Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “deployment strategy”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

The National Transmission Planning Study: Chapter 2: Long-Term U.S. Transmission Planning Scenarios

The National Transmission Planning Study (NTP Study) was led by the U.S. Department of Energy's Grid Deployment Office, in partnership with the National Renewable Energy Laboratory and Pacific Northwest National Laboratory. The study sought to develop new national grid-scale planning tools and methods that can be used by industry, especially when planning for interregional transmission capacity needs; identify potential transmission solutions that will provide broad-scale benefits to electric customers under a wide range of potential futures; inform planning processes for regional and interregional transmission; and identify interregional and national strategies to maintain grid reliability as the grid transitions, including to a reliance on low- and zero-carbon energy resources. The NTP Study is presented as a collection of six chapters.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

The National Transmission Planning Study: Chapter 3: Transmission Portfolios and Operations for 2035 Scenarios

The National Transmission Planning Study (NTP Study) was led by the U.S. Department of Energy's Grid Deployment Office, in partnership with the National Renewable Energy Laboratory and Pacific Northwest National Laboratory. The study sought to develop new national grid-scale planning tools and methods that can be used by industry, especially when planning for interregional transmission capacity needs; identify potential transmission solutions that will provide broad-scale benefits to electric customers under a wide range of potential futures; inform planning processes for regional and interregional transmission; and identify interregional and national strategies to maintain grid reliability as the grid transitions, including to a reliance on low- and zero-carbon energy resources. The NTP Study is presented as a collection of six chapters.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

The National Transmission Planning Study: Chapter 5: Stress Analysis for 2035 Scenarios

The National Transmission Planning Study (NTP Study) was led by the U.S. Department of Energy's Grid Deployment Office, in partnership with the National Renewable Energy Laboratory and Pacific Northwest National Laboratory. The study sought to develop new national grid-scale planning tools and methods that can be used by industry, especially when planning for interregional transmission capacity needs; identify potential transmission solutions that will provide broad-scale benefits to electric customers under a wide range of potential futures; inform planning processes for regional and interregional transmission; and identify interregional and national strategies to maintain grid reliability as the grid transitions, including to a reliance on low- and zero-carbon energy resources. The NTP Study is presented as a collection of six chapters.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

The National Transmission Planning Study: Chapter 6: Conclusions

The National Transmission Planning Study (NTP Study) was led by the U.S. Department of Energy's Grid Deployment Office, in partnership with the National Renewable Energy Laboratory and Pacific Northwest National Laboratory. The study sought to develop new national grid-scale planning tools and methods that can be used by industry, especially when planning for interregional transmission capacity needs; identify potential transmission solutions that will provide broad-scale benefits to electric customers under a wide range of potential futures; inform planning processes for regional and interregional transmission; and identify interregional and national strategies to maintain grid reliability as the grid transitions, including to a reliance on low- and zero-carbon energy resources. The NTP Study is presented as a collection of six chapters.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

The National Transmission Planning Study: Chapter 4: AC Power Flow Analysis for 2035 Scenarios

The National Transmission Planning Study (NTP Study) was led by the U.S. Department of Energy's Grid Deployment Office, in partnership with the National Renewable Energy Laboratory and Pacific Northwest National Laboratory. The study sought to develop new national grid-scale planning tools and methods that can be used by industry, especially when planning for interregional transmission capacity needs; identify potential transmission solutions that will provide broad-scale benefits to electric customers under a wide range of potential futures; inform planning processes for regional and interregional transmission; and identify interregional and national strategies to maintain grid reliability as the grid transitions, including to a reliance on low- and zero-carbon energy resources. The NTP Study is presented as a collection of six chapters.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

Mitigating Interfacial Mismatch between Lithium Metal and Garnet-Type Solid Electrolyte by Depositing Metal Nitride Lithiophilic Interlayer

Solid-state lithium batteries are generally considered as the next-generation battery technology that benefits from inherent nonflammable solid electrolytes and safe harnessing of high-capacity lithium metal. Among various solid-electrolyte candidates, cubic garnet-type Li 7 La 3 Zr 2 O 12 ceramics hold superiority due to their high ionic conductivity (10 –3 to 10 –4 S cm -1 ) and good chemical stability against lithium metal. However, practical deployment of solid-state batteries based on such garnet-type materials has been constrained by poor interfacing between lithium and garnet that displays high impedance and uneven current distribution. Herein, we propose a facile and effective strategy to significantly reduce this interfacial mismatch by modifying the surface of such garnet-type solid electrolyte with a thin layer of silicon nitride (Si 3 N 4 ). This interfacial layer ensures an intimate contact with lithium due to its lithiophilic nature and formation of an intermediate lithium–metal alloy. The interfacial resistance experiences an exponential drop from 1197 to 84.5 Ω cm 2 . Lithium symmetrical cells with Si 3 N 4 -modified garnet exhibited low overpotential and long-term stable plating/stripping cycles at room temperature compared to bare garnet. Furthermore, a hybrid solid-state battery with Si 3 N 4 -modified garnet sandwiched between lithium metal anode and LiFePO 4 cathode was demonstrated to operate with high cycling efficiency, excellent rate capability, and good electrochemical stability. This work represents a significant advancement toward use of garnet solid electrolytes in lithium metal batteries for the next-generation energy storage devices.

25 ENERGY STORAGE↗

DSO+T: Transactive Energy Coordination Framework (DSO+T Study: Volume 3)

This report describes a transactive energy coordination scheme designed to integrate into existing day-ahead and real-time wholesale energy markets. This scheme was evaluated in the Distribution System Operator with Transactive (DSO+T) study to assess the engineering and economic performance of the transactive energy coordination of a large-scale deployment of distributed energy resources (DER). Transactive agents were developed for a range of DERs (heating, ventilation, and air conditioning units, water heaters, batteries, and electric vehicles) that optimize flexibility over a 48-hour horizon and adjust their strategy in response to changes in real-time prices. A transactive energy coordination scheme, executed by a DSO retail market operator, aggregates these DER bids from participating customers and clears them against a DSO supply curve using a double auction market mechanism. The process of constructing the price-quantity DSO supply curve includes distribution-level transportation constraints (for example, substation congestion limits) and forecast locational marginal price of the DSO’s connected transmission node. The resulting day-ahead and real-time quantities are then bid into a competitive wholesale market operated by an independent system operator. This report also details additional capabilities for proper marketplace simulation such as wholesale price, weather, and load forecasting. The report concludes with a discussion of lessons learned and key design features required to ensure successful operation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Virtual Power Plant Profiles and Inventory

Increased adoption of distributed energy resources (DERs), growing quantities of renewable energy on the grid, and load growth from buildings, industry, and data centers are driving the need for increased demand flexibility and solutions to reliably and cost-effectively balance electricity supply and demand. In order to deploy DERs on a similar scale as conventional supply-side resources, utilities and state decision-makers are exploring a range of programmatic approaches and market designs, including Virtual Power Plants (VPP). Based on interviews with more than twenty subject matter experts on VPPs, the Insights into Scaling Virtual Power Plants report and appendix outlines actions that utilities and regulators can take to expand VPPs, organized around successful VPP designs, deployment, and operation. The companion report, Virtual Power Plant Profiles and Inventory describes three conceptual profiles that can be used as a starting point to facilitate clear discussions among regulators, utilities, solution providers, and stakeholders about various VPP strategies. It also includes details on more than 790 demand response programs and net energy metering solar plus battery programs, and 180 VPP programs. The Inventory is provided below as a separate file.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Resilient Operation of Networked Community Microgrids with High Solar Penetration

This project, funded by the US Department of Energy’s Solar Energy Technologies Office (SETO), focused on the operation of microgrids as a coordinated network. The primary objective, which was successfully achieved, was to develop both control strategies and hardware solutions to support the resilient and efficient operation of networked microgrids with high solar penetration. The work was structured around the following four main tasks: • Development of distributed and scalable optimization algorithms for AC-coupled networked microgrids. • Design and implementation of a novel DC interconnection hardware to enable precise power exchange between microgrids. • Laboratory operational validation of the developed technologies using 480 V testbeds and commercially available hardware. • Field operational validation of the complete solution in Adjuntas, Puerto Rico, interconnecting two kW-scale, split-phase microgrids of Casa Pueblo’s microgrids. This project addressed multiple technical challenges across the domains of optimization, control, hardware interconnection, and protection. One of its key contributions was delivering tangible, real-world solutions for networking microgrids. In contrast to purely theoretical or simulation-based work, this project included full-scale hardware operational validation both in the lab and in the field. The work conducted as part of this project—in collaboration with the University of Puerto Rico; the University of Tennessee, Knoxville; the University of Central Florida; and Casa Pueblo—has advanced the state of the art in networked microgrids. Key contributions include the development of distributed control strategies, practical solutions for real-world implementation challenges, and the introduction of a novel DC interlink approach for microgrid interconnection. The project featured both laboratory and field validation using commercial off-the-shelf components. The field deployment successfully validated that a group of microgrids can operate in a coordinated manner, enabling precise power flow between systems and mutual support during extreme events. This project resulted in 15 journal publications and 15 conference papers; 5 graduate students and 15 undergraduate students were supported. The codes of distributed optimization and forecasting were made open-source through OSTI.gov for distributed optimization and forecasting. All the publications are available in the ORNL-hosted project landing page. The DC interlink with state-of-charge balancing control was operationally validated in Adjuntas by interconnecting two real-world, 240 V split-phase microgrids. To the best knowledge of the team, this represents the first operational validation of AC microgrids interconnected via DC-interlinks. As a culmination of this project, a follow-on grant was awarded to support the technology transfer of the distributed optimization framework to a commercial microgrid controller, Stellar Edge, developed by the California-based company New Sun Road.

14 SOLAR ENERGY↗

Blueprint for DOE Quantum Supercomputing: Ensuring U.S. Leadership in the Quantum Decade

Quantum computing stands at the threshold of a transformative decade, where the field will evolve from small-scale demonstrations toward practical scientific computing at scale. This Blueprint identifies fault-tolerant quantum computers (FTQCs) as a viable, scalable, and broadly applicable path to achieving “quantum scientific utility,” defined as solving scientifically valuable problems beyond the reach of conventional, classical computers. This capability is expected to show scientific demonstrations in the late 2020s and to mature in the early-to-mid 2030s. This Blueprint outlines a strategy to prepare the U.S. Department of Energy (DOE) for FTQCs and their integration into the U.S. national scientific computing infrastructure. Its purpose is to identify the steps, milestones, and research directions necessary for DOE to enable initial deployment of FTQCs in 2028 as a scientific tool for the nation and mature this capability into the 2030s. DOE has a long history of supporting quantum information science and technology, contributing significantly to research advancements, training a quantum-ready workforce, and providing access to early small-scale quantum hardware. Given recent demonstrations of logical operations on error-corrected logical qubits and the advancement of commercial hardware roadmaps, DOE should begin preparations for large-scale, fault-tolerant quantum computing deployment for DOE science missions. This Blueprint proposes that DOE focus on (1) deploying first-generation scientifically relevant quantum computers with at least 100 logical qubits and performing at least 10,000 to 100,000 hard logical operations in scientifically relevant calculations; (2) developing essential FTQC programming competencies, system software, and facility readiness; and (3) investing in cutting edge focused R&D that fosters breakthroughs in scientific applications, algorithms, and logical architectures needed to accelerate the advent of scientific utility. This effort will position DOE to transition to larger systems: production-scale quantum computers that comprise 1,000 to 10,000 logical qubits, perform 1 to 10 billion hard logical operations, and execute scientifically useful computations at scale. Achieving these goals will require DOE facilities to evolve with urgency to support scientific campaigns that integrate quantum and classical computing resources into efficient workflows, novel software and firmware environments for compiling and routing quantum programs on FTQC machines, and suitable infrastructure for quantum hardware. It will also require further development and optimization of scientific applications from the fields of materials science, quantum chemistry, and high-energy and nuclear physics. The Blueprint calls for transformative R&D and collective action to accelerate the advent of scientific quantum utility and bring it within reach by 2028.

97 MATHEMATICS AND COMPUTING↗

2022 FORCE Development Status Update

Due to the rapidly changing nature of the energy landscape in both the U.S. and abroad, including the increase in non-dispatchable variable renewable energy (VRE) deployment and the abundance of carbonbased dispatchable fuels, the Integrated Energy Systems (IES) program under the Department of Energy (DOE) has been engaged in determining whether IES could assist in providing nuclear power plants (NPPs) with a viable strategy for achieving future economic competitiveness. This includes enhanced dispatch flexibility for NPPs, thanks to thermal and electrical storage technology as well as the generation of ancillary commodities such as hydrogen, desalinated water, and synthetic fuels from the heat generated by NPPs. The technical and economic viability of these systems is of primary concern to the IES program, with the intent of providing insight to the wider nuclear energy community at large.

97 MATHEMATICS AND COMPUTING↗

A critical literature review of the advances in methane dehydroaromatization over multifunctional metal-promoted zeolite catalysts

We report the drastic rise in shale gas production has encouraged the quest for alternative uses of methane as a chemical feedstock in the manufacturing industry. While two-step syngas routes for methane valorization are deployed commercially, direct one-step routes for methane conversion are attracting much attention. As steam cracking installations have shifted from using oil-based naphtha to shale-based natural gas liquids, production of aromatics has dropped. Methane dehydroaromatization (MDA) is a one-step reaction capable of valorizing methane to hydrogen and benzene. Challenges with the MDA reaction are two-fold: the reaction is thermodynamically limited with low one-pass methane conversion and even the best catalytic systems, Mo/zeolites, suffer rapid deactivation from coking. A catalyst design strategy to improve stability is the use of multifunctional Mo-X/zeolite systems where X is a dopant capable of modulating the stability. In this paper we provide a complete overview of the main Mo-X/zeolite systems used in MDA and critically draw connections among the different types of dopants (X) employed, as a function of the role they play in the reaction/deactivation pathway. We have also dedicated a section to emerging trends with non-Mo based catalysts. The goal of this review article is to establish a basis that will facilitate the identification of useful multifunctional catalytic systems, and recognize gaps in the knowledge of these systems that deserve more attention. Improving MDA systems to the point to which they can be commercially deployed requires a multifaceted approach that combines optimization of the designs of both the catalyst and the reactor configuration. We therefore also provide a brief overview of the most recent advances in process intensification strategies employed with different reactor configurations.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Distributed Energy Resource-Cognizant Upgrade Paths to the Traditional Restoration Strategy of Utilities for Improved Load Restoration: Preprint

Climate change has resulted in increasingly impactful and more frequent occurrences of extreme weather events. This trend poses a significant challenge for distribution utilities and system operators to ensure that there is uninterrupted power supply to critical loads in their networks under fault scenarios; however, currently, utilities deploying the automated fault location, isolation and restoration (FLISR) function in their advanced distribution management system (ADMS) do not take into account the available generation and load-modification capabilities of distributed energy resources present in the disconnected network due to an upstream isolated fault. This results in the network reconfiguration and restoration to result in sub-optimal load restoration. Therefore, this paper presents two approaches that can upgrade the existing FLISR capabilities of distribution utilities to significantly increase the restoration of critical loads. The performance of the proposed approaches is evaluated on a numerical model of a real distribution feeder in Georgia, USA.

DER↗

Sensitivity Analysis of Effectiveness of FLEX Strategies Using a CDF-Based Importance Measure Under Accident Conditions

One of the lessons learned from the Fukushima Daiichi nuclear power plant (NPP) accident is strengthening the station blackout (SBO) mitigation capabilities by enhancing defense in depth for all existing and new NPPs. One of the possible remedies is diverse and flexible coping strategies (FLEX). The objective of this study is to address the benefits of FLEX in various accident scenarios in terms of both risk and cost. FLEX was originally devised against SBO accidents. In this research, we investigate the fundamental plant responses against accidents considering two fundamentally different cases: accidents that lead to high pressure on the primary side and accidents that lead to low pressure on the primary side. Several uncertainties are associated with the characteristics of the FLEX portable equipment. Specifically, the time for FLEX deployment may depend on several factors such as type of accident, point of injection, availability of safety systems, battery backup timings, and human actions. This study utilizes a dynamic risk assessment framework to analyze accident scenarios and suggests a novel importance measure, which is a cumulative distribution function– based importance metric that characterizes the influence of input distribution on complete output distribution. The importance of the existing and newly developed FLEX strategy based on risk significance is illustrated with examples. The suggested measure provides clear insight into how FLEX affects risk of the whole system and additional risk margins thanks to new safety systems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Challenges for monitoring and data analytics in a leadership public data repository

The availability and disposition of data has assumed increasing importance in large-scale computational science. Data repositories are evolving to meet new classes of requirements: compliance with government access guidelines, support for reproducibility of experimental results, and long-term availability of data products. The Constellation public data repository at the Oak Ridge Leadership Computing Facility faces these issues while being situated in one of the most productive data centers in the world. While monitoring and operational data analysis are ingrained in the operation of the OLCF’s large-scale high performance computing platforms, data repositories do not have this history of support. Problems faced by Constellation range from data size (over 7 petabytes in current holdings) to analytic complexity (detailed curation is both absolutely necessary for many data sets and absolutely impossible for humans to accomplish in any practical manner) to deployment environment (OLCF storage resources are oriented toward the needs of the compute platforms). In this paper we describe some of the challenges for collecting monitoring and analytic data from a leadership public data repository. We also discuss various strategies we are pursuing in order to address these challenges, from manual data collection to plans for introducing machine learning-based curatorial techniques.

Widener, Patrick [ORNL] (ORCID:0000000258820816)↗

Pumped Storage Hydropower FAST Commissioning Technical Analysis

This report is designed to address barriers and solutions to modern pumped storage hydropower (PSH) development by establishing baseline project development knowledge, defining key aspects of project development, and identifying opportunities to reduce project timelines, costs, and risks. This report’s scope includes post-licensing activities and excludes factors related to permitting or licensing. The U.S. PSH fleet is composed of 43 projects providing the majority (95%) of utility-scale electricity storage in the US. However, only one new PSH facility has become operational in the past 20 years. Several factors contribute to diminishing PSH growth in the US, including the magnitude of project costs and financing interest during development and construction; the length of time from project investment until project revenue; permitting challenges and construction risks; competition from other storage technologies; and unrecognized energy storage valuation. Although innovative PSH concepts (including underground, small, and modular systems) have been investigated, widespread application has yet to occur. In short, the time, cost, and risk associated with modern PSH development has resulted in limited recent growth in the United States, despite the rising energy storage demand from increased deployment of variable renewable technologies. To address these challenges, the US Department of Energy’s (DOE) Water Power Technologies Office initiated the PSH Furthering Advancements to Shorten Time to (FAST) Commissioning project, aimed at catalyzing new solutions, designs, and strategies to accelerate PSH development. This report uses available data from previous license applications, ongoing project cost data, and other global PSH project information based on a typical closed-loop PSH project.

13 HYDRO ENERGY↗

OCTOKV: An Agile Network-Based Key-Value Storage System with Robust Load Orchestration

In this paper, we propose OctoKV, an innovative network-based key-value storage system. OctoKV addresses the repetitive address translation overhead associated with traditional key-value stores running on file systems on the client side. To mitigate this overhead, we implemented the key-value store on the server side using NVMe-oF and a user-level NVMe driver. In particular, we employed fine-grained resource monitoring and load balancing based on heuristics to optimize I/O performance. OctoKV is deployed on a Linux cluster with Intel SPDK. The extensive evaluation shows that OctoKV achieves lower I/O response times in comparison to traditional approaches where key-value stores run on the client side. Also, the proposed load balancing strategies efficiently enhance I/O response times by equally distributing the workload from overloaded cores to other cores.

Khan, Awais↗

Managing Subsurface Pressure Buildup and Interference in Commercial-Scale CO 2 Storage Project with Proximal Injection Wells

Large-scale decarbonization using carbon capture and storage (CCS) is likely to involve many commercial-scale CO 2 storage projects located in close proximity to each other. This close proximity raises concerns over pressure interference among the storage projects. Pressure interference between injection and storage efforts can reduce the practicable CO 2 storage resource and force wells to inject CO 2 at a lower rate to avoid the fracture pressure thresholds per United States Environmental Protection Agency (EPA) Class VI well regulations to preserve injection and confining zone integrity and potentially mitigate against inducing seismic activity. These analyses employ numerical full-physics reservoir modeling to evaluate how pressure buildup fronts and CO 2 plumes evolve under commercial-scale injection volumes of CO 2 in which multiple storage sites located in close proximity occur in tandem. The simulation models mimic injection at pseudo basin-scale and assume homogeneous saline formation(s) as storage targets with a pair of upper and lower homogeneous seal layer/s. These analyses specifically investigate the efficacy of two basin-wide reservoir pressure management strategies in addressing the technical challenges associated with pressure buildup and CO 2 plume commingling. The strategies explored include: 1) enlarging the area of injection well spacing (WS) and 2) storing CO 2 in a stacked sequence (SSS) of saline formations compared to a single formation. The storage and confining zones properties assumed were held common across the scenarios, unless specified otherwise. Analyses results show that after injecting 4 million tons per year for 30 years using 4 separate wells (each injecting 1 million metric tons per year), the radius of CO 2 plume extends to a mere 3 km or less from injection wells. Meanwhile, the radius of pressure buildup ranges on the order of tens to a few hundreds of kilometers, depending on the magnitude of pressure buildup threshold that one would use to define the front. CO 2 plume commingling from different injection wells appears to occur 50 years post-injection, especially under scenarios with narrowly spaced (i.e., < 5 km apart) injection well locations. Findings from sensitivity cases on the well spacing suggest that storage formations modeled would require different well spacing to avoid fracture pressure thresholds. For instance, modeled storage formations with high fracture gradients (i.e., 0.8 psi/ft) would need less than 5–km well spacing, whereas those with lower fracture gradients (i.e., 0.7 psi/ft) would need approximately 20–km well spacing, based on assumed modeling parameters. Under stacked injection, the pressure challenges (described above) still exist but are more alleviated due to distributing the same injection volume across more available reservoir volume. These analyses demonstrate that stacked-sequence storage can effectively address the challenges, while still providing the same target CO 2 storage volumes and allowing a large number of storage projects to be deployed in the same basin by better utilizing the available storage resource across different reservoir depths. Among cases modeled, the resulting pressure buildup front is most suppressed when each storage project distributes injection volumes over several wells, each of which injects a portion of the total CO 2 across the stacked sequence. This strategy results in the smallest CO 2 aerial footprint amongst scenarios evaluated but also shows the largest reduction in the pressure buildup at the top of perforation at the injection wells (upwards of approximately 42 percent compared to the commercial-scale single-formation storage), the result of which is crucial to maintain caprock integrity. The findings presented by this research draw attention to the importance of greater coordination among storage operators and regulatory stakeholders to foster the upscaling and deployment of CCS. These analyses provide insights into required decision-making when considering multi-project deployment in a shared basin. Because these analyses evaluate a very specific geologic situation, they bear further investigations across other geologic situations.

42 ENGINEERING↗