Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Closure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Predicting the Slowing of Stellar Differential Rotation by Instability-driven Turbulence

Abstract Differentially rotating stars and planets transport angular momentum (AM) internally due to turbulence at rates that have long been a challenge to predict reliably. We develop a self-consistent saturation theory, using a statistical closure approximation, for hydrodynamic turbulence driven by the axisymmetric Goldreich–Schubert–Fricke instability at the stellar equator with radial differential rotation. This instability arises when fast thermal diffusion eliminates the stabilizing effects of buoyancy forces in a system where a stabilizing entropy gradient dominates over the destabilizing AM gradient. Our turbulence closure invokes a dominant three-wave coupling between pairs of linearly unstable eigenmodes and a near-zero frequency, viscously damped eigenmode that features latitudinal jets. We derive turbulent transport rates of momentum and heat and provide them in analytic forms. Such formulae, free of tunable model parameters, are tested against direct numerical simulations; the comparison shows good agreement. They improve upon prior quasi-linear or “parasitic saturation” models containing a free parameter. Given model correspondences, we also extend this theory to heat and compositional transport for axisymmetric thermohaline-instability-driven turbulence in certain regimes.

Astronomy & Astrophysics↗

Electron Influence on the Parallel Proton Firehose Instability in 10-moment, Multifluid Simulations

Instabilities driven by pressure anisotropy play a critical role in modulating the energy transfer in space and astrophysical plasmas. For the first time, we simulate the evolution and saturation of the parallel proton firehose instability using a multifluid model without adding artificial viscosity. These simulations are performed using a 10-moment, multifluid model with local and gradient relaxation heat-flux closures in high-β proton–electron plasmas. When these higher-order moments are included and pressure anisotropy is permitted to develop in all species, we find that the electrons have a significant impact on the saturation of the parallel proton firehose instability, modulating the proton pressure anisotropy as the instability saturates. Even for lower β's more relevant to heliospheric plasmas, we observe a pronounced electron energization in simulations using the gradient relaxation closure. Our results indicate that resolving the electron pressure anisotropy is important to correctly describe the behavior of multispecies plasma systems.

79 ASTRONOMY AND ASTROPHYSICS↗

Estimation of the radiation budget during MOSAiC based on ground-based and satellite remote sensing observations

An accurate representation of the radiation budget is essential for investigating the impact of clouds on the climate system, especially in the Arctic, an environment highly sensitive to complex and rapid environmental changes. In this study, we analyse a unique dataset of observations from the central Arctic made during the MOSAiC (Multidisciplinary drifting Observatory for the Study of Arctic Climate) expedition in conjunction with state-of-the-art satellite products from CERES (Clouds and the Earth's Radiant Energy System) to investigate the radiative effect of clouds and radiative closure at the surface and the top of the atmosphere (TOA). We perform a series of radiative transfer simulations using derived cloud macro- and microphysical properties as inputs to the simulations for the entire MOSAiC period, comparing our results to collocated satellite products and ice-floe observations. The radiative closure biases were generally within the instrumental uncertainty, indicating that the simulations are sufficiently accurate to reproduce the radiation budget during MOSAiC. Comparisons of the simulated radiation budget relative to CERES show similar values in the terrestrial flux but relatively large differences in the solar flux, which are attributed to a lower surface albedo and a possible underestimation of atmospheric opacity by CERES. While the simulation results were consistent with the observations, more detailed analyses reveal an overestimation of simulated cloud opacity for cases involving geometrically thick ice clouds. In the annual mean, we found that, during the MOSAiC expedition, the presence of clouds leads to a loss of 5.2 W m −2 of the atmosphere–surface system to space, while the surface gains 25.0 W m −2 and the atmosphere is cooled by 30.2 W m −2 .

54 ENVIRONMENTAL SCIENCES↗

Experiments and Modeling of Proppant Embedment and Fracture Conductivity for the Caney Shale, Oklahoma, USA

ABSTRACT: The ultimate aim of hydraulic fracturing is to have a long and conductive flow path that extends from the wellbore into the formation. The effective fracture length is part of a hydraulically propped fracture which contributes to production. The difficulty in achieving economical production targets from shale reservoirs is at the forefront in many exploration companies. Fracture conductivity loss is related to; proppant embedment under depletion, proppant crushing, damage as a result of fracturing fluid, fines migration and proppant-pack permeability-damage are some of the factors that contribute to production decline after hydraulic fracturing in shale reservoirs. The Caney Shale is a calcareous organic-rich mudrock. Various studies have investigated the effect that clay on shale well productivity, however, there is currently no literature on the Caney shale in relation to horizontal wells; all available literature exists in vertical wells as well as on formations of the Caney that are shallow in comparison to an emerging play which is twice the depth. In this paper we investigate stress-dependent fracture conductivity of proppant-filled fractures and proppant embedment in Caney shale through laboratory and modeling studies. API fracture conductivity tests were conducted using 2% KCl on five locations within the Caney shale that consisted of selecting three brittle(reservoir) zones and two ductile zones. Confining pressures range from 1,000 psi to 12,000 psi at 210°F. Conductivity, permeability as well as embedment were measured during the test. Our experimental results have confirmed that improved fracture conductivity is attributed to; proppant size, the increase in porosity of the proppant pack, closure pressure changes and the reduction in fracture conductivity are a function of many factors such as fracture closure stress. The findings from this study could help the stimulation design by providing new insights into the critical factors that are to be determined to facilitate the choice of proppants as well as fracturing fluids for long term production and recovery from shale reservoirs. 1 INTRODUCTION The development of low permeability formations, like shales, has been aided by hydraulic fracturing of horizontal wells (Radonjic et al., 2020). Hydraulic fracturing fluid is injected at a high pressure to induce tensile fractures that can link to and stimulate natural fractures (Katende et al., 2021a,b). Preserving adequate conductivity in hydraulic fractures over the life of the wells is required for economic production; nevertheless, conserving such conductivity can be difficult in some circumstances, particularly in soft, clay-rich formations (Wang et al., 2021). Proppant particles help to keep the fractures open when the pumping stops and the fracturing fluid returns to the wellbore, producing one or more propped hydraulic fractures of varying length, breadth, and height (Katende et al., 2021a). The proppant pack within the hydraulic fracture boosts well output by providing a greater permeability flowpath for hydrocarbons (Duenckel et al., 2016). Proppant in the fracture is under complicated stress conditions, and the interplay between the rock formation and the proppant pack has a significant impact on proppant-pack permeability (Karazincir et al., 2019). Proppant may be embedded (Katende et al., 2021a) in the rock or crushed into small pieces if the proppant size and strength characteristics are not specified appropriately, resulting in a loss in proppant-pack permeability and fracture aperture, and consequently a fall in well output.

Katende, A.↗

Nuclear Power Fault Diagnostics and Preventative Maintenance Optimization

The nuclear industry is beginning to see reactors shut down—even after their operating licenses have been extended—because they are not economically competitive with other energy sources. These early closures happen primarily due to economic reasons, despite excellent safety records. Therefore, it is imperative to reduce costs in order to prevent these early closures. One of the contributors to these economic reasons is the large operations and maintenance costs. This paper showcases recent research on advanced fault diagnostics techniques and preventative maintenance optimization (PMO) for reducing NPP maintenance costs. Specifically, it focuses on the feedwater and condensate system (FWCS) for both pressurized- and boiling-water reactor (BWR) systems. The computerized maintenance management system (CMMS), which contains the plant’s digital record of all corrective maintenance (CM) and preventative maintenance (PM) work orders, provided the ground truth for locating potential faults and labeling the process data as either healthy or faulted. Various feature extraction techniques were used to further differentiate the faulted data from the healthy data. Through a cross-validation procedure, support vectors machines were used to label other test sets of process data as either healthy or faulted. With relatively few faults identified in the BWR system, the potential for PMO opens up, since an unnecessary amount of PM leads to inflated maintenance costs. The steps for PMO are summarized, from component health determinations to recommendations for action. An example of PMO assessment is presented for condensate pumps, condensate booster pumps, and the respective motors that drive them.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Nuclear Power Fault Diagnostics and Preventative Maintenance Optimization NPIC presentation

The nuclear industry is beginning to see reactors shut down—even after their operating licenses have been extended—because they are not economically competitive with other energy sources. These early closures happen primarily due to economic reasons, despite excellent safety records. Therefore, it is imperative to reduce costs in order to prevent these early closures. One of the contributors to these economic reasons is the large operations and maintenance costs. This paper showcases recent research on advanced fault diagnostics techniques and preventative maintenance optimization (PMO) for reducing NPP maintenance costs. Specifically, it focuses on the feedwater and condensate system (FWCS) for both pressurized- and boiling-water reactor (BWR) systems. The computerized maintenance management system (CMMS), which contains the plant’s digital record of all corrective maintenance (CM) and preventative maintenance (PM) work orders, provided the ground truth for locating potential faults and labeling the process data as either healthy or faulted. Various feature extraction techniques were used to further differentiate the faulted data from the healthy data. Through a cross-validation procedure, support vectors machines were used to label other test sets of process data as either healthy or faulted. With relatively few faults identified in the BWR system, the potential for PMO opens up, since an unnecessary amount of PM leads to inflated maintenance costs. The steps for PMO are summarized, from component health determinations to recommendations for action. An example of PMO assessment is presented for condensate pumps, condensate booster pumps, and the respective motors that drive them.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Geomechanical Characterization of the Mount Simon Sandstone and Eau Claire Formation of Northern Illinois Basin

The purpose of this paper is to analyze publicly available geomechanical data from two carbon storage sites in the Illinois Basin: the Illinois Basin-Decatur Project (IBDP) in Macon County, IL and the FutureGen2.0 project in Morgan County, IL, cancelled before injection began. This study estimates the magnitudes and directions of the least compressive principal stress gradient using hydraulic fracture-based stress measurement tests, borehole breakouts, and sonic logs in the Eau Claire Formation (primary confining zone) and the Mount Simon Sandstone (targeted reservoir). The range of stresses expected in the underlying Precambrian basement is also investigated. The evaluation of the state of stress is carried out in a probabilistic manner using the State of Stress Analysis Tool (SOSAT) developed under the National Risk Assessment Partnership (NRAP) program. Finally, the paper also provides a discussion on distinctions between fracture initiation pressure, propagation pressure, and fracture closure pressure, given that hydraulic fracture testing results show a significant difference between these three values. The discussion also addresses why the fracture closure pressure should be preferred in injection pressure determinations, a critical point in geological carbon storage projects.

de Toledo Camargo, Julia↗

Feasibility of Power Ramp Testing in the Advanced Test Reactor

For decades, the Halden Boiling Water Reactor (HBWR) in Norway was an international resource for assessing nuclear fuels and materials behavior and its unexpected shutdown in 2018 represented a significant loss in experimental capability for prototypical irradiation testing. In the aftermath of the closure, a study was performed to assess capability gaps related to the Accident Tolerant Fuels (ATF) program. It was concluded that the primary capability gaps left by the closure of the HBWR were the loss of prototypic in-pile Light Water Reactor (LWR) loops that provide operational transient testing and in-pile Loss-of-Coolant Accident (LOCA) testing capabilities. The study also concluded that the Advanced Test Reactor (ATR) and Transient Reactor Test Facility (TREAT) likely have the necessary key capabilities to absorb the breadth of the HBWR mission gaps related to the ATF program, but additional investments in experimental infrastructure were needed. One such investment is the design and installation of additional pressurized water loops in the medium-I positions of the ATR, hereafter referred to as I-Loops, to support power ramp testing and testing in Boiling Water Reactor (BWR) conditions. This paper gives an overview of the planned ATR I-Loops and assesses the feasibility of performing power ramp testing inside such a loop.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

An Improved Model For Determining Salinity Recharge Time for Deep Borehole Disposal - 20405

In a previous publication (K. P. Travis, D. Burley and F. G. F. Gibb, WM2017 Conference, Phoenix Arizona paper no. 17480) we introduced a numerical model to estimate the time it would take for a pressure perturbation to subside following its creation from the construction of a deep geological borehole in water-saturated rock. The model was based on the notion of a point source of momentum - a solution of the time-dependent pressure-diffusion equation. Using the model, we estimated that it would take on the order of 10 k years for physical equilibrium to become re-established following the sinking of a 5 km borehole in granite. The significance of such a model is that it places an upper bound on the lifetime required of a borehole sealing system - a necessary input to a borehole post-closure safety case assessment. No engineered sealing system has ever been devised which is capable of retaining its sealing properties for 10 half-lives of long-lived radioisotopes in spent fuel or high-level waste. One of the key advantages of disposing of nuclear waste via Deep Borehole Disposal (DBD) is the natural sealing provided by density stratified groundwater. Upon sinking of a borehole, and subsequent filling with fresh water, brine or drilling mud, this natural barrier may be temporarily damaged. Over time, fresh brine from the far-field will flow towards or away from the hole (driven by a pressure gradient) and will eventually re-establish the original salinity gradient. It follows that the engineered seals need last only as long as the time required for this salinity gradient to reset itself. One of the limitations of our previous model was the use of a static boundary condition on the borehole wall. The model used a boundary pressure which varied quadratically with depth (arising from differences between the pressure of a column of fresh water in the borehole and that of a column of brine in the host rock). However as brine replaces fresh water in the borehole (driven by a pressure gradient), the boundary function must change with time. We now introduce an improved model which takes this time dependent boundary condition into account. The model also takes into account the time taken for a mixture of brine and fresh water to re-establish chemical equilibrium through the process of diffusion. The paper contains the mathematical details of our new iterative model as well as results showing the time taken to reach steady state, and concentration profiles for the components of the brine-filled borehole as a function of time together with a discussion on the implications of the results for developing a post-closure safety assessment for DBD. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 55: US DOE Savannah River Operations Office: Liquid Waste Progress

This panel provided an overview of the SRS HLW Liquid Waste Program (history, challenges, opportunities, and future) including discussions of the Defense Waste Processing Facility (DWPF), Tank Closures, Actinide Removal Process/Modular Caustic Side Solvent Extraction Unit, Tank Closure Cesium Removal, and the Salt Waste Processing Facility (SWPF). Panelists with presentations: SRS Liquid Waste Program (James Folk); SRS Liquid Waste Progress (Mark Schmitz); Salt Waste Processing Facility (Frank Sheppard)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Conditioned System-Level Groundwater Model to Evaluate Long-Term Groundwater Impacts within a Performance Assessment - 20115

A preliminary performance assessment (PA) of single-shell tank Waste Management Area (WMA) A-AX located at the U.S. Department of Energy (DOE)'s Hanford Site in southeastern Washington is being conducted to satisfy the requirements of DOE Order 435.1 [1] as it relates to closure of the single-shell radioactive waste tanks in the WMA A-AX tank farms. A PA assesses the fate, transport, and impacts of radionuclides within a low-level radioactive waste disposal facility in its assumed closure configuration and the subsequent potential doses to humans over a 1,000-year compliance period and a 10,000-year performance evaluation period. The WMA A-AX preliminary PA evaluation is structured around the complementary use of process-level and system-level models to calculate the facility performance against established DOE Order 435.1 [1] performance objectives. Process-level models are those that represent a detailed phenomenological representation of processes of concern in the PA. Process models typically only represent one or a few of the components of the PA, such as groundwater flow and transport, and must be integrated with other modeling elements to perform PA calculations. System-level models are those that are abstracted from the process models, retaining the essential features of the process model, while allowing integration of all aspects of the PA in a single modeling framework. System-level models are often characterized by coarser numerical discretization, lower dimensionality, or other similar simplifications compared to the process-level model. Traditionally, a three-dimensional (3-D) process-level model is utilized primarily to evaluate the long-term impact on groundwater and the potential doses to individuals who consume contaminated groundwater. System-level models are also utilized to evaluate the groundwater pathway in PAs. These models typically have reduced dimensionality (1-D) and are conditioned utilizing flow fields (Darcy fluxes) and moisture content distributions that are abstracted from the process level models. The abstraction approach assures that the flow field in both models is consistent for a specific set of input parameters for flow, differing only in the discretization and dimensionality of the two models. The preliminary WMA A-AX PA incorporates a detailed representation of the geological system and hydraulic properties within the 3-D model STOMP{sup C} numerical code so that the effects of relevant features and processes on water flow and radionuclide transport in the subsurface can be evaluated. The complementary system-level model is developed utilizing the GoldSim{sup C} code to implement a simplified, 1-D equivalent model to represent the groundwater pathway. Contaminant transport through the vadose zone and unconfined aquifer for Tc-99 and I-129 were evaluated in each of the models. Adjustments to the saturated portion of the GoldSim{sup C} 1-D model were required to mimic the dispersion effect captured with the 3-D STOMP{sup C} model. Once this conditioning was conducted, highly similar results for the transport of Tc-99 and I-129 were achieved at the point of calculation, located 100 m downgradient from the WMA A-AX fenceline. These radionuclides represent elements that are regarded as primary dose drivers in the PA groundwater pathway analysis. The high degree of conformance between the two models suggests that the use of the equivalent 1-D system model is suitable for evaluating the full suite of radionuclides that will be released from the tank sources within WMA A-AX over the 1,000-year compliance period and over the 10,000-year evaluation period. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Update to the Performance Assessment for the Savannah River Site Saltstone Disposal Facility - 20124

In 2019, Savannah River Remediation developed a revision to the performance assessment (PA) on behalf of the U.S. Department of Energy (DOE) Savannah River Operations Office (SR) for the near-surface disposal of low-level waste at the Savannah River Site (SRS) Saltstone Disposal Facility (SDF). Soluble waste from SRS Tank Farms undergoes salt processing to remove cesium and other high activity constituents. The low-activity decontaminated salt solution (DSS) is then immobilized by mixing it into a cementitious waste form known as saltstone. After mixing, the saltstone is poured into leak-tight concrete vaults, known as saltstone disposal units (SDUs), where the waste form cures. By the time of facility closure, the SDF is expected to consist of 15 SDUs with a combined capacity of 1.06 E+09 L (280 Mgal) of cured saltstone. The facility operates under a Disposal Authorization Statement (DAS) from DOE and a permit from the South Carolina Department of Health and Environmental Control (SCDHEC). Since the start of operations in 1990, the SDF has received almost 6.7 E+07 L (18 Mgal) of DSS, resulting in the safe disposal of 2.7 E+16 Bq (7.3 E+05 Ci) of activity. Due to the radioactive decay of short-lived contaminants, the total remaining activity in the disposed waste is estimated to be approximately 1.4 E+16 Bq (3.9 E+05 Ci), as of September 2018. The Disposal Authorization Statement requires a demonstration that the system of engineered and natural features of the disposal facility will limit releases from the facility and be protective of human health and the environment for at least the next 1,000 years. The long-term performance of the facility was evaluated under the requirements of the DoE's Radioactive Waste Management Manual (US DOE Manual 435.1-1). Simulations were performed to demonstrate that the disposal facility would meet performance objectives specified in the manual. The evaluation was based on numerical models that simulate the releases of contaminants from the saltstone waste form. Contaminants were transported through groundwater and air pathways to points of assessment to evaluate compliance. In addition, the potential consequences of an inadvertent human intrusion (IHI) were also evaluated. In accordance with the guidance and recommendations in US DoE's technical standard for DAS, deterministic and probabilistic analyses were performed to demonstrate the SDF system, which includes the engineered cover system, the SDUs, the waste form, and the natural features of the site, provides a reasonable expectation that saltstone disposal will meet performance objectives. Post-closure doses to future members of the public (MOP) were evaluated; dose estimates from the air pathway were well below the 1.0 E-04 Sv/yr (10 mrem/yr) performance objective within 1,000 years, and the calculated doses to the MOP from all exposure pathways, including the groundwater and air pathways, were well below the 2.5 E-04 Sv/yr (25 mrem/yr) performance objective within 1,000 years. Doses following an assumed intrusion event within the facility boundaries were well below the IHI performance objectives, where the acute IHI dose was below the acute IHI dose performance objective of 5.0 E-03 Sv (500 mrem) and the chronic IHI dose was below the chronic IHI dose performance objective of 1.0 E-03 Sv/yr (100 mrem/yr) within 1,000 years. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Regulatory Decision-Making Process Using 'Weight of Evidence: An Evidence Integration Approach' by the State of Washington at the Hanford Site - 20163

Performance Assessment and Environmental Impact Statement Modeling, Human and Ecological Risk Assessments are the tools used by the Washington State Department of Ecology (Ecology) to make regulatory decisions for permitting and cleanup. These efforts all inherently have large amounts of uncertainty no matter how many alternative approaches are attempted. Professional feedback from tribal governments, stakeholders, federal and state regulators, the public and independent peer review groups are taken into account in this process of informed decision making. The process also includes full evaluation of the comments and the associated reviews made by the various peer review groups such as the Low -Level Waste Disposal Facility Federal Review Group (DOE order 435.1) and the Nuclear Regulatory Commission (NRC). The evolution of technology has produced quicker and more efficient fate and transport modeling tools with related quantification of uncertainties and their significance. Groundwater and vadose zone models have been expanded across the entire Hanford site. Many of the technical approaches identified in the Washington State Regulations are updated using current knowledge to better understand the complexities of the Hanford Site using the latest state of the art tools for risk assessment and modeling. More emphasis and time are directed on defining uncertainty and then managing the uncertainty. One added tool is to run sensitivity cases based on informed decision making. The weight of evidence approach considers all relevant information in an integrative assessment that takes into account the kinds of evidence available, the quality and quantity, the uncertainty and error associated with each type, and how they fit together. Evidence of integration involves looking at systematic reviews and evaluating their strengths and weaknesses. In conclusion, Ecology, Washington State's lead regulatory agency at the Hanford site, has had to modify its site closure approach compared to the rest of the state. A more holistic approach dealing with the Hanford site as an integrated system has evolved leading to a defensible informed approach for regulatory closure decisions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Zero-Valent Iron Permeable Reactive Barrier to Remediate Volatile Organic Compounds in Groundwater - 20209

The US DOE-SRS, the US EPA, and the South Carolina Department of Health and Environmental Control determined it was appropriate to perform a non-time critical removal action at the P-Area Groundwater Operable Unit at the SRS to reduce the mass and downgradient transport of trichloroethylene in the P-Area groundwater plume. Contaminated groundwater discharges to a nearby stream, Steel Creek, within the SRS boundaries, resulting in trichloroethylene concentrations above the maximum contaminant level. Impact to surface water is limited in areal extent and supported by recently collected characterization data. The P-Area Groundwater Operable Unit encompasses the groundwater beneath an industrial area within SRS, P Area, where the P-Reactor once operated. The boundaries of the P-Area Groundwater Operable Unit extend northwest to Steel Creek, northeast toward PAR Pond, and southeast to Meyers Branch. Groundwater in the Upper Three Runs Aquifer of the P-Area Groundwater Operable Unit has been impacted by reactor and facility operations between 1954 and 1991, including tritium and volatile organic compounds. The P-Area surface units contributing to groundwater contamination were remediated as part of the P-Area Operable Unit in 2011. The P-Reactor closure is one of the first of its kind in the DOE Complex and is one of only a few full-sized production reactors in the US to undergo completion of final closure activities. The nature and extent of groundwater contamination was determined using a variety of investigative approaches such as groundwater monitoring wells, direct-push technology, and surface water samples. Groundwater contamination associated with trichloroethylene is primarily exhibited in a narrow plume that extends from the source area at P-Reactor and west to Steel Creek. Maximum contaminant level exceedances in groundwater occur over an area of ∼6.9 hectares for trichloroethylene with concentrations as high as 7.7 milligrams per liter. To the west of the P-Area facility area, the trichloroethylene groundwater plume is controlled by a buried geologic feature, assumed to be an old stream bed, that further narrows the groundwater plume in what has been designated as the 'neck area.' This narrowing of the groundwater plume provides an ideal location for a treatment barrier. The non-time critical removal action alternative chosen is to install a zero-valent iron permeable reactive barrier within the neck area of the trichloroethylene groundwater plume, perpendicular to groundwater flow direction. This technology will provide a treatment barrier that will reduce trichloroethylene groundwater concentrations by 90% and has an anticipated useful life of at least 25 years. A pre-design investigation was performed in the neck area to confirm site lithology, hydrogeology, geochemistry, and extent of trichloroethylene contamination prior to a final design. A treatability study, conducted as part of the pre-design investigation, indicated that the subsurface and groundwater in the PArea Groundwater Operable Unit is compatible with the zero-valent iron and will not lead to excessive buildup from mineralization/precipitation or biofouling. Probabilistic modeling was conducted using field and laboratory data to determine the expected performance of the zero-valent iron permeable reactive barrier. The model simulations indicated that a 3.81-centimeter thick barrier would provide greater than 90% reduction of trichloroethylene groundwater concentration. The final design of the zero-valent iron permeable reactive barrier is a barrier that will extend 80.5 linear meters in a 'zigzag' orientation to best transect the trichloroethylene plume and account for varying groundwater flow. The barrier will be installed from 13.7 meters below ground surface to 41.1 meters below ground surface for 65.8 linear meters and from 13.7 meters below ground surface to 36.6 meters below ground surface for 14.6 linear meters, the base of which is 'keyed' into a low permeability zone. The barrier is designed to a thickness of 10.2 centimeters, which was determined to reduce the trichloroethylene groundwater concentrations by greater than 90% with a safety factor of 2.67. A total of approximately 689 metric tons of zero-valent iron will be injected through 22 injection wells spaced 3.66 meters apart, using guar to suspend the zero-valent iron. Zero-valent iron permeable reactive barrier construction will be monitored through 23 installed resistivity receivers offset 7.32 meters from the zerovalent iron permeable reactive barrier. The zero-valent iron will be energized with a low-voltage 100 Hertz signal during injection and will be monitored using the resistivity receivers to ensure complete coalescence of the zero-valent iron permeable reactive barrier. The zero-valent iron was sized to have a hydraulic conductivity greater than the natural subsurface, thus promoting groundwater flow through the barrier. As contaminated groundwater contacts the zero-valent iron, volatile organic compounds, including trichloroethylene, are immediately degraded to harmless compounds such as ethylene. The performance of the zero-valent iron permeable reactive barrier will be monitored using three upgradient monitoring well clusters, six downgradient monitoring well clusters, and four in-wall monitoring wells. The in-wall monitoring wells will indicate immediate reduction of trichloroethylene mass in the groundwater and allow analyses of the zero-valent iron permeable reactive barrier health. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Coupling coarse mesh CFD with fine mesh CFD for modeling for Molten Salt Reactors in the Virtual Test Bed VTB

The Nuclear Energy Advanced Modeling and Simulation (NEAMS) program aims at developing a simulation tool kit to accelerate the development and deployment of nuclear power technologies. NEAMS multiphysics tools have been designed to provide numerical simulation support for the design and licensing of GEN IV reactors. Pronghorn is NEAMS’s coarse-mesh computational fluid dynamics (CFD) tool, which is designed to run 3D core transients in GEN IV reactors at a reduced computational cost. To increase their accuracy, coarse-mesh CFD simulations require calibrated closure coefficients. One way of computing these coefficients is via the Nek5000, NEAMS’s high-fidelity CFD tool. This article discusses our current research lines in informing Pronghorn closure coefficients via Nek5000 to enable multiphysics simulations of the core cavity of the molten-salt fast reactor. We present an application in which Pronghorn mixing length turbulent viscosity has been calibrated from Nek5000 simulations. The resulting Pronghorn thermal-hydraulics model is then coupled to Griffin, the NEAMS neutron transport solver, to solve for the steady-state configuration of the molten-salt fast reactor.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Inspection and Mapping of Savannah River Site (SRS) Waste Tanks via Unmanned Aircraft System (UAS) – 25351

The CSTF at SRS contain 51 waste tanks with 8 closed waste tanks between FTF and HTF. SRMC is the LW contractor. The LW mission includes removing legacy nuclear waste from these tanks and treating it for final disposition. Once the bulk of the waste has been removed from a tank, it will undergo inspection and sampling to characterize the remaining waste in the tank prior to it being operationally closed. There are multiple points in the tank closure process where an inspection is performed, and there are multiple parts of a tank that get inspected. Waste tanks have a primary containment vessel (referred to as the “Primary”) and a secondary containment vessel (referred to as the “Annulus”) that surrounds the primary. Both of these sections of a tank receive multiple inspections throughout the closure process.

Murphy, Lucas D. [Savannah River Mission Completio↗

Future Opportunities for LWR Irradiations in US Test Reactors

After several years of relatively low activity in the field of Light Water Reactor (LWR) fuel development, the Department of Energy again began to engage in developing new fuel technologies and irradiation performance data prompted by the Fukushima Daichi nuclear accidents. New competencies for irradiation testing in material test reactors in the United States began to be developed at this time using the Advanced Test Reactor (ATR), High Flux Isotope Reactor (HFIR), Massachusetts Institute of Technology Reactor (MITR), and the Transient Reactor Test Facility (TREAT). Capsules for testing fuel and cladding materials in ATR and HFIR were deployed, a Pressurized Water Reactor (PWR) condition loop for testing fuel rods was established in ATR, cladding corrosion studies were performed using a water loop in MITR, and TREAT pulse testing capabilities were commissioned for fuel rods in water capsules. The more recent and unexpected closure of the Halden Boiling Water Reactor (HBWR) also prompted further investments in Loss of Coolant Accident (LOCA) testing capabilities at TREAT. New configurations of these test devices show further potential in enhanced steam condition control and other investigations are building toward a flowing water loop for testing transient to dryout conditions. The closure of HBWR also prompted a major project currently underway to construct additional water loops in ATR where a novel approach is being pursued to enable Boiling Water Reactor (BWR) conditions. A meaningful collaborative project was awarded to MITR which, amidst an unexpected major overhaul of the reactor, has expanded cladding corrosion test capabilities at MITR. New explorations have led to methods for unique experiments at HFIR including channel box irradiations. New device developments are also bridging toward future potential for instrumented capsule irradiation tests in ATR and HFIR. Finally, a new project referred to as the System Physics Advanced Reactor Critical facility (SPARC) is gaining traction towards a large zero-power reactor able to produce physics validation data for LWR fuel bundle designs with increased enrichment and enhanced absorbers for 24-month operation cycles. This paper provides a brief summary of the status of these irradiation testbed capabilities with an emphasis on current efforts toward future capabilities to obtain new data and maximize the performance potential of LWR fuel technologies.

Woolstenhulme, Nicolas [Idaho National Laboratory ↗

Fuel Bonding and its Impact on Axial Gas Communication Behavior in Light-Water Reactor Fuel Rods

Axial gas communication concerns the flow along the axial axis of nuclear fuel rods during ramp and loss of coolant accident (LOCA) conditions. During power ramps, the higher linear heat generation rate may cause fuel-to-clad gap closure that may prevent transport of released fission gases to the plenum. Upon reduction in power the gas then can communicate to the plenum. This phenomenon has been experimentally observed by short power dips during ramp experiments completed at the Risø reactor. At higher burnups it is observed that the UO2 fuel and Zircaloy cladding forms a chemical bond. This bond results in complete closure of the gap. When these high burnup rods are subjected to a LOCA, the bond has implications on both the mechanical response (i.e., ballooning) of the cladding and subsequent fuel relocation and axial gas communication. In the LOCA scenario, gas communication is of interest in two different regimes: 1) pre-rupture communication from the plenum towards the lower pressure ballooning area and 2) the post-rupture depressurization of the plenum to the external system pressure. In both regimes the presence of a fuel-to-cladding bond will impact the rate of depressurization. In this work we present a fuel-to-clad bonding model that is coupled to an existing axial gas communication model framework in the BISON fuel performance code. The effect of considering the bond on fuel performance modeling predictions is presented through comparisons to existing experimental data. Experiments considered include several rods from the Halden IFA-650 test series. An evaluation on a full-length rod that explores the combined effect of plenum size and bonding status on axial gas communication behavior is also presented.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗