level showed that IS reduced species diversity and the disruption led to new community compositions that in some cases did not return to the pre-IS state even after 15 to 16 weeks. The results found here reveal the impact of using IS to disrupt the presence of pathogen or spoilage microorganisms in US pork processing facilities may not have the intended effect.

59 BASIC BIOLOGICAL SCIENCES↗

Validation of the SCALE/Polaris-PARCS Code Procedure with the ENDF/B-VII.1 AMPX 56-Group Library: Pressurized Water Reactor

This study was conducted to validate the SCALE/Polaris v6.3.0–PARCS v3.4.2 code procedure with the Evaluated Nuclear Data File (ENDF)/B-VII.1 AMPX 56-group library for pressurized water reactor (PWR) analysis, by comparing simulated results with measured data for critical experiments and operating PWRs. Uncertainties of the SCALE/Polaris–PARCS code procedure for PWR analysis were evaluated in the validation for the PWR key nuclear parameters such as critical boron concentrations, reactivity, control bank work, temperature coefficients, and pin and assembly power peaking factors.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Validation of the SCALE/Polaris–PARCS Code Procedure With the ENDF/B-VII.1 AMPX 56-Group Library: Boiling Water Reactor

The SCALE/Polaris–PARCS code procedure has been used in the confirmatory analysis for boiling water reactors by the US Nuclear Regulatory Commission. In this study, the SCALE/Polaris v6.3.0–PARCS v3.4.2 code procedure with the Evaluated Nuclear Data File (ENDF)/B-VII.1 AMPX 56-group library was validated by comparing the simulated results with the measured data for operating boiling water reactors, including Peach Bottom Unit 2 cycles 1–3, Hatch Unit 1 cycles 1–3, and Quad Cities Unit 1 cycles 1–3. The uncertainties and biases of the SCALE/Polaris–PARCS code package for boiling water reactor physics analysis were evaluated in the validation for key nuclear parameters such as reactivity and traversing in-core probe data.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

NASA Announces Spacecraft Decontamination Procedures

The National Aeronautics and Space Administration has announced procedures for the sterilization of planetary spacecraft and revised the procedures for the decontamination of unmanned lunar landers.

DECONTAMINATION↗

Weld procedure produces quality welds for thick sections of Hastelloy-X

Welding program produces premium quality, multipass welds in heavy tube sections of Hastelloy-X. It develops semiautomatic tungsten/inert gas procedures, weld wire procurement specifications material weld properties, welder-operator training, and nondestructive testing inspection techniques and procedures.

Flens, F. J.↗

Simplified interplanetary guidance procedures using onboard optical measurements

Simplified guidance procedures have been developed which are based on preflight determination of the characteristics of perturbed trajectories. The results are devoted primarily to planetary approach guidance; however, some considerations for midcourse guidance are included. The methods are studied for an Earth-to-Mars trajectory but would be applicable to Grand Tour and other types of missions. Generally requiring only a single onboard optical angular measurement, the approach procedure predicts guidance corrections for the control of periapsis radius as well as orbital plane orientation. An error analysis has shown that the periapsis radius at Mars can be controlled to a 1 sigma accuracy of about 20 km if the guidance is performed 1/2 day before periapsis passage. If the guidance is performed at the Martian sphere of influence (2.2 days before periapsis), the error doubles because of the increased effect of measurement and maneuvering errors.

Hamer, H. A.↗

A procedure for predicting internal and external noise fields of blowdown wind tunnels

The noise generated during the operation of large blowdown wind tunnels is considered. Noise calculation procedures are given to predict the test-section overall and spectrum level noise caused by both the tunnel burner and turbulent boundary layer. External tunnel noise levels due to the tunnel burner and circular jet exhaust flow are also calculated along with their respective cut-off frequency and spectrum peaks. The predicted values are compared with measured data, and the ability of the prediction procedure to estimate blowdown-wind-tunnel noise levels is shown.

Hosier, R. N.↗