System Study: High-Pressure Safety Injection 1998-2022
Abstract
This report presents an unreliability evaluation of the high-pressure safety injection system (HPSI) at 62 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hours, and failure data from calendar years 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10-year period while yearly estimates for system unreliability are provided for the entire active period. Highly statistically significant increasing trends were identified in both the HPSI system start-only unreliability and 8-hour mission unreliability.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Ma, Zhegang, Kvarfordt, Kellie J., Wierman, Thomas. 2023-12-01. System Study: High-Pressure Safety Injection 1998-2022. https://doi.org/10.2172/2341464
Cite the original work for its findings. Save a collection to share your selection of sources.