Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Program Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

1970 Home Interview Survey

The 1970 Home Interview Survey was conducted by Twin Cities Metropolitan Council, Saint Paul. This database was used to develop mathematical models to predict future regional travel patterns, which were used to develop appropriate regional transportation policies, plans, and programs. The 1970 survey did not specifically include walking or bicycling as options in the travel diary; instead, these trips are included in a broad “other” category.

1Hz data

Progress towards the completion of the proton power upgrade project

The Proton Power Upgrade project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion in early 2025, 2 MW of beam power will be available for neutron production at the existing first target station (FTS) with the remaining beam power available for the future second target station (STS). The project has installed seven superconducting radio-frequency (RF) cryomodules and supporting RF power systems to increase the beam energy by 30% to 1.3 GeV, and the beam current will be increased by 50%. The injection and extraction region of the accumulator ring are being upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. The first four cryomodules and supporting systems were commissioned in 2022-2023 and supported neutron production at 1.05 GeV, 1.7 MW with high reliability. The first-article 2 MW target was operated successfully for approximately 4400 MW-Hours over two run periods. The long outage began in August 2023 for installation of the remaining technical equipment and construction of the Ring-to-Target Beam Transport tunnel stub that will enable connection to the STS without interrupting operation of the FTS. The upgrade is proceeding on-schedule and on-budget, and resumption of neutron production for the user program is planned for July 2024.

43 PARTICLE ACCELERATORS

Next-generation perovskite photovoltaics: improving, stabilizing, and lead-sealing of record-setting laboratory solar cells towards commercialization

Summary: In the proposed program we plan to improve perovskite photovoltaic performance by developing (1) orientational control of 3D/2D perovskite heterostructures to simplify device architectures, thus improving device efficiencies and stability; (2) high-throughput optical measurements and real-time device simulations for device optimization; (3) robust, dual-pronged lead-sealing and oxygen/moisture/UV barrier films for long-term stability. Specifically, we seek to develop an in-depth understanding of the perovskite film formation, interface passivation, device stability, and environmentally friendly encapsulation, which together will lead to perovskite devices with PCE of over 28%, stability of T80 at 85/85 (85% humidity at 85 degrees C) for 10,000, expected to be equivalent to T90 of 100 hours), and architectures that would satisfy the U.S. EPA and RoHS limits of lead-leaching. The knowledge generated with this project will be applicable to tandem devices with wider-bandgap perovskites.

14 SOLAR ENERGY

A product data network to enable faster, easier, and better planning of building envelopes

The building envelopes contributes significantly to the energy-efficiency of the building. Building performance simulation has made it possible to compare façade technologies regarding energy demand, daylighting, thermal and visual comfort in detail. Planners, such as architects and engineers, need experience to find product data with the right quality and level of detail, and to process the data to fit the calculation and the application. In the available time, planners can compare only a limited number of products, which means that better solutions could go unnoticed. This paper presents a new concept for making product data easily accessible for building façade planning. The concept consists of a network of databases for the efficient exchange and use of optical and calorimetric data of glazing units, shading devices, and combinations of both. The paper presents the research questions, an analysis of the current challenges, six design goals for the product data network and its implementation together with a discussion. Many product data sources can be connected to many planning software applications via the specified application programming interface. When planning software connects to the product data network, the planning of building envelopes can be much faster because planners do not need to spend so much time to search and process product data manually. The planning of building envelopes can also become much easier, especially for planners with limited experience. They do not need to understand all the details about which data fits which calculation if the software company implements this. The planning of building envelopes can become much more reliable when software companies validate their use of the product data network, because the current manual process is prone to errors. The planning of building envelopes can also improve because more products can be compared in the available time, allowing better solutions to be found.

Maurer, Christoph

Integrating Resilience Planning in Distribution System Planning

Electric utilities, regulators, and stakeholders face increasing risks of severe storms, freezes, floods, and heat waves damaging grid infrastructure and causing power outages—and increasing risks of utility equipment igniting wildfires. At the same time, customer electricity rates have risen substantially in recent years, due in part to replacing aging infrastructure and improving resilience to natural hazards and physical threats. To address these challenges, utilities are beginning to move beyond traditional, siloed planning processes to balance resilience with other fundamental grid objectives such as affordability, reliability, safety, and serving new loads. This study presents a framework for states and utilities that want to advance integration of resilience and distribution planning processes to improve planning efficiency, better prioritize cost-effective grid expenditures, and balance planning objectives. The framework includes 7 key integration points between these planning processes: -Strategy process -Data -Threat assessments -Solution identification and prioritization -Optimization opportunities -Consideration of other grid needs -Metrics Lawrence Berkeley National Laboratory reviewed utility distribution system plans and interviewed subject matter experts to identify emerging practices for each of the 7 integration points. This report presents these practices, which can be used as a guide toward more holistic planning and cohesive investment strategies. It also includes 3 case studies to provide practical examples of how utilities apply such integrated planning processes: two pole hardening programs and one microgrid planning effort. The report concludes by identifying opportunities for future research.

24 POWER TRANSMISSION AND DISTRIBUTION

Optimal Electrification Using Renewable Energies: Microgrid Installation Model with Combined Mixture k-Means Clustering Algorithm, Mixed Integer Linear Programming, and Onsset Method

Optimal planning and design of microgrids are priorities in the electrification of off-grid areas. Indeed, in one of the Sustainable Development Goals (SDG 7), the UN recommends universal access to electricity for all at the lowest cost. Several optimization methods with different strategies have been proposed in the literature as ways to achieve this goal. This paper proposes a microgrid installation and planning model based on a combination of several techniques. The programming language Python 3.10 was used in conjunction with machine learning techniques such as unsupervised learning based on K-means clustering and deterministic optimization methods based on mixed linear programming. These methods were complemented by the open-source spatial method for optimal electrification planning: onsset. Four levels of study were carried out. The first level consisted of simulating the model obtained with a cluster, which is considered based on the elbow and k-means clustering method as a case study. The second level involved sizing the microgrid with a capacity of 40 kW and optimizing all the resources available on site. The example of the different resources in the Togo case was considered. At the third level, the work consisted of proposing an optimal connection model for the microgrid based on voltage stability constraints and considering, above all, the capacity limit of the source substation. Finally, the fourth level involved a planning study of electrification strategies based mainly on microgrids according to the study scenario. The results of the first level of study enabled us to obtain an optimal location for the centroid of the cluster under consideration, according to the different load positions of this cluster. Then, the results of the second level of study were used to highlight the optimal resources obtained and proposed by the optimization model formulated based on the various technology costs, such as investment, maintenance, and operating costs, which were based on the technical limits of the various technologies. In these results, solar systems account for 80% of the maximum load considered, compared to 7.5% for wind systems and 12.5% for battery systems. Next, an optimal microgrid connection model was proposed based on the constraints of a voltage stability limit estimated to be 10% of the maximum voltage drop. The results obtained for the third level of study enabled us to present selective results for load nodes in relation to the source station node. Finally, the last results made it possible to plan electrification using different network technologies and systems in the short and long term. The case study of Togo was taken into account. The various results obtained from the different techniques provide the necessary leads for a feasibility study for optimal electrification of off-grid areas using microgrid systems.

24 POWER TRANSMISSION AND DISTRIBUTION

State Technical Assistance - New Mexico Energy and Conservation Management Division Report [Slides]

The New Mexico Energy and Conservation Management Division (ECMD) sought technical assistance to enhance their ability to evaluate program impacts using the Low-Income Energy Affordability Data (LEAD) tool. NLR assisted ECMD in leveraging the LEAD tool to calculate and analyze energy burden across electric utility service areas, enabling them to assess program outcomes more effectively. To meet ECMD's goals, NLR developed a customized methodology to calculate utility-specific energy burden metrics using census tract data and available utility service area information from the Energy Information Administration (EIA). While acknowledging some limitations in the EIA dataset, NLR estimated the percentage of households within each service territory and incorporated relevant filters such as income, housing characteristics, and other demographics from the LEAD tool. The analysis provided ECMD with a new capability to evaluate program success based on energy savings, reductions in energy burden, and other performance indicators. The data and methodology also support discussions with utilities to improve the accuracy of service territory datasets. ECMD can use the outputs to track program effectiveness and plan future initiatives. NLR offered the possibility of follow-on work, including capacity-building for ECMD to repeat the analysis independently and the option to refine the analysis with updated service.

29 ENERGY PLANNING, POLICY, AND ECONOMY

The Relationship of Hydrology in the Green River to Colorado Pikeminnow Populations

The Federally listed Colorado Pikeminnow (CP) (Ptychocheilus Lucius) has been declining in the Green River Basin over the last 20 years. Muth et al. (2000) recommended flows and temperatures to benefit endangered fish species downstream of Flaming Gorge Dam on the Green River. The recommendations identified a range of flows during the base flow period (flows that occur after the annual snowmelt runoff period, usually from early summer to the following spring) that were intended to benefit CP. The recommendations indicated that the mean flow for the summer–winter period should be established each year on the basis of anticipated hydrologic conditions, but adjustments could be made if hydrologic conditions change. Flow should gradually decline from peak flow to base flow, with the base flow reached by early to middle summer (depending on hydrologic conditions) and maintained through February. The rate of decline should depend on rates of decline in Yampa River flows and the recommended rates of decline for dam releases. No specific recommendations were made for base flow variation in Reach 1, but variation around the annual mean base flow should be restricted to achieve recommended levels of variation in Reach 2 (middle Green River) (Table 5.5 in Muth et al. 2000). Implementation of the flow and temperature recommendations served as the proposed action for an EIS on Flaming Gorge Dam operations. A Biological Assessment of the impacts on endangered species of implementing the recommendations was prepared and a Biological Opinion that called for development of a study plan to examine the effects of implementation. Projects to address this evaluation were identified in the Green River Study Plan and have been conducted since then. The purpose of the Study Plan was to identify and recommend to the Recovery Program those monitoring or research projects necessary for implementation and evaluation of the flow and temperature recommendations. Those projects included studies to evaluate the anticipated effects of implementing the recommendations (including potential adverse effects identified in the 2006 Biological Opinion) and studies to examine recognized uncertainties of the recommendations. A new recovery program summer base flow study plan was approved in September of 2020 to evaluate stable and elevated summer base flows below Flaming Gorge Dam intended to benefit CP spawning and rearing success. Anecdotal observations suggest CP production may have been higher in years prior to flow restrictions for endangered fish. Based on long-term CP monitoring data in the Green River, Bestgen and Hill (2016) concluded that CP would benefit from higher summer baseflows (1,700-3,000 ft 3 /sec) with flows above or below associated with lower abundance of age-0 CP. Therefore, flexibility in the ROD is currently being utilized to establish higher stable summer base flows in an attempt create more advantageous conditions for spawning and rearing CP. These fish recovery flows are restrictive to WAPA in the summer months, therefore it is necessary to conduct an analysis of historic river data relationships to CP abundance to better understand if the recommended fish flows (elevated and stable base flows) are necessary for fish recovery.

54 ENVIRONMENTAL SCIENCES

Demystifying Solar in WAP

Over the last two years, the National Renewable Energy Laboratory has identified the pathways for implementing solar in the Weatherization Assistance Program and Low Income Home Energy Assistance Program and practices for successful implementation. Learn about successful implementation models from around the network and the new resources that can give you a head start in planning solar into your program, including a demonstration of tools to help evaluate solar potential and cost-effectiveness at the household level, as well as a new tool from the U.S. Department of Energy National Community Solar Partnership to help connect households receiving LIHEAP assistance to community solar subscriptions that guarantee energy bill savings.

ENERGY PLANNING, POLICY, AND ECONOMY,SOLAR ENERGY

Electric Vehicle Supply Equipment (EVSE) Study for Vernon County, Wisconsin [Slides]

Viroqua is a town in Wisconsin with a population of approximately 4,500. The Vernon County Energy district is a local nonprofit in Viroqua that provides energy education, individualized energy consulting and coaching to residents and businesses. They have a very good relationship with our county government and wish to support their efforts. The Vernon County government is currently working on a comprehensive plan and would like to include planning for electric vehicle (EV) charging infrastructure in the plan. They are seeking guidance on logical phases for implementation and identifying the best locations for Level 2 and Level 3 EV chargers. NREL provided technical input on strategic planning for electric vehicle (EV) adoption and electric vehicle supply equipment (EVSE) expansion in Vernon County through the Clean Energy to Communities (C2C) Expert Match technical assistance program. NREL provided strategic planning support for EV expansion planning in Vernon County and siting considerations for locating EVSE.

24 POWER TRANSMISSION AND DISTRIBUTION

Impacts of Renewable Energy and Green Hydrogen Policies on Uttar Pradesh's Power Sector Future: Additional Modeling Scenarios to Explore Hydrogen Flexibility [Slides]

This slide deck is part of a broader program focused on supporting Indian states with long-term power system planning. More information about this program can be found at the National Renewable Energy Laboratory's "Supporting India's States With Renewable Energy Integration" web page at https://www.nrel.gov/international/india-renewable-energy-integration.html. The power sector in Uttar Pradesh, India's most populous state, is poised to transform over the next few decades due to a combination of national and state-level policies impacting both the supply and demand of electricity. The Government of Uttar Pradesh has policies and plans to develop in-state solar PV, pumped storage hydropower, and green hydrogen. Power system policymakers and utilities in Uttar Pradesh are faced with the challenges of planning a system that incorporates increasing amounts of renewable energy and storage resources, meets rising electricity demand due to economic development and green hydrogen production, and satisfies operational and reliability requirements. To support these various objectives, the National Renewable Energy Laboratory (NREL), RMI, and the Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA) evaluated the least-cost pathways for the state's power sector through 2050. NREL developed a capacity expansion model that identifies investment and operational decisions for every year (2024-2050) for all of India, with detailed representation for the state of Uttar Pradesh, which can provide a framework for recurring planning studies. The purpose of this slide deck is to supplement the main study (published in May 2024) with additional modeling scenarios to explore hydrogen flexibility.

08 HYDROGEN

Fusion Materials Research at Oak Ridge National Laboratory in Fiscal Year 2023

The materials science challenge of providing a suite of suitable materials to satisfy the technology to achieve fusion energy is addressed in this ORNL program. The inability of currently available materials and components to withstand the harsh fusion nuclear environment requires development of new materials, and an understanding of their response to the fusion environment. The overarching goal of the ORNL Fusion Materials program is to provide the applied materials science support and materials understanding to underpin the ongoing DOE Office of Science—Fusion Energy Sciences program, in parallel with developing the materials for fusion power systems. In this effort the program continues to be integrated both with the larger U.S. and international fusion materials communities and with the U.S. and international fusion design and technology communities. The excitement of this program comes from the priorities given to this subject in the two recent fusion reviews, by the FESAC and NAS committees. An important element of those recommendations is the support for pivoting the national R&D emphasis to the Fusion Materials and Technologies (FM&T), the long-advocated Fusion Prototypic Neutron Source, and for the Fusion Pilot Plant study that will help focus program direction and efforts. Furthermore, the surge of venture capital investment into the private fusion industry start-ups over the last few years is anticipated to help accelerate all aspects of the fusion energy development. This twelfth annual report of the ORNL (Oak Ridge National Laboratory) Fusion Reactor Materials Program summarizes the accomplishments in Fiscal Year 2023 (FY2023). The year was the first to return to full post-COVID-restriction operations, with students and international assignees no longer impacted by COVID restrictions, as in FY20-21-22. Following the pattern of planning used in this program, work for the year FY2023 focused on having the data and productivity to support a strong presence at the International Conference on Fusion Reactor Materials (ICFRM) 21, organized by Spain and occurred in October 2023. Twenty-nine ORNL-led abstracts were submitted, with all accepted. Four were invited presentations, nine contributed oral, fourteen posters, and two withdrawn due to unforeseen circumstances. Additionally, nine external abstracts with ORNL contributing authors were presented. These will be reported in the FY24 report next year.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY

Moving Beyond Direct Load Control: A Maturity Model for Realizing the Promise of Demand Flexibility

This report discusses a new maturity model that regulators and utilities can use to guide and expand demand flexibility programs and enable the resources to provide more grid services. The model has six demand flexibility categories: planning and design; customer engagement; program operations; evaluation, measurement and verification; distributed energy resource orchestration; and data infrastructure. Within each category, capabilities are identified and described on a maturity scale that ranges from performing below expectations to improving on best practices.

24 POWER TRANSMISSION AND DISTRIBUTION

Improving Resiliency in Planning MW-Scale Medium and Heavy Duty EV Charging Stations Considering TSCOTS Optimization

Electrification of heavy-duty (HD) vehicles marks an important milestone and technical challenge in the electric vehicle (EV) industry and the public grid. However, implementing EV charging at this scale will necessitate that traditional truck stops be updated with EV charging infrastructure that could represent 10's of MW in electricity consumption. Furthermore, as the transportation sector is represented as critical infrastructure, supporting resiliency considerations in EV charging infrastructure will be critical. This paper proposes an optimization-based approach for optimally designing a MW-scale microgrid charging network. This approach transforms conventional designed truck stops into a reliable HDEV charging stations capable of overnight slow charging and 30-minute to 1 hour fast charging. Using a mixed-integer linear program formulation blending capacity planning and reliability constraints, an optimal network configuration can be solved for a proposed EV charging station that includes photovoltaic and battery energy storage capabilities.

Ponce, Moises [University of Tennessee, Knoxville

X-Ray Imaging and Spectroscopy Mission

The X-Ray Imaging and Spectroscopy Mission (XRISM) is a joint mission between the Japan Aerospace Exploration Agency (JAXA) and the National Aeronautics and Space Administration (NASA) in collaboration with the European Space Agency (ESA). In addition to the three space agencies, universities and research institutes from Japan, North America, and Europe have joined to contribute to developing satellite and onboard instruments, data-processing software, and the scientific observation program. XRISM is the successor to the ASTRO-H (Hitomi) mission, which ended prematurely in 2016. Its primary science goal is to examine astrophysical problems with precise, high-resolution X-ray spectroscopy. XRISM promises to discover new horizons in X-ray astronomy. It carries a 6 × 6 pixelized X-ray microcalorimeter on the focal plane of an X-ray mirror assembly (Resolve) and a co-aligned X-ray CCD camera (Xtend) that covers the same energy band over a large field of view. XRISM utilizes the Hitomi heritage, but all designs were reviewed. The attitude and orbit control system was improved in hardware and software. The spacecraft was launched from the JAXA Tanegashima Space Center on 2023 September 6 (UTC). During the in-orbit commissioning phase, the onboard components were activated. Although the gate valve protecting the Resolve sensor with a thin beryllium X-ray entrance window was not yet opened, scientific observation started in 2024 February with the planned performance verification observation program. The nominal observation program commenced with the following guest observation program beginning in 2024 September.

Astronomy and AstroPhysics

Perform Design Support with MCNP for New Measurements

This report incorporates our work carried out during our 5-month internship at LANL under an internship agreement with EAMEA (École des Applications Militaires de l’Énergie Atomique). After outlining the context in which we worked, we present our work as aid to modeling and predicting the neutronic behavior of nuclear systems, with a view to carrying out criticality experiments qualifying the MCNP code as part of innovative projects. Fourth generation reactors will enable to tackle a lot of issues such as environmental crisis, affordable energy access, and nuclear waste management. They seem to be one of the keys for a sustainable future. Most of the projects that emerge nowadays include the use of HALEU (high assay low enriched uranium) or MOX recycled fuels. Our projects are part of this dynamic and addresses concrete scientific research issues in the nuclear field. Studies of HALEU package are essential to anticipate the need, therefore the Optimus L (OPTImal Modular Universal Shipping cask technology) designed by NAC (Nuclear Assurance Corporation) international but filled with 20 % enriched uranium dioxide (UO 2 ) will be studied to support safe transportation. However, it seems there is no benchmark with a high correlation with the combination of this fuel and this package to validate MCNP simulations. As such, the study will focus on the development of new criticality safety benchmarks for this case. On the other hand, there is a great need for critical benchmarks in the intermediate energy range with MOX fuel. An IER (Integral Experiment Request) has then be requested to answer it through a partnership between French institution IRSN and U.S. Department of Energy's Nuclear Criticality Safety Program (NCSP). This experience planned for 2025 requires to gather calculated data through a MCNP model to be realized safely. Finally, a presentation of our one-week experience at the DAF as part of our discovery of criticality experiments will be introduced in Appendix 1: Week at the DAF (Device Assembly Facility)

73 NUCLEAR PHYSICS AND RADIATION PHYSICS

Theranostic Radiopnictogens: 71 As, 72 As, and 119 Sb (Final Technical Report)

This project has developed new methods for the cyclotron production of medically relevant radionuclides 71 As and 119 Sb. Arsenic and antimony are chemically homologous elements (group 5A, also known as the pnictogens) that have radionuclides that are of considerable interest within nuclear medicine. Such radiopnictogens include the potentially therapeutic radionuclides 119 Sb (t 1/2 = 38 h) that decays with the emission of 24.5 low energy, high potency electrons per decay with little concomitant photon radiation and 77 As (t 1/2 = 39 h) that decays with average beta energy of 230 keV and diagnostic nuclides 71 As (t 1/2 = 65 h, 28% β+) and 72 As (t 1/2 = 26 h, 80% β+) for positron emission tomography (PET). This work has had major success developing new methods for the cyclotron production and radiochemical isolation of 71 As, supporting parallel developments for 119 Sb, and assessing the chemical similarities between these two homologous radionuclides. This project brought into collaboration two universities with complimentary skill sets, proficiencies, expertise, and facilities: the University of Wisconsin (UWisc) and the University of Missouri (Mizzou). Professors Ellison and Engle have experience in the small cyclotron production and radiochemical isolation of radionuclides, including 72 As and 119 Sb. Their recently developed metallurgic methods for fabricating cyclotron targets have great potential to expand and allow for the biomedical cyclotron production of long- lived, lower positron energy 71 As. Professors Hennkens and Jurisson have significant experience in the reactor production, radiochemical isolation, and biological functionalization of radioarsenic. Recent development of trithiol-based chelator molecules for functionalizing radioarsenic provide a platform for the investigation of the fundamental challenges of the promising low-energy-electron emitter, 119 Sb. Through their positions within their respective University’s graduate schools, the PIs and Co-Is effectively trained of graduate students and postdoctoral researchers in nuclear and radiochemistry, sub-specialties specifically identified in the Department of Energy (DOE) Office of Science Isotope Program long-range plan. Annual laboratory research visits for students between UWisc and Mizzou provided essential broad-field experience and scientific networking that is critical for maintaining their path along the training pipeline to productive careers in isotope production. This research collaboration has provided significant benefits to the DOE University Isotope Network and radionuclide-using researchers around the country.

07 ISOTOPE AND RADIATION SOURCES

Low-Mass and High-Efficiency Engine for Medium-Duty Truck Applications

This collaborative multi-year advanced engine technology project summarized in the report is to develop low mass and high efficiency medium-duty truck engine. The project was proposed as a large-scale engine design and demonstration enabled by an advanced materials and manufacturing development program, with a comprehensive plan spanning a period of four years (two phases).

33 ADVANCED PROPULSION SYSTEMS