Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “electrical distribution system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Oak Ridge National Laboratory Pilot Demonstration of an Attestation and Anomaly Detection Framework using Distributed Ledger Technology for Power Grid Infrastructure

This report summarizes the design and pilot demonstration of a framework called Grid Guard that was created to provide increased data and device trustworthiness to electric grid devices by leveraging distributed ledger technology (DLT), specifically blockchain. Grid Guard contains a combination of core cryptographic methods such as the secure hash algorithm (SHA), and asymmetric cryptography, private permissioned blockchain, baselining configuration data, consensus algorithm (Raft) and the Hyperledger Fabric (HLF) framework. The system implements a low energy, fast, and robust enhancement to system trustworthiness within and across electric grid systems such as substations, control centers and metering infrastructures. Blockchain is a distributed database structured that provides a practically unalterable (immutable) timeline of stored transactions. By relying on hashing and the Raft consensus algorithm, if an entity tries to illegitimately alter a record at one instance of the database the other ledger nodes are not altered. They work to cross-reference each other and easily locate any incorrectly added data and remove it. The bulk raw data is stored in an off-chain storage (outside of the blockchain ledger) and a hash of this baseline data is stored in the Blockchain ledger via hashing windows of time-series and configuration data, after aggregation and filtering. The bulk off-chain data repository is then considered to be trust-anchored using the hashes stored in the blockchain. To secure the electric grid testbed devices and data, device configuration baselines were compared to those baselines that had been previously stored in the ledger. Statistical baselines for device configurations, network communication patterns, and high-speed sensor data are calculated and then stored off-chain and hashes stored in the ledger. Measurements such as three-phase voltage and current, frequency, breaker status, protection scheme settings, network configuration settings (and other device configuration artifacts) and network traffic features (packet interarrival times) are compared every minute or other selected time windows. During phase 1 of the Grid Guard DLT project different DLT technologies were studies, and an assessment was performed on DLT technology vulnerabilities, uses, and key characteristics. DLT consensus protocols were studies (e.g., RAFT, named after Reliable, Replicated, Redundant, And Fault-Tolerant). Also, cryptography, public, private and permissioned or permissionless systems were assessed. Grid Guard implements a permissioned private DLT. Consensus algorithm selection and choice of DLT implementation depended heavily on the use-case. For this use-case, parameters were selected to measure performance and existing tools for assessment. Benchmarking was performed theoretically and practically. During phase 2 hashed transactions/blocks were inserted into the ledger every second. During phase 2 of the Grid Guard DLT project, a prototype framework was developed and demonstrated for attestation of critical substation devices and data using precision timing systems that use PTP and IRIG-B protocols) on a testbed of operational devices that emulated a distribution substation, control center, and power metering infrastructure using real Operational Technology (OT). The testbed includes OT devices such as protective relays, human machine interfaces (HMI), and power meters. To determine when to collect and compare system and network baselines, an initial examination of an anomaly detection capability to identify malicious manipulation of data streams was conducted. The resulting anomaly detection was demonstrated in a set of experiments and leveraged to trigger device artifact attestation checks. Attestation checks occur against device configuration baselines when compared with the immutable blockchain-stored baselines, which provided a cryptographically supported means by which to store baselines. The electrical substation-grid testbed was created to test the Grid Guard framework. The testbed emulates the operations of a portion of a power grid and SCADA systems as closely as possible. The testbed integrates real protocols, mainly IEC 61850 standard protocols, such as the Sampled Value (SV) and the GOOSE protocols. The testbed also supports DNP3 and other layer 2 and layer 3 protocols such as Telnet, SSH, SFTP/FTP and other proprietary protocols needed to connect to industrial control system equipment. The testbed emulates real power conditions using the OpalRT hardware-in-the-loop (HIL) device which can create fault situations that cannot be easily tested on real systems. The electrical substation-grid testbed was created using real measurement, communication, and protection devices that electrical utilities commonly use.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Fermilab PIP-II CDS & CM Cryogenic Controls System

Details on Final design for Cryogenic Electrical & Controls System for Fermilab' s next-gen particle accelerator PIP-II. Electrical Controls System includes instrumentation and controls of Cryogenics Distribution System and Cryomodules. Design includes Siemens PCS7 Controls System with 26 Remote IO Rittal Cabinets and 48 Relay Racks for Temperature Readouts, Valve Positioners, Level, Heater Controls etc. Electrical Drawings and Design have been completed with focus now on fabrication of the 26 Rittal Cabinets and 48 Relay Racks. All materials have been procured. EPICS will be used as a SCADA system communicating to S7 Controllers via OPC UA.

Patel, Pratik [Fermilab]↗

Fermilab PIP-II CDS and CM Cryogenic Controls System

Details on Final design for Cryogenic Electrical & Controls System for Fermilab' s next-gen particle accelerator PIP-II. Electrical Controls System includes instrumentation and controls of Cryogenics Distribution System and Cryomodules. Design includes Siemens PCS7 Controls System with 26 Remote IO Rittal Cabinets and 48 Relay Racks for Temperature Readouts, Valve Positioners, Level, Heater Controls etc. Electrical Drawings and Design have been completed with focus now on fabrication of the 26 Rittal Cabinets and 48 Relay Racks. All materials have been procured. EPICS will be used as a SCADA system communicating to S7 Controllers via OPC UA.

Patel, Pratik [Fermilab]↗

Simulating noise on a quantum processor: interactions between a qubit and resonant two-level system bath

Material defects fundamentally limit the coherence times of superconducting qubits, and manufacturing completely defect-free devices is not yet possible. Therefore, understanding the interactions between defects and a qubit in a real quantum processor design is essential. We build a model that incorporates the standard tunneling model, the electric field distributions in the qubit, and open quantum system dynamics, and draws from the current understanding of two-level system (TLS) theory. Specifically, we start with one million TLSs distributed on the surface of a qubit and pick the 200 systems that are most strongly coupled to the qubit. We then perform a full Lindbladian simulation that explicitly includes the coherent coupling between the qubit and the TLS bath to model the time dependent density matrix of resonant TLS defects and the qubit. We find that the 200 most strongly coupled TLSs can accurately describe the qubit energy relaxation time. This work confirms that resonant TLSs located in areas where the electric field is strong can significantly affect the qubit relaxation time, even if they are located far from the Josephson junction (JJ). Similarly, a strongly-coupled resonant TLS located in the JJ does not guarantee a reduced qubit relaxation time if a more strongly coupled TLS is far from the JJ. In addition to the coupling strengths between TLSs and the qubit, the model predicts that the geometry of the device and the TLS relaxation time play a significant role in qubit dynamics. Our work can provide guidance for future quantum processor designs with improved qubit coherence times.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Real Time - Optimal Power Flow Based Distributed Energy Resources Management System (DERMS) (CRADA Number CRD-20-16909 Final Report)

The integration of behind-the-meter distributed energy resources (DERs) into distribution systems brings transformative changes to power systems. This requires operators and planners to find solutions to modernize electric grids and to effectively manage DERs for grid services. NREL developed novel DER management algorithms (referred to as Real-Time Optimal Power Flow, RT-OPF) through U.S. Department of Energy (DOE)-funded efforts, including Advanced Research Projects Agency–Energy (ARPA-E) Network Optimized Distributed Energy Systems (NODES) funding. This cutting-edge control technology aims to modernize distribution systems with large amounts of DER integration, which will help utilities solve issues brought by renewable integration and build resilient and renewable-based electric grids nationwide. Utilidata worked with NREL to investigate the commercialization opportunity of this RT-OPF-based distributed energy resource management system (DERMS). In this project, NREL performs the technology transfer of the RT-OPF to Utilidata to help them fully understand the RT-OPF solution, to identify potential engineering hurdles, and to assess the expected commercial value of various RT-OPF use cases and deployment. The technology transfer work includes two major tasks. First, NREL performs an in-depth knowledge transfer of the entire RT-OPF solution to Utilidata to help them gain an extensive and detailed understanding of the complete RT-OPF solution. In this task, NREL provides exhaustive information (e.g., documentation, code packages, laboratory and field trial data, performance results) while conducting in-depth training sessions to provide a thorough explanation of the entire solution. NREL hosts meetings to present different topics related to the RT-OPF solution, and question-and-answer sessions are included in each meeting to better explain the RT-OPF-related work. Second, the RT-OPF simulations are performed in a laboratory environment. The main objectives of this task are to walk through with Utilidata engineers how to set up a simulation of RT-OPF, identifying each RT-OPF code block/component in operation, learning how these components interact with each other, and eventually running RT-OPF simulations under various system conditions. This task helps Utilidata engineers understand performance limitations and constraints while also quantifying the commercial value of the RT-OPF for different use cases. Based on these two tasks, Utilidata engineers should be able to define and prioritize the next steps of RT-OPF implementation with an eye toward commercial success and scalability of the solution. The next steps are expected to be part of a new project following the conclusion of this project.

24 POWER TRANSMISSION AND DISTRIBUTION↗

What Role Do Aggregators Play in Power System Security and Resilience?

Barriers to the participation of distributed energy resources (DERs) in wholesale electricity markets have limited the use of DERs for power system security and resilience. In September 2020, the Federal Energy Regulatory Commission (FERC) approved an order to reduce these barriers. FERC Order No. 2222 enables the participation of DER aggregators in wholesale electricity markets. DERs include renewable generation and technologies that support the integration of renewable generation by increasing grid flexibility and resilience. Requiring wholesale energy markets to allow DER aggregator participation provides a path for DERs to become competitive in these markets. As the contribution from aggregated DERs continues to increase, the aggregator's role in supporting grid security and resilience will become more critical. This paper reviews work that demonstrates how DER aggregators can provide resilience support through technical capabilities, operational strategies, and secure communication architectures. Socioeconomic influences and impacts of aggregators, including implications for social resilience, are presented. In surveying the current state-of-the-art across different but interconnected topics, we illustrate how aggregators can be power system participants that enhance grid security. There is no one-size-fits-all approach to enhancing resilience in a power grid that includes a growing cohort of DER aggregators, but there are many options for aggregators to contribute to a more resilient and secure power grid.

aggregator↗

A Hierarchical Local Electricity Market for a DER-rich Grid Edge

We report with increasing penetration of distributed energy resources (DER) in the distribution system, it is critical to design market structures that enable smooth integration of DERs. A hierarchical local electricity market (LEM) structure is proposed in this paper with a secondary market (SM) at the lower level representing secondary feeders and a primary market (PM) at the upper level, representing primary feeders, in order to effectively use DERs to increase grid efficiency and resilience. The lower level SM enforces budget, power balance, and flexibility constraints and accounts for costs related to consumers, such as their disutility, flexibility limits, and commitment reliability, while the upper level PM enforces grid physics constraints such as power balance and capacity limits, and also minimizes line losses. The hierarchical LEM is extensively evaluated using a modified IEEE-123 bus with high DER penetration, with each primary feeder consisting of at least three secondary feeders. Data from a GridLAB-D model is used to emulate realistic power injections and load profiles over the course of 24 hours. The performance of the LEM is illustrated by delineating the family of power-injection profiles across the primary and secondary feeders as well as corresponding local electricity tariffs that vary across the distribution grid. Through numerical simulations, the hierarchical LEM is shown to improve the efficiency of the market in terms of lowering overall costs, including both the distribution-level locational marginal prices (d-LMP) as well as retail tariffs paid by customers. Together, it represents an overall framework for a Distribution System Operator (DSO) who can provide the oversight for the entire LEM.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Precursor Analysis Report: Industroyer Targeting Ukraine Electric Power Transport Utility (Ukrenergo) 2016

The Industroyer Targeting Ukraine Electric Power Transport Utility (Ukrenergo) 2016 Precursor Analysis Report leverages publicly available information about the December 2016 cyber attack against the Ukrainian Ukrenergo electric transmission utility and catalogs anomalous observables for each technique employed in the attack. This analysis is based upon the methodology of the Cybersecurity for the Operational Technology Environment (CyOTE) program. Industroyer is a modular malware framework designed to deploy several Industrial Control System (ICS) protocol-specific attack payloads to disrupt electricity distribution. Adversaries deployed Industroyer within the target network on a Microsoft Windows endpoint capable of directly manipulating or communicating with ICS. Industroyer abuses the functionality of a targeted ICS’s legitimate control system to achieve its intended impact. Adversaries likely first gained access to Ukrenergo enterprise networks in early 2016 after a successful spearphishing campaign against organizations in the electric power sector. Adversaries then began capturing credentials beginning on 1 December 2016. This allowed access to the ICS environment at the Pivnichna electric transmission substation outside Kyiv through a device dual-homed on the Information Technology (IT) and ICS networks. Adversaries conducted discovery, targeting, and access to this device using information and previously captured credentials from compromised enterprise IT machines. Finally, the adversaries deployed and launched the Industroyer malware just before midnight on 17 December. By midnight, Ukrenergo had lost control of a targeted substation, resulting in electric power outages for over an hour in the city of Kyiv and the Kyiv region. Researchers and analysts identified 31 unique techniques (used in a sequence of 33 steps) utilized during the attack with a total of 846 observables using MITRE ATT&CK® for Industrial Control Systems. The CyOTE program assesses observables accompanying techniques used prior to the triggering event to identify opportunities to detect malicious activity. If observables accompanying the attack techniques are perceived and investigated prior to the triggering event, earlier comprehension of malicious activity can take place. Twenty-nine of the identified techniques used during the Industroyer cyber attack were precursors to the triggering event. Analysis identified 548 observables associated with these precursor techniques, 353 of which were assessed to have an increased likelihood of being perceived in the 300 days preceding the triggering event. The response and comprehension time could have been reduced if the observables had been identified earlier. The information gathered in this report contributes to a library of observables tied to a repository of artifacts, data sources, and technique detection references for practitioners and developers to support the comprehension of indicators of attack. Asset owners and operators can use these products if they experience similar observables or to prepare for comparable scenarios.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Integrated Transportation-Energy Systems Modeling

Transportation is currently the least-diversified energy demand sector, with over 90% of global transportation energy use coming from petroleum product. After over a century of petroleum dominance, however, many leading experts anticipate major electrification trends that could disrupt the transportation energy demand landscape. These changes in electricity demand complement profound changes happening within electric power supply systems, including integration of variable renewables, distributed generation and storage, and greater participation in power system planning and operations from traditionally passive consumers. This broader context underscores the importance of understanding how transportation electrification will impact electricity demand, including changes in the load shapes that characterize the system and the opportunity to leverage flexible EV charging to more cost-effectively balance demand and supply. This talk provides an overview of recent findings on infrastructure requirements to support EV adoption, integration challenges and the impact of EV on power systems, and opportunities to leverage flexible (or smart) EV charging to support power system planning and operations.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Volt-Var Curve Reactive Power Control Requirements and Risks for Feeders with Distributed Roof-Top Photovoltaic Systems

The benefits and risks associated with Volt-Var Curve (VVC) control for management of voltages in electric feeders with distributed, roof-top photovoltaic (PV) can be defined using a stochastic hosting capacity analysis methodology. Although past work showed that a PV inverter’s reactive power can improve grid voltages for large PV installations, this study adds to the past research by evaluating the control method’s impact (both good and bad) when deployed throughout the feeder within small, distributed PV systems. The stochastic hosting capacity simulation effort iterated through hundreds of load and PV generation scenarios and various control types. The simulations also tested the impact of VVCs with tampered settings to understand the potential risks associated with a cyber-attack on all of the PV inverters scattered throughout a feeder. The simulation effort found that the VVC can have an insignificant role in managing the voltage when deployed in distributed roof-top PV inverters. This type of integration strategy will result in little to no harm when subjected to a successful cyber-attack that alters the VVC settings.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimal Electric Vehicle Charging and Discharging Strategies Under DER Compensation Programs: Preprint

The adoption of electric vehicles (EVs) is becoming increasingly popular because of environmental concerns, the greater availability of models, and increased cost-competitiveness with gas vehicles. Because EVs have both charging and discharging capabilities, they provide great potential to help electric utilities with grid operation. When the grid demand is high, EVs can discharge to the grid to reduce the peak load, and vice versa; therefore, electric utilities have designed different policies to encourage EV charging station operators to charge or discharge at certain time periods. The New York State Public Service Commission established the Value of Distributed Energy Resources (VDER), or the Value Stack, to compensate for energy created by distributed energy resources, including EVs. This paper presents an optimization-based approach to identify the "golden hours" and "golden spots," i.e., the effective time periods and geographic locations for EV charging station operators to charge or discharge under the VDER program that can provide them the highest benefit. The proposed methodology can be applied to other compensation mechanisms and distribution systems as well. By working with industry partner NineDot Energy, realistic charging station information is used in this study, and the proposed approach is tested on a distribution feeder. The results from this study can help electric utilities and EV charging station operators determine the ideal charging/discharging time and the ideal locations for the charging station(s) in their distribution systems to achieve maximized benefit.

electric vehicle↗

A Plug-and-Play Design Suite of Converters for the Electric Grid

Power electronic (PE) systems are increasingly being integrated into the electric grid in a distributed fashion. As the number of installations increases, the challenge of integration of these systems into the grid is also growing. Advanced control features of these systems are often overlooked or neglected due to the complex nature and novelty of these systems. This is also complicated from the vendor point of view as different converter topology integration is usually composed of single system designs with tight coupling and configurations. The presented work discusses a novel architecture for the integration of PE systems with other sources and loads to create a coordinated controllable resource for the grid. The presented work also describes a system level controller to coordinate these systems. 1 Testing results on a hardware in the loop (HIL) platform are provided to show the validity of the proposed architecture and framework.

Starke, Michael↗

2022 Component Innovation Awardee: Windurance

Combining battery energy storage with distributed wind energy systems can increase production, ability to meet local electricity demands, interconnection capacity, and potential sales of surplus energy back to the grid, while reducing demand charges and the overall levelized cost of energy (LCOE). Energy storage options for distributed wind energy systems can vary widely in terms of power level and energy storage capacity, and their potential benefits depend on factors including wind resource, turbine design, connection requirements, use patterns, utility rates, and regulations. Windurance received a 2022 Competitiveness Improvement Project (CIP) funding award to add battery energy storage capabilities to the company's bidirectional DC converter. The energy storage component will complete a comprehensive portfolio of power conversion and control electronics that can be seamlessly integrated with distributed wind systems. The company received earlier CIP awards to fund prototype design and construction of wind turbine pitch actuators, inverters, and controllers.

CIP↗

Electrical Fault and Power Quality Detection Algorithms and Customer-Owned DERs Monitoring with a Cyber Grid Guard System and DLT

In this study, the electrical fault and power quality detection algorithms and customer-owned DERs monitoring use cases were implemented, with a Cyber Grid Guard system and DLT. Electrical utilities continue to deploy more intelligent electronic devices (IEDs) inside and outside electrical substations, and are associated with customer-owned distributed energy resources (DERs). Data from these IEDs, such as power meters and protection relays, must be kept confidential and of high integrity. Blockchain technology has the potential to increase microgrid resilience by enhancing data sharing security. The growing use of IEDs and customer-owned renewable energy sources (DERs) may make it necessary to connect Distributed Ledger Technology (DLT) with power system applications. We implemented the electrical faulted phase detection and power quality monitoring algorithms with a Cyber Grid Guard (CGG) system using DLT. In addition, the DERs (wind turbine farms) use case and protective relay cyber-event tests were assessed, by using the CGG system with DLT. In the experimental model, the testbed was created by using a real-time simulator and CGG system with power meters/ protective relays in the loop. The data collected from the CGG system and IEDs were compared with the same time stamp source. These results showed the successful assessment of protection, control and monitoring applications using a CGG system with DLT. In the future, power system applications for the ESGT with DERs and the CGG system will be based on executing smart contracts between electrical utilities and customer-owned DERs.

Piesciorovsky, Emilio↗

The Los Angeles 100% Renewable Energy Study (LA100): Chapter 7. Distribution System Analysis

The City of Los Angeles has set ambitious goals to transform its electricity supply, aiming to achieve a 100% renewable energy power system by 2045, along with aggressive electrification targets for buildings and vehicles. To reach these goals, and assess the implications for jobs, electricity rates, the environment, and environmental justice, the Los Angeles City Council passed a series of motions directing the Los Angeles Department of Water and Power (LADWP) to determine the technical feasibility and investment pathways of a 100% renewable energy portfolio standard. The Los Angeles 100% Renewable Energy Study (LA100) is a first-of-its-kind objective, rigorous, and science-based power systems analysis to determine what investments could be made to achieve these goals. The LA100 final report is presented as a collection of 12 chapters and an executive summary, each of which is available as an individual download. This chapter summarizes the growth in distribution-connected energy resources and provides a detailed review of impacts to the distribution grid of growth in customer electricity demand, solar, and storage, as well as required distribution grid upgrades and associated costs.

100% Renewable↗

The Distribution System Operator with Transactive (DSO+T) Study

The Distribution System Operator with Transactive (DSO+T) study investigates the engineering and economic performance of a transactive energy retail market coordinating a high penetration of customer-side flexible energy assets. The study seeks to answer whether such an implementation is cost effective for customers, recovers sufficient revenue for DSOs, and is equally applicable and beneficial to a range of flexible asset types, renewable generation scenarios, and market assumptions. Using a highly interdisciplinary co-simulation and valuation framework, this assessment encompasses the entire electrical delivery system from bulk system generation and transmission, through the distribution system, to the modeling of individual customer buildings and flexible assets (including heating, ventilation, and air conditioning [HVAC] units, water heaters, batteries, and electric vehicles). The study exercises a transactive energy retail market coordination scheme designed to integrate with an existing day-ahead and real-time competitive wholesale electricity market. Software decision-making agents are designed for the retail market operator as well as various price-responsive flexible assets. The engineering and economic performance of the transactive energy scheme is studied for two separate flexible asset deployments: flexible loads (HVAC units and residential water heaters) and behind-the-meter batteries. The results of each transactive case are compared to a business-as-usual case. These cases are subject to two different renewable generation scenarios, a moderate renewable generation scenario, representative of current levels of renewable generation deployment, and a future high renewables scenario, including the increased deployment of rooftop solar photovoltaic and electric vehicles. The transactive coordination scheme is shown to produce effective and stable control and decrease peak loads 9–15%. The resulting annual demand flexibility provides net economic savings of $3.3–5.0B per year for a region the size of Texas. Detailed analysis shows that net benefits were seen for a range of distribution system operator, customer, and flexible asset types. Both participating customer (with transactive flexible assets) and nonparticipating customers (with nonflexible assets) see reductions in annual utility bills and net annual energy expenses in the range of 10–16%.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Distribution System Operator with Transactive (DSO+T) Study: Volume 1 (Main Report)

The Distribution System Operator with Transactive (DSO+T) study investigates the engineering and economic performance of a transactive energy retail market coordinating a high penetration of customer-side flexible energy assets. The study seeks to answer whether such an implementation is cost effective for customers, recovers sufficient revenue for DSOs, and is equally applicable and beneficial to a range of flexible asset types, renewable generation scenarios, and market assumptions. Using a highly interdisciplinary co-simulation and valuation framework, this assessment encompasses the entire electrical delivery system from bulk system generation and transmission, through the distribution system, to the modeling of individual customer buildings and flexible assets (including heating, ventilation, and air conditioning [HVAC] units, water heaters, batteries, and electric vehicles). The study exercises a transactive energy retail market coordination scheme designed to integrate with an existing day-ahead and real-time competitive wholesale electricity market. Software decision-making agents are designed for the retail market operator as well as various price-responsive flexible assets. The engineering and economic performance of the transactive energy scheme is studied for two separate flexible asset deployments: flexible loads (HVAC units and residential water heaters) and behind-the-meter batteries. The results of each transactive case are compared to a business-as-usual case. These cases are subject to two different renewable generation scenarios, a moderate renewable generation scenario, representative of current levels of renewable generation deployment, and a future high renewables scenario, including the increased deployment of rooftop solar photovoltaic and electric vehicles. The transactive coordination scheme is shown to produce effective and stable control and decrease peak loads 9–15%. The resulting annual demand flexibility provides net economic savings of $3.3–5.0B per year for a region the size of Texas. Detailed analysis shows that net benefits were seen for a range of distribution system operator, customer, and flexible asset types. Both participating customer (with transactive flexible assets) and nonparticipating customers (with nonflexible assets) see reductions in annual utility bills and net annual energy expenses in the range of 10–16%.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗