The University of Illinois at Urbana-Champaign (UIUC) led this project to produce a front-end engineering design (FEED) study of an advanced Direct Air Capture and Utilization System (DACUS) system that can remove a minimum of 5,000 tonnes/yr net of carbon dioxide from air (based on cradle-to-gate LCA) and utilizing the CO 2 to produce low carbon intensity ready mix concrete. The designed system, if built, would be larger than any currently existing Direct Air Capture (DAC) collector in the U.S. Such carbon capture technologies are critical to meeting the goals of the DOE’s program to accelerate climate-critical technology. In addition to the power sector, industrial facilities for the manufacture of steel and cement/concrete are among the major sources of anthropogenic CO 2 . DAC is a promising new technology for reducing CO 2 , a potent greenhouse gas, in the atmosphere but is expensive, in part due to the energy required to adsorb and desorb captured CO 2 during cycles. By integrating CarbonCapture Inc. (CCI) DAC modules at United States Steel's Gary Works (USS) and utilizing the site's waste heat, energy, and location this project evaluates the feasibility of utilizing the captured CO 2 and the logistics of transportation. CarbonCapture Inc. has developed an innovative DAC system using novel adsorbents to cost-effectively capture CO 2 . The captured, liquified gas will be trucked to ready-mix concrete plants within the region, the closest of which is approximately 3.5 miles away, where CarbonCure will inject it into concrete during the mixing process at the facilities. The carbon dioxide reacts with concrete, mineralizing into calcium carbonate (CaCO 3 ), permanently locking the greenhouse gas into the matrix of the building material. This FEED study demonstrated a full CO 2 value chain for DACUS from industrial facilities. It also provided a means for Visage Energy Corp. (Visage) to assess the impact of this holistic approach on job creation, regional economic impact, and environmental justice. The project team also included Sargent & Lundy (S&L) to provide the constructability review and costing of the integration of the DAC with the steel plant. Ecotek Engineering USA, LLC designed the outside battery limit (OSBL) infrastructure to connect the DAC and the plant. Activities performed during the project included: (1) Project Management Plan; (2) Technology Maturation Plan (TMP); (3) Initial Workforce Readiness Plan; (4) Workforce Readiness Plan; (5) Front-End Engineering Design (FEED) Study; (6) Project Design Basis; (7) Hazards and Operability (HAZOP) Study; (8) Constructability Review; (9) Project Cost Assessment; (10) Logistics Analysis of CO 2 Transportation to the Utilization Site; (11) Business Case Analysis; (12) Life Cycle Analysis (LCA); (13) Environmental Health and Safety (EH&S) Analysis; (14) Environmental Justice Analysis; and (15) Economic Revitalization and Job Creation Outcomes Analysis. This report provides a summary of the outcomes and results of the project, which was performed between Oct. 1, 2022, through Sept. 30, 2024.
32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗