Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Welder”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Tooling For Robotic Welder

Robot obtains welding tool and position reference quickly and automatically. Multiple tools and stands in workspace give robot access to variety of welding torches and reference positions. Feature saves time and makes it unnecessary for operator to enter within outer limit of motion of robot arm.

Weeks, Jack L.↗

Ground-Sensing Circuit For Arc Welders

Ground-sensing circuit for arc-welding power supply prevents arc burns at loose ground connections on workpiece. Used with ac supply or dc supply of either polarity. Includes oscillator/detector pairs normally shorted out by ground connections to workpiece. When one or more of these four connections broken, one or more oscillator signals applied across power diodes and detected. Detected oscillator signal trips shutoff relay.

Burley, Richard K.↗

Rolling Spot Welder

Wheeled tool speeds tack-welding operations. Spotwelds foil to parts in preparation for brazing. Includes electrode wheel rolling across foil. Welding current in electrode pulsed as electrode moves along, making series of uniformly-spaced low-current spot welds.

Wagner, Garret E.↗

Controlled-Pinch Spot Welder

Handheld spot-welding gun clamps workpiece under air pressure instead of under operator's hand pressure. Trigger actuates both air pressure and welding current. Makes spot welds more repeatable and reliable. Reduces amount of manual labor required and enables welds to be made at faster rate. Compact and light in weight, reaches restricted area that ordinary commercial welding guns cannot.

Morgen, Gene E.↗

Compact Pinch Welder

Compact resistance-welding pinch gun lets one operator do jobs formerly needing two workers. Light in weight and produces repeatable, high-quality weld joints. Welding-electrode head rotates for easy positioning. Lever at top of handle activates spring to pinch electrodes together at preset welding force. Button at bottom of handle activates welding current. Cables supply electrical power.

Starck, Thomas F.↗

Rolling Stitch Welder For Foil

Hand-operated rolling spotwelder stitch-welds foil faster and more consistently than single-spotwelding gun without damaging it. Internal spring reacts against roller frame, exerting force on welding wheel when rollers contact workpiece.

Gilbert, Jeffery L.↗

Tracking Comb Filter Suppresses Welder Harmonics

Tracking comb filter includes charge-coupled-device delay line and phase-locked loop. Filter removes harmonics of frequency of repetition of welding-current pulses from acoustic-emission signal. Spurious signals reduced almost to fundamental limit.

Delcher, Ray C.↗

Special-Purpose Robotic Welder

Robotic-welding apparatus developed for use in repairing main combustion chamber of rocket engine. Design features beneficial in other robotic-welding applications; for example, manufacture and repair of pressure vessels, chemical-processing vessels, etc. Design problem solved by iterative application of computer-aided techniques.

Mcferrin, David C.↗

Portable Home Welder

Pyronetics, Inc. manufactured a small, do-it-yourself welding torch which weighs only 7 pounds, gives a 5,000 degree Farenheit flame, and costs only $40.00. This resulted from information provided by a NASA Industrial Application Center at the University of Southern California. The center provided information on chlorate candles, unique in that they generate oxygen while burning. A retrospective search uncovered information on composition, hazards, applications, manufacturers, and shipping regulations.

Source record↗

Electron Beam Welder Used to Braze Sapphire to Platinum

A new use for electron beam brazing was recently developed by NASA Lewis Research Center's Manufacturing Engineering Division. This work was done to fabricate a fiberoptic probe (developed by Sentec Corporation) that could measure high temperatures less than 600 deg C of vibrating machinery, such as in jet engine combustion research. Under normal circumstances, a sapphire fiber would be attached to platinum by a ceramic epoxy. However, no epoxies can adhere ceramic fibers to platinum under such high temperatures and vibration. Also, since sapphire and platinum have different thermal properties, the epoxy bond is subjected to creep over time. Therefore, a new method had to be developed that would permanently and reliably attach a sapphire fiber to platinum. Brazing a sapphire fiber to a platinum shell. The fiber-optic probe assembly consists of a 0.015-in.-diameter sapphire fiber attached to a 0.25-in.-long, 0.059-in.-diameter platinum shell. Because of the small size of this assembly, electron beam brazing was chosen instead of conventional vacuum brazing. The advantage of the electron beam is that it can generate a localized heat source in a vacuum. Gold reactive braze was used to join the sapphire fiber and the platinum. Consequently, the sapphire fiber was not affected by the total heat needed to braze the components together.

Forsgren, Roger C.↗

ARC+(Registered Trademark) and ARC PC Welding Simulators: Teach Welders with Virtual Interactive 3D Technologies

123 Certification Inc., a Montreal based company, has developed an innovative hands-on welding simulator solution to help build the welding workforce in the most simple way. The solution lies in virtual reality technology, which has been fully tested since the early 90's. President and founder of 123 Certification Inc., Mr. Claude Choquet Ing. Msc. IWE. acts as a bridge between the welding and the programming world. Working in these fields for more than 20 years. he has filed 12 patents world-wide for a gesture control platform with leading edge hardware related to simulation. In the summer of 2006. Mr Choquet was proud to be invited to the annual IIW International Weld ing Congress in Quebec City to launch the ARC+ welding simulator. A 100% virtual reality system and web based training center was developed to simulate multi process. multi-materiaL multi-position and multi pass welding. The simulator is intended to train welding students and apprentices in schools or industries. The welding simulator is composed of a real welding e[eetrode holder (SMAW-GTAW) and gun (GMAW-FCAW). a head mounted display (HMD), a 6 degrees of freedom tracking system for interaction between the user's hands and head. as well as external audio speakers. Both guns and HMD are interacting online and simultaneously. The welding simulation is based on the law of physics and empirical results from detailed analysis of a series of welding tests based on industrial applications tested over the last 20 years. The simulation runs in real-time, using a local logic network to determine the quality and shape of the created weld. These results are based on the orientation distance. and speed of the welding torch and depth of penetration. The welding process and resulting weld bc.1d are displayed in a virtual environment with screenplay interactive training modules. For review. weld quality and recorded process values can be displayed and diagnosed after welding. To help in the le.tming process, a learning curve for each student and each Virtual Welding Class'" can be plotted, for an instructor's review or a required third party evaluation.

Choquet, Claude↗

Thermal Stir Welder

A welding apparatus is provided for forming a weld joint between first and second elements of a workpiece. The apparatus heats the first and second elements to form an interface of material in a plasticized or melted state interface between the elements. The interface material is then allowed to cool to a plasticized state if previously in a melted state. The interface material, while in the plasticized state, is then mixed, for example, using a grinding/extruding mixer, to remove any dendritic-type weld microstructures introduced into the interface material during heating.

Ding, R. Jeffrey↗

Advanced Welding Tool

Accutron Tool & Instrument Co.'s welder was originally developed as a tool specifically for joining parts made of plastic or composite materials in any atmosphere to include the airless environment of space. Developers decided on induction or magnetic heating to avoid causing deformation and it also can be used with almost any type of thermoplastic material. Induction coil transfers magnetic flux through the plastic to a metal screen that is sandwiched between the sheets of plastic to be joined. When welder is energized, alternating current produces inductive heating on the screen causing the adjacent plastic surfaces to melt and flow into the mesh, creating a bond on the total surface area. Dave Brown, owner of Great Falls Canoe and Kayak Repair, Vienna, VA, uses a special repair technique based on operation of the Induction Toroid Welder to fix canoes. Whitewater canoeing poses the problem of frequent gashes that are difficult to repair. The main reason is that many canoes are made of plastics. The commercial Induction model is a self-contained, portable welding gun with a switch on the handle to regulate the temperature of the plastic melting screen. Welder has a broad range of applications in the automobile, appliance, aerospace and construction industries.

Source record↗

Clamp force and alignment checking device

A check fixture measures a total clamp force applied by a welder device. The welder device includes a welding horn having a plurality of weld pads and welding anvil having a plurality of weld pads. The check fixture includes a base member operatively supporting a plurality of force sensors. The base member and the force sensors are received between the weld pads of the welding horn and the anvil pads of the welding anvil. Each force sensor is configured to measure an individual clamp force applied thereto by corresponding weld and anvil pads when the base member is received between the welding horn and the welding anvil and the welder device is in the clamped position. The individual clamp forces are used to determine whether the weld and/or anvil pads are worn or misaligned.

42 ENGINEERING↗

ARIES Oxide Production Program Monthly Report – April 2014

A summary of the accomplishments, milestones, financial summary, project performance and issues facing the Oxide Production Program for the end of April 2014 is presented in this Executive Summary. PF-4 and ARIES operations remain paused in order to resolve issues and perform an extent-of-condition review for Criticality Safety and Conduct of Operations. On April 28th, Jeff Yarbrough issued a memorandum updating status on the “pause” of PF-4 programmatic operations. He reported that 150 of the procedures that control programmatic operations in PF-4 have successfully resumed. These 150 procedures represent about ½ of the total that will enable us to meet FY14 programmatic commitments. No formal letter of direction will be provided to LANS via the NNSA Field Office contracting officer to address the direction relative to shipments, analytical chemistry sampling and guidance for financial adjustments in FY14 and FY15. LANS will provide a revised plan based on the funding profile included in the President’s Budget Request for the remainder of FY14 and FY15 to include revised FY14 milestones and proposed FY15 milestones. The ARIES Pit Cutter project met the NNSA milestone (Complete Design of Simple Pit Disassembly Equipment [ARIES Pit Cutter] – Due 8/15/14) by completing the fabrication design on 4/3/14, well in advance of the 8/15/14 due date. The project team has started procurement of long-lead items in preparation of the prototype fabrication and cold testing. The fabrication is scheduled to complete in FY14 and the cold testing will begin in FY14 and complete in early FY15. LANL and PNNL met on April 14 to discuss the path forward for PNNL criticality support to the program. The consensus was that PNNL resources can be effectively applied to the generation of detailed CSEs to support the program independent of the current ESS strategy. FY15 program planning is underway. The team is working on planning/drafting the work packages and developing the schedule under the assumption that operations will begin October 1, 2014. A planning schedule has been finalized and the team is meeting regularly to discuss details at the work package and WBS levels. The FY15 PMP is also in the process of being updated. The goal is to have all the drafts reviewed/approved and finalized prior to the start of the FY. MQ personnel have completed ADPSM Management Assessment: Evaluate Quality Roles and Responsibility Agreements between ADPSM and LANL Technical Support Organizations (PFITS 2011-1943). Two findings and four opportunities for improvement were reported. The robotic lathe controller upgrade has entered the construction phase of the project. The controller cabling IWD pre-job meeting was completed. The initial robotic lathe functional test was completed. The existing controller power supply disconnect is scheduled for early May. The NDA Cage project team received notification on 3/28/14 to restart the NDA cage project. Since then the team have been busy with activities that include assigning a planner, getting the construction work package ready for construction and getting the USQ completed. The electrical services installation for the new welding skid for the Inner Can Welder was completed. A gas bottle rack, used to support welding operations, will be installed in early May. The Outer Can Welder design is complete and the IWD is in development to execute construction. Installation materials have been ordered. Work continues on the MD-2 preliminary design. The project engineer is performing a technical evaluation of the Project Management Plan that was submitted by the design agent in response to the LANL Request for Proposal. If all requirements have been captured, LANL procurement will develop a contract and give the design agent notice to proceed on the preliminary design. Estimated completion is scheduled for September 2014. The design for the TA-55 Bldg. 314 warehouse was issued at 90% complete and has begun the last review process. A constructability review is scheduled for early May. The Project Manager has been working with the LANL estimating group to get the class 3 estimate for review. The Oxide Production Cage Upgrade project has kicked-off efforts on the 30% design. Requirements documentation has been drafted. The floor space was walked-down with other project managers and stakeholders and the boundaries were agreed upon.

ARIES↗

Investigations for the improvement of space shuttle main engine electron beam welding equipment

Progress made in the testing, evaluation, and correction of MSFC's 7.5 kW electron beam welder in support of space shuttle main engine component welding is summarized. The objective of this project was to locate and correct the deficiencies in the welder. Some 17 areas were deficient in the 7.5 kW ERI welding system and the associated corrective action was taken to improve its operational performance. An overall improvement of 20 times the original reliability was obtained at full rated capacity after the modifications were made.

Smock, R. A.↗