Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “unreliability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Stochastic Event Counter for Discrete-Event Systems Under Unreliable Observations

This paper addresses the issues of counting the occurrence of special events in the framework of partiallyobserved discrete-event dynamical systems (DEDS). First, we develop a noble recursive procedure that updates active counter information state sequentially with available observations. In general, the cardinality of active counter information state is unbounded, which makes the exact recursion infeasible computationally. To overcome this difficulty, we develop an approximated recursive procedure that regulates and bounds the size of active counter information state. Using the approximated active counting information state, we give an approximated minimum mean square error (MMSE) counter. The developed algorithms are then applied to count special routing events in a material flow system.

99 GENERAL AND MISCELLANEOUS↗

Sequential Window Diagnoser for Discrete-Event Systems Under Unreliable Observations

This paper addresses the issue of counting the occurrence of special events in the framework of partiallyobserved discrete-event dynamical systems (DEDS). Developed diagnosers referred to as sequential window diagnosers (SWDs) utilize the stochastic diagnoser probability transition matrices developed in [9] along with a resetting mechanism that allows on-line monitoring of special event occurrences. To illustrate their performance, the SWDs are applied to detect and count the occurrence of special events in a particular DEDS. Results show that SWDs are able to accurately track the number of times special events occur.

97 MATHEMATICS AND COMPUTING↗

System Study: Residual Heat Removal 1998-2014

This report presents an unreliability evaluation of the residual heat removal (RHR) system in two modes of operation (low-pressure injection in response to a large loss-of-coolant accident and post-trip shutdown-cooling) at 104 U.S. commercial nuclear power plants. Demand, run hours, and failure data from fiscal year 1998 through 2014 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10 year period, while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing trends were identified in the RHR results. A highly statistically significant decreasing trend was observed for the RHR injection mode start-only unreliability. Statistically significant decreasing trends were observed for RHR shutdown cooling mode start-only unreliability and RHR shutdown cooling model 24-hour unreliability.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

System Study: High-Pressure Safety Injection 1998-2022

This report presents an unreliability evaluation of the high-pressure safety injection system (HPSI) at 62 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hours, and failure data from calendar years 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10-year period while yearly estimates for system unreliability are provided for the entire active period. Highly statistically significant increasing trends were identified in both the HPSI system start-only unreliability and 8-hour mission unreliability.

99 GENERAL AND MISCELLANEOUS↗

System Study: Emergency Power System 1998-2022

This report presents an unreliability evaluation of the emergency power system (EPS) at 93 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the industry-wide estimates of EPS system start-only unreliability, but a highly statistically significant decreasing trend was identified in the industry-wide estimates of EPS system 8-hour mission unreliability.

99 GENERAL AND MISCELLANEOUS↗

System Study: Auxiliary Feedwater 1998-2022

This report presents an unreliability evaluation of the auxiliary feedwater (AFW) system at 62 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from calendar year 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the industry-wide estimates of AFW system start-only unreliability, but a highly statistically significant decreasing trend was identified in the industry-wide estimates of AFW system 8-hour mission unreliability.

99 GENERAL AND MISCELLANEOUS↗

System Study: Reactor Core Isolation Cooling 1998-2022

This report presents an unreliability evaluation of the reactor core isolation cooling (RCIC) system at 28 U.S. commercial operating boiling water reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from calendar years 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. Statistically significant decreasing trends were identified in both the RCIC system start-only unreliability and 8-hour mission unreliability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: Emergency Power System 1998-2014

This report presents an unreliability evaluation of the emergency power system (EPS) at 104 U.S. commercial nuclear power plants. Demand, run hours, and failure data from fiscal year 1998 through 2014 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. An extremely statistically significant increasing trend was observed for EPS system unreliability for an 8-hour mission. A statistically significant increasing trend was observed for EPS system start-only unreliability.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

System Study: Isolation Condenser 1998-2014

This report presents an unreliability evaluation of the isolation condenser (ISO) system at four U.S. boiling water reactors. Demand, run hours, and failure data from fiscal year 1998 through 2014 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10 year period, while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing trends were identified. A statistically significant decreasing trend was identified for ISO unreliability. The magnitude of the trend indicated a 1.5 percent decrease in system unreliability over the last 10 years.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

System Study: Auxiliary Feedwater 1998-2020

This report presents an unreliability evaluation of the auxiliary feedwater (AFW) system at 69 U.S. commercial nuclear reactors. Demand, run hour, and failure data from calendar year 1998–2020 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS), formerly the INPO Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10-year period while yearly estimates for system unreliability are provided for the entire active period. Statistically significant decreasing trends were identified in the industry-wide estimates of AFW system start-only unreliability and AFW system 8-hour mission unreliability.

99 GENERAL AND MISCELLANEOUS↗

System Study: High-Pressure Core Spray 1998-2022

This report presents an unreliability evaluation of the high-pressure core spray (HPCS) at eight U.S. commercial operating boiling water reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10-year period while yearly estimates for system unreliability are provided for the entire active period. Statistically significant increasing trends were identified in both the HPCS system start-only unreliability and 8-hour mission unreliability.

99 GENERAL AND MISCELLANEOUS↗

System Study: Emergency Power System 1998-2024

This report presents an unreliability evaluation of the emergency power system (EPS) at 93 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998 to 2024 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the industry-wide estimates of EPS system start-only unreliability, but a statistically significant decreasing trend was identified in the industry-wide estimates of EPS system 24-hour mission unreliability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: Auxiliary Feedwater 1998-2024

This report presents an unreliability evaluation of the auxiliary feedwater (AFW) system at 62 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from calendar years 1998 to 2024 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period and yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the industry-wide estimates of AFW system start-only unreliability, but a statistically significant decreasing trend was identified in the industry-wide estimates of AFW system 24-hour mission unreliability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: Residual Heat Removal 1998-2024

This report presents an unreliability evaluation of the residual heat removal (RHR) system in two modes of operation (low-pressure injection in response to a large loss-of-coolant accident and in response to post-trip shutdown cooling) at 93 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998 to 2024 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS), formerly the INPO Consolidated Events Database. The unreliability results are trended for the most recent 10 year period and yearly estimates for system unreliability are provided for the entire active period. Statistically significant and highly statistically significant decreasing trends were observed for RHR low-pressure injection mode start-only unreliability and RHR low-pressure injection model 24-hour unreliability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: High-Pressure Safety Injection 1998-2024

This report presents an unreliability evaluation of the high-pressure safety injection system (HPSI) at 62 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from calendar years 1998 to 2024 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10-year period and yearly estimates for system unreliability are provided for the entire active period. Statistically significant decreasing trends were identified in both the HPSI system start-only unreliability and 24-hour mission unreliability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

DHARMA - Discriminant hyperplane abstracting residuals minimization algorithm for separating clusters with fuzzy boundaries

Learning of discriminant hyperplanes in imperfectly supervised or unsupervised training sample sets with unreliably labeled samples along the fuzzy joint boundaries between sample clusters is discussed, with the discriminant hyperplane designed to be a least-squares fit to the unreliably labeled data points. (Samples along the fuzzy boundary jump back and forth from one cluster to the other in recursive cluster stabilization and are considered unreliably labeled.) Minimization of the distances of these unreliably labeled samples from the hyperplanes does not sacrifice the ability to discriminate between classes represented by reliably labeled subsets of samples. An equivalent unconstrained linear inequality problem is formulated and algorithms for its solution are indicated. Landsat earth sensing data were used in confirming the validity and computational feasibility of the approach, which should be useful in deriving discriminant hyperplanes separating clusters with fuzzy boundaries, given supervised training sample sets with unreliably labeled boundary samples.

Dasarathy, B. V.↗

Sensitivity and reliability of key electrochemical markers for detecting lithium plating during extreme fast charging

Lithium plating is one of the key challenges for enabling extreme fast charging (XFC, ≤10 to 15 min charging at ≥6C) in graphite-based lithium-ion batteries. Significant R&D effort has been focused on how to mitigate Li plating. Parallel effort is also being devoted to developing methods to detect Li plating when and if it happens during fast charging. In that regard, electrochemical (EC) signature-based detection techniques are less resource intensive, more convenient, and more practical from an end-user application perspective. However, a comprehensive understanding of key plating related EC signatures for extreme fast charging is presently unavailable. In particular, there exist distinct issues of unreliability with key plating-related EC signatures—e.g., incremental capacity (dQ.dV -1 ), differential OCV (dOCV.dt -1 ), end of lithiation (EOL) rest voltage—at XFC conditions, and the underlying reasons have not been explored and identified methodically. Using a comprehensive test matrix and XFC conditions with Li/graphite half cells, this article highlights the unreliability issues associated with the EC Li plating diagnostics and explains the underlying root cause. This study finds distinct sensitivity and unreliability issues with plating related dQ.dV -1 , dOCV.dt -1 , and EOL rest voltage signatures with charging rates. Furthermore, the complex interaction between graphite and plated Li that happens through multiple competing mechanisms —Li stripping and chemical intercalation— at different charging rates is at the core of the sensitivity and unreliability issue.

25 ENERGY STORAGE↗