Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “cost estimation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Engineering Study of Svante’s Solid Sorbent Post-Combustion CO 2 Capture Technology at a Linde Steam Methane Reforming H 2 Plant

An initial engineering design study was performed for an advanced post combustion CO 2 capture (PCC) technology to be installed at a commercial-scale steam methane reforming (SMR) hydrogen plant located in the US Gulf Coast. The PCC process integrated the VeloxoTherm™ structured adsorbent technology from Svante for the CO 2 separation and CO 2 compression and purification and balance of plant systems provided by Linde. This pre-FEED equivalent study included following: (1) design basis, (2) basic engineering, including development of process flow diagrams and heat & material balances, (3) inside the battery limit (ISBL) equipment and systems specification, (4) balance of plant outside the battery limit (OSBL) equipment and systems specifications, (5) technology maturation plan, (6) hazard identification (HAZID) review, (7) environmental, health and safety (EH&S) assessment and environmental permitting analysis, (8) constructability review, (9) ISBL and OSBL EPC cost estimation, and (10) commercial-scale techno-economic analysis including capital expenditures (CAPEX) and operating expenditures (OPEX) and CO 2 capture cost estimates.

03 NATURAL GAS↗

Amorphous ZrCl 4 -Based Superionic Conductor as a Cost-Effective Solid Electrolyte for Batteries

Developing highly conductive and cost-effective solid electrolytes is essential for the commercialization of all-solid-state batteries (ASSBs). Zr-based halide electrolytes hold great promise due to their low estimated cost and high oxidation stability. However, the ionic conductivities of most of them are not high enough to enable moderate- and high-rate cycling of ASSBs. Here, fast ion transport is achieved in a group of cost-effective ZrCl 4 -based electrolytes via a design strategy to create highly disordered amorphous structures. Amorphous Li 0.8 ZrCl 4 (SO 4 ) 0.4 , with a low estimated cost of $21 kg –1 , achieves an ionic conductivity of 1.86 mS cm –1 at 25 °C. It also shows a high oxidation limit of 4.5 V vs Li/Li + and good compatibility with high-voltage cathodes, as demonstrated by the stable cycling of ASSBs (73.7% capacity retention after 1000 cycles at 1 C). Synchrotron X-ray diffraction, pair distribution function analysis, and electrochemical impedance spectroscopy reveal that the outstanding conductivity of these amorphous electrolytes is closely related to their short-range and medium-range ordering, revealing new insights for designing high-performance, cost-effective solid electrolytes.

Zhang, Guangxing [Georgia Institute of Technology,↗

Application of the PHDS Germanium Gamma-ray Imager (GeGI) in Facility Decontamination Assessment - 19471

As part of a site wide investigation, U.S. EPA Region 5 had to assess the nature and extent of contamination in a former radioactive source manufacturing facility. This work involved verification of the radioisotope expected, ensuring no other radioisotopes were present, and quantification of the activity and areal extent of contamination throughout the facility. The device used to support this assessment work was the Germanium Gamma-ray Imager (GeGI) manufactured by PHDS Co. of Knoxville, Tennessee. GeGI is a germanium-semiconductor imaging detector system that provides identification, location, and quantification of radioactive materials within its field of view. GeGI provides the highest fidelity radiological assay information including the best gamma-ray energy resolution and spatial localization of any existing technology, including gamma-ray energy resolution of ∼0.3% full-width half-max (FWHM) at 662 keV and angular location resolution ∼ +/-1 degree. The GeGI is a mechanically cooled, portable system well-suited to field operations. PHDS Co. also provided on-site support during assessment operations and performed subsequent data analysis. Gamma-ray spectral data and associated images were collected with GeGI in six primary areas of the facility having significant residual contamination. A total of 61 gamma-ray spectrum/image sets were collected over the course of three working days (22 Compton images and 39 Pinhole/Compton images). During data collection, Compton imaging was used as the means by which to identify and prioritize hotspots. After contaminated regions were identified via Compton imaging, short-distance Pinhole spectrum/image sets were collected for additional analysis. All of the spectrum/image sets were analyzed to determine the radioisotope distribution within the GeGI field of view, as well as to provide an estimate of the activity associated with each hotspot. It was determined that the nature of residual contamination present was distributed across specific areas of elevated activity, where in some areas there was significant accumulation of contaminated material. It was also determined that no discrete sources of high-activity were present, as would be expected in the case of radioactive material product intended for sealed source manufacture. Results included the activity of residual contamination for each of the areas assessed, and an estimate of the physical area over which that contamination was distributed. It was anticipated by EPA that if decontamination were to be performed that it would involve some type of concrete scabbling or other means of physical removal of contaminated material. The GeGI data could be used to estimate the areal extent (square footage) of concrete removal that would be required for decontamination. Using the activity estimate data from the GeGI along with an estimated depth of concrete removal, planning could be performed for decontamination work (equipment and personnel), waste collection, packaging, transportation, and disposal, along with an associated cost estimate. With regard to health and safety, use of the GeGI reduced the radiation dose to the EPA R5 staff performing the assessment work. The GeGI is a non-destructive device that supports assessment of radioactively contaminated areas and sources from a distance, reducing the need for close contact to radiation, and the time necessary for personnel to operate near such hazards. Use of the GeGI in this facility assessment was our first attempt to apply this technology in what proved to be a quick and efficient decontamination assessment method. The GeGI can assess the nature and extent of residual contamination in a facility, first by quickly identifying the areas of elevated activity, followed by refined measurement and assessment of those elevated areas. The GeGI data can then be used to develop planning and a cost estimate of required decontamination and waste management activities. Since it's a non-destructive gamma identification and imaging device, it can reduce the distance of workers from radioactive sources and the dose incurred from assessment work. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cost and price estimate of Brayton and Stirling engines in selected production volumes

The methods used to determine the production costs and required selling price of Brayton and Stirling engines modified for use in solar power conversion units are presented. Each engine part, component and assembly was examined and evaluated to determine the costs of its material and the method of manufacture based on specific annual production volumes. Cost estimates are presented for both the Stirling and Brayton engines in annual production volumes of 1,000, 25,000, 100,000 and 400,000. At annual production volumes above 50,000 units, the costs of both engines are similar, although the Stirling engine costs are somewhat lower. It is concluded that modifications to both the Brayton and Stirling engine designs could reduce the estimated costs.

Fortgang, H. R.↗

Readings in program control

Under the heading of Program Control, a number of related topics are discussed: cost estimating methods; planning and scheduling; cost overruns in the defense industry; the history of estimating; the advantages of cost plus award fee contracts; and how program control techniques led to the success of a NASA development project.

Hoban, Francis T.↗

Cost analysis of carbon dioxide concentrators

A methodology is developed to predict the relevant contributions of the more intangible cost elements encountered in the development of flight-qualified hardware and is used to predict the costs of three carbon dioxide concentration systems. The cost and performance data from Gemini, Skylab, and other programs are utilized as a basis for establishing the cost estimating relationships. The concentration systems analyzed are the molecular sieves C02 concentrator, the hydrogen-depolarized concentrator, and the regenerable solid desiccant concentrator. Besides the cost estimates for each system, their comparative criteria including relative characteristics, operational differences, and development status are considered.

Yakut, M. M.↗

Air-cushion tankers for Alaskan North Slope oil

A concept is described for transporting oil from the Arctic to southern markets in 10,000-ton, chemically fueled air-cushion vehicles (ACV's) configured as tankers. Based on preliminary cost estimates the conceptual ACV tanker system as tailored to the transportation of Alaskan North Slope oil could deliver the oil for about the same price per barrel as the proposed trans-Alaska pipeline with only one-third of the capital investment. The report includes the description of the conceptual system and its operation; preliminary cost estimates; an appraisal of ACV tanker development; and a comparison of system costs, versatility, vulnerability, and ecological effect with those of the trans-Alaska pipeline.

Anderson, J. L.↗

The importance of operations, risk, and cost assessment to space transfer systems design

This paper examines several methodologies which contribute to comprehensive subsystem cost estimation. The example of a space-based lunar space transfer vehicle (STV) design is used to illustrate how including both primary and secondary factors into cost affects the decision of whether to use aerobraking or propulsion for earth orbit capture upon lunar return. The expected dominant cost factor in this decision is earth-to-orbit launch cost driven by STV mass. However, to quantify other significant cost factors, this cost comparison included a risk analysis to identify development and testing costs, a Taguchi design of experiments to determine a minimum mass aerobrake design, and a detailed operations analysis. As a result, the predicted cost advantage of aerobraking, while still positive, was subsequently reduced by about 30 percent compared to the simpler mass-based cost estimates.

Ball, J. M.↗

Cost of energy evaluation

The estimated cost per kilowatt hour, the wind resources in the utilities service area, and the reliability of the units are considered in computing the cost of energy of the wind turbine generator system.

Hasbrouck, T. M.↗

Quantitative software models for the estimation of cost, size, and defects

The presentation will provide a brief overview of the SQI measurement program as well as describe each of these models and how they are currently being used in supporting JPL project, task and software managers to estimate and plan future software systems and subsystems.

software metrics process improvement↗

Modification of the ECAS reference steam power generating plant to comply with the EPA 1979 new source performance standards

Detailed capital cost estimates for the ECAS and modified reference plants in mid-1978 dollars for both 250 and 175 F (394 and 353 K) stack gas reheat temperatures based on the cost estimates developed for the ECAS study are presented. The scope of the work included technical assessment of sulfur dioxide scrubber system design, on site calcination versus purchased lime, reheat of stack gas, effect of sulfur dioxide scrubber on particulate emission, and control of nitrogen oxides.

Fogelson, S. A.↗

Air Force Reusable Booster System: A Quick-look, Design Focused Modeling and Cost Analysis Study

This paper presents a method and an initial analysis of the costs of a reusable booster system (RBS) as envisioned by the US Department of Defense (DoD) and numerous initiatives that form the concept of Operationally Responsive Space (ORS). This paper leverages the knowledge gained from decades of experience with the semi-reusable NASA Space Shuttle to understand how the costs of a military next generation semi-reusable space transport might behave in the real world - and how it might be made as affordable as desired. The NASA Space Shuttle had a semi-expendable booster, that being the reusable Solid Rocket MotorslBoosters (SRMlSRB) and the expendable cryogenic External Tank (ET), with a reusable cargo and crew capable orbiter. This paper will explore DoD concepts that invert this architectural arrangement, using a reusable booster plane that flies back to base soon after launch, with the in-space elements of the launch system being the expendable portions. Cost estimating in the earliest stages of any potential, large scale program has limited usefulness. As a result, the emphasis here is on developing an approach, a structure, and the basic concepts that could continue to be matured as the program gains knowledge. Where cost estimates are provided, these results by necessity carry many caveats and assumptions, and this analysis becomes more about ways in which drivers of costs for diverse scenarios can be better understood. The paper is informed throughout with a design-for-cost philosophy whereby the design and technology features of the proposed RBS (who and what, the "architecture") are taken as linked at the hip to a desire to perform a certain mission (where and when), and together these inform the cost, responsiveness, performance and sustainability (how) of the system. Concepts for developing, acquiring, producing or operating the system will be shown for their inextricable relationship to the "architecture" of the system, and how these too relate to costs. Design and technology features bear special relevance to early program research and development directions. Given the uncertainties involved in both their actual performance promise and their relation to costs of operational systems, this later relationship is also given special attention.

Zapata, Edgar↗

Cost analysis of carbon dioxide concentrators

Methodology and cost estimating relationships, for flight-type and prototype CO2 concentrators, have been developed and presented. A validity check was made by comparing the molecular sieves system considered here and that developed for Skylab. The system evaluated here is twice the size of the Skylab system and is also more complex as it desorbs CO2 thermally and stores it in an accumulator. The cost estimates developed were found to be approximately 50 to 70% higher than the actual cost of the Skylab unit.

Yakut, M. M.↗

DACC program cost and work breakdown structure-dictionary. General purpose aft cargo carrier study, volume 2

Results of detailed cost estimates and economic analysis performed on the updated 201 configuration of the dedicated Aft Cargo Carrier (DACC) are given. The objective of this economic analysis is to provide the National Aeronautics and Space Administration (NASA) with information on the economics of using the DACC on the Space Transportation System (STS). The detailed cost estimates for the DACC are presented by a work breakdown structure (WBS) to ensure that all elements of cost are considered in the economic analysis and related subsystem trades. Costs reported by WBS provide NASA with a basis for comparing competing designs and provide detailed cost information that can be used to forecast phase C/D planning for new projects or programs derived from preliminary conceptual design studies. The scope covers all STS and STS/DACC launch vehicle cost impacts for delivering an orbital transfer vehicle to a 120 NM low Earth orbit (LEO).

Source record↗

GPACC program cost work breakdown structure-dictionary. General purpose aft cargo carrier study, volume 3

The results of detailed cost estimates and economic analysis performed on the updated Model 101 configuration of the general purpose Aft Cargo Carrier (ACC) are given. The objective of this economic analysis is to provide the National Aeronautics and Space Administration (NASA) with information on the economics of using the ACC on the Space Transportation System (STS). The detailed cost estimates for the ACC are presented by a work breakdown structure (WBS) to ensure that all elements of cost are considered in the economic analysis and related subsystem trades. Costs reported by WBS provide NASA with a basis for comparing competing designs and provide detailed cost information that can be used to forecast phase C/D planning for new projects or programs derived from preliminary conceptual design studies. The scope covers all STS and STS/ACC launch vehicle cost impacts for delivering payloads to a 160 NM low Earth orbit (LEO).

Source record↗

Solar energy research and utilization

The role is described that solar energy will play in the heating and cooling of buildings, the production of renewable gaseous, liquid and solid fuels, and the production of electric power over the next 45 years. Potential impacts on the various energy markets and estimated costs of such systems are discussed along with illustrations of some of the processes to accomplish the goals. The conclusions of the NSF/NASA Solar Energy Panel (1972) are given along with the estimated costs to accomplish the 15 year recommended program and also the recent and near future budget appropriations and recommendations are included.

Cherry, W. R.↗

Coal gasification systems engineering and analysis. Appendix D: Cost and economic studies

The detailed cost estimate documentation for the designs prepared in this study are presented. The include: (1) Koppers-Totzek, (2) Texaco (3) Babcock and Wilcox, (4) BGC-Lurgi, and (5) Lurgi. The alternate product cost estimates include: (1) Koppers-Totzek and Texaco single product facilities (methane, methanol, gasoline, hydrogen), (2) Kopers-Totzek SNG and MBG, (3) Kopers-Totzek and Texaco SNG and MBG, and (4) Lurgi-methane and Lurgi-methane and methanol.

Source record↗