Engineering PapersSearch

SEARCH · Engineering Papers

Results for “projection operator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Loss Factors for Small Distributed Wind Turbines Based on Field Data in the United States

While wind energy production loss due to unavailability, environmental impacts, curtailment, and other causes has been studied and characterized at the utility-scale wind farm level, observation-based characterization of project loss is lacking for distributed wind energy, particularly for projects involving small wind turbines. Contemporary tools and research that support pre-construction distributed wind energy characterization present a wide range of default loss factors to convert gross energy estimates to net: 7-18%. We hypothesize that we can use generation observations from operational distributed wind projects to develop more accurate representations of loss. Using a density-based filtering technique on distributed wind power generation timeseries, we determine periods of typical performance and use them with regression algorithms in a measure-correlate-predict fashion to simulate what the generation would have been during periods of atypical or unreported performance. From there, the actual versus predicted generation leads to the establishment of observation-informed loss factors (median = 17%) for small, single turbine installation distributed wind projects.

17 WIND ENERGY

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2024

Energy Savings Performance Contracts (ESPCs)are a contractual mechanism that allow a federal agency to procure energy savings and facility improvements without upfront capital costs to reduce costs and resiliency. ESPCs are covered under FAR Part 23.2, and 42 USC § 8287. Section 8287(a)(2)(A) of Title 42 of the U.S. Code requires that each energy savings performance contract (ESPC) undergo an annual energy audit, resulting in a separate audit report for every project. The objective of the present report is to compile and analyze all annual ESPC audit reports issued between October 1, 2023, and September 30, 2024, for projects awarded under Generations 1, 2, and 3 of DOE’s ESPC IDIQ contracts. During this period, 205 measurement and verification (M&V) reports were produced for 200 projects; the total number of reports exceeds the number of projects because some projects generated more than one report(for example, a few projects measure savings twice per year and produce two audit reports annually, each covering a different six-month period). By aggregating the results from these individual audits, the report determines the portfolio-wide realization rate of energy and cost savings for all active ESPC projects awarded under DOE’s IDIQ program. For all 205audit reports, sufficient information was available to compare project-level estimated, reported, and guaranteed cost savings. Reported cost savings accounted for ESCO verified savings per each project’s M&V plan. The total reported cost savings for the period addressed were $\$$647.8million,compared with the total guaranteed cost savings of $\$$601.6million. On average across the reported projects: •ESPC contractors guaranteed 92.8% of the estimated cost savings• projects reported achieving 100.0% of the estimated cost savings• projects reported achieving 107.7% of the guaranteed cost savings. The M&V performed for the period indicated adjustments for government operations and maintenance impacts to savings amount to$\$$43.9millionandcould be restored with the original operational parameters for impacted projects. Accounting for this potential cost savings impact, these projects still realized 100.4% of the guaranteed cost savings. The information on estimated and reported energy savings was collected and compared for all 205of the reports examined. Based on site energy, estimated savings totaled 14.88million MMBtu, and reported savings were 15.33million MMBtu; 3.1% greater than the estimated energy savings. All of the reports examined contained sufficient information to calculate source energy savings. Based on site-adjusted source energy, total estimated energy savings were 20.90 million MMBtu, and reported savings were 21.22million MMBtu, 101.5% of the estimated energy savings. For water savings, the estimated savings were 11,539,055 kGal and the reported savings were 13,315,930 kGal. This means 1,776,875 kGal more water was saved than estimated, which is about 15% higher than the estimate. These results indicate that, overall, the reported energy savings slightly exceeded the estimated values, while estimated water savings significantly exceeded estimated values, suggesting that the projects achieved greater cost savings than originally projected. The total annual expense for the ESCOs to perform annual M&V audits and reporting was $\$$10.02million. Through this effort, $\$$647.8 million in annual cost savings was verified. The M&V results indicated that $\$$43.9 million of these verified savings reflected adjustments due to government operations A-6and maintenance impacts, which could be restored under the original operational parameters for the affected projects. These findings show the value of M&V that only costs 1.7%of the guaranteed cost savings to ensure guarantees are met.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Nano Filters for Selective Metal Capture (CRADA Final Report)

As part of the Cyclotron Road program, Sunchem investigated novel nanoporous materials and their metal extraction performance in both batch and dynamic continuous flow operations. The proposed project developed novel nanoporous materials for selective metal extraction from complex industrial mixtures. The technical objectives were to synthesize and characterize the nanoporous materials, structure the nanoporous materials with binders along with structuring techniques and evaluate its performance in both a batch and dynamic continuous flow operation. The nanoporous material was structured through a disc granulation method to obtain particles in the size range of 250 to 500 micron diameter. This structured material was packed into a continuous flow column which achieved up to 48 wt% of gold capture. This work aimed to address the key technical risk of the materials’ capability to be employed in an industrial operation with competitive performance compared to other adsorbents.

36 MATERIALS SCIENCE

CO2 Storage Economic Analysis: CarbonSAFE Use Case

Poster on “CO2 Storage Economic Analysis: CarbonSAFE Use Case” for the CCUS 2025 conference held in Houston, Texas March 3-5, 2025. The cost of designing, permitting, constructing, operating, and closing a CO2 storage project is of vital importance to project developers. The National Energy Technology Laboratory has developed the NRAP/SMART Technoeconomic and Liability Evaluation for Storage (TALES) Model to provide quantitative cost-based insights to support developers planning CO2 injection and storage projects. This study presents a collaborative economic analysis applying TALES with data from the San Juan Basin CarbonSAFE Phase III project led by the New Mexico Institute of Mining and Technology to estimate potential costs incurred during the implementation of a real-world commercial-scale carbon storage project. Scenario analysis was implemented in which different operational and cost attributes were varied and the associated cost implications observed. Key results data and project cost summary metrics, first-year breakeven price of CO2 ($/tonne) and net present value (NPV), are presented for base and alternative cases. Output provides a unique perspective for project stakeholders towards evaluating the influence of different operational strategies and financing approaches on overall project cost and financial viability.

carbon storage

High-Temperature Aquifer Thermal Energy Storage (HT-ATES) Projects in Germany and the Netherlands—Review and Lessons Learned

Aquifer thermal energy storage (ATES) is a concept that can help to address heating and cooling needs through the use of the subsurface as a seasonal thermal energy storage (STES) system. Over 2800 ATES systems have been deployed with storage temperatures typically below 25 °C and only a few with higher temperatures (>40 °C), which would increase the energy density and utility of the stored thermal fluids. Until now, only a few high-temperature aquifer thermal energy storage (HT-ATES) projects have been initiated and are still in operation. These HT-ATES projects have encountered a range of technical and non-technical challenges. This study reviews ten such projects: four in Germany and six in the Netherlands. The non-technical issues include public acceptance, a lack of regulatory framework for these systems, managing overlapping uses of the subsurface, managing changes with the providers and off-takers of thermal energy, and obtaining financing to implement these projects. Common technical issues include geological factors such as incomplete characterization of the subsurface and reservoir heterogeneity; geochemical issues such as mineral scaling, corrosion, and biofouling; lower than expected thermal recovery; and issues with system design and reliability. This review highlights benefits and challenges faced by HT-ATES projects with the goal to use the lessons learned to improve the siting, design, development, and operation of such systems. Recommendations include improved initial subsurface site characterization, use of coupled process models to optimize system design and predict system performance, cascaded uses of stored thermal energy to better utilize the stored heat, monitoring networks to provide feedback on system performance, and expanded system scale to allow for continued operation even when maintenance of some system components is required. Techno-economic modeling and risk analysis could be used to optimize such HT-ATES project design and identify key factors that will affect sustained economic viability. In addition, design flexibility is important for these systems to allow for changing conditions regarding the supply and demand of thermal energy. Adopting these findings should improve the performance and reduce the risks for future HT-ATES projects worldwide.

15 - GEOTHERMAL ENERGY

Control System Upgrade for Battery State-of-Charge Indications

The Advanced Test Reactor (ATR) Complex at Idaho National Laboratory (INL) relies on Battery Backed Power (BBP) systems and Uninterruptible Power Supplies (UPS) to ensure continuous power supply to critical components. This project aims to enhance the reliability and functionality of the battery monitoring and control systems by updating the State-of-Charge (SOC) system, Programmable Logic Controller (PLC), and Human-Machine Interface (HMI) for the nuclear safety-related battery banks. The current system, while functional, has areas for improvement, particularly in recharging calculations and alarm functions. The project objectives include developing flow charts, programming the new PLC and HMI, conducting bench tests, and updating design documentation. Additionally, the project ensures compliance with safety standards, develops training materials, creates comprehensive documentation, and integrates seamlessly with existing ATR infrastructure. The new SOC system is designed to be scalable for future upgrades, improve efficiency, enhance data accuracy, implement redundancy features, and achieve project goals within budget constraints while considering environmental impact. The methodology involved familiarizing with BBP and UPS systems, collecting current readings, rescaling signals, learning ladder logic, and updating the HMI. The transition from SLC 5/03 PLC using RS Logix 500 to CompactLogix 5380 using Studio 5000 was a key step. Despite challenges in transferring outdated PLC ladder logic and HMI code, starting from scratch led to a more accurate and efficient monitoring system, contributing to improved safety and operational efficiency. The project is currently awaiting approval of the Engineering Calculation and Analysis Report (ECAR) before implementation.

42 - ENGINEERING

ROTA-CAP™: An Intensified Carbon Capture System Using Rotating Packed Beds (Final Scientific/Technical Report)

GTI Energy and Carbon Clean Solutions Limited successfully designed, constructed, and operated an integrated ROTA-CAP carbon capture skid. ROTA-CAP™ is a process intensification technology, applied for post-combustion carbon capture, which utilizes the centrifugal forces generated from rotation of rotating packed beds as well as advanced solvents to achieve increased mass transfer rates 1-2 orders of magnitude higher than conventional columns while substantially decreasing footprint. The test skid, which consisted of a dual stage RPB absorber with external interstage cooling and a single stage RPB regenerator, was operated at capacities up to 0.5 tonne/day of CO 2 capture with flue gas concentrations ranging from 4% to 22% CO 2 by vol. CO 2 removal rates greater than 95% were achieved, with CO 2 product purity also exceeding 95% by vol. Over 1,600 hours of operation were accumulated throughout the project, including over 1,000 hours of operation of the with real flue gas containing at least 9.8% CO 2 by vol. The skid was operated continuously for 24 hours per day and 7 days per week over the course of 7 long-term test campaigns, with the campaigns ranging from approximately 2-4 weeks per campaign. A techno-economic analysis was performed, and a cost of capture of $\$$41.18/tonne CO 2 was calculated for the ROTA-CAP process, compared to $\$$45.75/tonne for a Cansolv-based process. These results show a cost reduction of approximately 10% compared to the Cansolv-based process. Although this still exceeds the target cost of capture of $\$$30/tonne specified for this project, GTI expects that the cost of capture can be further reduced through further optimization of the design and technology. GTI also performed an engineering design review to determine the scale-up potential of the technology, with the results of the preliminary assessment indicating that it appears to be feasible to scale up the RPB technology to 4,000 TPD. It was also determined that both horizontal and vertical rotor orientations are feasible, though there are mechanical advantages to the vertical orientation.

20 FOSSIL-FUELED POWER PLANTS

Interregional Transmission Operational Coordination (IRTOC)

This report presents a modeling and evaluation framework developed through the Inter-Regional Transmission Operational Coordination (IRTOC) project to study market-to-market (M2M) congestion management across day-ahead and real-time markets. The framework extends the Sienna platform through Sienna Decomposition, a multi-stage evaluation architecture that enables flexible representation of multiple regions and systematic assessment of alternative market coordination designs. Additional modeling capabilities include reserve deliverability constraints, High-Voltage Direct Current (HVDC) optimization for Alternating Current (AC) congestion management, and several real-time distributed coordination algorithms. Case studies using the RTS-GMLC test system and a large-scale Eastern Interconnection model demonstrate that the framework can evaluate alternative coordination structures and quantify their economic and operational impacts. The proposed framework provides a scalable platform for analyzing inter-regional coordination strategies in large-scale electricity markets.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Simple and Scalable Process for Nanocellulose Production from Residues and Waste (CRADA Final Report)

This project successfully developed an innovative, cost-effective, and scalable method for converting low-cost agricultural waste feedstocks into nanocellulose—a sustainable material with wide-ranging industrial applications. It addressed the critical challenges of high production costs and limited global supply, which have hindered the widespread adoption of nanocellulose in industry. Through this work, significant advancements were made in optimizing resource use, improving process efficiency, and reducing costs. Notable achievements included a 50% reduction in water usage, 30% lower chemical consumption, and 20% energy savings, all while maintaining high-quality product standards. The technical feasibility of the process was further validated at a 10L scale in collaboration with the Advanced Biofuels and Bioproducts Development Unit (ABPDU), demonstrating scalability and replicability. Key challenges in reducing nanocellulose production costs were addressed by utilizing low-cost biomass feedstocks and implementing low-temperature conversion reactions, leading to lower capital and operating expenses. The project also mitigated financial risk by generating critical data on the feasibility, adaptability, and scalability of the conversion technology, paving the way for its commercial implementation. Public benefits include advancing the circular bioeconomy, reducing environmental impact, fostering job creation, and enabling a shift toward biobased materials as sustainable alternatives to fossil-based products. These outcomes align closely with national goals to reduce greenhouse gas emissions and promote sustainable technological innovation.

09 BIOMASS FUELS

Modernizing Fermilab's Accelerator Control Hardware

Modernizing the Fermilab accelerator control system is essential to future operations of the laboratory's accelerator complex. The existing control system has evolved over four decades and uses hardware that is no longer available.The Accelerator Controls Operations Research Network (ACORN) Project will modernize the control system and replace end-of-life power supplies to enable future accelerator complex operations with megawatt particle beams. The ACORN project is planning to replace Fermilab s obsolete CAMAC crate-and-card controls hardware with modern MicroTCA hardware. There are over 2,000 CAMAC cards and over 250 CAMAC crates serving various functions in Fermilab s control system. We will review the existing CAMAC hardware and provide updates on the status of the ACORN project, which includes the conceptual design of the MicroTCA replacement hardware and software tools for supporting the installation of hundreds of MicroTCA crates.

43 PARTICLE ACCELERATORS

Design and implementation of the cosmic ray tagger system for the ICARUS detector at FNAL

The ICARUS-T600 Liquid Argon Time Projection Chamber is operating at Fermilab at shallow depth and thus exposed to a high flux of cosmic rays that can fake neutrino interactions. A cosmic ray tagging (CRT) system (∼ 1100 m 2 ), surrounding the cryostat with two layers of fiber embedded plastic scintillators, was developed to mitigate the cosmic ray induced background. Using nanosecond-level timing information, the CRT can distinguish incoming cosmic rays from outgoing particles from neutrino interactions in the TPC. In this paper an overview of the CRT system, its installation and commissioning at Fermilab, and its performance are discussed.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND

Ducted Fuel Injection and Cooled Spray Technologies for Particulate Control in Heavy-Duty Diesel Engines

Heavy-duty diesel engine manufacturers are continually seeking simple, low-cost technologies to reduce emissions. Ducted Fuel Injection (DFI) and Cooled Spray (CS) technologies have emerged as promising solutions, offering the potential for nearly sootless operation. These innovations could significantly decrease harmful Particulate Matter (PM) emissions while enabling further optimization to reduce Nitrogen Oxides (NOx) and increase efficiency. While initial experiments across various engine types have shown promise, uncertainties remain regarding the ideal geometry, scaling properties, and effectiveness of these technologies across different operating conditions. This project aims to address these knowledge gaps through experiments in both optical and metal single-cylinder engines.

33 ADVANCED PROPULSION SYSTEMS

Reduction of Porosity in Cementitious Waste Forms to Reduce Effective Diffusivity

Although current practices meet regulations for grout waste forms, development of sequestration materials and techniques for contaminants of concern could expand the use of grout waste forms and reduce risk to established processes from future compositional changes. There are contaminants in waste streams that are not permanently and completely sequestered in current grout waste forms under certain conditions. These contaminants include methyl mercury, 129 I, 99 Tc, and nitrate. Each of these species have minor fractions that are not permanently and completely isolated from the environment and therefore potentially contribute to long-term environmental impacts. An approach of interest includes the technique of reducing porosity to result in reduced leachability of all contaminants simultaneously. The current Savannah River Site (SRS) saltstone formulation was used to evaluate the relationship between leachability and porosity reduced waste forms by altering the water-to-binder ratio. Results indicated decreasing the water-to-binder directly reduced porosity and resulted in the waste form’s ability to more effectively immobilize nitrate. This work was funded by the Department of Energy Office of Environmental Management (DOE-EM) Technology Operations Office (TOO) Project # HQ221818.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W

A Complexity Agnostic Clustering Engine for Time Projection Chambers and its Implementation in FPGA

A clustering functional block implemented in field-programable-gate-array (FPGA) for time projection chambers (TPC) operating with predictable time regardless the complexity of the event is described in this paper. The clustering functional block reorganizes input data and the hits data belonging to the same clusters are output together for further process in the later stages. The clustering operation consists of two phases, data filling phase and data outputting phase, and the later uses the same number of clock cycles as the data filling phase. The clustering block can accommodate events with arbitrary number of clusters and number of hits per cluster as long as the total number of hits is within a predesigned limit. The operation time is exactly twice of the data filling time with no residual O(n2) term. The clustering block has been implemented with operating frequency of 200 MHz in a low-cost FPGA evaluation module and test results confirm the expected performance.

Wu, Jinyuan [Fermilab] (ORCID:0000000344329521)

Modernizing to an AI-Ready Control System

The Accelerator Controls Operations Research Network (ACORN) project will modernize the accelerator control system and upgrade power supplies to enable future operations of the Fermilab Accelerator Complex with megawatt proton beams. By focusing on MLOps, ACORN enables full integration of AI into the control system to allow safe and reliable improvements to accelerator beam operations.

43 PARTICLE ACCELERATORS

Helium recovery system at IB3a

The increasing need for optimal and sustainable use of cryogenic resources to support Fermilab’s scientific mission has highlighted the necessity of improving the Laboratory’s helium management practices. An assessment of cryogenic test facilities identified the Technical Division’s Industrial Building 3a (IB3A) as a key site requiring upgrades to integrate a helium recovery system. The IB3A facility is essential for characterizing and testing superconductors, cables, and coils for various R&D projects, including the US High-Luminosity LHC Accelerator Upgrade Project (AUP), Mu2e, and other external collaborations. Currently, the facility relies on 500 L helium Dewars and vents the vaporized helium directly into the atmosphere, leading to significant helium loss. Given the non-renewable nature of helium, recovering and reusing this resource is critical for the sustainability of Fermilab’s operations. To address this challenge, a project has been initiated to connect IB3A to an existing helium purification station and refrigeration system located in another building via a dedicated pipeline pass over the roof of several buildings. This solution will enable the efficient capture of vented helium, its transfer to the purification station, and subsequent liquefaction for reuse in future operations. The project includes a detailed design phase, specifying the pipeline route, flow control mechanisms, and integration with the existing cryogenic infrastructure, followed by phased implementation and commissioning. By implementing this pipeline connection and upgrading IB3A, Fermilab aims to significantly reduce helium waste, lower operational costs, and align with its commitment to sustainability. This initiative provides a model for resource-efficient cryogenic operations and reinforces the Laboratory’s capacity to support its science mission for the long term.

Porwisiak, D. [Fermilab]

Determining Exact RANS Operators with the Macroscopic Forcing Method (Final Report)

This report contains a compilation of key results and findings from the ACT project “Determining Exact RANS Operators with the Macroscopic Forcing Method.” The Macroscopic Forcing Method (MFM), a numerical tool for determining closure operators, is used to measure eddy diffusivity moments in Rayleigh-Taylor (RT) instability. It is first applied to low-Atwood 2D RT instability; that work is then extended to 3D RT at different finite Atwood numbers. It is found that nonlocality is important for modeling the mean scalar transport closure operator in RT mixing. Additionally, work is done to improve the statistical convergence of MFM for chaotic problems like RT mixing.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC

FEED Study of CarbonCapture Inc DAC and CarbonCure Utilization Technologies Using United States Steel’s Gary Works Plant Waste Heat (Final Report)

The University of Illinois at Urbana-Champaign (UIUC) led this project to produce a front-end engineering design (FEED) study of an advanced Direct Air Capture and Utilization System (DACUS) system that can remove a minimum of 5,000 tonnes/yr net of carbon dioxide from air (based on cradle-to-gate LCA) and utilizing the CO 2 to produce low carbon intensity ready mix concrete. The designed system, if built, would be larger than any currently existing Direct Air Capture (DAC) collector in the U.S. Such carbon capture technologies are critical to meeting the goals of the DOE’s program to accelerate climate-critical technology. In addition to the power sector, industrial facilities for the manufacture of steel and cement/concrete are among the major sources of anthropogenic CO 2 . DAC is a promising new technology for reducing CO 2 , a potent greenhouse gas, in the atmosphere but is expensive, in part due to the energy required to adsorb and desorb captured CO 2 during cycles. By integrating CarbonCapture Inc. (CCI) DAC modules at United States Steel's Gary Works (USS) and utilizing the site's waste heat, energy, and location this project evaluates the feasibility of utilizing the captured CO 2 and the logistics of transportation. CarbonCapture Inc. has developed an innovative DAC system using novel adsorbents to cost-effectively capture CO 2 . The captured, liquified gas will be trucked to ready-mix concrete plants within the region, the closest of which is approximately 3.5 miles away, where CarbonCure will inject it into concrete during the mixing process at the facilities. The carbon dioxide reacts with concrete, mineralizing into calcium carbonate (CaCO 3 ), permanently locking the greenhouse gas into the matrix of the building material. This FEED study demonstrated a full CO 2 value chain for DACUS from industrial facilities. It also provided a means for Visage Energy Corp. (Visage) to assess the impact of this holistic approach on job creation, regional economic impact, and environmental justice. The project team also included Sargent & Lundy (S&L) to provide the constructability review and costing of the integration of the DAC with the steel plant. Ecotek Engineering USA, LLC designed the outside battery limit (OSBL) infrastructure to connect the DAC and the plant. Activities performed during the project included: (1) Project Management Plan; (2) Technology Maturation Plan (TMP); (3) Initial Workforce Readiness Plan; (4) Workforce Readiness Plan; (5) Front-End Engineering Design (FEED) Study; (6) Project Design Basis; (7) Hazards and Operability (HAZOP) Study; (8) Constructability Review; (9) Project Cost Assessment; (10) Logistics Analysis of CO 2 Transportation to the Utilization Site; (11) Business Case Analysis; (12) Life Cycle Analysis (LCA); (13) Environmental Health and Safety (EH&S) Analysis; (14) Environmental Justice Analysis; and (15) Economic Revitalization and Job Creation Outcomes Analysis. This report provides a summary of the outcomes and results of the project, which was performed between Oct. 1, 2022, through Sept. 30, 2024.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI