Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “corrective actions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Evaluating offshore legacy wells for geologic carbon storage: A case study from the Galveston and Brazos areas in the Gulf of Mexico

In this article, federal offshore waters in the Gulf of Mexico are of interest for large-scale geologic carbon storage (GCS). However, more than 80,000 offshore oil and gas wells exist in the region, which could impact the integrity of sealing intervals. In this study, we propose a screening methodology for ranking offshore legacy wells based on the challenge they may present to GCS. The methodology relies on the review of well regulatory records to 1) identify leakage pathways and assess the potential hazards that wells pose to planned GCS operations, 2) evaluate well features that impact the accessibility of wells to determine the feasibility of potential corrective actions, and 3) rank wells based on the overall challenge they may pose for GCS. We demonstrate our framework by evaluating the construction and abandonment of 156 wells across eight areas of interest (AOIs) in shallow federal waters along the Texas Gulf Coast. The majority (99.3 %) of wells considered were constructed and plugged in a manner that did not isolate prospective GCS targets in the Upper and Lower Miocene formations and may potentially require a challenging or uncertain corrective action prior to GCS. Dataset trends suggest that the observed well construction and plugging designs may be common in shallow offshore federal waters along the Texas Gulf Coast. Consequently, operators pursuing offshore GCS projects in the region may consider selecting areas that avoid challenging wells or performing robust evaluations of legacy well leakage risks to plan corrective action prior to CO 2 injection.

58 GEOSCIENCES↗

Strategic Qualitative Risk Assessment of Thousands of Legacy Wells within the Area of Review (AoR) of a Potential CO2 Storage Site

The subsurface confinement of anthropogenic carbon dioxide (CO2) demands robust risk assessment methodologies to identify potential leakage pathways. Legacy wells within the Area of Review (AoR) represent one potential leakage pathway. Robust methodologies require enormous amounts of data, which are not available for many old legacy wells. This study strategically categorizes 4386 legacy wells within the AoR of a potential CO2 storage site in the Illinois basin and identifies the high-risk wells by leveraging publicly available data—reports and well logs submitted to state regulatory agencies. Wells were categorized based on their proximity to the injection well location, depth, the mechanical integrity of well barriers, and the accessibility to these wells throughout the project lifecycle. Wells posing immediate risks were identified, guiding prioritized corrective actions and monitoring plans. Out of 4386 wells, 54 have high priority for corrective action, 10 have medium priority, and the remainder are of low priority. Case study results from the Illinois basin demonstrate the effectiveness and applicability of this approach, to assess the risk associated with legacy wells within the AoR of potential CO2 storage site, strategically categorizing over 4000 such wells despite data limitations.

Arbad, Nachiket (ORCID:0000000215353656)↗

Risk matrix for legacy wells within the Area of Review (AoR) of Carbon Capture & Storage (CCS) projects

The success of CCS depends on the capacity, injectivity, and confinement by the storage medium. Thousands of wells drilled over the past century with the intention to find the trapped oil and gas may penetrate the containment seals. These wells may provide leakage pathways for the CO 2 to escape and contaminate the underground sources of drinking water (USDW) or reach the surface in the worst-case scenario. Identifying the risky wells penetrating the containment seals and predicting their current as well as future well integrity is the most challenging task when limited data is available. Here, this paper proposes a unique methodology for risk assessment of the wells penetrating the containment seals based on the proximity of these wells from the proposed injection location, mechanical integrity, and accessibility of these wells over the lifecycle of the CCS project. This helps in identifying the wells which need immediate attention from the wells that need little to no attention. It also highlights the corrective actions necessary for the success of the CCS project as well as help estimate the approximate cost required to perform the corrective actions. This methodology focuses on all wells (producers, injectors, orphan, abandoned, water, stratigraphic, etc) while the majority of the studies found in literature focused on wells with sustained casing pressure (SCP) reports and cement bond logs (CBL). The proposed risk matrix, if applied to future CCS projects across the globe, will uniformly categorize the wells within the Area of Review (AoR).

58 GEOSCIENCES↗

Microgrid Frequency Stability: A Proactive Scheme Based on Dynamic Predictions

The dynamic nature of microgrids introduces challenges in the context of frequency stability. This work presents a framework where the future state of microgrid frequency is predicted and corrective actions are optimized. Predictions are generated through Bayesian filters leveraging synchronized data acquired via PMUs. Taking a proactive approach makes it possible to optimize corrective actions considering dynamic system conditions. Testing is conducted via Matlab simulations. The performance of the solution presented in this work is compared to traditional load-shedding schemes and to predictive solutions found in literature. The results indicate that the proposed framework outperforms both. Some of the advantages of this framework include a reduction in amount of load dropped during compensation, the use of adaptive parameters which eliminates the need to simulate contingency conditions, and dynamic uncertainty quantification provided the particle filter.

Paramo, Gian↗

LANSCE Facility Longevity Assessment

This LANSCE Facility Longevity Assessment examined 34 total systems critical to the operation of the LANSCE accelerator complex. These systems are primarily owned, operated, and maintained by AOT Division. Based on the criteria used in this assessment, there are 12 AOT Division systems that are potential high risk as related to longterm LANSCE operations. These systems may also impact the success of LAMP. Also summarized in this report are the facility activities planned over the next decade. These include general facility maintenance and infrastructure upgrades, as well as planned electrical system upgrades. The LANSCE Facility Operations (LFO) Division is responsible for this activity scope and budget planning. Most of the planned activities are general in nature and should have little impact on accelerator operations or LAMP activities as currently envisioned. However, close coordination with between AOT, LFO, and LAMP would be prudent. A next step should be to develop an actionable plan to address the high-risk systems. Potential criteria for developing such a plan could include: (1) Evaluating the global impact of the system (operations, program, safety, etc.), (2) Ranking by impact (ranked now by risk), (3) Estimating cost to implement the corrective actions (Is there already a plan or not?), and (4) Estimating the time required for corrective actions. An alternative could include integration of the assessment data into both the Asset Management System and the Maintenance Analytics Risk Register.

43 PARTICLE ACCELERATORS↗

Federal Facility Agreement and Consent Order Nevada National Security Site Use Restriction Management Plan, Revision 2

This Use Restriction Management Plan (URMP) provides the information needed to create, modify, and manage use restrictions (URs) for sites on the Nevada National Security Site (NNSS), and sites accessed through the NNSS main gate, that were closed using the corrective action alternative (CAA) of closure in place under the Federal Facility Agreement and Consent Order (FFACO). It addresses URs established under the FFACO for releases related to the development, testing, and production of nuclear weapons that are located on the NNSS and that are accessed through the NNSS main gate. FFACO URs are established at sites where contamination remains at levels exceeding final action levels (FALs) or is forecasted to exceed Safe Drinking Water Act (SDWA) maximum contaminant levels (CFR, 2025a) over the next 1,000 years following completion of corrective actions. Administrative URs are established at Industrial Sites and Soils sites where contamination remains at levels exceeding industrial action levels as defined in the Soils RBCA document. All URs stipulate restrictions sufficient to ensure the protection of human health, safety, and the environment.

54 ENVIRONMENTAL SCIENCES↗

Harmonized Automatic Relay Mitigation of Nefarious Intentional Events (HARMONIE) - Special Protection Scheme (SPS)

The harmonized automatic relay mitigation of nefarious intentional events (HARMONIE) special protection scheme (SPS) was developed to provide adaptive, cyber-physical response to unpredictable disturbances in the electric grid. The HARMONIE-SPS methodology includes a machine learning classification framework that analyzes real time cyber-physical data and determines if the system is in normal conditions, cyber disturbance, physical disturbance, or cyber-physical disturbance. This classification then informs response, if needed and/or suitable, and included cyber-physical corrective actions. Beyond standard power system mitigations, a few novel approaches were developed that included a consensus algorithm-based relay voting scheme, an automated power system triggering condition and corrective action pairing algorithm, and a cyber traffic routing optimization algorithm. Both the classification and response techniques were tested within a newly integrated emulation environment composed of a real-time digital simulator (RTDS) and SCEPTRE™. This report details the HARMONIE-SPS methodology, highlighting both the classification and response techniques, and the subsequent testing results from the emulation environment.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Solar-assisted Voltage Optimization Method for Transmission Solar Network Power System

This paper proposes a new formulation and solution algorithm that uses transmission level solar inverters to address the security-constrained optimal power flow (SCOPF) problem. The goal is to stabilize voltage fluctuations in transmission networks in base case and contingency scenarios, by using bulk solar power plant with a minimal number of post-contingency corrections. To achieve this goal, a two-stage volt/var optimization method is proposed to first correct all voltage violations with the volt-var alternating current optimal power flow (ACOPF) algorithm for a base case. Then a linearized SCOPF volt-var control algorithm is proposed to identify the corrective actions for all potential voltage violations in all contingency scenarios. The proposed method was tested and validated on a modified IEEE 118-bus system with solar photovoltaic (PV) data.

Photovoltaic, Volt/Var Control↗

Feedback Control Strategy for Transient Stability Application

Power systems are subjected to a wide range of disturbances during daily operations. Severe disturbances, such as a loss of a large generator, a three-phase bolted fault on a generator bus, or a loss of a transmission line, can lead to the loss of synchronism of a generator or group of generators. The ability of a power system to maintain synchronism during the few seconds after being subjected to a severe disturbance is known as transient stability. Most of the modern methods of controlling transient stability involve special protection schemes or remedial action schemes. These special protection schemes sense predetermined system conditions and take corrective actions, such as generator tripping or generation re-dispatch, in real time to maintain transient stability. Another method is the use of a real-time feedback control system to modulate the output of an actuator in response to a signal. This paper provides a fundamental evaluation of the use of feedback control strategies to improve transient stability in a power system. An optimal feedback control strategy that modulates the real power injected and absorbed by distributed energy-storage devices is proposed. Its performance is evaluated on a four-machine power system and on a 34-machine reduced-order model of the Western North American Power System. The result shows that the feedback control strategy can increase the critical fault clearing time by 60%, thereby improving the transient stability of the power system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Compliance of NNSS Activities with P322-4 Issues Management and NNSSWAC Requirements

The Institutional Quality and Performance Assurance Division's Quality Support Services Group conducted a surveillance of the compliance of Waste Management Program activities to Issues Management/Corrective Action requirements communicated in P322-4 and the Nevada National Security Site Waste Acceptance criteria (NNSSWAC). All corrective actions reviewed and records examined were found to be compliant with appropriate and relevant procedures. There were no Findings or Opportunities for Improvement noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗

Fostering Nuclear Security Culture through Effective Leadership: An Operational Perspective

Security culture plays a critical role in determining the effectiveness of an organization's security performance, making its significance impossible to overemphasize. It encompasses the collective values, shared perceptions, and habitual actions embraced by all individuals within a nuclear organization—from leadership to frontline staff. When the entire workforce recognizes the reality of potential threats, accepts that security is a shared duty, and integrates security-minded behavior into everyday routines, it fosters an environment where strong security practices are the norm. In such a setting, everyone can take pride and feel reassured in being part of an organization where a strong security culture is deeply embedded. Security culture is based on the broader concept of organizational culture. All organizations—whether families, social clubs, religious institutions, businesses, non-governmental organizations, or governments—possess an underlying culture shaped by core values and beliefs. These values and beliefs influence attitudes and drive behavior throughout the organization. While multiple factors contribute to the development of a strong security culture, leadership plays a particularly pivotal role. In organizations where security culture is well-established, leaders go beyond rhetoric; they demonstrate a genuine commitment to security through their actions. They implement policies and procedures that actively engage all employees, foster open dialogue around security concerns, and encourage teamwork in resolving issues. Furthermore, they reward proactive behavior and ensure that corrective actions are taken promptly. Regular assessments of the organization's security culture allow such leaders to gauge its effectiveness and take strategic steps to strengthen it when necessary. This paper leverages practical, real-world experience to guide leadership and senior management within nuclear organizations through the foundational steps of cultivating a robust, organization-wide culture of nuclear security. It emphasizes the critical importance of early leadership engagement in shaping this culture and outlines a comprehensive approach that includes strategic, tactical, and operational measures. Additionally, it explores methods for fostering a unified vision across all levels of the organization to ensure alignment, commitment, and continuous improvement in nuclear security practices.

Zineddin, Dr. Z. [ORNL] (ORCID:0009000848740725)↗

Technical Specification Surveillance Interval Extension Using Self-Diagnostics

As part of the Light Water Reactor Sustainability program, an ongoing research effort is being conducted on technical specifications surveillance interval extension of digital equipment in nuclear power plants. The research team is led by Idaho National Laboratory and includes Pacific Northwest National Laboratory, Technology Resources, and Oak Ridge National Laboratory. This research focuses on developing methods for applying the U.S. Nuclear Regulatory Commission (NRC)–approved guidance to implement a licensee-controlled, risk-informed surveillance frequency change program in digital instrumentation and control (I&C) systems that include self-diagnostics and online monitoring (OLM) capabilities. Although approved methods exist for extending technical specifications (TS) surveillance test intervals (STIs) for general equipment, including analog I&C equipment, gaps remain in technology and guidance on crediting newer digital equipment’s internal self-diagnostics and OLM characteristics. Previous research described a general methodology for crediting internal self-diagnostics for extending surveillance test intervals. The methodology used self-diagnostics to detect—and credited recovery from—failure. Self-diagnostics were also applied for performance monitoring during the extended surveillance interval. This report discusses the status of recent activities to evaluate the previously developed methodology using a pilot study. Although both a utility partner for a pilot study and a specific digital asset were identified in FY2020, delays in obtaining proprietary information resulted in a limited ability to fully evaluate the methodology, and further interactions were complicated by the COVID pandemic. Therefore, at that time, the use of public-domain information—along with current processes for surveillance interval extension through a surveillance frequency control program—identified the need to fully assess diagnostic coverage as part of the pilot study. Furthermore, self-diagnostics were also identified as a potential option to replace the drift analyses conducted as part of current STI extension procedures. In FY2022, the project was reconstituted with the industry partner, and information and data were made available by the industry partner to the research team for review. The shared information included failure event descriptions and data for a digital I&C system since its implementation, as well as recent STI extension interval reports developed by the utility partner on that digital I&C system. This report presents an evaluation of this information and data and describes an application of the proposed methodology cited above. The methodology seeks to take advantage of the self-diagnostics and OLM capabilities to reduce risk or reduce the level of qualitative monitoring assessment needed to perform a risk-informed STI extension using existing NRC approved guidance or both. Addressing these issues of STI extension by crediting self-diagnostics is likely to result in benefits for current and future nuclear power plant (NPP) operations, including lowering the barriers to adoption of digital I&C systems and increasing cost savings by deferring or eliminating unneeded preventive maintenance (tasks or checks or activities). Specifically, self-diagnostic and OLM capabilities of newer digital equipment being installed in non-safety and safety applications are designed to detect failures, provide early warning of potential failures, and notify plant operators to take appropriate action to reduce out of service (OOS) time thus protecting safety margins. Moreover, the equipment is expected to provide information that time-related operational degradation is identified early to ensure timely and planned corrective actions instead of a reactive and unplanned approach ahead of an extended-surveillance interval.

42 ENGINEERING↗

Advanced Long-Term Environmental Monitoring Systems (ALTEMIS) Artificial Intelligence Data Management Plan

Across the Department of Energy’s Environmental and Legacy Management sites, complex groundwater plumes exist that will require long-term monitoring to ensure remedial actions that have been put in place remain effective decades into the future. The current monitoring paradigm predominantly consists of groundwater well sampling, whereby samples are collected, concentrations analyzed, and plume anomalies are detected after they have occurred. The Advanced Long Term Environmental Monitoring Systems (ALTEMIS) program is a multi-lab, multi-institution team of researchers that is deploying spatially integrative technologies (i.e., real-time in situ sensor networks), coupled with artificial intelligence and machine learning, to establish a more proactive monitoring paradigm. Within this approach, plume anomalies can be predicted, and corrective actions can be established prior to the occurrence, offering a more cost-effective and robust approach to long-term monitoring. The team has deployed a variety of different in situ sensing technologies at the Savannah River Site’s F-Area Hazardous Waste Management Facility around the F-Area Seepage Basins, which are unlined basins that received 7 billion liters of acidic low-level radioactive waste from the 1950s until the late 1980s. The technologies and techniques that the team is deploying are intended to ensure that the remedial actions that have been taken by the site remain effective decades into the future. Foundational to this approach is a robust, integrated data management and analysis plan to ensure accurate and timely reporting from the variety of sensor systems that are in place. This report will outline the data management plan that has been implemented by the ALTEMIS team at the Savannah River Site and will serve as a blueprint as the technology is translated to new sites across the DOE Complex.

54 ENVIRONMENTAL SCIENCES↗

Prevalence of typical operational problems and energy savings opportunities in U.S. commercial buildings

In the United States, as much as 30% of the 19 EJ that commercial buildings consume is considered excess. Much of the excess energy is due to the inability to manage building operations efficiently. Because almost 20% of the total primary energy consumption is associated with commercial buildings, significant energy reductions in this sector are needed to mitigate climate change. Therefore, many cities and states are mandating periodic “tune-ups” of these buildings to eliminate excess energy consumption. Although the benefits of tune-ups and retro-commissioning are clear, focusing these mandates to look for specific opportunities has been a challenge because of the lack of studies that document the prevalence of opportunities. Therefore, we analyzed building automation system data from 151 buildings across the United States to document common operational problems and opportunities to improve building operations. This analysis showed that opportunities to improve building operations exist in almost every building. These opportunities were not strongly correlated with building vintage or size, but were reflective of how the buildings are operated. The prevalence of the top 20 opportunities ranged between 74% and 23%, with 40% of these associated with air-handling units. The rest of the opportunities are associated with schedules, chilled and hot-water distribution, and zone controls. Of the 151 buildings, 69 of them implemented corrective actions of some or all opportunities that were identified. Implementation varied across the Re-tuning categories, with 60% for schedule opportunities, 50% for zone opportunities, over 40% for the air-handling unit and hot-water opportunities, and 35% of the chilled-water opportunities. There was wide variation in whole building energy savings, ranging from 0 to 50% and 0 to 18 $/m2 with median percent annual whole building savings of 12% and median normalized annual cost savings of $1.75/m2. In addition to documenting these key findings, the paper provides a list of opportunities that can be automatically and continuously identified and corrected and offers a list of those opportunities that should be the focus of the mandates.

Katipamula, Srinivas↗

Performance Assessment for the Disposal of Low-Level Waste in the 200 West Area Burial Grounds (Annual Status Report FY 2022)

This annual review provides the projected dose estimates of radionuclide inventories disposed in the active 200 West Area Low-Level Waste Burial Grounds (LLBGs) since September 26, 1988. These estimates are calculated using the original dose methodology developed in the performance assessment (PA) analysis (WHC-EP-0645). The estimates are compared with the performance objectives defined in U.S. Department of Energy requirements (DOE O 435.1 and its companion documents DOE M 435.1-1 and DOE-STD-5002-2017). All performance objectives are currently satisfied, and operational waste acceptance criteria (HNF-EP-0063) and waste acceptance practices continue to be sufficient to maintain compliance with performance objectives. Inventory estimates and associated dose estimates from future waste disposal actions are unchanged from previous years’ evaluations that indicate potential impacts well below performance objectives; therefore, future compliance with DOE O 435.1 is expected. Within the active burial grounds, low-level and mixed low-level waste currently may be disposed only in two lined trenches in the 218-W-5 Burial Ground (Trenches 31 and 34) until they are either filled or a decision is made to close these trenches. Some mixed low-level waste is also disposed at the Environmental Restoration Disposal Facility in the 200 West Area (which is covered under a separate PA). During this (fiscal year 2022) reporting period (October 1, 2021, through September 30, 2022), waste was disposed to the 200 West Area LLBGs. Continued groundwater monitoring of the 200 West Area LLBGs indicates no groundwater contamination due to LLBG waste. Current assumptions about future land use at the Hanford Site are consistent with PA analysis assumptions of a postclosure facility that will not be degraded by human activity. The LLBGs are in an area identified for waste management and containment of residual contamination (DOE/EIS-0391). The current closure plan for the LLBGs (DOE/RL-2000-70) estimates that the 200 West LLBGs will be closed in the 2050 timeframe. The Disposal Authorization Statement, other technical basis documents, and the radioactive waste management basis are of continued adequacy to meet the performance objectives of DOE O 435.1. Overall, there are no substantive changes to primary PA assumptions and no changes to the PA analysis conclusion; therefore, compliance with DOE O 435.1 and the Disposal Authorization Statement is maintained. A new PA to evaluate the long-term impacts of three disposal trenches that are currently active within the 200 East and 200 West Areas (Trench 94 in the 200 East Area and Trenches 31 and 34 in the 200 West Area) was initiated in fiscal year 2019 and completed in fiscal year 2022. Corrective actions addressing 3 key issues and 31 secondary issues identified during the review process were developed and submitted to the Low-Level Waste Disposal Facility Federal Review Group Co-Chairs for review and approval. This PA provides additional technical basis for the continued adequacy of the existing Operating Disposal Authorization Statement.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Feedback-Based Fault-Tolerant and Health-Adaptive Optimal Charging of Batteries

The key technology barriers that hinder the growth of Electric Vehicles (EVs) are long charging time, the shorter life-time of EV batteries, and battery safety. Specifically, EV charging protocols have significant effects on battery lifetime and safety. If not charged properly, the battery could end up with shorter life, and more importantly, improper charging can cause battery faults leading to catastrophic failures. To overcome these barriers, we propose a closed-loop feedback based approach, that enables real-time optimal fast charging protocol adaptation to battery health and possess active diagnostic capabilities in the sense that, during charging, it detects real-time faults and takes corrective action to mitigate such fault effects. We utilize battery electrical-thermal model, explicit battery capacity and power fade aging models, and thermal fault model to capture battery behavior. In conjunction with the models, we adopt linear quadratic optimal control techniques to realize the feedback-based control algorithm. Simulation studies are presented to illustrate the effectiveness of the proposed scheme.

batteries↗

Root cause analysis of a molten salt pump in FLUSTFA

The primary salt pump installed in the high-temperature FLUoride Salt Test Facility (FLUSTFA) was successfully operated for some time, but later ceased operation. To understand what occurred, a Root Cause Analysis (RCA) was performed. Steps taken to try to get the pump operational include adjusting the shaft position, increasing the heating power of the tape heaters on the pump volute, and manually rotating the pump shaft. While removing the insulation, corrosion was noted on the outside of the pump volute, and decolorization of the insulation and tape heaters was observed. Significant corrosion products were also observed in the pump itself and the piping connected to the pump. The nitrogen cover gas was maintained from before salt was introduced into the loop until the pump was dismounted and continues to be maintained even after the pump was removed. After considering probable scenarios, causes were assigned and corrective actions were developed to prevent those causes. Then, the RCA was presented to an advisory committee for review, the “Review Committee,” consisting of experts in large molten salt systems: Brandon Haugh, David Holcomb, Kevin Robb, and Vicente Rojas. As a result, the advisory committee provided comprehensive feedback, which have been incorporated into a revised RCA. Findings have then been summarized and reported in this publication.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗