Engineering Papers⌕ Search

DOE OSTI · 2341464

System Study: High-Pressure Safety Injection 1998-2022

Abstract

This report presents an unreliability evaluation of the high-pressure safety injection system (HPSI) at 62 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hours, and failure data from calendar years 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10-year period while yearly estimates for system unreliability are provided for the entire active period. Highly statistically significant increasing trends were identified in both the HPSI system start-only unreliability and 8-hour mission unreliability.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Ma, Zhegang, Kvarfordt, Kellie J., Wierman, Thomas. 2023-12-01. System Study: High-Pressure Safety Injection 1998-2022. https://doi.org/10.2172/2341464

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Fire Protection Design

The purpose of this project is to design the demolition and installation of a deluge valve swap from a DV-5 to a DV-5A valve.

99 GENERAL AND MISCELLANEOUS↗