Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “technology life cycle”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Design, performance and life cycle cost relationships for a 500kW space solar array

The effects on life cycle costs of a number of technology areas are examined for a LEO, 500kW space solar array. A baseline system conceptual design is developed and the life cycle costs estimated in detail. The baseline system requirements and design technologies are then varied and their relationships to life cycle costs quantified. For example, the thermal characteristics of the baseline design are determined by the array materials and masses. The thermal characteristics in turn determine configuration, performance and hence life cycle cost.

Richardson, P. W.↗

Using System Mass (SM), Equivalent Mass (EM), Equivalent System Mass (ESM) or Life Cycle Mass (LCM) in Advanced Life Support (ALS) Reporting

The Advanced Life Support (ALS) has used a single number, Equivalent System Mass (ESM), for both reporting progress and technology selection. ESM is the launch mass required to provide a space system. ESM indicates launch cost. ESM alone is inadequate for technology selection, which should include other metrics such as Technology Readiness Level (TRL) and Life Cycle Cost (LCC) and also consider perfom.arxe 2nd risk. ESM has proven difficult to implement as a reporting metric, partly because it includes non-mass technology selection factors. Since it will not be used exclusively for technology selection, a new reporting metric can be made easier to compute and explain. Systems design trades-off performance, cost, and risk, but a risk weighted cost/benefit metric would be too complex to report. Since life support has fixed requirements, different systems usually have roughly equal performance. Risk is important since failure can harm the crew, but it is difficult to treat simply. Cost is not easy to estimate, but preliminary space system cost estimates are usually based on mass, which is better estimated than cost. Amass-based cost estimate, similar to ESM, would be a good single reporting metric. The paper defines and compares four mass-based cost estimates, Equivalent Mass (EM), Equivalent System Mass (ESM), Life Cycle Mass (LCM), and System Mass (SM). EM is traditional in life support and includes mass, volume, power, cooling and logistics. ESM is the specifically defined ALS metric, which adds crew time and possibly other cost factors to EM. LCM is a new metric, a mass-based estimate of LCC measured in mass units. SM includes only the factors of EM that are originally measured in mass, the hardware and logistics mass. All four mass-based metrics usually give similar comparisons. SM is by far the simplest to compute and easiest to explain.

Jones, Harry↗

Configurable technology development for reusable control and monitor ground systems

The control monitor unit (CMU) uses configurable software technology for real-time mission command and control, telemetry processing, simulation, data acquisition, data archiving, and ground operations automation. The base technology is currently planned for the following control and monitor systems: portable Space Station checkout systems; ecological life support systems; Space Station logistics carrier system; and the ground system of the Delta Clipper (SX-2) in the Single-Stage Rocket Technology program. The CMU makes extensive use of commercial technology to increase capability and reduce development and life-cycle costs. The concepts and technology are being developed by McDonnell Douglas Space and Defense Systems for the Real-Time Systems Laboratory at NASA's Kennedy Space Center under the Payload Ground Operations Contract. A second function of the Real-Time Systems Laboratory is development and utilization of advanced software development practices.

Uhrlaub, David R.↗

Research requirements to reduce civil helicopter life cycle cost

The problem of the high cost of helicopter development, production, operation, and maintenance is defined and the cost drivers are identified. Helicopter life cycle costs would decrease by about 17 percent if currently available technology were applied. With advanced technology, a reduction of about 30 percent in helicopter life cycle costs is projected. Technological and managerial deficiencies which contribute to high costs are examined, basic research and development projects which can reduce costs include methods for reduced fuel consumption; improved turbine engines; airframe and engine production methods; safety; rotor systems; and advanced transmission systems.

Blewitt, S. J.↗

Assuring data transparency through design methodologies

This paper addresses the role of design methodologies and practices in the assurance of technology transparency. The development of several subsystems on large, long life cycle government programs was analyzed to glean those characteristics in the design, development, test, and evaluation that precluded or enabled the insertion of new technology. The programs examined were Minuteman, DSP, B1-B, and space shuttle. All these were long life cycle, technology-intensive programs. The design methodologies (or lack thereof) and design practices for each were analyzed in terms of the success or failure in incorporating evolving technology. Common elements contributing to the success or failure were extracted and compared to current methodologies being proposed by the Department of Defense and NASA. The relevance of these practices to the design and deployment of Space Station Freedom were evaluated. In particular, appropriate methodologies now being used on the core development contract were examined.

Williams, Allen↗

Status of Regenerative Life Support Research and Technology Program at NASA Ames Research Center

1. Provide Advanced Life Support technologies that significantly reduce life cycle costs, improve operational performance, promote self-sufficiency, and minimize expenditure of resources for missions of long duration. 2. Develop and apply methods of systems analysis and engineering to guide investments in technology, resolve and integrate competing needs, and guide evolution of advanced life support systems. 3. Resolve issues of hypogravity performance through space flight research and evaluation. 4. Ensure timely transfer of new life support technologies to missions. 5. Transfer technologies to private sectors for national benefit.

Kliss, Mark↗

A study of characteristics of intercity transportation systems. Phase 1: Definition of transportation comparison methodology

Decision making in early transportation planning must be responsive to complex value systems representing various policies and objectives. The assessment of alternative transportation concepts during the early initial phases of the system life cycle, when supportive research and technology development activities are defined, requires estimates of transportation, environmental, and socio-economic impacts throughout the system life cycle, which is a period of some 40 or 50 years. A unified methodological framework for comparing intercity passenger and freight transportation systems is described and is extended to include the comparison of long term transportation trends arising from implementation of the various R & D programs. The attributes of existing and future transportation systems are reviewed in order to establish measures for comparison, define value functions, and attribute weightings needed for comparing alternative policy actions for furthering transportation goals. Comparison criteria definitions and an illustrative example are included.

English, J. M.↗

The Need for Technology Maturity of Any Advanced Capability to Achieve Better Life Cycle Cost (LCC)

Programs such as space transportation systems are developed and deployed only rarely, and they have long development schedules and large development and life cycle costs (LCC). They have not historically had their LCC predicted well and have only had an effort to control the DDT&E phase of the programs. One of the factors driving the predictability, and thus control, of the LCC of a program is the maturity of the technologies incorporated in the program. If the technologies incorporated are less mature (as measured by their Technology Readiness Level - TRL), then the LCC not only increases but the degree of increase is difficult to predict. Consequently, new programs avoid incorporating technologies unless they are quite mature, generally TRL greater than or equal to 7 (system prototype demonstrated in a space environment) to allow better predictability of the DDT&E phase costs unless there is no alternative. On the other hand, technology development programs rarely develop technologies beyond TRL 6 (system/subsystem model or prototype demonstrated in a relevant environment). Currently the lack of development funds beyond TRL 6 and the major funding required for full scale development leave little or no funding available to prototype TRL 6 concepts so that hardware would be in the ready mode for safe, reliable and cost effective incorporation. The net effect is that each new program either incorporates little new technology or has longer development schedules and costs, and higher LCC, than planned. This paper presents methods to ensure that advanced technologies are incorporated into future programs while providing a greater accuracy of predicting their LCC. One method is having a dedicated organization to develop X-series vehicles or separate prototypes carried on other vehicles. The question of whether such an organization should be independent of NASA and/or have an independent funding source is discussed. Other methods are also discussed. How to make the choice of which technologies to pursue to the prototype level is also discussed since, to achieve better LCC, first the selection of the appropriate technologies.

Robinson, John W.↗

Advanced Manned Launch Systems

Advanced Manned Launch Systems (AMLS) studies underway at the NASA Langley Research Center are part of a broader effort examining options for the next U.S. manned space transportation system. AMLS study phases have focused on investigating mission needs and identifying technologies and technology levels, concepts, systems, operational requirements, and life-cycle costs. For near-term technologies and an operations-oriented approach, two-stage vertical-takeoff rocket vehicles with significant levels of reusability are shown to be cost-effective for moderate to high flight rates. All-hydrogen fuel vehicles are also preferred over methane boosted systems from both operational and cost considerations.

Talay, Theodore A.↗

Technology needs for lunar and Mars space transfer systems

The determination of appropriate space transportation technologies and operating modes is discussed with respect to both lunar and Mars missions. Three levels of activity are set forth to examine the sensitivity of transportation preferences including 'minimum,' 'full science,' and 'industrialization and settlement' categories. High-thrust-profile missions for lunar and Mars transportation are considered in terms of their relative advantages, and transportation options are defined in terms of propulsion and braking technologies. Costs and life-cycle cost estimates are prepared for the transportation preferences by using a parametric cost model, and a return-on-investment summary is given. Major technological needs for the programs are listed and include storable propulsion systems; cryogenic engines and fluids management; aerobraking; and nuclear thermal, nuclear electric, electric, and solar electric propulsion technologies.

Woodcock, Gordon R.↗

Advanced Range Technologies

Historically, the majority of the total life cycle cost for any complex system is attributed to operational and support activities. Therefore, a primary strategy for reducing life cycle costs should be to develop and infuse spaceport technologies in future space transportation systems. Advanced technologies will benefit current and future spaceports on the earth, moon, Mars, and beyond

Nelson, Richard A.↗

Implementing Effective Mission Systems Engineering Practices During Early Project Formulation Phases

Developing and implementing a plan for a NASA space mission can be a complicated process. The needs, goals, and objectives of any proposed mission or technology must be assessed early in the Project Life Cycle. The key to successful development of a space mission or flight project is the inclusion of systems engineering in early project formulation, namely during Pre-phase A, Phase A, and Phase B of the NASA Project Life Cycle. When a space mission or new technology is in pre-development, or "pre-Formulation", feasibility must be determined based on cost, schedule, and risk. Inclusion of system engineering during project formulation is key because in addition to assessing feasibility, design concepts are developed and alternatives to design concepts are evaluated. Lack of systems engineering involvement early in the project formulation can result in increased risks later in the implementation and operations phases of the project. One proven method for effective systems engineering practice during the pre-Formulation Phase is the use of a mission conceptual design or technology development laboratory, such as the Mission Design Lab (MDL) at NASA's Goddard Space Flight Center (GSFC). This paper will review the engineering process practiced routinely in the MDL for successful mission or project development during the pre-Formulation Phase.

Processes↗

Gallium arsenide solar array subsystem study

The effects on life cycle costs of a number of technology areas are examined for a gallium arsenide space solar array. Four specific configurations were addressed: (1) a 250 KWe LEO mission - planer array; (2) a 250 KWe LEO mission - with concentration; (3) a 50 KWe GEO mission planer array; (4) a 50 KWe GEO mission - with concentration. For each configuration, a baseline system conceptual design was developed and the life cycle costs estimated in detail. The baseline system requirements and design technologies were then varied and their relationships to life cycle costs quantified. For example, the thermal characteristics of the baseline design are determined by the array materials and masses. The thermal characteristics in turn determine configuration, performance, and hence life cycle costs.

Miller, F. Q.↗

Configuration Management at NASA

NASA programs are characterized by complexity, harsh environments and the fact that we usually have one chance to get it right. Programs last decades and need to accept new hardware and technology as it is developed. We have multiple suppliers and international partners Our challenges are many, our costs are high and our failures are highly visible. CM systems need to be scalable, adaptable to new technology and span the life cycle of the program (30+ years). Multiple Systems, Contractors and Countries added major levels of complexity to the ISS program and CM/DM and Requirements management systems center dot CM Systems need to be designed for long design life center dot Space Station Design started in 1984 center dot Assembly Complete in 2012 center dot Systems were developed on a task basis without an overall system perspective center dot Technology moves faster than a large project office, try to make sure you have a system that can adapt

Doreswamy, Rajiv↗

Solar thermal power systems point-focusing distributed receiver /PFDR/ technology - A project description

The goal of the Project is to support the industrial development of PFDR technology that will provide favorable life-cycle costs per unit of electrical or thermal energy produced. The technology will be made available in the early 1980s for applications project experiments. PFDR systems utilize concentrator dishes to furnish energy to their own individual receivers and power conversion subsystems. Initial effort is with steam Rankine and gas Brayton cycles. Periodic assessments will be made to confirm or change the cycles initially selected. Subsystems will be designed, fabricated and tested together in modules as appropriate. This paper describes PFDR systems briefly, outlines the project goals and organization, discusses the plans and current status of the project, and lists the benefits of PFDR technology concepts.

Lucas, J. W.↗

The space station assembly phase: Flight telerobotic servicer feasibility. Volume 2: Methodology and case study

A methodology is described for examining the feasibility of a Flight Telerobotic Servicer (FTS) using two assembly scenarios, defined at the EVA task level, for the 30 shuttle flights (beginning with MB-1) over a four-year period. Performing all EVA tasks by crew only is compared to a scenario in which crew EVA is augmented by FTS. A reference FTS concept is used as a technology baseline and life-cycle cost analysis is performed to highlight cost tradeoffs. The methodology, procedure, and data used to complete the analysis are documented in detail.

Smith, Jeffrey H.↗

Reliability of photovoltaic modules

In order to assess the reliability of photovoltaic modules, four categories of known array failure and degradation mechanisms are discussed, and target reliability allocations have been developed within each category based on the available technology and the life-cycle-cost requirements of future large-scale terrestrial applications. Cell-level failure mechanisms associated with open-circuiting or short-circuiting of individual solar cells generally arise from cell cracking or the fatigue of cell-to-cell interconnects. Power degradation mechanisms considered include gradual power loss in cells, light-induced effects, and module optical degradation. Module-level failure mechanisms and life-limiting wear-out mechanisms are also explored.

Ross, R. G., Jr.↗

A design optimization process for Space Station Freedom

The Space Station Freedom Program is used to develop and implement a process for design optimization. Because the relative worth of arbitrary design concepts cannot be assessed directly, comparisons must be based on designs that provide the same performance from the point of view of station users; such designs can be compared in terms of life cycle cost. Since the technology required to produce a space station is widely dispersed, a decentralized optimization process is essential. A formulation of the optimization process is provided and the mathematical models designed to facilitate its implementation are described.

Chamberlain, Robert G.↗